Loading...
HomeMy WebLinkAbout20190214 Ver 3_I-5986 - Permit Application MOD - 20210201 - Signed_20210428 eee Appe ©Suggest,Sites ©cic.e loporled From IE NC BC DM:W t Res.. 0 Se tu o a„na.,r.rr�economy NOR Ire146�lo,�51arTea�t lN®rd (. NCDOTN NORTH itNres Paden Orkin,r ey TRANSPORTATION Connecteng people,a. e..m p l eth Ca end Orkin,*Mtn customer rows,�reune,a.Mr.�ra,,.ra�n.nr r,.a,m-mr an Monty s ff I p I te i Business UMV Newsroom Programs Construction Travel B. • Flle Transfer System:Inbox File tal) arc X Download Foard Print Delete To:Kristi Lynn Carpenter ekristilynn.carpenterotncdenr.gov> Subject:1-590UB Permit Mod Message:71 ease let me know when you get this Attached Files:ddOO9da5-2d3c-44afi-9562-dbl9bebd2322.zip Size:45.03 MR Sent:4/20/2021 9:2132 AM Received: c c»,ra NCoor NUur noun I Plague I Pacsihaite I Privacy Statement d ,w STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY February 1st, 2021 US Army Corps of Engineers NC Department of Environmental Quality Regulatory Field Office Wilmington Regional Office 69 Darlington Avenue 127 Cardinal Drive Wilmington,NC 28403 Wilmington,NC 28405 Attention: Liz Hair Joanne Steenhuis Regulatory Project Manager Environmental Senior Specialist Subject: Modification Request of Phased Section 404 Individual Permit No. SAW- 2018-02276, Section 401 Water Quality Certification No. 4187, and Neuse Riparian Buffer Authorization for the widening of I-95 to eight lanes from I-95 Business Route (Exit 56) to I-40 (Exit 81), in Cumberland, Harnett, and Johnston Counties, STIP No. I-5986. WBS 47532.1.2 and 47532.1.3 Reference: 1) Application for a Phased Section 404 Individual Permit, Section 401 Water Quality Certification, and Neuse Riparian Buffer Authorization (Submitted May 23, 2019) 2) Section 404 Individual Permit No. SAW-2018-02276 (Issued July 9, 2019) 3)Action Id. SAW-2018-02276 (PJD Issued August 19, 2019) 4)Action Id. SAW-2016-00682 (PJD Issued October 4, 2018) 5)Action Id. SAW-2016-00688 (PJD Issued October 4, 2018) 6)Action Id. SAW-2016-00689 (PJD Issued October 4, 2018) 7)Action Id. SAW-2018-02276 (Permit Modification Issued November 24, 2020) 8) Section 401 Water Quality Certification No. WQC004187, Neuse River Buffer Permit with ADDITIONAL CONDITIONS, NCDWR Project No. 20190214 (Issued May 30, 2019) 9)NCDWR Project No. 20190214 V2 Modification(Issued November 6, 2020) Dear Madams: The North Carolina Department of Transportation(NCDOT)proposes to widen existing I-95 to an eight-lane median divided facility on existing location from Business Route 95 (Exit 56) in Cumberland County north to Interstate 40 (Exit 81) in Johnston County. The project is approximately 26 miles in length. Mailing Address: Telephone:(910)364-0603 Location: NC DEPARTMENT OF TRANSPORTATION Fax:(910)486-1959 558 GILLESPIE ST. HIGHWAY DIVISION 6 Customer Service: 1-877-368-4968 FAYETTEVILLE,NC 28301 P.O.BOX 1550 FAYETTEVILLE,NC 28302 Website:www.ncdot.gov This is a request for a modification of Section 404 Individual Permit No. SAW-2018-02276 (Issued July 9, 2019). Enclosed, you will find a project phasing map (Attachment A) for locations of all sections in this phased modification application. The purpose of this letter is to request modifications to a Section 404 Individual Permit and a Section 401 Water Quality Certification. The modifications are needed to reflect the development of final designs for multiple phases of the widening project located in Harnett and Johnston Counties. In addition to this cover letter, the package includes the following: a State Stormwater Management Plan (SMP), permit drawings, roadway plans and Division of Mitigation Services (DMS) mitigation acceptance letter. 1.0 Purpose and Need The portion of I-95 included in the I-5986 project is an important part of the local, regional, state, and national transportation system. • At a local level, I-95 functions as a major arterial that provides access to work and school, parks and other recreational facilities, shopping venues, medical facilities, and other destinations. • Regionally, I-95 serves as an important route for commuters by connecting highways that carry traffic into the Raleigh-Durham and Fayetteville metropolitan areas. • I-95 serves as a transportation facility with statewide significance and has been designated as a Strategic Highway Corridor(SHC)by NCDOT. Additionally, it is a vital hurricane evacuation route and intersects with two hurricane evacuation routes (US 421, I-40)within the I-5986 study area. • Nationally, the I-95 corridor is designated as part of the National Highway Systems (NHS) Strategic Highway Network(STRAHNET). STRAHNET sets to establish a system of public highways providing access, continuity, and emergency transportation of personnel and equipment in times of peace and war. The I-95 corridor links Fort Bragg, located just off the corridor in the Fayetteville area, and the many other military facilities located along the nation's east coast. The portion of I-95 between Exits 56 and 81 has the highest average annual daily traffic (AADT) along the facility with 2016 volumes reaching almost 60,000 vehicles a day in southern Johnston County. The I-95 Planning and Finance Study Environmental Assessment(2012) forecast the 2040 Level of Service (LOS) along the I-5986 portion at I-95 at LOS F without widening to eight lanes. Since construction of I-95 began in the 1950s, American Association of State Highway and Transportation Officials (AASHTO) interstate roadway design standards have changed. The I-95 Planning and Finance Study- Study Area Needs Assessment(2010)reviewed the I-95 corridor in the I-5986 study area and identified places where decision sight distances, ramp designs, vertical bridge clearances, and overall bridge conditions do not meet current standards. The I-5986 project ensures that I-95 would remain a vital part of the transportation system. The proposed project will widen I-95 to eight lanes, increasing capacity and achieving a LOS D or 2 better along the corridor. The project will also improve interchanges to meet current AASHTO standards. 2.0 Project Description The NCDOT is proposing to widen an approximate 26-mile portion of existing Interstate 95 to an eight-lane median-divided facility on existing location through Cumberland, Harnett and Johnston Counties,North Carolina. The proposed project begins approximately a half-mile south of SR 1832/Murphy Road(Exit 55) where 4-lane I-95 will taper to 8-lanes at Business Route 95 (Exit 56)near Fayetteville in Cumberland County and extends north through Harnett County and into Johnston County to the Interstate 40 interchange (Exit 81), north of the City of Benson. The proposed project is listed in the approved 2018-2027 State Transportation Improvement Program (STIP) as Project Number I-5986 and is federally funded. I-95 interchange improvements in Harnett County associated with the project are NCDOT STIP No. I-5877, I-5878, and I-5883. 3.0 Summary of Impacts Waters of the U.S.: Based upon Final Permit Drawings for the Proposed impacts to jurisdictional areas for the I-5986B - Section 1 (I-5877), I-5986B - Section 2 (I-5878), I-5986B - Section 3 (I-5883), and I-5986B - Section 4 (Johnston County) and I-5986A(Cumberland County), there will be 18.595 aces of permanent wetland impacts and 6,052 linear feet of permanent stream impacts. Table 1. Summary of Water Resources Impacted Proposed Total#of Total#of Buffer Rule Section Design Stage LET Wetlands Streams Impacts Impacted2 Impacted2 (Y/N) I-5986B-Section 1 (I-5877)1 Final FY 2019 6 8 No I-5986B-Section 2(I-5878) Final FY 2022 3 4 No I-5986B-Section 3(I-5883) Final FY 2022 10 9 No I-5986B-Section 4(Johnston County) Final FY 2022 7 7 Yes I-5986A(Cumberland County) Final FY 2021 50 16 No Totals 76 44 Notes: 1. Impacts at I-5986B—Section 1(I-5877)have not changed since final designs were presented in the initial permit application, 2. Features may be impacted at more than one Permit Site. Table 2. Summary of Wetland Impacts Section Design Stage Total Wetland Impacts Requiring Impact Area(ac) Mitigation(ac) I-5986B-Section 1 (I-5877)1 Final 1.362 1.362 I-5986B-Section 2(I-5878) Final 1.238 1.238 I-5986B-Section 3(I-5883) Final 0.854 0.854 I-5986B-Section 4(Johnston County) Final 2.707 2.707 I-5986A(Cumberland County) Final 12.434 12.434 Totals 18.595 18.595 Notes: 1. Impacts at I-5986B—Section 1(I-5877)have not changed since final designs were presented in the initial permit application, 3 Table 3. Summary of Stream Impacts Section Design Stage Total Stream Impacts Requiring Impacts(10 Mitigation(lt) I-5986B-Section 1(I-5877)1 Final 1,465 1,208 I-5986B-Section 2(I-5878) Final 511 476 I-5986B-Section 3(I-5883) Final 1,062 1,042 I-5986B-Section 4(Johnston County) Final 1,277 1,201 I-5986A(Cumberland County)2 Final 1,737 1,299 Totals 6,052 5,226 Notes: 1. Impacts at I-5986B—Section 1(I-5877)have not changed since final designs were presented in the initial permit application. 4.0 Summary of Mitigation NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible. The proposed construction of 1-5986 will result in unavoidable impacts to 18.595 acres of wetlands (5.750 acres of non-riparian wetlands; 12.845 acres of riparian wetlands) and 5,226 linear feet of jurisdictional stream (4,514 linear feet of perennial stream and 712 linear feet of intermittent stream)that will require mitigation. The Department has acquired the compensatory mitigation for these unavoidable impacts from the North Carolina Department of Environmental Quality(NCDEQ) Division of Mitigation Services (DMS). Mitigation Acceptance Letters from DMS for the anticipated impacts are included in Attachment C. 5.0 Project Schedule The STIP I-5986 project has been combined with and will include proposed activities from three additional separate interchange improvement projects. The entire 26-mile project corridor will be broken down into five phased sections, with the corridor widening activities being combined with the interchange improvements. The phases of the I-5986 project along with approximate section limits, length and proposed construction letting are summarized in Table 4. This permit modification request is being submitted with the final designs for Sections 2—4. Table 4. I-5986 Project Phasing Section Approximate Section Limits Approximate Construction Length(mi) Letting I-5986B-Section 1 (I- South of SR 1180(Bud Hawkins Road—Exit 70)to North of 3.3 May 2019 5877) SR 1002(Long Branch Road—Exit 71) I-5986B-Section 2 South of SR 1793(Spring Branch Road—Exit 72)to 1.8 July 2021 (I-5878) North of US 421 (Cumberland Street—Exit 73) I-5986B-Section 3 South of SR 1808(Jonesboro Road—Exit 75)to 3.6 July 2021 (I-5883) North of SR 1709(Hodges Chapel Road—Exit 77) I-5986B-Section 4 North of SR 1709(Hodges Chapel Road—Exit 77)) 4 July 2021 (Johnston County) to I-40(Exit 81) I-5986A(Cumberland I-95 Business Route(Exit 56)to South of SR 1811 (Bud 15.4 June 2020 County) Hawkins Road—Exit 70) 4 6.0 NEPA Status NCDOT approved the Categorical Exclusion(CE) for STIP I-5878 on February 7, 2018 and the CEs for STIPs I-5877 and I-5883 were approved on February 15, 2018. The CE for the I-5986 project was approved by NCDOT on January 31, 2019. NCDOT has conducted multiple Public Meetings listed in Table 5. NCDOT has held multiple 30%Hydraulic Design Review Meetings, also listed in Table 5. NCDOT held the Initial Permit Drawings Review Meeting on December 4, 2018. Table 5. Milestone Dates by Project Section CE Signed Public Meeting Dates 30%Hydraulic Permit Drawings Design Review Review _ I-5986B-Section 1 (I- STIP I-5877 5877) February 15,2018 April 17,2018 December 4,2018 I-5986B-Section 2(I- STIP I-5878 October 24,2017 5878) February 7,2018 October 18,2018 January 15,2019 December 19,2019 I-5986B-Section 3(I- STIP I-5883 November 8,2018 5883) February 15,2018 August 7,2018 December 19,2019 I-5986B-Section 4 May 21,2019 December 19,2019 (Johnston County) STIP I-5896 October 18,2018 I-5986A(Cumberland January 2019 November 8,2018 March 11,2020 May 13,2020 County) 7.0 Logical Termini and Independent Utility The subject project is in compliance with 23 CFR Part 771.111(f)which lists the Federal Highway Administration(FHWA) characteristics of independent utility of a project: 1) The project connects logical termini and is of sufficient length to address environmental matters on a broad scope; 2) The project is usable and a reasonable expenditure, even if no additional transportation improvements are made in the area; 3) The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. 8.0 Resource Status The southern portion of the project through Cumberland and Harnett Counties is located in the Cape Fear River Basin and lies within Hydrologic Unit Codes (HUCs) 03030004 (Sub basin Upper Cape Fear) and 03030006 (Sub basin Black River). The northern portion of the project through Johnston County is located in the Neuse River Basin and lies within HUC 03020201 (Sub basin Upper Neuse). This project is located within the Middle Atlantic Coastal Plain eco- region. The project crosses Baker Swamp, Black River, Stony Run, Mingo Swamp, Hannah Creek, and Driving Branch as well as several unnamed tributaries to waters of the US, and multiple wetlands. 5 Based on field reviews of the delineation of Waters of the US (WOUS), including wetlands, the USACE issued Preliminary Jurisdictional Determinations (PJD) (Table 6). In addition, on October 11 and 12, 2018, the NCDWR issued an On-Site Determination for Applicability to the Mitigation Rules (15A NCAC 2H .0506[h]) and On-Site Determination for Applicability to the Neuse Buffer Rules (15A NCAC 2B .0233). Table 6. Applicable Jurisdictional Determinations Issued by the USACE STIP County Action Id. Date Issued U.S.G.S.Quad River Basin I-5877 Harnett SAW-2016-00682 10/4/2018 Erwin Cape Fear I-5878 Harnett SAW-2016-00688 10/4/2018 Dunn Cape Fear I-5883 Harnett SAW-2016-00689 10/4/2018 Dunn — Cape Fear Cumberland Vander,Stedman,Slocomb, Cape Fear I-5986 Harnett SAW-2018-02276 8/15/2019 Wade,Erwin,Dunn,Benson Neuse Johnston 8.1 Wetland Delineations Wetland delineations were initially conducted for three interchange projects (STIP I-5877, I- 5878 &I-5883) in Harnett County. Field work for these delineations were carried out in April, June and July of 2016. Findings for these projects are summarized in the respective July 2017 Natural Resources Technical Reports (NRTR). Additionally, wetland delineations were conducted for the I-95 Widening Project(STIP I-5986) remaining corridor areas in Cumberland, Harnett and Johnston Counties. Field work for this delineation was carried out in September and October of 2017,with expansions carried out in October of 2018 and September of 2019. The wetlands within the project study areas were delineated based on the 1987 USACE Wetland Delineation Manual and a preliminary design was prepared to avoid and minimize wetlands to the maximum extent possible. 8.2 Stream Delineations The stream channels within the project study areas were identified, evaluated, and classified using the NCDWR stream identification form. Water quality information for the streams within the project study area was derived from available sources provided through NCDEQ. 8.3 Characterization of Jurisdictional Sites 8.3.1 Wetlands Ninety-five jurisdictional wetland sites were identified within the project corridor. After design revisions (avoidance/minimization and expansion of the corridor right-of-way), there are 76 jurisdictional wetlands sites that will be permanently impacted by the proposed project. Wetland systems throughout the study area vary in vegetative composition depending on hydrological regime and site-specific disturbances. The project area contains the following North Carolina Wetland Assessment Method(NCWAM)wetland types: Non-tidal Freshwater Marsh, Pine Flat, Riverine Swamp Forest, Hardwood Flat, Headwater Forest, Basin Wetland, and Bottomland Hardwood Forest. 