HomeMy WebLinkAboutWM0301119_Final Permit_20210412ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
S. DANIEL SMITH
Director
Mr. Zach Bumgarner (via email)
Bumgarner Oil Company, Inc.
P.O. BOX 126
Hickory, NC 28603
Dear Mr. Bumgarner,
NORTH CAROLINA
Environmental Quality
April 12, 2021
RE: Monitoring Well Construction Permit
Permit # WM0301119
1969 Northwest Blvd., Newton
Catawba County
In accordance with your completed application received on April 12, 2021, we are forwarding
herewith Monitoring Well Construction Permit Numbered WM0301119 and issued for the
construction of three monitoring wells located near the subject site in Hickory, Catawba County.
This Permit will be effective for one year from the date of issuance and shall be subject to the
conditions and limitations as specified therein.
Should you have any questions, please contact Edward Watson at (704) 235-2198, or by
email at edward.watsonncdenr.qov.
Sincerely,
DocuSigned by:
Lpy1.4t4v H Papa4
F161FB69A2D84A3...
Andrew H. Pitner, P.G., Assistant Regional Supervisor
Mooresville Regional Office
Water Quality Regional Operations Section
Division of Water Resources
CC: WQROS, Central Office (via Laserfiche)
Ryan Kerins, Terraquest Environmental (via email)
Jonathan Grubs, Terraquest Environmental (via email)
North Carolina Department of Environmental Quality Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws,
Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
Bumgarner Oil Company, Inc. (Terraquest Environmental as Agent)
FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of three monitoring wells owned by Bumgarner
Oil Company, Inc. near the subject site, in Hickory, Catawba County. This Permit is issued in accordance with the
application received on April 12, 2021, in conformity with specifications and supporting data, all of which are filed with the
Department of Environmental Quality and are considered integral parts of this Permit.
This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or
regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction
Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well
construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon
written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to
Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service
Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions,
limitations, or exceptions as follows:
1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as
part of an investigation for contamination from an underground storage tank or dry cleaner incident.
2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency.
3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application.
4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o).
5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information
Processing Unit within 30 days of the well completion.
6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a
well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing
Unit within 30 days of the well abandonment.
7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well
shall be grouted within one day after the casing is set or the well abandoned.
8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours)
of completion of drilling the borehole.
Permit issued the 12th day of April, 2021
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
L14.01414V
DocuSigned by:
H P: 4.L4
F161FB69A2D84A3...
Andrew H. Pitner, P.G., Assistant Regional Supervisor
Division of Water Resources
By Authority of the Environmental Management Commission
Permit No. # WM0301119