Loading...
HomeMy WebLinkAbout20210865 Ver 1_Pre-Filing Request Review_20210428DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210865 Version* 1 Asheville Regional Office - (828) 296-4500 Andrew Moore Pre -Filing Meeting Request submitted 4/28/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Zan Price zan@jenningsenv.com Cane Creek Bank Stabilization JEFFREY W LEDFORD REVOCABLE LIVING TRUST Buncombe Owner Address: Street Address 15 Walnut Meadow Ln Address Line 2 City State / Province / Region Fletcher NC Fbstal / Zip Code Country 28732 USA Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: f7 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Andrew Moore Please give a brief project description below and include location information. * Proposed project includes streambank stabilization on approximately 500 linear feet of the left bank of Cane Creek located on private property on Walnut Meadow Lane in Fletcher, NC (Coordinates: 35.483438, - 82.430670). The proposed natural channel design approach will include toe wood stabilization, geolifts, and a native riparian buffer. See attached historical aerial photos illustrating significant bank erosion over the past 5 years resulting in sediment loss downstream. Please give a couple of dates you are available for a meeting. 5/20/2021 Please attach the documentation you would like to have the meeting about. Historical Aerials.pdf pdf only 225.97KB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/28/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* Yes 6' No IF rmre inforrration is needed. please add corrrrents for the en -ail notification below. 2020 Aerial Measure Tools t4 -- Feet Measurement Result 64.2 Feet 2015 Aerial IVICd SLIC I VLIS 0 1 Feet Measurement Result 2010 Aerial: Woody buffer removed between 2010 and 2015 aerial resulting in significant bank erosion.