6 8.3.2 Streams Streams within the project footprint with surface water classifications include Baker Swamp, Black River, Stony Run, Mingo Swamp, Hannah Creek, and Driving Branch. Unnamed tributaries to waters listed above were also identified within the project corridor. Surface water classifications for streams can be found in Table 7. Additional information for the jurisdictional streams within the project area is provided in the NRTRs. There are no waters within the project vicinity classified as High-Quality Waters (HQW).Neither Water Supplies (WS-I: undeveloped watersheds or WS-II: predominately undeveloped watersheds), nor Outstanding Resource Waters (ORW) occur within 1.0 mile of the project area. Streams within the project area are not designated as North Carolina Natural or Scenic Rivers, or as National Wild and Scenic Rivers. One stream within the project footprint(Hannah Creek) is listed on the 2018 303(d) list of impaired waters due to exceeding criteria for dissolved oxygen. Table 7. Water Resources within the Project Corridor Stream Name Stream Index Best Usage Class Description Number Cape Fear River Basin—Subbasin Upper Cape Fear Baker Swamp 18-28-2-2 C From source to Reece Creek Cape Fear River Basin—Subbasin Black River Black River(Little Black River) 18-68-12-1 C: Sw From source to South River Stony Run(Hannas Pond) 18-68-12-2-2 C: Sw From source to Mingo Swamp Mingo Swamp 18-68-12-2 C: Sw From source to South River Neuse River Basin—Subbasin Upper Neuse Hannah Creek 27-52-6 C;NSW From source to Mill Creek Driving Branch 27-52-6-1 C;NSW From source to Hannah Creek 8.4 Impacts to Jurisdictional Resources Impacts to jurisdictional resources for I-5986B— Section 1 (I-5877 Section)were based on final designs and addressed in the initial permit application. Proposed impacts to jurisdictional resources for I-5986A (Cumberland County Section)were based on final designs and included in the permit modification(Issued November 24, 2020). This modification request does not include changes to impacts at either of the abovementioned sections of this project. This permit modification request will only address changes in impacts for the below sections (Sections 2— 4). Tables 8 & 9 summarize the impacts to jurisdictional water resources for the final design of I- 5986B - Section 2 (1-5878 Section). Tables 10 - 14 summarize the impacts to jurisdictional water resources for the final design of I-5986B - Section 3 (1-5883 Section). Tables 15 - 20 summarize the impacts to jurisdictional water resources and riparian buffers for the final design of I-5986B - Section 4 (Johnston County Section). Site numbers for each table correspond with each section of the set of permit drawings included within this application in Attachment B. The stream and wetland labels correspond to the NRTRs as noted in each table. Brief descriptions for each proposed final impact site for the sections with final designs are included below. 7 I-5986B-Section 2 (I--5878 Section) Table 8. I-5986B- Section 2 Wetland Impacts Permit Permanent NRTR Structure Temporary Mitigation Drawing Site Type Impacts 3 Number 1 Label Size/Type (ac.)a Impacts(ac.) Required? I-5986B-Section 2(I-5878 Section) HUC 03030006 3 WBH4 Riparian Roadway Fill 0.192 - Yes WBH4 Riparian Roadway Fill 0.162 - Yes 4 WBG4 Riparian Roadway Fill 0.069 - Yes WBG4 Riparian Roadway Fill 0.492 - Yes 6 WB5 Non-Riparian Roadway Fill 0.323 - Yes Total Riparian: 0.915 0 Totals6 Total Non-Riparian: 0.323 0 Grand Total: 1.238 0 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings 1-5878(March 13, 2020)included in Attachment B. 2. Permanent Impacts include Permanent Fill,Excavation,and Mechanized Clearing in wetlands 3. Mitigation required for features permanently impacted. 4. Waterbody labels from STIP I-5986 NRTR/JD(SAW-2018-02276) 5. Waterbody labels from STIP I-5878 NRTR/JD(SAW-2016-00682) 6. Impacts determined based on final designs. Table 9. I-5986B- Section 2 Stream Impacts Permit Drawing NRTR Classification Permanent Temporary Permanent Temporary Mitigation Site Structure Size/Type Label (from NRTR) (ac) (ac) (It) (It) Required?2 Number 1 I-5986B-Section 2(I-5878 Section) HUC 03030006 1 2 at 60"Welded Steel SB3 Perennial 0.020 - 108 - Yes Inlet Channel SB3 Perennial 0.003 0.002 24 12 Yes lA 1 at 8'x 8'RCBC SB3 Perennial 0.004 - 83 - Yes Inlet Channel SB3 Perennial 0.030 _ - _ 28 - Yes Outlet Channel SB3 Perennial 0.020 0.003 92 16 Yes 1B Roadway Fill SA3 Intermittent 0.003 - 35 - No 2 Roadway Fill SD3 Perennial - 0.014 - 94 No 3 Roadway Fill Stony Run4 Perennial 0.018 0.021 - - No 5 3 at 8'x 9'RCBC Stony Run4 Perennial _ 0.103 - 86 - Yes Inlet Channel Stony Run4 Perennial 0.013 0.013 16 12 Yes Outlet Channel Stony Run4 Perennial 0.030 0.018 39 11 Yes Total Stream Impact: 0.244 0.071 511 145 Total Perennial Stream Impact: 0.241 0.071 476 145 Totals s Total Intermittent Stream Impact: 0.003 0.000 35 0 Total Perennial Mitigatable: 0.223 0.000 476 0 Total Intermittent Mitigatable: 0.000 0.000 0 0 Total Mitigatable 6: 0.223 0.000 476 0 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings I-5878(March 13, 2020)included in Attachment B. 2. Mitigation required for features permanently impacted.No mitigation required for permanent intermittent stream impacts less than 150 linear feet. 3. Waterbody labels from STIP I-5878 NRTR/JD(SAW-2016-00682) 4. Waterbody labels from STIP I-5986 NRTR/JD(SAW-2018-02276) 5. Impacts determined based on fmal designs. 6. Total Mitigatable includes permanent impacts to Perennial streams and Intermittent Streams with an impact total of more than 150 linear feet. 8 Impact Descriptions by Permit Site Below are brief descriptions of impacts to wetlands and surfaces waters based on final designs that will result from the I-5986 B Section 2 (1-5878 Section)phase of the I-5986 project. Details mentioned in each Permit Site description refer to the details found on the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 2 (March 13, 2020) included in Attachment B. Permit Site 1 (Sheets 2, 3, & 4): The widening of I-95 will result in the removal of existing culverts and the installation of a new culverts. Existing dual 54" RCP culverts currently provide flow for Stream SB from the west side of I-95 to the east side of I-95. These culverts will be filled with flowable fill and a headwall located at the inlet of the existing culverts will be removed. Approximately 108 LF of stream SB will be filled during the installation of new dual 60"welded steel pipe culverts that will be installed through trenchless methods in the existing channel of stream SB. Construction activities will also include the installation of an estimated 5 tons of class `B' rip rap for inlet bank and scour hole stabilization as well as lateral 2' base ditch that will be installed and routed to the culvert inlets (see Detail 29)resulting in an additional 24 LF of impact. Construction activities at this location will result in 132 LF of permanent stream impact and 12 LF of temporary impacts. Permit Site 1A (Sheets 2, 3, & 5): The widening of I-95 will result in installation of a new culvert that will maintain flow for stream SB beneath a proposed side road located on the west side of I-95. The new culvert installation will include one 8' x 8' RCBC along with inlet channel and outlet channel protection. Construction activities will include the installation of an estimated 48 tons of class `I' rip rap for inlet bank and scour hole stabilization as well as a tail ditch that will be installed and routed to the culvert inlet(see Detail 32), as well as estimated 125 tons of class `I' rip rap for installed for stabilization at the culvert outlet(see Detail 35). Construction activities at this location will result in 203 LF of permanent stream impact and 16 LF of temporary impacts. Permit Site 1B (Sheets 2,3, & 4): The widening of I-95 will cause 35 LF of permanent fill to Stream SA. The permanent impacts will occur during the installation the I-95 south bound on ramp. Permit Site 2 (Sheets 8 & 9): The widening of I-95 will cause 94 LF of temporary fill to Stream SD. Temporary construction impacts will be restored to pre-construction conditions upon completion of project. Permit Site 3 (Sheets 10 & 11): The widening of 1-95 will require the widening of the existing road base. This will result in roadway fill impacts with toe protection(See Detail 46) to portions of wetland WBH and Stony Run, located on the west side of I-95. The widening of I-95 and associated Roadway Fill at this location will result in 0.354 acres of wetland impact, 0.018 acres of surface water impact 0.021 acres of temporary surface water impact resulting from installation activities. Permit Site 4 (Sheets 10 & 11): The widening of I-95 will require the widening of the existing road base. This will result in roadway fill impacts with toe protection (See Detail 46) to portions 9 of wetland WBG, located on the east side of I-95. The widening of I-95 and associated Roadway Fill at this location will result in 0.561 acres of wetland impact. Permit Site 5 (Sheets 10, 11, & 14): The widening of I-95 will result in the removal and replacement of existing culverts that currently maintain flow for Stony Run beneath I-95. Three existing 8' x 7' RCB culverts will be removed and replaced with three 8' x 9' RCB culverts in the same location(Details on Sheet 14). Construction activities will also include culvert inlet stabilization consisting of an estimated 10 tons of class "I"rip rap (see detail 24), culvert outlet stabilization that will include an estimated 40 tons of class "I"riprap (see detail 33), as well as the installation of a tail ditch with an estimated 25 tons of class "I"riprap (see detail 41). Construction activities at this location will result in 141 LF of permanent stream impact and 23 LF of temporary impacts. Permit Site 6 (Sheets 15, 16, & 17): The widening of I-95 will require the construction of a road on new location to maintain traffic between Jackson Road and Interstate Drive located on the west side of I-95. The construction of this road will result in permanent fill impacts to wetland WB. The base of this road, along with toe protection, will be installed with an equalizer pipe (30"RCP-IV)to maintain hydrology in wetland WB. A cross section for the road is included on sheet 17. The proposed installation of the road will result in 0.323 acres of permanent wetland fill. I-5986B—Section 3 (1-5883 Section) Table 10. I-5986B—Section 3 Wetland Impacts Permit Permanent NRTR Structure Temporary Mitigation Drawing Site 2 Type Impacts Number t Label Size/Type (ac.)3 Impacts(ac.) Required?4 I-5986B—Section 3(I-5883 Section) HUC 03030006 1 WB Riparian 2 at 48"Pipes 0.011 - Yes 1A WB Riparian Drainage Ditch 0.027 - Yes 3 WAC Riparian Drainage Ditch 0.110 - Yes 6 WA Riparian Roadway Fill 0.020 - Yes _ 10 WK Riparian 2 at 48"Pipes 0.110 - Yes WK Riparian Outlet Channel 0.070 - Yes 11 WG Riparian 2 at 48"Pipes 0.170 - Yes 13 WE Riparian 42"PIPE 0.082 - Yes 14 WD Non-Riparian Roadway Fill 0.008 - Yes 18 WI Riparian Inlet Channel 0.094 - Yes 20 WJ Riparian 2 at 42"Pipe 0.041 - Yes 21 WK Riparian 2 at 42"Pipe 0.050 - Yes WK Riparian Outlet Channel 0.041 - Yes WK Riparian Drainage Ditch 0.020 - Yes Total Riparian: 0.846 0.00 Totals 5 Total Non-Riparian: 0.008 0.00 Grand Total: 0.854 0.00 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 3(April 8, 2020)included in Attachment B. 2. Waterbody labels from STIP I-5883 NRTR/JD(SAW-2016-00689) 3. Permanent Impacts include Permanent Fill,Excavation,and Mechanized Clearing in wetlands 4. Mitigation required for features permanently impacted. 5. Impacts determined based on final designs. 10 Table 11. I-5986B- Section 3 Stream Impacts Permit Drawing NRTR Classification Permanent Temporary Permanent Temporary Mitigation Site Structure Size/Type Label' (from NRTR) (ac) (ac) N) M Required?3 Number t I-5986B-Section 3(1-5883 Section) HUC 03030006 1 2 at 48"Pipes SB Perennial 0.003 0.001 43 15 Yes 4 Roadway Fill SC Intermittent 0.050 0.010 321 8 Yes 5 Roadway Fill SA Perennial 0.030 - 248 - Yes Outlet Channel SA Perennial 0.003 0.002 27 21 Yes 8 Roadway Fill SG Perennial 0.002 0.001 12 14 Yes Roadway Fill SG Perennial 0.004 - 53 - Yes 9 Roadway Fill SH Perennial 0.004 - 41 - Yes _ 10 Outlet Channel SK Intermittent 0.003 0.002 20 10 No 12 54"Pipe SI Perennial 0.008 - 69 - Yes Outlet Channel SI Perennial 0.002 0.002 16 12 Yes 18 2 at 7'x 6'RCBC SJ Perennial 0.020 - 37 - Yes Inlet Channel SJ Perennial 0.009 - 26 _ - Yes _ Outlet Channel SJ Perennial 0.009 0.006 31 15 Yes 19 54"Pipe SE Perennial 0.007 0.002 100 22 Yes Outlet Channel SE Perennial 0.001 0.002 18 16 Yes Total Stream Impact: 0.155 0.028 1062 133 Total Perennial Stream Impact: 0.102 0.016 721 115 Totals a Total Intermittent Stream Impact: 0.053 0.012 341 18 Total Perennial Mitigatable: 0.102 0.000 721 0 Total Intermittent Mitigatable: 0.050 0.000 321 0 L Total Mitigatable 5: 0.152 0.000 1042 0 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 3(April 8, 2020)included in Attachment B. 2. Waterbody labels from STIP I-5883 NRTR/JD(SAW-2016-00689) 3. Mitigation required for features permanently impacted.No mitigation required for permanent intermittent stream impacts less than 150 linear feet. 4. Impacts determined based on final designs. 5. Total Mitigatable includes permanent impacts to Perennial streams and Intermittent Streams with an impact total of more than 150 linear feet. Table 12. I-5986B- Section 3 Open Water Impacts Permit Drawing Structure Size/Type NRTR Classification Permanent Temporary Permanent Temporary Mitigation 3 Site Label (from NRTR) (ac) (ac) Of) (if) Required? Number' I-5986B-Section 3(1-5883 Section) HUC 03030006 2 Pond PA Open Water 2.950 - - - No 7 Pond PC Open Water 0.200 - - - No 2 at 66"Pipe PC Open Water 0.100 - - - No 15 Pond PF Open Water 0.760 - - - No 16 Rock Fill in Pond PE Open Water 0.100 - - - No 17 Pond OWC Open Water 0.490 - - - No Total Open Water 4: 4.600 0 0 0 No Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 3(March 13, 2020)included in Attachment B. 2. Waterbody labels from STIP 1-5883 NRTR/JD(SAW-2016-00689) 3. No mitigation required for impacts to surface waters verified as open water(ponds or jurisdictional ditches). 4. Total Open Water includes impacts only to surface waters verified as open water(ponds or jurisdictional ditches) 11 Impact Descriptions by Permit Site Below are brief descriptions of impacts to wetlands and surfaces waters based on final designs that will result from the I-5986 B Section 3 (I-5883 Section)phase of the I-5986 project. Details mentioned in each Permit Site description refer to the details found on the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 3 (April 8, 2020) included in Attachment B. Permit Site 1 (Sheets 2, 3, 5, 6, & 7): The widening of I-95 will result in the removal of existing culverts and the installation of a new culverts. An existing 36"RCP culvert currently provides flow for Stream SB from the west side of I-95 to the east side of I-95. These culverts will be filled with flowable fill and new dual 48"welded steel pipe culverts will be installed through trenchless methods at the location of the current culvert inlet in Stream SB and abutting wetland WB. Construction activities at this location will result in 0.011 acres of wetland impact, 43 LF of permanent stream impact and 15 LF of temporary impacts. Permit Site 1A (Sheets 5, 6, & 7): In addition to the proposed activities at Permit Site 1, a proposed lateral"V" ditch will be installed connecting nearby pond PA to the culvert inlet at Stream SB. This ditch will be installed through a portion of Wetland WB (see Detail 3). Construction activities at this site will result in 0.027 acres of wetland impacts. Permit Site 2 (Sheets 2, 3, 5, 6, & 7): The widening of I-95 will result in the realignment of Jerry Car Road on the west side of I-95. The realignment will result in draining of farm pond PA. Proposed activities will result in 2.950 acres of open water impacts. Permit Site 3 (Sheets 5 & 6): The widening of I-95 will result in the installation of a special lateral base ditch (see Detail 4) in a portion of wetland WAC along the east side of I-95. Construction activities at this site will result in 0.110 acres of permanent wetland impacts. Permit Site 4 (Sheets 5 & 6): The widening of I-95 will result in the realignment of Jerry Car Road on the west side of I-95. The realignment will result in permanent fill to stream SC. Existing hydrology for stream SC will be routed through a proposed special lateral 6' base ditch (see Detail 9). Proposed activities at this site will result in 321 LF of permanent stream impacts and 8 LF of temporary impacts. Permit Site 5 (Sheets 9, 10 & 11): The widening of I-95 will result in the realignment of 1-95 northbound exit to Jonesboro Road. This realignment will result in permanent fill impacts to stream SA. Existing hydrology will be maintained downstream through a series of proposed base ditches (see Details 16, 22, &42) and proposed culverts beneath the realigned exit ramp. Construction activities at this location will result in 248 LF of permanent stream impact from roadway fill as well as 27 LF of impact from culvert outlet channel, and an additional 21 LF of temporary impacts. Permit Site 6 (Sheets 9, 10, & 11): The widening of I-95 will result in the realignment of I-95 northbound exit to Jonesboro Road. This realignment will result in permanent fill impacts to wetland WA. Construction activities at this site will result in 0.020 acres of permanent wetland impacts. 