HomeMy WebLinkAboutNC0081949_LTR_20210428ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
April 28, 2021
Mr. Paul Tran, South East Regional Manager
Cube Yadkin Generation, LLC
PO Box 575
Badin, NC 28009
SUBJECT: Compliance Evaluation Inspections
Tuckertown Powerhouse
NPDES Permit NC0081949
Montgomery County, NC
Dear Mr. Tran:
On March 30, 2021, Roberto Scheller of this Office conducted a compliance inspection at the
subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to
insure compliance with permit requirements and conditions. The subject facility appeared to be
well operated and we wish to thank the operating staff for their assistance regarding this
inspection.
The enclosed report should be self-explanatory; however, should you have any questions, please
do not hesitate to contact myself or Roberto Scheller at (704) 235-2204 or
roberto.scheller@ncdenr.gov.
Sincerely,
r—DocuSigned by:
\•••—A14CC681AF27425...
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosure: CEI Report Tuckertown Powerhouse
NORTH p,m..m f I,o
oenaroMmm�.imn�aiuwi�
North Carolina Department of Environmental Quality Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699