12 Permit Site 7 (Sheets 14 & 15): The widening of I-95 will result in the removal of existing culverts and the installation of a new culverts. Existing 48"RCP will be filled with flowable fill and new dual 66"welded steel pipe culverts will be installed through trenchless methods in approximately the same location. Construction of the proposed culvert outlet will impact Pond PA. Construction activities at this site will result in 0.300 acres of permanent open water impacts. Permit Site 8 (Sheets 14, 15, & 16): The widening of I-95 will result in the removal of existing culverts and the installation of a new culverts that will maintain the flow of stream SG beneath I- 95. Existing 48"RCP will be filled with flowable fill and new dual 66"welded steel pipe culverts will be installed through trenchless methods in approximately the same location. The installation of the new culverts will result in impacts to stream SG. Additionally, the realignment of George Perry Road, located on the east side of I-95 will result in permanent fill to portions of stream SG. Hydrology for the stream will be maintained though a special cut 4-ft base ditch(see Detail 15) and proposed dual 48"pipe culverts beneath an existing driveway. Construction activities at this site will result in 65 LF of permanent stream impacts and 14 LF of temporary impacts. Permit Site 9 (Sheets 14 & 15): The widening of I-95 will result in the realignment of George Perry Road located on the east side of I-95. The realignment will result in permanent fill to the top of stream SH. Proposed activities at this site will result in 41 LF of permanent stream impacts. Permit Site 10 (Sheets 17 & 18): The widening of I-95 will result in the realignment of George Perry Road located on the east side of I-95. This realignment will impact portions of wetland WK. Additionally, the widening of I-95 will result in the replacement of an existing culvert beneath the interstate. An existing 30" RCP culvert that conveys stream SK from the east side of I-95 beneath the interstate to the west side of I-95 will be filled with flowable fill. The culvert will be replaced with dual 48"welded steel culverts that will be installed with class "I"riprap outlet protection into the stream. Construction activities at this site will result in 0.180 acres of permanent wetland impact, 20 LF of permanent stream impact and 10 LF of temporary stream impact. Permit Site 11 (Sheets 17 & 18): The widening of I-95 will result in the realignment of Saddler Road located on the west side of I-95. This realignment will impact portions of wetland WK. Additionally, the widening of I-95 will result in the replacement of an existing culvert beneath the interstate. An existing 30"RCP culvert that conveys stream hydrology from wetland WK from the east side of I-95 beneath the interstate to the west side of I-95 will be filled with flowable fill. The culvert will be replaced with dual 42"welded steel culverts that will be installed into the wetland. Construction activities at this site will result in 0.170 acres of permanent wetland impact. Permit Site 12 (Sheets 21, 22, & 23): The widening of I-95 will result in the realignment of Saddler Road located on the west side of I-95. This realignment will impact portions of stream SI. A 54"RCP-V culvert with an estimated 33 tons of Class "I"riprap outlet protection will be 13 installed beneath the realignment of Saddler Road. Construction activities at this site will result in 85 LF of permanent stream impact and 12 LF of temporary impact. Permit Site 13 (Sheets 21, 22, & 24): The widening of I-95 will result in the realignment of George Perry Road located on the east side of I-95. This realignment will require the installation of a 42" RCP culvert into a portion of wetland WE. Construction activities at this site will result in 0.082 acres of permanent wetland impact. Permit Site 14 (Sheets 21, 22, & 25): The widening of I-95 will result in the realignment of the entrance on to southbound I-95 from Hodges Chapel Road, on the west side of I-95. This realignment will result in impacts to wetland WD. Construction activities at this site will result in 0.008 acres of permanent wetland impact. Permit Site 15 (Sheets 21, 22, & 29): The widening of I-95 will result in the realignment of Robin Hood Road located on the east side of I-95. This realignment will impact open water pond PF. The pond will be drained and filled to natural ground levels to allow for the realignment of Robin Hood Road. Construction activities at this site will result in 0.760 acres of open water impacts. Permit Site 16 (Sheets 21, 22, 27, 28, & 29): The widening of I-95 will result in the realignment of Robin Hood Road located on the east side of I-95. This realignment will impact open water pond PE. The pond will be drained and filled with rock to allow for the realignment of Robin Hood Road. Construction activities at this site will result in 0.100 acres of open water impacts. Permit Site 17 (Sheets 27 & 28): The widening of I-95 will result in the draining of open water pond OWC located on the west side of I-95. Construction activities at this site will result in 0.490 acres of open water impacts. Permit Site 18 (Sheets 27 & 28): The widening of I-95 will result in the replacement of an existing culvert beneath the interstate. Existing 48"RCP culverts that convey stream SJ from the east side of I-95 beneath the interstate to the west side of I-95 will be filled with flowable fill. The culverts will be replaced with dual 7' x 6' RCB culverts with inlet and outlet channel protection. Construction actives at this site will result in 0.094 acres of permanent wetland impact, 94 LF of permanent stream impact and 15 LF of temporary stream impact. Permit Site 19 (Sheets 31 & 32): The widening of I-95 will require in the realignment of Jerry Car Road on the west side of I-95. The realignment will result in the installation of a 54"RCP-V culvert with class "I"riprap outlet protection into a portion of Stream SE. The construction activities at this site will result in 118 LF of permanent stream impacts and 38 LF of temporary impacts. Permit Site 20 (Sheets 33 & 34): The widening of I-95 will result in the realignment of George Perry Road located on the east side of I-95. The realignment will result widening of the existing road base and the replacement of an existing 24"RCP culvert with dual 42" RCP-V culverts. Slope stabilization and culvert replacement will result in impacts to wetland WJ. Construction activities at this site will result in 0.041 acres of permanent wetland impacts. 14 Permit Site 21 (Sheet 33): The widening of I-95 will result in the realignment of George Perry Road located on the east side of I-95. The realignment will result widening of the existing road base and the replacement of an existing 24"RCP culvert with dual 42"RCP-V culverts with riprap outlet protection and two special lateral V ditches (see Details 19 and 32). Slope stabilization, culvert replacement, and ditch installation will result in impacts to wetland WK. Construction activities at this site will result in 0.111 acres of permanent wetland impacts. Utility Impacts Temporary utility impacts are summarized in Tables 13 and 14. Details for each utility impact site are included in the I-5986B Wetland and Surface Water Impacts Utility Permit Drawings Section 3 (April 2, 2020) included in Attachment B. All proposed impacts resulting from utility relocations are temporary in nature and include activities such as hand clearing underground directional boring. Any disturbance to jurisdictional features will be restored to preconstruction conditions before completion of the project. Table 13. I-5986B—Section 3 Utility Impacts - Wetlands Permit Permanent NRTR Structure Temporary Mitigation Drawing Site Label Type Size/Type Impacts Impacts(ac.) Required?3 Number (ac.) I-5986B—Section 3(1-5883 Section) HUC 03030006 3 WAC Riparian Utility - 0.181 No 9 WC Riparian Utility - 0.102 No 10 WK Riparian Util - 0.190 No 13 WE Riparian Utility - 0.301 No 22 WAA Riparian Utility - 0.094 No Total Riparian: 0.000 0.868 Totals Total Non-Riparian: 0.000 0.000 Grand Total: 0.000 0.868 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Utility Drawings Section 3 (April 2,2020)included in Attachment B. 2. Waterbody labels from STIP I-5883 NRTR/JD(SAW-2016-00689) 3. Mitigation required for features permanently impacted. Table 14. I-5986B— Section 3 Utility Impacts— Surface Water Permit Drawing NRTR Classification Permanent Temporary Permanent Temporary Mitigation Site Structure Size/Type Label 2 (from NRTR) (ac) (ac) (It) (It) Required?' Number 1 I-5986B—Section 3(I-5883 Section) HUC 03030006 5 Utility SA Perennial - 0.004 - 40 No 9 Utility SG Perennial - 0.002 - 31 No 10 Utility SK Intermittent - 0.002 - 14 No 16 Utility PE Open Water - 0.010 - 19 No 18 Utility SJ Perennial - 0.008 - 19 No 22 Utility OWl Open Water - 0.004 - 23 No Total Open Water 0 0.014 0 42 Totals s Total Perennial 0 0.014 0 90 Total Intermittent 0 0.002 0 14 Grand Total I 0 0.030 0 146 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Utility Drawings Section 3 (April 2,2020)included in Attachment B. 2. Waterbody labels from STIP I-5883 NRTR/JD(SAW-2016-00689) 3. Mitigation required for features permanently impacted. 15 I-5986B-Section 4-North (Johnston County Section) Table 15. I-5986B - Section 4 Wetland Impacts Permit Drawing NRTR Permanent Temporary Mitigation z Type Structure Size/Type Impacts Impacts 4 Site Number Label 2 3 Required? (ac.) (ac.) I-5986B-Section 4(Johnston County Section) HUC 03030006 1 WBK Riparian Roadway Fill 0.888 - Yes 2 WBK Riparian Bridge 0.229 - Yes WBJ Riparian Bridge 0.049 - Yes 3 WBJ Riparian Roadway Fill 0.409 - Yes Total Riparian: 1.575 0 HUC 03030006 Totals Total Non-Riparian: 0.000 0 Grand Total: 1.575 0 HUC 03020201 6 WBO Riparian 84"RCP Outlet Channel 0.070 - Yes 7 WBP Riparian 36"RCP Outlet Channel 0.102 - Yes 8 WBS Riparian Bridge 0.079 - Yes WBS Riparian Inlet Channel 0.003 - Yes WBR Riparian Outlet Channel 0.243 - Yes 9 WBS Riparian Roadway Fill 0.015 - Yes 10 WBQ Riparian Roadway Fill 0.140 - Yes 12 WBR Riparian Roadway Fill 0.437 - Yes Total Riparian: 1.089 0 HUC 03020201 Totals Total Non-Riparian: 0.000 0 _ Grand Total: 1.089 0 Total Riparian: 2.664 0 Section 4 Wetland Totals 5 Total Non-Riparian: 0.000 0 Grand Total: 2.664 0.00 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 4(April 8, 2020)included in Attachment B. 2. Waterbody labels from STIP I-5986 NRTR/JD(SAW-2018-02276) 3. Permanent Impacts include Permanent Fill,Excavation,and Mechanized Clearing in wetlands 4. Mitigation required for features permanently impacted. 5. Includes totals from Cape Fear River Basin and Neuse River Basin. 16 Table 16. I-5986B - Section 4 Stream Impacts Permit Drawing Structure Size/Type NRTR Label i Classification Permanent Temporary Permanent Temporary Mitigation 3 Site (from NRTR) (ac) (ac) (If) (If) Required? Number t I-5986B-Section 4(Johnston County Section) HUC 03030006 2 Roadway Fill Mingo Swamp Perennial 0.051 0.091 45 70 Yes 4 Roadway Fill SM Perennial 0.002 0.001 24 10 Yes Total Stream Impact: 0.053 0.092 69 80 Total Perennial Stream Impact: 0.053 0.092 69 80 HUC Total Intermittent Stream Impact: 0.000 0.000 0 0 03030006 Totals^ Total Perennial Mitigatable: 0.053 0.092 69 0 Total Intermittent Mitigatable: 0.000 0.000 0 0 Total Mitigatable 5: 0.053 0.092 69 0 HUC 03020201 5 60"RCP Inlet Channel Hannah Creek Intermittent 0.001 0.003 3 10 No 60"RCP Outlet Channel Hannah Creek Intermittent 0.008 0.001 73 10 No 6 30"RCP SO Perennial 0.001 0.001 11 10 Yes 84"Pipe SO Perennial 0.007 _ 0.001 79 10 Yes Roadway Fill SO Perennial 0.013 - 143 - Yes Roadway Fill SO Perennial 0.037 - 176 - Yes SO Perennial 0.039 0.005 175 15 Yes 7 36"WSP Outlet Channel SP Perennial 0.018 0.003 92 49 Yes 8 Bridge Driving Branch Perennial - 0.012 - 29 No Bank Stabilization Driving Branch Perennial - - 18 - Yes 2 at 6'x 9'RCBC Driving Branch Perennial 0.003 - 63 - Yes Inlet Channel Driving Branch Perennial 0.020 - 31 - Yes Outlet Bank Stabilization Driving Branch Perennial - - 32 - Yes Outlet Channel Driving Branch Perennial 0.086 0.010 207 16 _ Yes 11 Roadway Fill SQ Perennial 0.006 0.002 105 29 Yes Total Stream Impact: 0.239 0.038 1208 178 Total Perennial Stream Impact: 0.230 0.034 1132 158 HUC Total Intermittent Stream Impact: 0.009 0.004 76 20 03020201 Totals a Total Perennial Mitigatable: 0.230 0.022 1132 0 Total Intermittent Mitigatable: 0.000 0.000 0 0 Total Mitigatable 5: 0.230 0.022 1132 0 Total Stream Impact: 0.292 0.130 1277 258 Total Perennial Stream Impact: 0.283 0.126 1201 238 Section 4 Total Intermittent Stream Impact: 0.009 0.004 76 20 Stream Totals' Total Perennial Mitigatable: 0.283 0.114 1201 0 Total Intermittent Mitigatable: 0.000 0.000 0 0 Total Mitigatable 5: 0.283 0.114 1201 0 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Drawings Section 4(April 8, 2020)included in Attachment B. 2. Waterbody labels from STIP I-5986 NRTR/JD(SAW-2018-02276) 3. Mitigation required for features permanently impacted.No mitigation required for permanent intermittent stream impacts less than 150 linear feet 4. Impacts determined based on fmal designs. 5. Non-mitigatable impacts to intermittent streams include impacts less than 150 linear feet. 17 Impact Descriptions by Permit Site Below are brief descriptions of impacts to wetlands and surfaces waters based on final designs that will result from the I-5986 B Section 4 (North—Johnston County)phase of the I-5986 project. Details mentioned in each Permit Site description refer to the details found on the I- 5986B Wetland and Surface Water Impacts Permit Drawings Section 4-North (April 8, 2020) included in Attachment B. Permit Site 1 (Sheets 2, 3, 5 & 6): The widening of I-95 will require the widening of the existing road base. This will result in roadway fill impacts with toe protection to portions of wetland WBK, located on the west side of I-95. Construction activities at this site will result in 0.888 acres of wetland impact. Permit Site 2 (Sheets 5, 6, & 7): The widening of I-95 will result in the removal of four existing 12' x 9' concrete box culverts beneath the interstate. The existing culverts will be removed and replaced with an approximately 245' bridge that will span Mingo Swamp (see Sheet 7 for details). The area beneath the proposed bridge will be excavated and terraced to an elevation of 194 ft to maintain the hydrology and flow of Mingo Swamp beneath the interstate. Bridge abutments on either side of Mingo Swamp will be protected with class `B"riprap. The main channel of Mingo Swamp beneath the proposed bridge will be stabilized with class II bank stabilization(see Detail 38). Construction actives at this site will result in 0.278 acres of permanent wetland impact, 45 LF of permanent stream impact and 70 LF of temporary stream impact. Permit Site 3 (Sheets 2, 3, 5 & 6): The widening of I-95 will require the widening of the existing road base. This will result in roadway fill impacts with toe protection to portions of wetland WBJ, located on the east side of I-95. Construction activities at this site will result in 0.409 acres of wetland impact. Permit Site 4 (Sheets 10, 11, & 12): The widening of I-95 will result in the removal of an existing culvert and outfall and the installation of a new culvert. An existing 36"RCP culvert that currently provides passage for Stream SM will be removed. Hydrology will be maintained through the installation of a 60"welded steel pipe culvert and associated class "I"riprap outfall protection. Construction activities at this site will result in 24 LF of permanent stream impact and 10 LF of temporary stream impact. Permit Site 5 (Sheets 14, 15, 16, & 17): The widening of I-95 will result in the replacement of an existing culvert beneath the interstate. An existing 36"RCP culvert that conveys Hannah Creek from the east side of I-95 beneath the interstate to the west side of I-95 will be filled with flowable fill. The culvert will be replaced with a 60"welded steel pipe culvert with inlet and outlet channel protection. Construction actives at this site will result in 76 LF of permanent stream impact and 20 LF of temporary stream impact. Permit Site 6 (Sheets 19, 20, 21, & 22): The widening of I-95 will result in the removal and replacement of several culverts that currently convey stream SO from the west side of I-95 to the east side of I-95. A series of 72"RCP culverts will be filled with flowable fill and the hydrology for stream SO will be redirected through a system of proposed 30"RCP and 84"welded steel 18 pipe culverts and 7' base tail ditches with class "I"riprap (see Details 18 and 19) that will eventually tie back into the existing channel just east of the project area. Construction activities at this location will result in 0.070 acres of permanent wetland impact, 584 LF of permanent stream impact and 35 LF of temporary impacts. Permit Site 7 (Sheets 26 & 27): The widening of I-95 will result in the replacement of an existing culvert beneath the interstate. An existing 18" RCP culvert that conveys stream SP from the east side of I-95 beneath the interstate to the west side of I-95 will be filled with flowable fill. The culvert will be replaced with a 36"welded steel pipe culvert with outlet channel protection. Construction actives at this site will result in 0.102 acres of permanent wetland impacts, 92 LF of permanent stream impact and 49 LF of temporary stream impact. Permit Site 8 (Sheets 29, 30, 31, & 35): The widening of I-95 will result in the removal of two existing 6' x 8' RCB culverts currently conveying the flow of Driving Branch beneath the interstate and replacement with a bridge along with the installation of two 6' x 9' RCB culverts for the realignment of North Walton Ave located on the east side of I-95. The existing culverts will be removed and replaced with an approximately 106' bridge that will span Driving Branch (see Sheet 31 for details). The area beneath the proposed bridge will be excavated and terraced to an elevation of 171.8' ft to maintain the hydrology and flow of Driving Branch beneath the interstate. Bridge abutments, terraced slopes and the proposed main channel on either side of Driving Branch will be lined and protected with class "II"riprap. (see Detail 38). Additionally, the installation of two 6' x 9' RCB culverts downstream of the proposed bridge for the realignment of North Walton Avenue will include inlet and outlet channels (see Details 41, 42, and 43) and associated drainage ditches (see Details 2, 17, and 29) that will be installed in adjacent wetland areas. Construction actives at this site will result in 0.325 acres of permanent wetland impact, 351 LF of permanent stream impact and 45 LF of temporary stream impact. Permit Site 9 (Sheet 29): The widening of I-95 will require the widening of the existing road base. This will result in roadway fill impacts with toe protection to portions of wetland WBS, located on the west side of I-95. Construction activities at this site will result in 0.015 acres of wetland impact. Permit Site 10 (Sheets 29 & 30): The widening of I-95 and realignment of North Walton Avenue will result in roadway fill and the installation of a lateral 4' base ditch(see Detail 17) in Wetland WBQ to facilitate drainage between I-95 and North Walton Avenue. The proposed construction activities will result in 0.140 acres of permanent wetland impact. Permit Site 11 (Sheets 29 & 30): The widening of I-95 will require the widening of the existing road base. This will result in roadway fill impacts to portions of stream SQ, located on the west side of I-95. Construction activities at this site will result in 105 LF of permanent stream impact and 29 LF of temporary stream impact. Permit Site 12 (Sheets 29 & 30): The widening of I-95 will require the realignment of North Walton Avenue, located on the east side of the interstate, resulting in portions of the road base being widened. This will result in permanent impacts from roadway fill to wetland WBR. Construction activities at this site will result in 0.460 acres of permanent wetland impact. 19 Utility Impacts Temporary utility impacts are summarized in Tables 17 and 18. Details for each utility impact site are included in the I-5986B Wetland and Surface Water Impacts Utility Permit Utilities Drawings Section 4—North (April 2, 2020) included in Attachment B. Most proposed impacts resulting from utility relocations are temporary in nature and include activities such as hand clearing and underground directional boring. The installation of a utility sewer line will require open cut excavation to Wetland WBR at Permit Site 12 resulting in approximately 0.043 acres of permanent impacts. Any temporary disturbance to jurisdictional features will be restored to preconstruction conditions before completion of the project. Table 17. I-5986B — Section 4 Utilit Impacts—Wetlands Permit Permanent NRTR Structure Temporary Mitigation Drawing Site Label Type Size/Type Impacts Impacts(ac.) Required?3 Number 1 (ac.) I-5986B—Section 4(Johnston County Section) HUC 03020201 7 WBP Riparian Utility - 0.013 No 12 WBR Riparian Utility 0.043 0.109 No Totals Total Riparian: 0.043 0.122 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Utilities Drawings Section 4- North(April 2,2020)included in Attachment B. 2. Waterbody labels from STIP I-5986 NRTR/JD(SAW-2018-02276) 3. Permanent Impacts include Permanent Fill,Excavation,and Mechanized Clearing in wetlands Table 18. I-5986B— Section 4 Utility Impacts— Surface Water Permit Drawing NRTR Classification Structure Size/Type Label 2 (from NRTR) Per(ac)nent Temporary ary Permanent tint Temporary Required?Mition Number 1 I-5986B—Section 4(Johnston County Section) HUC 03020201 7 Utility SP Perennial - 0.001 - 10 No Totals Total Perennial 0 0.001 0 10 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Wetland and Surface Water Impacts Permit Utilities Drawings Section 4- North(April 8,2020)included in Attachment B. 2. Waterbody labels from STIP I-5986 NRTR/JD(SAW-2018-02276). Table 19. I-5986B - Section 4 Summary of Neuse River Riparian Buffer Impacts Buffer Impacts Impacts Requiring Mitigation(sq. Permit Drawing Structure Type Allowable Impacts(sq.ft.) ft.) Site Number 1 Zone 1 Zone 2 Total _ Zone 1 Zone 2 Total 5 Roadway Fill Road Crossing - - - 8,305 7,395 15,700 6 Roadway Fill Parallel Impact - - - 10,843 6,639 17,482 8 Roadway Fill Road Crossing - - - 6,408 3,708 10,116 Roadway Fill Road Crossing - - - 15,346 6,199 21,545 Totals 3: 0 0 0 40,902 23,941 64,843 Notes 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Buffer Impacts Permit Drawings Section 4(North)(April 8,2020)included in Attachment B. 2. Buffer impact numbers requiring mitigation exclude riparian wetland impacts at Permit Sites 6&8.These riparian wetland impacts are accounted for in the compensatory wetland mitigation. 3. Totals from I-5986B Buffer Impacts Permit Drawings Section 4(North)(April 8,2020)included in Attachment B. 20 Table 20. I-5986B - Section 4 Wetlands in Riparian Buffers Buffer Impacts Permit Area of Wetland in Area of Wetland in Total Area of Drawing Site Number' NRTR Label Wetland in Buffers Zone 1(sq.ft.) Zone 2(sq.ft.) (sq.ft.) 6 WBO 3,034 3,224 6,258 8 WBS/WBR 2,040 66 2,106 WBS 13,411 6,810 20,221 Total: 18,485 10,100 28,585 Notes: 1. Permit Drawing Site Numbers refer to Site numbers presented in the I-5986B Buffer Impacts Permit Drawings Section 4(North)(April 2,2020)included in Attachment B. 9.0 Protected Species The United States Fish and Wildlife Service (USFWS) lists eight federally protected species for Cumberland County as of July 17, 2020, four federally protected species for Harnett County as of July 17, 2020 and five federally protected species for Johnston County as of July 17, 2020 (Table 21). Table 21. Federally Protected S ecies in Cumberland, Harnett, and Johnston Counties Common Name Scientific Name Habitat Federal Biological Present Status* Conclusion Cumberland County Vertebrate: American alligator Alligator mississippiensis No T(S/A) N/A Cape Fear shiner Notropis mekistocholas No E No Effect Red-Cockaded Woodpecker Picoides borealis No E No Effect Invertebrate: Saint Francis'satyr butterfly Neonympha mitchellii francisci No E No Effect Vascular Plant: American chaffseed Schwalbea americana No E No Effect Michaux's sumac Rhus michauxii Yes E No Effect Pondberry Lindera melissifolia _ Yes E No Effect Rough-leaved loosestrife Lysimachia asperulaefolia Yes E No Effect Harnett County Vertebrate: American alligator Alligator mississippiensis No T(S/A) N/A Cape Fear shiner Notropis mekistocholas No E No Effect Red-Cockaded Woodpecker Picoides borealis No E No Effect Vascular Plant: Rough-leaved loosestrife Lysimachia asperulaefolia Yes E No Effect Johnston County _ Vertebrate: Red-Cockaded Woodpecker Picoides borealis No E No Effect Invertebrate: Dwarf wedgemussel Alasmidonta heterodon No E No Effect Tar River spinymussel Parvaspina steinstansana No E No Effect Yellow lance Elliptio lanceolata No T No Effect Vascular Plant: Michaux's sumac Rhus michauxii Yes E No Effect E—Endangered T—Threatened T(S/A)—Threatened due to similarity of appearance 21 The US Fish and Wildlife Service has developed a programmatic biological opinion(PBO) in conjunction with the Federal Highway Administration(FHWA), the US Army Corps of Engineers (USACE), and NCDOT for the northern long-eared bat(NLEB) (Myotis septentrionalis) in eastern North Carolina. The PBO covers the entire NCDOT program in Divisions 1-8, including all NCDOT projects and activities. The programmatic determination for NLEB for the NCDOT program is "May Affect, Likely to Adversely Affect." The PBO provides incidental take coverage for NLEB and will ensure compliance with Section 7 of the Endangered Species Act for five years for all NCDOT projects with federal nexus in Divisions 1-8, which includes this project. 9.1 Bald and Golden Eagle Protection Act (BGPA) In the July 9, 2007 Federal Register(72:37346-37372), the bald eagle was declared recovered, and removed(de-listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668-668d)became the primary law protecting bald eagles. Nesting and foraging habitat are not present in the project area, nor have bald eagle nests or individuals have been seen within a 660-foot radius of the project area. 9.2 Moratoria There is no in-stream work moratorium required for 1-5986, including the 1-5877, I-5878, and I- 5883 sections. 10.0 Cultural Resources 10.1 Historic Architectural Resources The potential effect of the proposed project on historic architectural resources was evaluated in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended. NCDOT's 2005 Historic Bridge Inventory resulted in a determination of eligibility for two Harnett County bridges. Based on their engineering significance, Harnett County Bridges number 420037 and number 420081 have been determine eligible for the National Register under Criterion C of the NRHP Criteria. The Advisory Council on Historic Preservation(ACHP) received notification regarding adverse effects of the proposed 1-5877 and 1-5883 projects to Harnett County bridges #420037 and#420081 and determined that their participation in the consultation to resolve adverse effects is not needed. Memoranda of Agreement (MOA)between the Federal Highway Administration (FHWA),NCDOT, and the North Carolina State Historic Preservation Office (SHPO)have been completed for both bridges, corresponding to the 1-5877 and I-5883 projects. A copy of each MOA was included in the initial permit application. Additionally, there are three properties within the project study area which have been determined to be eligible for listing on the National Register of Historic Places. They are listed as follows: • Uriah James Tart House (JT0609) 22 • W. P. Lee House (JT0608) • Benson Singing Grove (JT1312) A review of the project design in October of 2018 revealed that all widening and related activities will occur on the north side of E. Main Street in Benson, away from the three NR- eligible properties. Therefore, a finding of"no historic properties present or affected"will satisfy both GS 121-12(a) and Section 106 compliance requirements for the I-5986 Project. 10.2 Archaeological Resources An investigation was conducted by Environmental Services, Inc., (ESI) of Raleigh,North Carolina, for the North Carolina Department of Transportation(NCDOT) to fulfill the requirements of Section 106 of the National Historic Preservation Act(NHPA; 1966, as amended) and is administered under the 2007 Programmatic Agreement for Minor Transportation Projects (Revised 2015)between the FHWA,NCDOT, the Advisory Council on Historic Preservation (ACHP), and SHPO. As a result of the investigation, 26 new archaeological sites (31 CD2152-2171; 31 JT506-511) were recorded, none of which are recommended eligible for the National Register of Historic Places. In summary, it is recommended that the proposed transportation improvement projects be allowed to proceed without concern for impacts to significant cultural resources. If the project boundaries are modified outside of the current project area, coordination with the SHPO may be necessary to determine if additional cultural resource investigations will be required. 11.0 FEMA Compliance The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency(FEMA) to assure compliance with FEMA, state, and local floodway regulations. 12.0 Mitigation Options NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining,unavoidable jurisdictional impacts. Avoidance measures were implemented to the extent possible during the planning and design phases, and minimization measures were incorporated into the project design. USACE has adopted, through the Council on Environmental Quality(CEQ), a wetland mitigation policy that embraces the concept of"no net loss of wetlands" and sequencing. The purpose of this policy is to restore and maintain the chemical,biological, and physical integrity of the waters of the United States. CEQ has defined mitigation of wetland and surface water impacts to include: avoiding impacts, minimizing impacts, rectifying impacts, reducing impacts over time, and compensating for impacts (40 CFR 1508.20). 23 12.1 Avoidance and Minimization All jurisdictional features were delineated, field-verified, and surveyed within the study area. Proposed widening of I-95 towards the median in areas where possible has aided in reducing the project footprint and overall impact to jurisdictional resources. The designs were developed in more detail and adjusted to avoid and minimize impacts to jurisdictional areas. Project designs were reviewed during development stages by an interagency review team consisting of representatives from NCDOT,NCDEQ-DWR,NCWRC, USACE, Michael Baker International, and Sungate Design Group. Input from parties concerned have helped develop appropriate and practicable steps to avoid and minimize impacts to sensitive areas. NCDOT employs many strategies to avoid and minimize impacts to jurisdictional areas in all of its designs. Many of these strategies have been incorporated into BMP documents that have been reviewed and approved by the resource agencies that will be followed throughout construction. All wetland areas not affected by the project will be protected from unnecessary encroachment. General avoidance and minimization measures are as follows: • NCDOT's Best Management Practices (BMPs) for the Protection of Surface Waters will be strictly enforced; • Impacts to wetlands, streams, and open waters were avoided and/or minimized by adjusting alignments and slopes; • 3:1 fill slopes have been used at stream and wetland crossings to reduce impacts and to promote sheet flow since shoulder berm gutter is not used; • All storm drainage will be diffused and designed for non-erosive velocities before entering stream and wetland areas to the maximum extent practicable; • Direct discharge of stormwater to streams has been avoided to the extent practicable; • Rip rap stabilization on banks of jurisdictional streams will be implemented to prevent erosion; • Minimizing "in stream" activities; • Decreasing the footprint of the proposed project through the reduction of right-of-way widths; • Utilizing natural stream channel design principles when relocating streams. 12.2 Compensation The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. Compensatory mitigation requirements for I-5986 jurisdictional features are summarized below in Table 22. This project proposes to permanently impact a total of 6,052 linear feet of warm water streams, including 5,226 linear feet of stream channel (4,514 perennial; 712 intermittent) that will be subject to mitigation. The project will also permanently impact a total 18.595 acres of wetlands including 5.750 acres of non-riparian wetlands and 12.845 acres of riparian wetlands. Additionally, this project will permanently impact 22,417 ft2 of Zone 1 and 13,8441 ft2 of Zone 2 riparian buffers (wetlands removed; summarized in Table 23). The unavoidable impacts to Waters of the U. S. and riparian buffers will be offset by compensatory mitigation provided by the North Carolina Department of Environmental Quality (NCDEQ) Division of Mitigation Services (DMS) at ratios of 2:1 for wetland and perennial 24 stream impacts, 1:1 for intermittent stream impacts that are greater than 150 linear feet, 3:1 for Zone 1 riparian buffer impacts, and 1.5:1 for Zone 2 riparian buffer impacts. There will be no mitigation required for permanent impacts to streams impacted by bank stabilization and intermittent streams where the impact total is less than 150 linear feet in length. Table 22. I-5986 (Entire Corridor) Jurisdictional Feature Mitigation Summary Stream(it) Wetlands(ac) Section Basin Lo ation Region Cold Cool Warm Riparian Non- Coastal Riparian Marsh I-5986B-Section Cape Fear 03030006 NICP 1,208 1.106 0.256 1 (I-5877 Section)t p I-5986B Section Cape Fear 03030006 NICP - 476 0.915 0.323 2(I-5878 Section) I-5986B Section Cape Fear 03030006 NICP - 1,042 0.846 0.008 3(I-5883 Section) I-5986B-Section Cape Fear 03030006 NICP - - 69 1.575 - - 4(Johnston County Section) Neuse 03020201 NICP - - 1,132 1.132 - - I-5986A 03030004 NICP - - 1,062 6.075 3.513 - (Cumberland Cape Fear County) 03030006 NICP - - 237 1.196 1.650 - Total' 0 0 5,226 12.845 5.750 0 Grand Total 5,226 18.595 Notes 1. I-5986B-Section 1(I-5877 Section)final designs addressed in initial permit. Table 23. I-5986 Riparian Buffer Mitigation Summary Zone 1 Zone 2 River CU Mitigation Mitigation Buffers Impacts1 Mitigation Impacts' Mitigation Basin Location (sq.ft.) Ratio 2 Required (sq.ft.) Ratio z Required (sq.ft.) (sq.ft.) Impacts Neuse 03020201 22,417 3 : 1 67,251 13,841 1.5 : 1 20,762 Total(sq.ft.) 88,013 Notes 1. Wetland area(sq.ft.)at sites 6 and 8(Wetlands WBO,WBS,&WBR)were removed from calculations.Mitigation for these wetlands are covered in the JD Feature Mitigation Summary. 2. 15A NCAC 02B.0295(e)Mitigation program requirements for protection and maintenance of riparian buffers—Neuse River Basin. NCDOT is applying for a Modification to the Phased Section 404 Individual Permit that was issued on July 9, 2019. Designs have been finalized for sections 2, 3 and 4. NCDOT has coordinated with NCDEQ DMS to reserve mitigation credits for the entire corridor and will provide an acceptance letter for impacts in phases of the project that have a final design (Table 24) with the anticipation that subsequent permit modifications will update mitigation requirements based on refined final designs for each phase. Acceptance letters from NCDEQ DMS are attached(Attachment C). 13.0 Indirect and Cumulative Effects Transportation impact causing activities as a result of this project may include new network connections, an increase in access, or creation of activity centers. This project has a low likelihood to increase development potential and intensity in the areas adjacent to the project corridor. This score is most reflective of the project scope (26 miles of widening), public policy in place to manage growth, abundance of available land, presence of notable environmental features, and a lack of travel time savings resulting from the project. Based upon the information 25 analyzed and the corresponding values assigned for each category within the ICE screening matrix,the output recommendation is `Land Use Scenario Assessment Not Likely Warranted'. This indicates that further analysis is not warranted. 14.0 Essential Fish Habitat The project will not impact any Essential Fish Habitat afforded protection under the Magnuson- Stevens Act of 1996(16 U.S.0 1801 et seq.) 15.0 Wild and Scenic Rivers The project will not impact any designated Wild and Scenic Rivers or any rivers included in the list of study rivers(Public Law 90-542, as amended). 16.0 Regulatory Approvals Section 404: Application is hereby made for a Modification to the USACE Individual 404 Permit issued on July 9,2019 (Action ID: SAW-2018-02276) as required for the above-described activities Section 401: We are requesting a Modification to Section 40I Water Quality Certification No.. WQC004187 from NCDWR(issued May 30, 2019) and providing this application to NCDEQ for their approval. Neuse River Riparian Buffer Authorization: We are requesting a Modification to the Neuse Riparian Buffer Authorization from NCDWR. A copy of this permit request and its distribution list will be posted on the NCDOT website at: https://connect.nc d ot.govlresou rc e s1En v i ro nm a nta i Sincerely, It7/6‘feje, Gregory W. Price,PWS Division Environmental Program Supervisor cc: Joanne Steenhuis,Environmental Senior Specialist,NCDWR. NCDOT Permit Application Standard Distribution List Attachments Attachment A:Project Phasing Map Attachment B:1-5986 Wetland and Surface Water Impacts,Utilities,and Buffer Permit Drawings Attachment C:1-5986 DMS Mitigation Acceptance Letters 26 Attachment A: Project Phasing Map 27 Attachment B: I-5986B Wetland and Surface Water Impacts, Utilities, and Buffer Permit Drawings • I-5986B Section 2(I--5878) Wetland and Surface Water Impact Permit Drawings—March 13. 2020 • I-5986B Section 3 (1-5883) Wetland and Surface Water Impact Permit Drawings—April 8, 2020 • I-5986B Section 3(1-5883) Wetland and Surface Water Impact Permit Utility Drawings—April 2, 2020 • I-5986B Section 4(North) Wetland and Surface Water Impact Permit Drawings—April 8, 2020 • I-5986B Section 4(North) Wetland and Surface Water Impact Permit Utility Drawings—December 28,2020 • I-5986B Section 4(North)Buffer Impacts Permit Drawings—April 8, 2020 • I-5986B Section 4(North)Buffer Impacts Permit Utility Drawings—December 28, 2020 28 Hi wa North Carolina Department of Transportation gS Y tOYil1LV71 2 Highway Stormwater Program 41111- (1:—.) STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 53078.1.1 TIP No.: 1-5878 County(ies): Harnett Harnett Page 1 of 2 General Project Information WBS Element: 53078.1.1 'TIP Number: 1-5878 I Project Type: Roadway Widening IDate: 12/5/2019 NCDOT Contact: Paul Atkinson,PE Contractor!Designer: William H.Hines,PE Address:1590 Mail Service Center Address:Sungate Design Group,P.A. Raleigh,NC 27699-1590 905 Jones Franklin Road _ Raleigh,NC 27606 Phone:919-707-6707 Phone:919-710-8454 Email:patkinson(a�ncdot.sov _ Email:whines@sungatedesign.com City/Town: Dunn County(ies): Harnett River Basin(s): Cape Fear 1 CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 2.216 mi. I Surrounding Land Use: 'Urban and Agricultural Proposed Project Existing Site Project Built-Upon Area(ac.) 68.9 ac. 40.8 ac. Typical Cross Section Description: Concrete median barrier.4 paved lanes with 12'paved shoulder in each direction. Grassed median with 2 paved lanes in each direction. Outside grass roadway ditches with 6:1 sides.Cut and fill slopes have a maximum 3:1 slope. Annual Avg Daily Traffic(veh!hr!day): Design/Future: 83400 Year:2040 Existing: 61400 Year: 2020 General Project Narrative: The North Carolina Department of Transportation(NCDOT)has proposed to widen 1-95 from south of SR 1793(Spring Branch Road/Pope Road-Exit 72)to north of US 421 (Description of Minimization of Water (Exit 73).There are 2 proposed major structures involved with the improvements to 1-95 that are to be constructed at or downstream of existing stream crossing locations.The Quality Impacts) first proposed structure,along an unnamed tributary to Mingo Swamp,is a 1 @ 8'x 8'Reinforced Concrete Box Culvert(RCBC)with a 6"beveled headwall.The proposed culvert will be buried 1'.The proposed culvert is in a new location downstream of the existing crossing.Therefore,the culvert is not replacing any existing drainage structures.The culvert construction will include upstream and downstream channel improvements.The second proposed structure,along Stony Run,is a 3 @ 8'x 9'RCBC with a 6"beveled headwall.The proposed culvert will have 3'toe walls on the upstream and downstream ends.The proposed culvert is replacing a 3 @ 8'x 9'RCBC with a square edge headwall. The culvert construction will include upstream and downstream channel improvements.Both structures have been designed to have as little environmental and surface water impacts as possible.Velocities at jurisdictional features and wetlands are non-erosive. WI Waterbod Information Surface Water Body(1): Mingo Swamp NCDWR Stream Index No.: 18-68-12-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters(Sw) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: I N/A Project includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Hi hwa North Carolina Department of Transportation t �StOYIIInw1fef Highway Stormwater Program STORM WATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 53078.1.1 TIP No.: 1-5878 County(ies): Harnett Page 2 of 2 Additional Waterbody Information Surface Water Body(2): I Ston Run NCDWR Stream Index No.: 18-68-12-2-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters(Sw) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? LN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) $' See Sleet IA For Index of Sheets STATE OF NORTH CAROLINA PERMIT DRAWING N.0 ^TI-5878- 1 4. See Sheet IE For Conventional symbols DIVISION OF HIGHWAYS SHEET 1 OF 18 d„__ „__ S \\ 52078.11 NHP-0095100]I]3 PE 46 ,` \ l 52078.22 N11,00751017pJ 0W 8 UTIL. 00 \1 , �_� HARNETT COUNTY t. ®,\ cm�„%41f 64 J LOCATION:IMPROVE 1-95 INTERCHANGES AND WIDEN TO EIGHT 1-5878 �A_ ♦ LANES SR 1793(SPRING BRANCH ROAD /POPE ROAD)(EXIT 72) FINAL RIGHT OF WAY PLAYS 1 ,END PROJECTS TO US 421(EXIT 73) [. , 0, TYPE OF WORK GRADING,PAVING,DRAINAGE,SIGNALS,CULVERT s�.{e01144�ti 1' V "` AND STRUCTURES tR`r1�j�1\.�r�.,�y1�e + [)<4 '1'''. JP., 1 -SR9A-POT SO.27+61.37 MPACTS PERMIT Va. F� \ a END CONSTRUCTION I O \I BEGIN BRIDGE -LREV-POT Sta.981+00.00 AH BEGIN PROJECT -Y14-POT STA.24+91.78 -L-POT Sta.981+00.00 BK 0/6 1 -Y14-POC Sta.15+]5.00 ;8-POT Sta.10+00.00 VICINITY MAP BEGIN CONSTRUCTION • CONSTRUCTION �10 (Not to Scale) I� 015-POT st,.ls+ao.00 �No -EGIN CONSTRUCTION _„- -Y25A-POT Sta.10+84.53 SR9-POT Sm.73+93.42 ° BEGIN CONSTRUCTION END CONSTRUCTION ,P: -LREV POT SI,.10+21.98.66 BK= BEGIN TIP PROTECT 1-5878 , ?a ',� POT Sto.1022+00.00 AH SITE 6 -L-POT STA.946+00.00 SITE 2 is �, ,��\►y�' DUNN SR11-POT Sta.10+00.00 �� CITY LIM END CONSTRUCTION �_®� �� BEGIN CULVERT \�jJ �j1 I ��— _� �� ` -L-POT STA.T04T+93- TO FAYEITEVILLE _ 1 -SR13-POT Sta.10+00.00 �— ■ �- � � I BEGIN CONSTRUCTION 9 MM. L 10� • 4 14,W 4� ��L,\�*�� \� END TIP PRO CT I-5878 Ago"�� ���T.�'�` �' L—POT STA.1063+00.00 -L-POT Sta.925+00.00 SITE 1,1A,113 ���, ° BEGIN CONSTRUCTION `•i.�. ,�,L>hy `` ePilliiii&r.....,,'Mftri � �ifirT DUNN SO CITY LIMIT -Y14-POT Sta.44+25.00 END BRIDGE {_POT STA.1042+25_ -Y14-POT STA.27+18.78 SITE 3,4,5 END CONSTRUCTION _y24-POT SO.69+53.13 -SR12-POT Sta 10+13.67 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO END CONSTRUCTION -Y15-POC Sta.49+30.00 BEGIN CONST'UCTION THE LIMITS ESTABLISHED BY METHOD II&III. END CONSTRUCTION END BRIDGE THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. -LREV-POT STA 1003+31.60 A PORTION OF THIS PROJECT IS WITHIN DUNN MUNICIPAL BOUNDARIES BEGIN BRIDGE .ee..us,ox..u,as= v mLREV-POT STA.1002+26.85 U GRAPHIC SCALES DESIGN DATA PROJECT LENGTH r°0°' la L ;B,1Lee�,'. amp HYDRAULICS ENGINEER 5 i 5 po ADT 2020- 61,400 Michael Baker 7°„nr,,;^^^"��� l I I {, ADT 2040= 83,400 LENGTH ROADWAY TIP PROJECT I-5878............2.190 MILES INTERNATIONAL f _ N SUSAN w, lw�.x�.m.,. n aam. ,w, ' K - 7 % FOR Mt" OF MGHWAYS n PLANS D = 55% LENGTH STRUCTURE TIP PROJECT 1-5878...........0.026 MILES me srexaOa srar.Lnu t RIGHT OF WAY DATE: C.IAN�af TER.P.E. ...OAD ra ii T = 18 %• TOTAL LENGTH OF TIP PROJECT I-5878 2.216 MILES MOATS ROADWAY DESIGN �nillill�-ft V = 70 MPH PHASE I. j PROFILE HORIZONTAL MARCH 29,2018 RICK STTATON� ENGINEER O (HORIZONTAL) •(13%TTST+5% DUALS) FINAL: 10 5 0 10 20 FUNC CLASS= AUGUST L:2019 aUI i I I I I I I I I I` _L_--I INTERSTATE LETTING DATE STEVE D.KEND.tALL,P.E. s 79I2 V ,` PROFILE(VERTICAL) ` STATEWIDE TIER JULY 21.2020 xcoor coxr I cr PERMIT DRAWING . e'O SHEET 2 OF 18 :,...:F; =, Po� a III . '•. t 1 y z S. Sr,LY 0,_ / © r —mom P �� �°4 1 // --_,„,.. ':00/- iii„..-- .._ •__-_-.1p,...-:----et-, 41'4_ 'pat,„„*. MOIELt 411,0110: 'r ‘,..,, -tee - ,. _,.-»,tom ii _. .. f r. __ i term 4 : E;;;;'''''' J d� .e .. ENLARGEMENT SHEETE 5 VIEW _''- per:""mom......eo m....e...o--® \ e— SEE 5 OF 1B / \ - \. i \ , / \ m gym.. :I'�ug _ m., A, `� �� ,7 1 ate , ' E 1'�I3I�AWING w ,r' 49,A,'�� ! ,, SH• T 18 lc a O 7r��' I�f -_,„, ! 0,,,ix,, .,..,.,F � "� r ia� ,,oiti;i:,.. , 4, ,,, ..., . .,---,?, r;')4J ' '''- ) $ / awl Illi CC—�'" �z �,�, r ° , gill► %,, ,..„ .4„ 4,,,., ......,..7,,,,,,Lw„,„„4- 4-4 Et)-,,-,.\,,, „,..•-----„, 7-77,1 ohl,v.„,„,-2 „,_ _ ___ .,. .j.w.7,406,.... .10....,, ,„.,..4p,, ,..,...?/, ...,,,,,,, ,,,.,,,,,,, ,,, ,,..4.,,,.,._:,.,,_ ,.. ® _ ,,, gre r .�el mwouir''''' R sue , 1y !9 , Q )1/0>MnliN:419,- � �eP� _ � �7 O� � ® r �i°rf71j�T tr .�'#y��,���`� .l�l�l �f� . •— =-- ---------7g.'',,, •!-_ ,_-_—___.-_-•-••-•!--, -3"2___"--,------ -t17-7-'..- ---- _ /44F1*,..._,._ __i.. , _su rrr ;, .' IIN_ �• alp, , ..-2--,,74------7--- 6L--'-=-T4.-. ._....-,-,_.,.. -AVV4e:A? �/�.�. �, 4114N41 �e //, ,� ���� � ALRR yitilOrmil � f� >��� \�,�� ��� ��—use Poi,,. , �l '"" ' ���' ''ii►��s �� °. 1 Z k - Nye 7��,��v� $ 4q 4 '° �� i ... I I ® `/% � / ` '\ L'f'+ -- ENLARGEMENT VIEW i�,E �® / J I SEE SHEET 5 OF IB / \ ..o 8 _ //// ,Q "=1.86`" x�smeu No. DENOTES IMPACTS IN 2� '� ��/ I //A IMPACTS NSURFACE A SURFACE WATER TER SCALE,r•=5a• %� DENOTES TEMPORARY e3 DOE OT CONSIDERED FINAL \ \ /�I €W D HOTEL LLC PER T D4 OF RAWI BG JESSIE ANNA WALKER t < C 1 G \ 0 TEMPORARY IMPACTS � GG� 0 / • IN SURFACE WATER /'7 \ \ \\ 50 / \ \ 2:, SI 'E ` \A / N /WOODS �\ \\1\RETAIN �x�� \\ / iziTB YSI \ -- —— / LAT.2'BASE H oit� t+K` T�o1�`����� ?q. fi L_UF N o`'s CULTN BEST.350 IP F / ''^4����/i W , �� _ _ SEE DETAIL � f 'Y � ° _--'rG ,�/ /• / LAT. SE DITCH j� TRENCHLESS INSTALLA �.•_ �-CG �5 ° `�%��o`.,/ / SEE DETAIL 4 -�r TE ���r4� _ \ eV8 t'sr v - ' — /P! / L `I�fl�/ 20'IITILRY EASEMENT-a.B.PVC _ T_ - _ �_� . „„,,,,-,,, ,. ---._>7, , ,, __- i ../..."0„,./. .. ,i el_9..; /�TG•2,P E oft�4Rgx �Z Res` - 1#—-G • .1 it - \ k \ I\ / / 1 FLOWABLE�FILL j/� ...... -. .- 11I / / X EVI XS€LO LINE�O - i '• p ROPUW%� ` 4, �1 -_—_ p C� . NATE LOW AREAS� / NAP pPVE -f q�% ,\ / „� //P .CUT V-DITCH ' / / 1 % ' `_ _ _/// // $L%Ej ETAIL 1 .. .. - WOODS`v GC 'O ♦? T // - . _ 25 E O 5 ..s, C.6, : ,"CB' / o _ ///// �IX�5986Bce rroEFET o x�emeu No. DENOTES IMPACTS IN 71 11 1111 11 1-\ // IMPACTS SURFACE IN SURFACE WATER TER SCALE.r•=sa• DENOTES TEMPORARY e3 DOCUMENT MOT LOINSIDERED FINAL OMEN OIL SIONATURE•COMPLETED / `� i SHEETS OF 18'� i,Ni _'.i.�.. nr awe — / // �� ��s `\,'Ri 9 SY • Wo°° Aa; . �� PERMIT DRAWING' // ES �� _ "•. 1700 CY _ Mj�/ It �.N. .EE DETAIL 32 // �/ / / /a �� LENGTH=113 Lj �� VVV",�/r /PEA -NBC[) / / FILL TO' A . i // // ELEV=182'�%�1 � O i /�%—Ms� W°°p5 4.0 `� SITE lA / _ IMPACTS IN -.r• " p�� / SURFACT�ds;9i1� //No HEpDW kt, a t. �� --- / SPEC.CUT V-DITCH JOHN ALLEN WALKER - / ���s SEE DETAIL 1 %:� 1,14 ''''j� • IMPACTS IN.iliP 1 tdett 1 SURFACE WATER FOE 4 ?ot LAT.3'BASE DITCH �// • itt).0',.SEE DETAIL 31 /��`� �; _ I nE / � TAIL•'.CH vdCL I R".' p --_-__ P��ESEST:125 TON: O '.S TEMPORARY IMPACTS SEE DE .L 3 IN SURFACE WATER FOE F o F T / ' SLOP,-r.Z 0 PUE ' ITCH % \ 5Illy / E DETAL LF e \ / 1� LENGTH=42 LF ,/�(/\ t`d SLOPE=0.10k ./°\ \ �s 7ice. 0, . ,... 1 v.a1-5 Ho. smEr Ho. FOONBO INS apBTE LIM P`_RMI1 DRAW G SHEET 6 OF 18 400 450 300 950 900 150 100 50 0 50 100 190 21110 250 f IL 5 A:2+25 -Y14RPB- CL STA 24+45-Y14- CL STA 972+90-L- y V, I 11SITE 1 /11.: "::\ \ / \ / : z4. / \ / PROP T/// RCP \ , EX WS _ i - N �X 2@54"RCP . `INV=181.0 2@60"RCP j I V=1796�-- - - - I SLOPE=0.d2% 2@66"RCP j EX BED SLOPE=0.82% INV=178.6 PROP BED JP — . E%BED}L PROP B'ktl'RL,BQ J i. i I i I i I i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I moor Er FENCE o oEor No. INSa.% a" POCOMENT NOT CONSIDEREll ANAL NLIVREA COMPLETED . ' ' ' ' ' PERMIT�DRAWING- SHEET 7 QF 18 SITE. 1 • 200 100 0 100. 200. CL STA.15 147—NBCD- 1@8'.8'RCBC SKEW-88 DEG. GP ELEV.=192.52 Ft. - ' 200 I 4:1 NORMAL II TB LT 4:1 SKEWED TB Br I IBEVELED HW—V______ . 3:1 NORMAL 190 3:1 SKEWED 7 3L --\\ —PROP.TB RT PROP 2 PROF'FLd 1 56'E RCP—IV \--77_ / �` TB R 180 54"RCP yTB T _ _ P.TB LT ems= EXST BED EXST BE PROP.CHANNEL BED PROP.CHANNEL BED NG AT CULVERT OBS WS ON CENTERLINE 2-27-19= CL INV.=177.1 NWS=180.6'T SLOPE=0.30% _ME . . . . . . . J i ''P me STOMP PUN asli PwssR_ o. 1 oe o�,a,xTx� E«G�xff.// DENO S TEMPORARY sa zv o sa ioD , IMPACTS N SURFACE ATE `IIIIIIIIt\I� .V. /� „r FLA SCALE:V=100' /—L IDkSE / / `L ÷9I,,II=UDNOLCE.SUSM a017,1u Esxsrrmw En® 6 es°x ENOCONSTRU . PERMIT DRAWING • n'iz sYii•,ro Rom STa1°za,s°.o STA 1wr TOO-r-n L-SRII Sta.36+0000 -SRII-H 6: "° " " o �,, o SHEET 8 OF 18 59ox SRII PC Si,.3/+06.37 // 3 / I - ll-PT Sta.33+91.45 srtc S.onus. EARL Es :T aLa �•:..gym°a..=E ,l/� i i I �n. PIMP SITE 2 �„HE0 c `.k,� Sn°TT.ri Y/I/ itl �ti..o;°�. SLOWS PROPERTIES.LLc ... / PUP PUE 'S9Pa` PUE 0. Pu P E m. ry°Tc PUE PUE ..,,;°S:°w / .. ,o0„ AA °o. Fx r�ma wa.mr itiir� c� �iii11 � i.�-.�;..,- ,,o- 7—,� - 1 Y _ _ psi c= x . . x 3- .—. . x—x—,—x—x x—= ><—x x x —' �.a w..x..A — o ESL',5 — xm �,--- _ _ _ ems-ammo•. �s - ., u^ a ,.•s,. — acP- �^ E.. ins T6< -_- _ --- Q wawa rPd.ow .� so* 'O �., P..mEa�,a.d OP BO Q :._� I.x-.� > . x—x x --x �.�-xZ'+ • x—• "N"o , „ �� Or..x _ - _P- E E PLE a ooa& PUS �PDE SPEcca. pR . i1� ' WON—1 Ti; °I EARL P.JONES 1\ Calla/E. .3a. xrT..3�®To.n ;OMmE Wxom� n°°TTx T.a EVENTS,LLC NO REAL ESTATE.LUC e N vE ET. !1,1': , ox N I — - � FF.,.nn,°.n.m.o�ssDETAIL...64�<x +* CnaOLIHs POWER a LIGN\ zoom zra.1mr.m TOSTAINS-FAO-LAnr / pg.-nn.a�,ev To srA ss.n snn-n i � 'Ns mom nA,9.P,ron.T„e „rT PROP FOaa t,71 PZ,YESEE SHEET 1W a vwreR_ rvo. aro. 47,NET r a O/ s.arEr PUN as c. rvo. 6 rv,r+rvEA zwwaa Y reEa?� %�✓// DENO S TEMPORARY sI i i o sD 100 �' r� ��° IMPACTS N SURFACE ATE ,� 1 I I�� /� n 19, SCALE: j »,jr' / , � F DOCUENTNOT O CONSIDERED FINAL f A UNLESS ._j .7 T ® Q �� 6 END CONSTRU P IT DRAWING ar/ a'v]. / n� ww ,z,a'zz sr"v s.iz�.." / worn s,a a w,oo-r-n SRII S X. Sie`3�, 6` \ `):� SHEET 9 OF 18 9/ / ��. SRII PC Si..3:d. b3 / "ll-PT SYo.33+9I.45 gsv 4 -pveo 77/i .. � \ �, o�7 e I I�i era. a , _ice z„sera„ ) \�/0 y4 I ��1 J" td11 `7L / ` . 4,17 � _camp. . a� ..- �.>. a nsAllr �■im i'{Ya ` n -v. —"�q t �— xs Lvb _ it —r wwn ' �rv� __�JIYO --,--4 ... uss . �— i b \. � __-- ..• _—,A , O F "x� zb,. x w....„,,,. ..wrownwir.2 [ v4 r p1lE R ru[ \vuF •.'3uF ,� •, '�e 1 I e�rv\ kr,„,.....,„Ls R'..' \� I uro ' FZ VV _ T'S 1111 07"Oir� A ' Ff a' \ TF IT T.01071011 s( ry rv� �� I` �a, A,a a.o,9 w` 1 (�I -� �,I q� �,m?✓^r J 7 '''' \ \ , NETA c. �`�'uE �xlZo I Wov,srn ion.Oo ssDETAILrv64. /� ..r� �msraiomrv�+.r Faannaar..v.oaraAVEsnrvn u i Dn<x �.aoLrv.F� •LIGHT Fo / rrE m] l .�/ 1 E. \ I .,na,9.r.ro n..,r.,e�.rr F a as seE sneer�3 FOa Sa11-DPROFILE SEE no 1 W ?Rona,77aim,/rvo my simr 00 °MAIO ''''7M'" 7 1111['h-----2L----27 L'T.V:EorC. ZHF.' SCALE 1 100 I W M'.'e.k a so Fi Rom A 10 SIII TO STA 2 OAT-S219-LT 6 6o Er FROM 51,1024,0 TO OA 10E0+00 L LT , MAIL 41 mom 50,1037+00 TO STA IOSS+21 W/1/ DENOTES IMPACTS IN SURFACE WATER —Ii-.... ,,',-,„7' 0 DOCLIMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED / 13211 =17.:A2' 'UNIN7Aql. y/i,./ DENM/ AIE411151_IN ,... . •-,. ., .. PERMIT DRAWING SHEET 10 OF 18 ,rTolo+or Litoo 0 D6.1 O/A AIA DENOTESE INTEmsPGucaRcYE W R1 L9 # ' \ iD° l DENIIESETON 00 DENOTES MECHANIZED L N WE ----EXAELES P LUCAS ..- ..on 10 -*SR 13'POT St,16+0000 C) / .r..._----------o ---------- DUE-- .. . . Pan * P. ,, _-2 L.* Val L 4514119a;_ _5, . 04 ,,,= l' ''.-- \ ' L2....... .... .-....". ..... - - g -sr"' 8 ' AO _ 'x -•'.- -•'•I' '''' ,,,'.,,,..;,.,.-„ '—` '-- ''"?r.:,„:- , + ."T' -------------— if _ ,o,... ,,, ------wo.......,. - -....,,zzat 4.;31,44-02=rx x x im2 -----__.-- .3 e.--- ."--1-0.• - .,,,, v4410: •84, ' cd, —t— ''I:*ieggMtll'Mhf*:lgtgKAM SITES . -- . /7 7 @ -SRI,POT SW,10+00.00 SITE 4 // 0/STIMR0M CTOATTNY LLC i cu rem ounn cr... a E, otmomE 1 UTESSTVHOEWWNAr OrHE"10:HISE°1 pa;R181i.g T8 11;13.1.n b:g MI M'V TS ill Itt A t_g 1 2:ITOMMEstrIl?,,, '7 m5o. s E2 i" xoOEuL,O sn'pgt'squ M'TCx I[5III[0 \50 10 SCALE 1 100 y ewxn D4=1 T... . .. ,gyp na�so i we+aa♦6n F 1o+sznro naix+sz.z-MI,a �b MOM nw im,.00,o STA.iose.ei MMp 41 �/////� DENOTES IMPACTS IN nix TEE u'uL°CVFss uLsio:eCONSIDERED ON6no co �j' SURFACE WATER /71 eo FINAL F//, DENOTES FILL IN ✓� 1..,.— PLETED r `gg^^ .T.�.�.m.� /// WETLAND .�.. .o l "s��.t� LF »mr fl- Erare`siiMroRARr m ° ) MPERMIT DRAWINGt, /' %ir,„ "fa AErA , (i /r„ `* 1\ a SHEET 11 OF 18 CTS I S RFAC6. ER:' S E pT#ON \ ill:1 �` ) 7 3 Oa.. xo�,} 0 i7, q_ IYENO S ECHANI e ` NO,i`/k� qp„ � � a4E1$n.we o.xl <S '•�• LCy(]]^;NJ�'. I®. �� "fF!lNE7T.AN * N <a R, �� '/ I /11 L 6O )V P e/J ® * *'A -x r ,� .>����1��3 x�\ 1 DuE ia "— �'€_ : '° -_.11 F. ?.i 1.4i . .rQv. gl e Erie ,'�� net, �u?+ -nu7aa x„w, r < t Ytil - — ,errs �. - .. — — _I "i -tea x,n:xn.vox �3� nEF« . — ° +r m 7 I ►-€ �. 6 4/�,!°/ e,r s �� fe'c`sil'f�r �� afI IA" -- w--= ° „ c ..) - ,„,-w ;u- .-.44 . .,!,: „.2 �' a+ '—' ;� - .�,� —.,.as.—_"1 IIw • ^- " `vim -v, V��++' 4�11)'M�i�Wr' rill .✓ li v qm ]/ ^ q �/l+' ry ... . 1 �* .1 ,�� 'l -SRI, SIP.0+0: COMPANY LI') 4' . A,� > � � ( o ES:S oSHO WAY= ISEo n j non na iaaz.ry ro nn.lwx.se-H z, MT s,n.wi+sn To n..1w1A-I-n O Yi,9RO E SSXSTH „] I no "'I75986B" X"276 110 1,0 130 120 110 100 90 80 0 60 40 30 : 11) 0 10 20 30 • 50 60 )0 80 90 100 10 130 130 I 0 1'0 PERMIT DRAWING SHEET 12 OF 18 190 4 SITE 4 190 3 180 — —0025 _ 0025---g r 0.025 0.025 FILL IN WETWJD _ , 180 1711 - 0 160 1041+-00.00 D SITE 3I I I D 190 10 m Z 180 ■■ FILL IN W _1____'5-- — .0015 n00 FILL I I LLAND,' .0 170 ■■� �+ �_ 1 • 1 1 160 1 160 II ■■--...-_l .... ■M■_:: _FILL IN WFLAND 51TE 4 160 1.00 120_ ° •0 3 s ISM _. 18a ` �•pL/C_M�MMII:a_ 100 IIIL _ / _ _0 1039+ 160 1.00 NE L r 110 140 130 1:0 1)0 100 90 .: • 60 50 40 30 • 18 0 10 20 30 • 50 60 )0 80 90 100 110 1:0 1:0 1,0 150 T. 1 5,, 1 Io n D Ro1.REFEREN E No. STEER50 5 I-5986B X-2TT 1¢0 150 140 170 120 _ D0 100 90 g BO TO 60 90 • 30 . 10 0 10 20 30 -• 50 0 75 80 •5 1.0 110 I 110 I 180 I 140 180 100 L 3 g g PERMIT DRAWING 180 ® .FILL IN WETLAND _ 0.025 __ 0025 - .�._—_ 0.025 0.025 \ ,FILL IN ET ND SHEET 13 OF 18 0 IMPACTS IN SURFACE WATER— . /lI �/ \ 1)9.90 '1' SITE d TEMPORARY IMPACTS 3I———I 70 — ——— _ __— o0 IN SURFACE WATER 160 1043+00.00 160 180 I SITE 5 I —i,p25_ r 0025 - 0.025 0.02_IMPACT SURFACE ATER 1)9.dfi �� , 1B0 FILL N WETLAND TEMPORARY( 3:1 \ 3\ WATER 170 IN SURFACE WATER - - - - - - - - - - 70 160 -' 1042+50.Of1 u0 g gI . 150 3 511E 4 I 180 0.025 0025 --1— 0.025 0.02 ■■■- 180 17881 i IN I i i i I I I I 1iO4?+0Q.00 160 160 190 180 �_ __ 0.02 5 _ _ 0.025 —_— 0.025 - 0.025_\\\ 180 1) 39 SITE 5 1 0 _ ---- - - - N I-. IMPACTS IN SU WATER—A- 170 \ `INS1RFACE WATERS —5 nIt 160 \ _____ _____ .—--1 160 1041 50.00 150 180 r 150 140 130 130 10 100 90 80 TO 60 50 dp 30 20 10 10 2 Illio i 80 90 100 180 120 50 1.0 150 noncr 11NFENCF NO 1 sE°N 'moa.%PLAN" UNLESS ALL P.INNENT NOT CONSIDEREO ANAL PERMIT DRAWING- SHEET 14 OF 18 II1 290 100 0 100 200 CL STA 1042+09-L- .@8 A9 RCnC SKEW=19 DEG I 190 STE 5 1 3:1 NORMAL GRADF POINT 1 GRADE PCINT 1 18043'1-SKEW EL=180.31\ EL=180.16 3:1 N RN L 6EVELED HW '-9_ 3.43:1 SK E I NG AT CULVERT 1/ CENTERLINE TB LT 170T6 RT LT 1 -----I. )/ TB RT } _J_ _ EXSLT BED J -------_ I. EXS IN 3 S'�9'P2CBC EXSII 1VO ---- --- - T BED OBS.WS ON 3'TOE WALL CL I V.=162.7 �`3'TOE W LL 0227/20:9= SLOPE-0 30% NWS=167.8'11 1 Z. i. 1 1 I I 1 s P 1 -_ r 50• z5I o so• Ioo• PERMIT DRAWING .�,ER_ NO. I a,E55o. �z\e Q "; Innhnii l� SHEET 15 OF 18 "O q SCALE:1"=100' Q o g dx '1 I \ DOCUMENT NOT CONSIDERED UNLESS ALL SIGNATURES COMPLETED I LULA N WILLIAMS ,0 'II n IrEt L-- al `� \ Ba'zory , \--,-- --t� ^GI 050I R R 1 uEEo ' D WHOLE ARMOR".:,RE:" 4 SIDNEY Olin x ° ..ND."DRDN \ to Ia uEIRTIAW" - _ J, .. .. I TOE ,„ \5R9A-P(Stu 19+6393 0 Lii ° \ @ SPEC If='''''''''---,....,....j g '''‘, * * * *\ 11 �— _Ek �i✓1, \"' * 7 , p�j' END CONSTRUCTION /II -5R9A-POT 50.27+78E6 1 L \ O'l%..I/�•`„Or /`mar f8 SPEC ur I SEE DETAIL x,sr.air Y �LL.N,.R, ffErN,,, W —� A. CITY or oulx l 5i ‘11) �roF� I �' �, SIDNEY R.DORMAN I u uhwlr -SODA-PT Sta.24+39.96 -SR9A-RC SIo.22+65E2 I�' # �/ -SR9A-PO!Sta.21+8996 ns xa.so*o n..x..aa-.wr.-er --_______.\ DETAIL T 1 ta eI //� DENOTES FILL IN o WETLAND _ .9.9 n.x..:O,O n.x..xo_.9.n DENOTES MECHANIZED ,wu.E,..,o.os,o:..::„o sR:.-„ . . . . CLEARING OA xMr FOR-SRO.-PROFILE SEE SHEET IOR l } —0s d i;.e_ - I I °1' '-- h ° �° -_ °° PERMIT DRAWING n1 55 -_ -z * , c ' SHEET 16 OF 18SE "-100'g s < • �T s�° h c l 1$'QI, k �: j � `s , I "�� \ , - r( C f Uniesaaiisioo: ^ $ . # AS yor-og 7-,' L--7 4,, f `-,1 , 11::): 41°e'vzoi, \---- 41 ,1 q-- -44t?-s,„2-_ ______H ---21 ,c-,-. ..,,,,.„ ro,,,_.E. ,z,.); .f..,---,,...‘,. , '4.J2, ,,,_, II r " 0 \<` JC : ,� a E 1 5R'9At PT ...,.39)3 L. \ 0i.9f, F ©. ' > � `I� 5P1 Pyu,'Q4 II `VI 3 , 7 .I a 6 ° II I \' J ate\ Cp flu " �— �` _ �reryV �� w EN,9N57R TI0 I I \i% - \T, `b .sis \r i� �� -5R9A-POT Sir. —. :i L 7 , k ��•���I 1 ��,E4 ii4i '✓ . '.4Irk s I * �� `s`�r.►oo�Hrror.t_�'y' .6, ,--- -, i w= /PIP—--2„.., -••••••• =41 -.—,-.4------- . - ,, zi,lia,,,--:-_, CITY OF DUNN �" -.--i;'\— nc& ' v. " -SR9A-PT Sta.24f3996 -51,9A-PC SYo.�+6522 . -_}' ,25 l L' ,. -5��POT SY0.9*899b ww..n.,u.su.o n.,..uu-.wra-er ff ,Qire� ~�i/V {/1 i d 9.. DETAIL ,„" .,. .... J-A� `iFL 1l Fra 0 ENQTE �E1LL I� �I WETLASD I ..ow n.:.:o,o.,.,.,o_u99-. DENOTES MECHANIZED ,wu.:,..,o.os,o:..::„o sa:.-,, . . . . CLEARING e m1 xMr I FOR SR9A-PROFILE SEE SHEET 102 0. Ifc.4�10 Fa01IxE598 C1 N0. x98 397 150 140 1 0 120 110 100 90 80 70 60 Silo i 30 i 13 0 10 20 30 i 50 60 70 80 90 100 110 130 I 140 I 140 140 PERMIT DRAWING SHEET 17 OF 18 1 200 200 0005 0.020 --- ---4 190 190 1 9.23 188.98—/I I I 20+50.00 180 180 200 -- 0.021 0.021 J.1 I _____ _ — - - - - - - 190 191.O7 20+00.00 180 180 _ SITE 6 200 FILL IN WETLAND n 200 0.047 0.04J 9=\ J:) 190 1 ______ - ___ __ _ ____ - - 190 I I I 19+50.00 180 _ 180 11, V jk.IN WETLAND 6 200 0.060 0., 190 _ _____---- L 191.51 - -----' 1 19+00.00 1 180 180 200 FILL N WETLANI n 0 0.060 0., J:1 190 ----_— — _— _ 1111111111111111111110 19C.94 18+50.00 20 3 SITE V 200 61 FILL IN WETLAND yI 379. 200 0.060 0.360 _L 3a .1 91 50 18+00.00 13,' Ian gF -SF 9a- r Iso 140 130 130 110 100 90 80 ro 60 90 30 ID 0 ID 20 30 50 60 70 80 90 140 130 130 130 1.0 150 WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I E SURFACE WA I EH IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (It) (It) (ft)_ 1 21+71 to 22+33-Y14RPB- 2 AT 60"WELDED STEEL 0.020 108 INLET CHANNEL 0.003 0.002 24 12 _ 1A 15+47-NBCD- 1 AT 8.x8'RCBC 0.004 83 15+47-NBCD-LT INLET CHANNEL 0.030 28 15+47-NBCD-RT OUTLET CHANNEL 0.020 0.003 92 16 1B 21+71 to 22+10-Y14PRB-LT ROADWAY FILL 0.003 35 2 1035+67 to 1036+76-L-LT ROADWAY FILL 0.014 94 _ 3 1038+79 to 1041+14-L-LT ROADWAY FILL 0.165 0.027 1041+96 to 1045+30-L-LT ROADWAY FILL 0.123 0.039 0.018 0.021 4 1042+86 to 1044+16-L-RT ROADWAY FILL 0.018 0.031 0.020 1044+41 to 1045+26-L-RT ROADWAY FILL 0.402 0.090 _ 5 1042+09-L- 3 AT 8'x9'RCBC 0.103 86 1042+09-L-LT INLET CHANNEL 0.013 0.013 16 12 1042+09-L-RT OUTLET CHANNEL 0.030 0.018 39 11 6 17+51 to 19+89-SR9A- ROADWAY FILL 0.273 0.050 TOTALS`: 0.981 0.000 0.031 0.226 0.000 0.244 0.071 511 145 0 'Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3-5-2020 HARNETT COUNTY 1-5878 53078.1.2 'noised 00Fre SHEET 18 OF 18 Hi wa North Carolina Department of Transportation gStOO1Wak E Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 53083.1.1 TIP No.: 1-5883 County(ies): Harnett Page 1 of 1 General Project Information WBS Element: 53083.1.1 ITIP Number: 1-5883 I Project Type: Roadway Widening IDate: 12/5/2019 NCDOT Contact: Paul Atkinson,PE Contractor!Designer: William H.Hines,PE Address:1590 Mail Service Center Address:Sungate Design Group,P.A. Raleigh,NC 27699-1590 905 Jones Franklin Road _ Raleigh,NC 27606 Phone:919-707-6707 Phone:919-710-8454 Email:patkinson@ncdot.00v _ Email:whines@sungatedesign.com City/Town: Benson County(ies): Harnett River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 3.201 mi. I Surrounding Land Use: 'Urban and Agricultural Proposed Project Existing Site Project Built-Upon Area(ac.) 85.7 ac. 49.9 ac. Typical Cross Section Description: Concrete median barrier.4 paved lanes with a 12'paved shoulder in each direction. Grassed median with 2 paved lanes in each direction. Outside grass roadway ditches with 6:1 sides.Cut and fill slopes have a maximum 3:1 slope. Annual Avg Daily Traffic(veh!hr!day): Design/Future: 75700 Year:2040 Existing: 58000 Year: 2019 General Project Narrative: The North Carolina Department of Transportation(NCDOT)has proposed to widen 1-95 from south of SR 1808(Jonesboro Road-Exit 75)to north of SR 1709(Hodges Chapel (Description of Minimization of Water Road-Exit 77).There are 2 proposed major structures involved with the improvements to 1-95 that are to be constructed at existing stream crossing locations.The first proposed Quality Impacts) structure,along Mingo Swamp Tributary I,is a 2 @ 66"trenchless installation welded steel pipe with a headwall.The proposed pipes will be buried 1'.The proposed pipes are replacing 2 @ 48"RCP without a headwall.The pipe construction will include downstream channel improvements.The second proposed structure,along Mingo Swamp Tributary 1,is a 2 @ 7'x 6'Reinforced Concrete Box Culvert with a 6"beveled headwall.The proposed culvert will be buried 1'.The proposed culvert is replacing 2 @ 48"RCP with a headwall.The culvert construction will include upstream and downstream channel improvements.Both structures have been designed to have as little environmental and surface water impacts as possible.Velocities at jurisdictional features and wetlands are non-erosive. WI Waterbod Information Surface Water Body(1): Mingo Swamp NCDWR Stream Index No.: 18-68-12-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) See sheet IA Far Index of sheets STATE OF NORTH CAROLINA PERMIT DRAWING N.C. 1-5883 1 See sheet le For Conventional Symbols SHEET 1 OF 38 / -� DIVISION OF HIGHWAYS ..,.__ .. - S '� 53083.1.1 NHPP-00951033)74 P.E. J --%• ,�. HARNETT COUNTY 53083.].] NHPP-00 9 510 3 317 6 RrJI 8 UIIL. NI � " 1 ENCP'•Jkl00 1-5883v`t ff r LOCATION: IMPROVE I-95 INTERCHANGES AT SR 1808(JONESBORO ROAD) FINAL RIGHT OF WAY PLANS �/' r (EXIT 75)AND SR 1709(HODGES CHAPEL ROAD)(EXIT 77). r 4r t TYPE OF WORK:GRADING,PAVING,DRAINAGE,AND STRUCTURES U !r oao lif 1�1�����i��i�W M, '� WETLAND AND SURFACE WATER IMPACTS PERMITIP it►.edi oloks;•p, 4 °"E% n 0 ,-' �CTION 3 �+�' GIN P�J ' -Y17-POC Sta.13+50.00 ly CEO / BEGIN CONSTRUCTION END TIP PRO ECT 1-5883 "[1 1 VICINITY MAP -L-POT Sta.]232+00.00 '�) (Not to Scale) SITE 19 yao` SITE 17,18 PM SITE 4 -Y16-POT Sta.11+50.00 BEGIN CONSTRUCTION 10 e -SR16-POT Sta.85+93.6. SITE 2 r END CONSTRUCTION ,,,v SITE 1 -SR13-POT Sta.59+70.56 SITE 12 rftil li. END CONSTRUCTION _A._�y DRNN ��� \ � BEGIN BRIDGE -SR16-POT Sta.10+00.00 SITE 11 �T� 1��` To eENso �' r� r� -YI6-POT STA.26+16± BEGIN CONSTRUCTION -����1 Emili airamiima BEGIN TTP PRO ECT I-883 v�J : \��' ` -L-POT Sta.IRO+00.00 �14p I �� END BRIDGE . GEORG4 PE,Y L.E RD. BEGIN BRIDGE -Y16-POT STA.28+01 �-`� ' yy``\\ -Y17-POT STA.25+77± V • -Y26-POT Sta.10+11.21 7 ��p SITE b � v BEGIN CONSTRUCTION 'S-• SITE 13 END BRIDGE -SR15-POT Sta.10+13.43 jg2 •O-I5 ® -Y17-POT STA.27+84± BEGIN CONSTRUCTION O -Y77-POT 51a.40+50.00 SITE 8 I I SITE 20,21 -Y16-POT Sto.44+00.00 END CONSTRUCTION END CONSTRUCTION SITE 10I -Y26-POT Sta.30+84.53 CLEARING ON IRIS PROJECT SHALL BE PERFORMED 70 END CONSTRUCTION TIM LIMITS ESTABLISHED BY METHOD II Ca III re Is A coom,!FP AAccEss PROJECT WITH ACCESS -5R17-POT Sta.10+09.89 �I ` DEw0 rLwlaD o CIDINGES BEGIN CONSTRUCTION• Y1 ""°"""""`°"°` re U GRAPHIC SCA!FS DESIGN DATA PROJECT LENGTH ram' t°".°a 'W HYDRAULICS ENGINEER Michael Baker r,i727,7,'' ' _ ADT 2019 = 58,000 LENGTH ROADWAY TIP PROJECT 1-5883 3.201 MILES `"c'" 51411110 S ADT 2040= 75.700 INTERNATIONAL f K = 7 % FOR DIVISION ry OF cHIGHWAYS' 1/��lyy; PLANS p = 55 % 11 50 45, 0 5,0 100 TOTAL LENGTH OF TIP PROJECT 1-5883 3.201 MILES m� a SPECIFICATIONS SUSAN 0C.LANCASTER.P.E :,rw N T = 24 %" nwecr e .vaen ROADWAY DESIGN ENGINEER V = 70 MPH RIGHT OF WAY DATE O PROFILE(HORIZONTAL) (HORIZONTAL)) '(7TST 17% + DUAL 7%) February 28,2018 CURT IS°TILLMAN.PE 1.49 10 5. 9 10 20 FUNC CLASS= nn°rncr cvcn "cxnnn r, INTERSTATE LETTING DATE, STEVE D.KENDALL,PE ai.`\v7 PROFILE(VERTICAL( STATEWIDE TIER July 21.2020 "''aOr`'�"'"cr eE PERMIT DRAWING ''a'ro'iFssn'''' I E"zs SHEET 2 OF 38 IOW SO. " \ ii](11�I 100\\ zrvcixezc x.cmzzr \ \ SCALE:I"=100' ' DtTAIL 1@ " I �uu� ruzu.r ".ee.cxt. x� / iNM eaNLRPl1m yiT 1111) \h7 o __ m.nnBxs REIC ���eee�V} I I n n. a..u.. p c / .......e. !I\ 4 r am o�xx m. 1�F n.,..,x,n n.,P..x % \\� of STA ��+`TDENores IMPACTS IN ENLARGEMENT V 7" I ///// DENOTES IMPACTS IN a. .%/,f//// (POND) I— �\ I I %j' /�/y/' SURFACE WATER �f pONDCE WATER _SEE_IIEEI l_O- 3E — �,"\".. �w \\ �i I oxroAEo ✓///// DENOTES TEMPORARY I w�,�..x, c ��° /, IMPACTS IN SUR ACE WATER \�--� * " * . DENOTE$MECHA IZ.D C.H.WEN I COPE ENTEP CLEARING a I Zg a \�BBB CLAWSDN WEBB a..BDN wE� I "Ic«nEx AND COM BUE,; x .. a ° MECH i PUE 0 I I E O O C3 e P mE PUEPu p I '.... eEi ''3 I TS I SITE 1 Bn TO D a rvoEo dre J OF PUE T aT `�Px "� E� 3 PDF r uF .,.,PrvF _ _ , , la` ,v n c1 VI o_ Li t OP,".F! ' 1Tj S——T—Eon.——x—x i.?P—x—`7_- x_x —x—"—x—'—x-1_'—'—...'—x z,x—xi rx41) x x x—x—xx= ',,_x p /P —a— ® : a�:ziai I � lJ — �y I 0 century tepee,D ,slza U -SR/4 . el U 1 of Dunn IT.DIP \ -\LI e -- - - -- - - _ Enury �PVE �__�.r,e,g- _F e`_ _�___ o r an u. 3 Lnz o EMOTiIrvNG B n, PUE .' PUE PUB PUF eFUT-- _ UE v p /1 l E l 1 1 �P /-P 5�a 1 1 P NE :� s x 1 1 i 1 s x 9( * 1 y SPEC zn. rrt 11 1 1 1 1 1 1 1 1 1// 1 1,/ 1 1 1 1 1 1 1 1 1 1 } 1 NA,.B.LIU.. DSiRIBuiIDx up>x cor,LLE 1 1 1 1 1 1 1 1 1 1 / 1 1 j1 1 1 1 1 1 1 1 1 1 1 1 1 tAtti / NOIE:DRIVEWAY RADII I I1 1 1 1 1 1 1 1 1 1 1 1 1 I dz UNLESS SNOWN OTXERWISED Y .i- ., y �, a 1.J' Ira SRI}p1MITSEE SHEET 116 6 119 g PERMIT DRAWING R'"C'iFssnN 1 °rvzs \ SHEET 3 OF 38 ...ID \\ I I Yi I\I 00 zrvcirvzz° x.cmeer 1 DtTAIL 1@ R \ \ I zx,n :A u zu.r ix�e�Lo� '" rvmm sw. DOLUNIEN wee.,,„„ i FINAL OMPLETED \h7 o _ —� m.nnWILE.All Ylu IIERC ,\ I .ry a.ee.i �p / \ � ,a 1 \ \ DENOTES IMPACTS IN ENLARGEMENT V'" DENOTES IMPACTS IN a. //,f///� — \e\ I SURFACE WATER �f SURFACE WATER �EE�F�EI Z 9 �Ly(e 5 "'� / ��� *NOTES TE/40 (POND) i E ^� A\ A �4 IA AICTS IN SUR AC K- �'�� \V TMa\ " DEIJOTES MEC A IZED$ ( —� „I �,,,,o ,I xc I CLEARIN „ cx.. x Aov- \„i t ND9ry \ \ MECH C3 CELL," `� RUES '. e3 I :ice SITE , E FF PUE � a „wnu x x x x -- —` x `�y�-,—x -x x � s3.. I,.... - _„.,_ i W x x x x�_ o _4-e_ - _ .y -- _ I — : a m y w _ x r x I x —x—x=�.2,_ x—,T�x x—x�x x s—zzrx� x— �°wO, il - = n— e _ _ - I _ a.. .,. .71x _ si— Lf'- — —. r e ' x rvs '1e } SRl4 _.r I NI /I uam d ' _ —° '� ' e� _ ,f — - In 70.STING 't - ' , / E 4 * t. . le FY - UE RUE Y * BE I I * I * EI * * y' SPEC UT wiLarrtc: l i * BE i * BE 1 Ae BE 1 t j j BE * * * * * I 1 * * * rv./EER.Ua.UE oSERxuii9R OW?,LLe l t / 1 t / 1 A fe t k 1 tj / NOTE:DRIVEWAY RADII , I1 ie 4 Y I dz UNI ESS SHOWN OTXERWISEo »Y 1.J+ r0:1 SRI}pINFreSEE WIEET 116 6 119 Fa REFEREN o. SEE.N ol.I-5883E N X 5070. /70 /EF /70 /40 /30 /20 /F 100 N •F 70 60 97 40 X 30 /7 0 /7 03 30 40 97 97 70 80 90 /00 hip /4o do PERMIT DRAWING SHEET 4 OF 38 Pon Pon '71 6R13 XI 40+51.47 0.020 0.020 wp 2d0 / _3 0025 0025 0.0"5 0.025 200 IM 195.37 ��7:1 �V.�� �———— 195-_.`J�_ X P9 9X1 -6R13- 40 1 01.47 m; 0.020 0.020 211'I 3: __ ay 0.025 0025 0.075 0.02s 301 190 wsa5 1077+56,00 195.09 �� 190 S n SITE 1A ; 3 0/ FILL IN E11AND3q+R13- 5147 $'a 0020 0.020 90'_ \ n24 0 025 U — 0 0'5 n n25 NM �/197.3a — �� l47 _ 194.91 /0 /+00.00 194.6f \J r4'1 731 fl01 -6R13- 39+01.47 Pon 0.020 0.020 0,025 0025 0.025 20D l47 1i4.67 F6/7�19765 � —_-- 194.59 \��/ l4"1 EL Zif L /M /E0 I60 /40 /30 /^0 // 100 90 .1 70 60 50 40 30 © /7 0 /7 © 40 40 97 90 70 80 9) 100 110 120 /=0 DENOTES IMPACTS IN % DENOTES IMPIO.CTS IN spp x• o sr loo �''`',7 n xo I xx24o. / SURFACE WATER //� SURFACE WATER 1��lC` P� xo. (POND) II SCALE:1^=100' rD mE SITE 2 DENOTES TEMPORARY s o /� �T h / E rD // IMPACTS IN SURFACE WATER�R� DENOTES EXXI AVATION "to 9e `""xee. Exa�xew /. //// IN WE, ND +oTO E�'De\ ///)/ DENOTES FILL IN ('!� ���RT 1al, WETLAND 2,n DENOTES ECHANIZE[j//iy ShF p �Duxexr xm eoxafoenm nxu ..A �., � , DEraL a + + « + CLEAR NG / F?OC` Q _ I Sy II:: 8:noxeruRRaco=LI .*w�/��/ a voxrx // � e,•�,,,Ae:�yo; '14, n.,,+„YYro,r.w.msa, . �ae, �....�. ,�1 ; g - �. .f/I/�I,Ai � ',,\ x e /� ,r SPEC ar. m .4PERMIT DRAWING ole,•' �+ 2+, _-,o � L POT SrT S1a 10,00 1 a- SHEET 5 OF 38 -]TZ•4 ,[A eury o•m yy -YI6RPBx q SIa.IO+W La�. ' xsvens� /l/ jr® / anTxvco ' + CONE ENTERPRISES TER -YI6RPB-SC SYa.Il+8900 � 1, ,r ; oTCx sxoer.Lx nro. k oc �`di aPRW `�' 10 % die, o W; _ c _ ,�7 4 # �J .,� ,�,, 1 i! s a.ro66«n -AAS a �0 �r'gF' _ __ T— � s "w[�[o��"SITE lA x—_-'�. - _ 1I11 ., .. e _ ,,. i _- t. SITE 1 xownau xu YI6RPB- — wovs a, I I� .xTom w o I o l: - ' c 0 WE- p� ETIIARGEMEFI l IEX i; E, 6RP _ ,PLO�,Ex,r a — �-- R I x PR -°°_e w �0r +A`�.. �iiiH�/>��.FGl�� . _•� sseoc y o ,mhg•o _=— _\_ � -_/ 12 RI rK.�^uuse OTm ' ' - . P11 �! EE�L'VE'T' W [ ME PUE Ei IL 8 P eYe i I Y.i �-SRN-PC Sia.48+0154 E �P� PUE n'c/ \`~` CL sxP IR CONE ExrERPR SEE \ o t mg *uioivod'w �� ® i VY „� •,�Ts o�ox$P oEa eRr>xr vsv \ ^'^ i i t i+rom PP aiYs°o?o°is*wa xo o-eit x'« l"" _ e / �nnva.m „. \ sns U ex L-POT SIa.1086+0978-6I.W'RT- - I"" • xx -Yl6RPC-POT SIC.10+00.00 - - sx 0-2'2056D' Horn sraav+uo°o snai+o s L\i y } y * .., LJ paL 3x e i S 4 i i i t t i tyO(na aF+oo rope.p ,snq Lx syscw urtwLeass oncx nµDETnEL DITCH RIVEWA RADII= i t tx 1 1x u�Rs \ T scow srwion.m ra nw rxex.m-r-n DETAIL/ 'Mx ory�I.:;, —.. 1.74 OIED 0' } } } } } i ed° --ox ,_, Ux1 SHOWN'OTHERWISE Hpi `"., * •"o x wow nA x+ss ro srn ia+sa-nwA U OR-L-PROFILE SEE SHEET ET ..\ ROm na rnTe+as TO rnn.an+m FOR-L-PR FILE SE SEE SHE82 ET 119 i ream sraae.xo ro sra sv+m sx+- FOR -8116RRPC-PROFILE SEE SHEEET 11O DENOTES IMPACTS IN % DENOT T5 IN sp• x• o sQ' mo• '''+`15Bn xoo 2xZq o. SURFACE WATER ///� SURF E 1I��C` I, (POND) SCALE:1^=100' m I SITE 2 I / DENOTES TEMPORARY s o /� mE m 7�/•/ DENOTES EXI VATION /�SoC'" eh 4,/ E %// IMPACTS IN SURFACE WATER / IN WET AND yea 0010 E•«x.E. ,„��,,,,, E�'De\ ///y. DENOTES FILL IN q7 S�r��yl p �,'��• oO';41 / , , �E / WETLAND D�raL3 + + « + �16LEAyt 1H-NIZE/�ry F)sC �euxexr xor eoxaLoenm nxu SI ��pD it -tea .elf , frA•0 A " "xL.,. .;d � '�0 i�!/- , 4,.„ so, „o v„ \ ,.„To Sr f E • jvJ �1 '` •xPERMIT DRAWING? p/ �s3 s.�.� + qo �v, 1 SHEET 6 OF 38 . 4 'so -L POT S11.I086+36J1 �� 1' Y16RPB K {� ` �'\ mE TER NV SC SYa.Il+8900 ©fie � �/ *,; / 7fI. , �ro ',-/ea.v`" �-�� i yi/ 4-;i'-ep x of L, _ k� Il� o.N i �0�1« S''''- 1 00-'� I c srooar+9ln R°-- a-SA..w��w„aA+ at:� . �_�.s'�' bIs�'iF` .�J � . _ r 5 Ts so.roa6wsn m I 4 r f►1 _ ' --:-'�. sr - -" - _ 'r"�.zD`,, cic1. won���rr: ''A IL.:,- _ I� W! — r 1iv-.. ,— i:t_ -- 0'v" 'tea, - � P Exrr 00 1 — 0 ' ' [-NW- A__ __ .. R u I 1 w_ y,',R - o FU PIA o mE Pie e.:�— E1 Le ME PUF ti ��� ;,E;,- _^- P,I ,. SRla-PC s/o.aawisa E �P'� PUE ' "--N '1s I °�^ •"* CORE LxrERPR:Es m I mo %,,II IP®E : 1 s „� 0 9x$P 9L.RR..x,9E. / \ SPECIAL *. r I : man +0 SR, ... s n - i �2,1 s Ex L-POT sa.loa6+o9.rs-6r.cv Rr= "" m -Y16RPC-POT Sic.10,00.00 - sw 0=Z2056D' Horn nna9+0oio znwi+0s L\i i 1 3 t 1 1 3 .�i\9 LJ paL 32 e �� S 4 i i i t t i ty�nw aF+oo ropeDETAIL .p ,snq Lx y¢cw urtwLeasE oncx nµDEinEL 310 x RIVFNA RADII= i t tx 1 1x u�Rs \ mT ,row srwi0n.m r0 nw r0e2.m-r-n / '.. ory�L OIED 0' } } } } } i Led° ,_, IU11.5$5 071;OTHERWISE `"k * •ao^ "IX nn x+z9 ro srn ia+sa-naves n OR-l-PROFILE SEE SHEET B] ..\ Horn nw r0,e.a2 r0 r0n.a0+x FOR dR13-PROFILE SEE SHEET 119 E. ,rom Srwm+20 70 5,39+m sxa- \ FOR -Y816RRPC-PROFILE SEE SHEEET 110 7r 25'12.5' 0 25' 50' 7%*97 - -- DENOTES IMPACTS IN �1-598„6B�E� //C/ DENOTES FILL IN // SURFACE WATER SCALE:I"=50' M''y WETLAND (POND) WDENOTES IMPACTS IN e SURFACE WATER 9 DENOTES TEMPORARY SITE 2 2 //✓ //n,I IMPACTS IN SURFACE WATER co Nr DENOTES EXCAVATION RN -� OMEN IN WETLAND �.�...�„ .2I 11.7. ..Ail SIONATURE*COMPLETED H � P • P • P • P P • P • P • P • P P � „e DENOTES MECHANIZED M O -� PERMIT DRAWING CLEARING _ p p p p p p p p p p p ,�^ tr SHEET 7 OF 38 J J� P • P • P • P . . P • P • P • P • P P CULTIVATED M I I MECHANIZE? P P P P P P P P P P P P P P 1 CLEARIN!, a, O P P P P P P P P P P P P ✓\ + • F P P P P P P P P P P P P H� H� r- Ln O \ P P r � P P P P P P P 0 . V. P P P P P P P P P P P P M •ANIZ'• C NRIN. p P P P P P P y'�\ 0 P P P . /D P P P P P P TEMP IMPACTS \TO SURFACE WATER 'f' \ P •P P P P P P +y \ q. E -� P P P�P P P P CULTIVATED PUE PUE PUE �� 'a• �C►+��. p,11�v'�/// P P P • P P P P tr SITE 1 I W � ��^p��� v � _ e...,.—L t EXISTING liTERL3=_, G IMPACTS-TO R --, 48"RCP-IV G -- SURFACE WATER a 'S REMOVE HW EXCAVATION FILL IN WETLAND — - - O e W • IV IBX X X X X-X X X X 1 Y1 RI:NCHLE'SS INS I ALAI ION X X--SITE 1AX x X X REMOVE _! / 48"WELDED STEEL 10'BST SHLDR ¢ I-95 SBL 24'BST M • - 11"RCP-IV -�--_ — _ — 2 /-95 NBL 24'BST - FLOWABLE FILL -" 10'BST SHLDR . ;__ 0 PROI ri ESMC3 NO, SHEET no. 150 /40 /30 /20 / 100 9 00 70 60 50 40 30 30 /7 0 /7 27 39 40 50 97 70 00 97 /00 I47 /20 140 40 /50 PERMIT DRAWING SHEET 8 OF 38 • 'TE 9 97n fl$ 44+00.00 •57/ 905 E/CAVATION 3 Aso POO /90 190 43+50 Q0 0 m 3 00 G SITE 3 • CNC\NATION PIP 075 /9D /90 43+00 00 m m 3 005 — 20'1 /97 /90 42+50.00 m 2 xn 4. 42+00.00 if; m m -SR14- iii /40 /30 /20 /p 100 90 80 70 60 50 40 30 50 17 0 /7 E3 30 40 50 60 70 80 90 /00 MO /20 /30 /40 /50 \ t, Prvez...H.1 — a ,;04,-„ '3'a L. _ 4 d N.. SHEET'my a n 4 ¢.+dmara•, `�� . .`IQ � -s a a \) 3 b tl wadi_ win. ....n...________,,,„......_ -_____.„ ,,,,, _.____,—, ---i, \\x,v,,,t_r,„:„.„ , , 61 � v s F . 5 ----, ,,.‘ :- i ,� . s \\ -`^„.. �"' " 'i [_ .� .., �. i:f ...III ‘:4 .:. \ ' .4444,4 v = ;;;" -71 gym 1 ` 2r ;gyp ENLARGEMENT VIEW +° \ ®/ wmnxo w^hR EE SHEET 1p OF 38 gyp,° � SEE SHEET '.�d.. AYE f:XFFl,x w i',.' - - '2kwa ,, -` ,..�1- I. �� °ra, PERMIT Fie ►., "fit -M- �M - ✓ e I� a ..®outs ...V,\\*N., -7"Yr.r,..,,i 1,:i.,,,1 -%'Li 31 vli P*'hiM...4,, mil tophiob,. No ,.,,,,7,,,,,,5.°V. ,._„a,,,,..,<;•'"I.,..-4. . ,..\,4467:, �4 lit .- *_ ®,, i i a Wiffat‘i: _ -.,. _ __-,----=-7-_______,----- _ ,1,4i,'.i. 4 --._ -. '.-_-.--1-'-5.%-ii. ,.-t., .• ....lir 1 litilh„ '*,,, . -4, 1..--,ii--ahL-11..; '1,7,....*--- -------,4.7 - ,„--,-A,,. ,,,px, ---_, ..,it-4.,.,:,-,.--,-:---:,,,,,',,, i_--c-..... - %1.1.. -- --, ,.,, , ‘16.2.7":' -.-tail --- sire/ /S ,:� ;'7-' !* ' '="illti . _ __%__2 _-__.- --.. z,-4,-AN.*.- ,‘ 'T.-----------i________-.,-;-, ,,.,,-,.--7_._,-,--ri,-,----= .......,._,-17,-,-,-;--- .-..--1: ‘,„ ,,% %.„,„ . .. .„,,, .„, „,,„ _ ___„, , ,,,,,,_,.., ,,,_,.._,__* .%\_ ,____ _„,,,,.„...,..„,,,,. .,. ,.. , „,. „...„.„,....,,,,, ‘‘, _ .. , ..„ , , .,„ .,,,,,„,,,, , _.\‘. „..„.L.„ ,,,i,,,_ ___5,_ .„„;____ _ ,„,,,,. .,..„)„,„ „At:: ,,..„,, , , .. „., _ , , \\ ® L ,....^"."- r 4, �� �� : �� "/. �3fi _ .,, „., \\ ., ,„ Nf ~i � Y �_ % -. �, ENLARGEMENT O VIEW a +° t se \ \�y�l wmo l LVVA, n x5'1R.5ILJ.I��, �sruxvs� "'''rvo. �1-5986B�E SCALE:1"=5 E�ew... Me x.emeex O, ,0M1 DI \\ DOCUMENT NOT CONSIDERED FINAL \Y� ��� \.�� LL OF DEBRIS e F xxs ,4-' \ \ \\ \\ // \�Y.. w am .ffiL SPEC LAT V DITCH� � ;\ k \\ 0 // PERMIT DRAWINGp SEE DETAIL 1 Y\ �\ _�E \ SHEET 11 OF 38 H �\ BASE DITCH ,co ��,„ \\ �\ EEEB,�DETAIL 42 , ►� /H., W any -,+ \� ".SLOP07% �`i 11,„ \\`f\ EST.DT'S 16955 A �� \\7 REMOVE \\\ \\ SPEC.LAT.5'BASE DITCH %la,_ - IMPACTS TO .o s SURFACE WATER drii, SFF DFTAII 22 _ SIT // `-**. - 15" 'i \ �.� � '` .'!a 2 E S ECM A Z, iQ_ Q Q (1/ ' l L'�..' RAW�" S1/` �:" C a .• ,3�.��r. SITE 6 1� N _=11 IMPACTS TO o V EIR (/F _,119444 SURFACE WATER X Q __`NSW ry/\ ///C/ DENOTESWETLAND IN • TEMP IMPACTS • y/ TO SURFACE WATER ,\ pV$c © �,\\ / DENOTES IMPACTS IN ''''''''''-•.,,,. __=\\ // SURFACE WATER ,\ / DENOTES TEMPORARY �'' ' ��014* IMPACTS IN SURFACE WATER ����� A ''''''''kb'---7 �j/I�IIv i__ A PUE- �`/ PUE 'POE��QJE A LAT.4'BASE DITCH PUE\ PUE C. SEE DETAIL 16 _ if PR REFEREN SBELT o/.I-5883E R X-612 o. /50 /40 160 /20 /E 1F+ 9 80 70 6 50 40 30 80 /7 0 /7 a0 30 40 99 80 70 80 87 /00 03 /20 I 140 I 140 140 PERMIT DRAWING SHEET 12 OF 38 94n 94n 930 0.088 0080 \ '�' SITE 5 PRO �.� \\ 97n IMPACTS SURFACE__..,...ATEB n .......1- ______ ------------ �2�0/E�.3/7� 7 q� 70/7 25-+00 00 203.80 Pan 94n 94n 95n 11.080 0080 _ 750 } SIZE 6 921) I SIZE 5 ` 97n 4:1 \, _ PAPAL,Xi —StlRFACS WATER PIO 20E.94 y)20�1� 76/0 203 20 22/50.00 10 'a' 94n 940 93n P8) SIZE 5 97n ( ~_ SU'FACE WATER J/ _ _ — _— -- — _— �,, 20E.64 S 1� —_ — 9� 203.,E 2'+00.00 20.80 90, fl Yl6RPC- Lii 150 /40 160 /20 // Iq0 90 80 70 60 50 40 30 50 /7 0 /J 23 30 40 53 60 70 80 90 /00 /03 /20 130 /40 /50 '1-59173° watzera ma" :=:17:ar„=1,7z,z7vg. iD3ROvs CL STA12)4+833F,C116RPC SHEET- F 38 _ , 210 SITE 5 I 220 .8 210 200 2@48" INV IN-203.0 INV OUT=202.5 SLOPE-0.29% 173.1 zoo 100 0 100 200 I .. I �EiNLy������ �'@, Noisr/58T/rvo zxEz ro. DETNL u. #•'S .'zv[crnl "vn sae cx —Tot -- exe rveee xo we rv[[x L .I w.v,_msr arIll }m —rn•' srnatnrosw �Q -���x� , = x x 1..1111 �� �3'96_ _ .• y aP° DOCUMENT NOT CONSUMED — ou'ET 50' 2y 0 5P' 100'11 u slow REa _ Geormo.W rm UNLESS. Tu COMPLETES .+.o TO u+oo xF OTES IMPACT k^Y S..E.,..x.,.. ...xxxxHoxaan,Rr. 3�— 1('. � .o,. srn SCALE:1'=100' ,�,.,.,. T '1 � r. PERMIT DRAWING ®/� 'NOTE IMPACTS IN s IN SHEET 1' OF 38 TDE- \ // $URF WA R SU FACE WATER r �\ OTES TEMPORARY / W� PACTS IN SURFACE WATER DEN TES MECHANIZED I'w \ ro Ua.Ue •S'S•'• CLEARING AIL AMB PURL HE HERS //� / R DEN RAW IN I(/ -ETLAND f' #/� .RENTALS L �\2 Fin. � -- mew--o cx .oxRz aoHH , UF vxm /$ aLro.x v u a IIX .,,� vT . ,_ __.__ __ w s_avxnc. o erP xx, I o„ .,W RX,x mx,w o .._...... — cam- - — — - — _ — — _ iv i YN 66 + : i — T F10 I - • I —5R15 ". x, - ' _ R 4-. RS` � . _ i P .iil = l i...� is i' \\ ®rliA oa u ck p� '/ry/ •�� //T '�f: Q 'I /,4"/ 711,,,,, � vu[ ^•`..... .v FUE'IYIT{ I a E u "-;� ` u ONNL.o/ ` /Q/IEsr..zrcr cuue euHLNE HUBS z �`� . - vets \� P \ —mkt, arrow 5 M ® TOE : a a E - m _ / Il ✓I DAWN cx.RLLs.Rea mm: �I I Q a / PH TA SWIM e.HOH..sxx s.HER.nsxxwTx ooR s sLwcu I — J/ "'ITV"' mT \\\ o -SR'S-PT S1a.33+5421 / \ curs'"" II C� I \ iii mu / ! I / NOTE:DRIVEWAY RADII= 10' I .„„„„„„„,,,,_. HiFOR{-PROFILE SEE SHEET Bd NOUNLESS SHOWN OTHERWISE ��FO0.dR15-PROFILE SEF SXEET 120 6 121 I TRU sysaA,DETNL LETETZ.Tw I YE'6Fx�F '' 6• r RN ° ; -------—=J rwisrrveee8n xxo. sxc rvssv o. rt u eG III •., ti r —u — <z A - .� ; , 2 .�/ — ° - — �.- o f d x- v s., u�:as":"iR"�oN:ru CONSOMME ;l £��Y. L ✓ .. • .ro L•' o , ' Y tR/ IT DRAWING? / cg I /%/��"",��+ N IN �% y OTES IMPACTS IN ET 15 OF 38 F i� \ / /PL %I��, A R VA sS,..CE WATER = eV ' 0,n L. d cR P.9�n) i '. �' OTES bTE RARY r +y �'' 7 1.. , CUD LMe r 44, •�R PACTS IN SU•'FACE R ER DEN Q LEM'ING NIZED MLA.euR � :r. ' 7AL, Xa G ,`� Mr s Lx�bERR �/ 1 i �i— f, �� ®/�� DENv FILL IN _ ������ LY n D ETLAND FIL c . • r ° _ -- — _ . .„o n 0 161_.� _ --- c .�!� .. in ::� z -- o Ir- _�" s r nigwri ce a - : � i is 0J -000, .., __BURL... , I ,_, ,, kk ..R C DAWN . CHARLES NEW °R'� ✓ I ——Fes`/ s s yEra,�1S cx g S.NxR.nsxx sauoR<nsxxoxix \\\ o 12' ck rk -SRIS-PT SYa.33+5421 / ��.� - \ cvnz awuzx � Ii---------------------------_ \— mu / 1 /UV NOTE:DRIVEWAY RADII- . FOR{-PROFILE SEE SHEET Bd UNLESS SHOWN OTHERWISE ��FO0.SR15-PROFILE SEF SHEET 120 6 121 _ Yodzd PROJ49867 NO I SHEET no. PERMIT DRAWING SHEET 16 OF 38 200 110 II 100 200 C ST 11'8 15 L- •L S A 2+:8 Rl• 2E066 W Idel St el '@6" el•ed to I SITE 8 SK =:0 •E =94 D G L LE =2.8.6 C EL =22813 240 CL I 31 NO L 230 1 SKEW D '�'ii. ..tli{� / tMLED IIW ba ORMA • 6:1 S 2 � 111 I A IL OI' PRO niTru IX T MAT x . L ' kXISIIN(i 24"RLP 220 ' '^RAF v Kr_�REMOVE +/-12 LF ��NWSE AND WSE `I!!!!� II�III i ------:--1 — ON b 27 18-21 SE • p I _ -- C C LV:RT NV ELE =15..3 N SE ND SE 210 PROP FD 0 •27-18=216 6 ,y0 DENOTES IMPACTS IN • • • * DENOTES MECHANIZED PERMIT DRAWING "D E.Bnno gGlxrpina �j' SURFACE WATER II •••`••• CLEARING SHEET 17 OF 38 %�✓// DENOTES TEMPOR,R�RY //�� DENOTES FILL IN 2p�\ 1//. IMPACTS IN SURFCE WATER y� WETLAND N�8 i �Sp• s• o sQ• 100• ,(.////� DENOTES EXCAVATION /" IN WETLAND �R��R� FINAL I xxc PROPERTIES uc SCALE:1"=100' DOCUMEED ...,�.,.Au MOT AR�RRRe� -L-ST Sta.118T+9/59 N e'er^'I F {1 -L-POT SlT.lSta..100 0 6I.00'LT= -Y/1RPB-ST Sta.IO+Ltl00\ cr.?, srcc. -5R16-PT Ste.57+07.06 see oHUL.- —SRl6-PC Ste 60+9gg9 Qfn� � �icnnc ,nxT SITE 1 9 I L*CS Ste.//86+9359 au *I o ow vUe -��\ q-i RIF orue* * * v d ruF'Pu 1 PUF rue rue vuFo * c, u ���, %�JI � i/4 so L Ber . .�A _ -_'� .yr — � 11 . _. Em 61 Mt im F,S x—x—x _ + -YIIRPR- —I,.oVe „wea _: .. heow o,E Fn o� RP_r in if roe ��� a _. , to A. �„�\ c * woo* * * Ins ©_ e�enrr.. - a7 "' F �\�6 PIA ruesxc:Ee'',v,�. wF JIMMY I te8891r ff�>„°2" „ sa� Hei * T_C * 1 1 I -SRlS-PT Ste.93+6993 \ s o Hnr BAREFOOT * * * * * * * * -SRIS-PRC 5/a.88W3T2 �Al ailr-wu I, /eecrc MECH w+goo.wF cnnnreLLI I B II' -L-POT Ste.1188+16OT-6100'RT= \ — #-� -Yl1RPC-POT Sla.I0+0000 HiLORFU Tax* } 4-3'56'S9A' ARE PROPERTIES uG!I ,s.r rsuL III e[x,ou nxo sore wxn PROPERTIES LLc e n s s. STA..w,a .,..,oRS-LT III D�J DETAIL iJ w TAILs89 air <.'sou i% -It .' --� � Na ‘ i FO0.-L-PROFILE SEF SXEEi 86 3 z=omx zR. 4,,,.®.a on n NOTE:DRNEWAY RADII= 10' OR S115-PROFILE SEE SHEET 122 8 12 FOR SUS-PROFILE SEE SHEET 125 »• s rwu s*ee..z ro srn.ve.ao MY n, vz+es sHs w IESS SHOWN OTHERWISE FOR-1 117 RP8--PROFILE SEE SHEET 115 DENOTES IMPACTS IN * * * * DENOTES MECHANIZED PERMIT DRAWING "DE.Bnx o �G1NF lx� SURFACE WATER II '�*** CLEARING SHEET 18 OF 38 %�✓// DENOTES TEMPORAIRY //�� DENOTES FILL IN pi1 �/" IMPACTS IN SURF CE WATER A WETLAND N�8 �Sp• s• o s• ioo• �.///� DENOTES EXCAVATION /" IN WETLAND 62i(1 �� UMENT SID NMI I xxc PROPERTIES uc SCALE:1"=100 Y..,M NO IL SIONATUvs ems -L-ST S/a.Il8l+9/59 N e'�^•I E {S -L-POT Slo.ll9/+3OJI-6I.00'LT= Maga -V/1RPB-ST S.l0+0000 srcc. see 0nue. -..-J ).T F).. & /\ryF)/�s TA�s-r 1 �— • % ! IDS / /( -}(//S' �� ® �'* �*L*CS Sia. =.+9359 t , fie" t J' h,'q 1,IIN" o V l III �,�^, FUF (� it / J *i ,\�din [ vU wE d PUEll'4 P. '-'. - o'a - o e0uo p �e. V'rl'PbPUF .E E 13, 'd a Ug tr 5 n � e f7lf � r7rfs�zTr '�' V sr '�i Is2 c°1" a��ea Mrr N L g a.=-- _.. _ A - z,-- .=. u�_��rr n ,©W.�. RrcpT<� .mom , omo'a�M 1 � F- n.. • ` 3 ,F U E :r — \."4 * FA ma,. w ff oenz2 1 -./ a 93i6993 \ ; * . * *'a* L - ' J --/Nry \.a Y3 O * I13/ "/ RC Ste 88W 2 L �II .4, ' s " j - E St.n:f 66 6/AO"RT lj • ® � x.x ' Li] Y'RPC E o I0+0000— uN 3a -EuC •356'59A' I% I t./ I \" SEXTON a ..CUM FAOFEVTES u: ® I'l (J,_`'� i ((�l a':J" EITY61:01116.1711 I FOR-L-PROFILE SEE SHEET 86 / FROM Srnee..s..9.30-NI R3 � NOlE:3DRNEWNY DEI EU. FOR-SR15-PROM"'�90.=Y1)RPC-PER�FIIEE SEENS EET HEET I15133 «. s lE / ..t Fao/.R I-5EFER883F EN N o. SREE. X 5570. Pof /70 /60 I50 /40 /30 /20 /F 100 N •F 70 60 BO 40 0 50 /7 0 /7 23 .'b 40 97 00 70 80 'l7 /00 /4) 140 /30 PERMIT DRAWING SIE„ SHEET 19 OF 38 260 c 0. o 2 a 2 4 250 a 3b Fl IN WETLAND - - - r i ,.020 0.020 0.02E "44 O.B^i m5 2 33 _�. °:7 54 _ i —� �� . ` 9qn 238.13 3/84+50.00 960 7 P 8 R1403 950 FILL IN WETLAND .02 n.0.020 .. . 5 n ms e 298.28 `��/ 24(.83 ___ -\ '/84/000C 9 fl70 g -f q 060 IC fl 915,3 8 F 5 D53 FILL IN WETLAND 4,5 .020 MOTO OA, 8925 ,:;i3 OA:S D935 ry d 9R. _ L�� 0411 T 238, ���� 24 25 ����—i—\ l/83/50,00 9 230 &fa D60 SHEETI +I fl 9812 F4 t5 I 250 FILL IN WETLAND �QQ 1,.025 0.020 0025 0-025 .iti --0.025 0.025 ry 2 84 ems- _--� -_ - 040 —— -— 9f!S -- 238.81 ��� �_� '''`,__ iii ,l83+0000 Z ➢0 230 IT L Lii /70 /60 /50 /40 /30 /^0 // 100 90 .T 70 60 50 40 .30 50 1) 0 /7 50 30 40 510 40 70 30 .20 100 /0) 120 /30 10 Fao/ITV No X—mD70 N.I-5883 4 /50 /40 /30 /20 /F 100 90 80 70 60 50 40 30 30 /7 0 /7 a0 20 40 03 60 70 87 97 /00 /70 /20 140 40 140 PERMIT DRAWING SHEET 20 OF 38 n 97n T 700 2 I snE C7 <0y 250 'q 0.020 0.220 —FILL N WEMN• _______ ---__---—— Lr o 87+83 R9 230 n 97n P60 2 v nye L3 n50 1j 0.020 0.y20 —A -A—FI.L IN WEI AND ___--_-- — ----�� —I--_---- I— —�`_ l\ — '40 o R7+3:3 49 0sn n PM 060 o g <g�L&, 3 I SITE l .050 s 3iy;, 0 020 0.)30 L =0L W WTLAND q , —------ --- —------- I— 1:! I 940 za1 v n 86+83,09 van in -SP/5 150 /40 /30 /20 /2 100 90 00 70 60 50 40 30 0 17 0 /7 40 30 40 50 60 70 87 97 /00 /03 120 00 /40 /50 u / ..°.:a te KyA °°duKN..° /l ,. / Ir.-art=1 / .... .Aa..m. IS S G Mi5 OFE384a..a � - Imo•'''' ®0.. . "•.••••ll ', "" PERMR DRAWIlim NG „ ," 8 �`a aw\ J / SHEET 2l OF 88 _ SEE SHE .� �•'. P ce i, f ®/ I' ENIAHEET 23 ° I 1f "-© u/�M/ / /J-_j -m \MIS 3 y` ^° /= i /i i 1,0 \\, ;tee " 1- SEE SHEET 24 OF 38 ��• `�' a L — ., `J I _ gr ii , ,7,7r; ,;:y.,,,,7,::, -------__ - ,___. : ' '7 / 007;4---0,..., _-_-..illilLifi"--4--.."- oh----------------- I__ r ,',-, -,,,,, ,,,, . _,, ;„,,,,_,,,,„--. ...„„.„-_,2„,. ,, , ...„14 opej.,....--,.. .ra W-0,40,71y, 1 n II FNIARGEMENT VI . 1O. Lin ,� ' /, \ J\ SEE SHEET 29 OF a8 ` Y" �Y...".yam \ / I I o, � 5 g2 / a' / A gyp, u �/ _ \ i ' w:ys.. .HISNko �Po NHS Vo. ,ti.m y5! °Fracas•s°xrnrv,„„..6Ll.i.. a e° _+IF A�j-4. �.Va "Q .��� r l '/6y3'/f yam„•a �� ENuxG6+.ENr h I �� ► '' _ / - ISEE SHEET 5 OF L RGC ,.' `y' I y��/' e'0$ Mr DAAyWING T �I. G i , v�� / If SHEET 3l OF.AH /.,/li li ..°�""�— ENIARGE�T�EW_ 1 S�J � _� /:.�'"� �\ � —M/ II SEE SHEEP __.// �F/ � (� ra 1 b� �~ �� __ _ L it b - - — n�"' _-- _ — 111 . Isw — ! r,41 ors ®a, \\ //�" ®0 °7". N hall:4- 4411,1)A- '''''',,, /50' /_ --- il I� dJ '' < —\ �,A ��,s�wi I \FNWRGEMENT VI$ — �.:� _ i/ / ��µ�._ _ _ 5\ zv of a991 I EE SHEET \ - / r ` 9;11: ' : TT E - 7-5979Ce "'''ro. DENOTES ACE WATERTS IN SURF I TICOMPeLa 6 PLANS i5'1]�5' 0 5' 5Q' /// ����� i 10„ DENOTES TEMPORARY SCALE.1"-50' COOOLUMENT MOT COMMAND MAL IMPACTS IN SURFACE WATER OMEN All SIONATURES COMPLETED PERMIT DRAWING iy M SHEET 23 OF 38 HW HW pk! OW OW NTEMPORARY IMPACTS UE I I N IN SURFACnE WATER p I I I I mg E N �o pQ0HHG p� Q � ~OQ PROPERTIES LLCo 1DE�O pV 2 C3\ m M U M SITE 12 pUE SR16 I \ F— SPEC.DITCH 2 Ca ^ BASE DITCH "'---"""��\ pUE SEE DETAIL 4 el N E—D 4a ""ACTS IN �y�� I_• =i1 .u„,A�1RFACE WATER _IA003Pro4,1,t' s9Y ' -•- Eo v _ p,TN REMOVE tEIP x T • T •IiC til'tie5.6 PVC REMOVE p -Yl7RP8- TRENCHLESS INSTALLATION \, j FLOWABLE FILL ------42"WELDED STEEL - r. -- ---- — T GI-A - �— - ___., 2GI-A 42"RCP-IV MIr di \p2'1q —TRENCHLESSINSTALLATION ---- 42"WELDEDED STEEL ». .— - - - _--_ --SPECIAL DETAIL 9868 v eno n m _Y17RP8_ ." c"... x.smeex -- - J _ _____ ,,,,...,0 ,...-, � Jv"=— "' py®LEE�S i�1SS�FLOWABLE FILL _`------ SCALE 1"=50 M N DOCUMEMI I-W W 42"RCP-V 2(,1 — - .�iaiax.'�s's COMPLETED o - — — e �.[....F.., .L SL I_ I 2GI-A 42"RCP-IV PERMIT DRAWING SHEET 24 OF 33 1 I o o O O ------- ------ --SPECIAL DETAIL _-- c - •.. .. + K_'MIN DEPTH TYPE'h" P') 2GI A' �.� ITEM _ _ ~R V CMP(BU IEDJ __-_ \` \ �y/7R/j�\ " H �� ' H �1' _,fit.. w,_ AA, 1 0 0 \ CL B RIPRAP I / -@- ��: V AkW LI— H EST 2 TONS • k.`\\ \ E PUE EST 7 SY GFI SPEC.CUT DIXLHA -� - A \\ �, SEE DETAIL/33 > EI _-_ n C) U°'X e I PUE t \\ I SUE X� ` 5 C.CUT DITCH I /\ /, 11 .* P SEE DETAIL 33 I / \SSPEC.LA. i i m A 1 4r P(j \\ —VL DITCH ii/ a `PUP_ I •G. F\ \�_- _,-------- LC) SEE DET\IL 32 // y. ———"/ MECHANIZED CLEAR G �'^ \\BENT01 AND rx x x`_ PUF \SONS RUNN X PROPERTIESXLLC �\ X �ss__ • • • • DENOTCLEARINED �.� F..,. I I SANITARY SEWER / ~ LIFT STATION __ lo^ e �r///A DENOTES EXCAVATION S I LC I I X PVC /- IN WETLAND N. X 111, 1 n X s ro DENpTE&FILL IN .I et. �.� �e WETLAA6 A '- n Lx I- X X \\ k I _ X I�� LA. I 1I II i I c:IIIIII:IIII::3 I _�$EE I I OVES TRAVEL STOPS INC / 1 I / / 1 rat I 1 / / I rog — / % Jp ` ]5'1]5�P �1-59lOW. .O. zxzn rv0. �� SCALE Y=50' zO 'cw ne«ez. mz«°O�ix°iix" `1'�``Q, i^vS A II lv `\\ Q� g 1 ox�o.®P�8T6 PLPL�S \\� NPo 1 SPEC.LAT.V DITCH I I \\� SEE DETAIL 1 A \� A xx xor eaxaoaao nxu //)/ DENOTES FILL IN I I TAIL DITCH QF '�wNe^u aiaxs a:sews«o WETLAND I EST.DDE ITV F �� 'ea°''- °J= I cmi I SEE DETAIL 28 """°"'`�""'^'m ``'"`°`� v�1ED n I SLOPE = 0.45% Y PERMIT DRAWING /O TdP/ m I 111, SHEET 25 OF 38 DRAIN AO�, A OVB o �� �F / O POND........................................ w—HW OVE / 1 c ok)t SITE 14 WW 5Rj6, FILL IN WETLAND Vy j TOTAL TAKE \e i CDCOL1Np'f EO e�� �o / O ,, e's 0 c , r t � /- SPEC,LAT.3'BASE DITCH _ fi� SEE DETAIL 5 r T. B 2GI is .�. WOODS P/� PROJ.PEFEREN N SHED I-5883E k-moo. 150 /40 /30 /20 I/O 100 90 80 70 6 50 40 30 50 II 0 II 27 39 40 97 97 70 80 92 /00 hip I /20 140 140 /50 PESHEETRMIT 26 DRAOF 38WING O. 2 '' 93 I SITE 13 I 2 50 6./31 0.08) onnn EXCAVATION 9 �__�r —___ - —ram \62.,_ =— 2, 239.31 23830 /8+`3.00 Py o 260 a (/r4 . \94) fly fl50 EXCAVATION 246.59 238 Is • .I/ Py .0 °zg 260 BITE 13I fl Vi ,50 EXCAVATION A— O 00 3 7I,0 FI1 IN WEILAND ——_— ———_ �— 6: -=�3— P40 -----— 241 33 '— 17t33.00 ,m 7, 2� 260 fl I fl50 OA, 0940 v-. a: — — -- ----24n Z'` 16+83.00 9.(! 230 MI -Y17RPC- /50 /40 /30 /20 /10 /00 90 80 70 60 50 40 30 0 lI 0 /3 23 30 40 90 60 70 80 90 /00 /8) 120 /30 /40 /50 : 7_77.00 77 DET136 AIL 35 DETAIL I DETAIL 24 SCALE 1"=100 \ re WcSIPI,M!WA li SEA.1995 FAAILI LTD A. . D O. EAF. ''''''""+"'"""''' FROM STA 3,00 TO STA 36,1 OW RT FROM STA 1220.35 TO STA Z13•00 4.a DETAIL 36 DETAIL 40 DOLOMENT NOT CONSIDERED MN. MILE.ALL SIONATURES COMPLETED 1 n—TOF TOE-, wa-.65 ,. .„... DRAWING SITE 17 N -- R SHEET 27 OF 38 t; o,e • ---7 ___- -___,-- ,—. \ -c-r -,!,,,,,..,:--- ,._.,—_--_-_=-----, 7---, _-!---,,,— \\\ „, e ----F,w_vs,-pszgo-T, (77 . , ,____ ( - ,.. •r.oge,-------- i MA D 10 Ft \\ 5'3 ....,<,'\.,.V...--,"..-.--' 4. ":1°,1' --- •,..-741 - 4,,----Ve _ c c _ 7 10.02. _y A ,,,_,. . ..._, _______ . . ROAM.F LE A IIIIIMIUMWEJ, MM -----,.m--1111 -- I. * —-- .. „,. — ----- -- : i 5',CP,' -IW .111Maliarn. .e..... 1 . I I t ___LL W"'" —— 93.2•1157 MM10.1111.11a1.1.11,' . ..1.117M1--f TIT x , ct __ __ g-11,v.....0 NW NI:I I.,MO f-7.1 *-B li•i=I M el I IWr is I 0 NI II is II II I I I ris II 1 WIN---. — - -. -- --- - •-- .. r-."- "6."--- A.F.,,m.„-?,, ._ . Negastgo°11.111pv.-- - . . -til I— '' ,,,, .__________— 41-,—-- --_ _ , ka 1111 °' I UE PUE SEE SKA: FUE PUE 181/ POE FUE PUE _Oa s,c,DE, 51EE iirryire," t :..i.16 -5RI7-PT Sic Id DENOTES 17..!.. DENOTES IMPACTS'614''' SIT 16 LK sr210:11Y, \ - 14/ SURFACE WATER — I 6r6V:rn/ DETAIL 80 DETAIL 50 (POND) DETAIL 46 \ 10BIN VOLLEY IMOD I °AVERT..C.......... ,rEEIVEZ: 'M.ECA'''.:E'AE7°A;.°N ,y//i,/ DEN,„.11,EITISAr41115L IN .„,,,,,,,, 1,-k'I . ,...., —1 ,/01/ DENOTES IMPACTS IN I Err" \ ,...... i 1 I I (...111. 7,' 0,4 STA.1330,1E L RT 04 TEOrre%1 i 1 TEA 1.; ENLARGEMENT VIEW \ SURFACE WATER DENOTES TEMPORARY 8 17//s /i IMPACTS IN SURFACE WATER V er, SEE SHEET 29 OF 38 hfc' \ ra \ UNI'jirl'ESSDSRHOWANVORATH'EU ED- 1 FOR-L-PROFILE SEE SHEET 87 hi FOR-O7RPA-PROFILE SEE SHEET 113 FOR-SRI,PROFILE SEE SHEET 127 F'''50' 2�5' 0 50' 100'\ 1F58T1 N No sxe5ro. kW s DETAIL 24 s cDETAIL 35 umxAIL 4 ® \ 'I unr.N=� oGRauFFa sesE loss FAILS LTD - © .-.4. :.. ..,A T. R6E0 B 20TT I rxwA nA ssro To nAro'-'S.' srS DETAIL 36 R PROM STA.3S.nn TO STA.se.0-SR1T-RT snc FROM STA.1220.ss TO A 223.00 L.a DETAIL 40 DOLOMENT NOT CONSIDERED MN. MILE.ALL SIONATURES COMPLETED p djrr JO 1� --j•PERMIT DRAWING �{I 0 ,O/�Ia _ ® c. ,. R- SHEET 28 OF 38 t<4 AV • elT_RT DDND<TD 9 00TO L a r, 1 Oil( ') 1 1 ..ate. .. ,�- is / i �1 I ` �i L-Po srolzzr+lsaa "loo'lr�' / DETAIL a 1� a id ,I �. - _rnrrva aor o°:r°si'°°20' / "_/ .� ry � 5,�. 1 / _�� \\ u _ W �'' S ,Rar.n.,�1NTo n.�TTT.DN y,. 1\ o i u� 1 A 1 o= —_ - ei� R F - _ � • �.�� m •�. �ifi .F,: !•tea--�n�«, ,ta91 '6- ,v. '�,s� •��� tie s e E He W ue 1 �7 E `'M o rue rue FUE I �4� 2R,„ro o ,: �e o I -�'I^ -SRO-PT sheq� Ns SA INC L�TDE mE °= n .!'... 8 ///� DENOTES IMPACTSDDII uo SIT'16 LNR sr \ `""' `""' /P SURFACE WATER I qI .NinEY HD OD a Ns.eRT, DETAIL a9 NL.T o p DETAIL 50 (POND) DETAIL 0 CHANNEL STABILIZATION s M.I 181� \ ,//� DENOTES FILL IN WETLAND .tlo^o SFa-I=- MIII Po m u,. "n.,T,N.TP..T "Lw �.µ nA a:o«=URT a•w ///// DENOTES IMPACTS IN -`� I ^-° SURFACE WATER ow:�� i"v D °• z°v e ENLARGEMENT VIEW °""-°'T SEE SHEET 29 OF 38 ° \ 1//. DENOTES TEMPORARY s-oxER j \ /, IMPACTS IN SURFACE WATER Q ». \ NOTE:oRlvexA RADIIRWISE= To• UNLESS SHOWNT OTHE FOR-L-PROFILE SEE SHEET 07 FOR-YIIRPA-PROFILE SEE SHEET 113 OR SR12-PROFILE SEE SHEET 127 -7 58]]xo. zxen xo. SCALE 1'=50• p14T®P�6TR PLPL�S NPR 3 _ PERMIT DRAWING �REMovE EMOVE__ ----' ---- — SHEET 29 OF 38 X_ _ x=X=X—--- SPEC.CUT DITCH SPEC.CUT 3'BASE DITC5H _ - X SEE DETAIL 24 SEE DETAIL X� x __----_- _ - 'tI rTi:- VA IAc_: E_D . - N 5 r^ .n: � r�'L __-_----.--_-0-_-_----,--,-.*----..--_-._.4$-_-*4--1'-/a0.-..,:i.r 0-O 1C1 1W V_--e'„-.--r-_*2.._-„_.-_--__-_*_-_4-_/1-_0*5?-_ "- s/-/- 4 _ ` 42"RCP-IV ���� 42 R P IV ��j\l►, -� ate' Cardr�`��%... P-P P ,.... 1 - :,-.4,,,, ,, % ' -, /A le ;11tOrr ,A441cyrojir r jett ''.',,,', ' ? r ' •Po --1.....,- Dutn O 1J4 0 ft\ ''.g ig `- • �i ► d O u, ` I— er x� 747-yixer �E d \ �� ROCK FILL IN POND O �(/� QVE ROBIN WHITLEY HOOD II /NE SEE DETAIL 52 OO I- \ R SITE 15 " 5D TONS =o �o G.---- NE Q110)350 CFSSRI]-LT DRAIN POND i_N ~Q P I L S1o.=29+50 SRl] VII0 2.3 FPS <^ ,c) gltol-_s(t s=0�=% F. FILL TO NATURAL GROUND M iEf10). ].0 Ft. =0.04 -YI7�'an.- �C�Sta.I OO N s=]65% Liner=WA / jy1^�'� Liner-Clan'B'Rip•p /' LAT.3'BASC DITCII / / W/CL B RIP RAP .A EST.394 TONS m EST.991 SY GF \ (/ SEE DETAIL 25 / l\ \ w s \ / \ \\ g r1 c-5986B-9868-30. I —— ROJOWNE DESIGN ENGINEER %MET 1Nz i pBra ma" PERMIT DRAWING SJ-IFFT 30 OF.'18 • 200 100 0 100 200 CL STA 1220+34. L- CL STA 3q+22-SR17- GP LE✓=234.4 GP ELEV= 231.6 SKEW=A7 DEGREES 207'X6'RCBC 250 • I SITE 18 4 240 77 : NORMAL GRAPE 10:1 NORMAL 0: SKEW 0. 3EVI LED HW i - 3:1 NORMAL 230 EX TB LT/RT - 3'.1 SKEWELI EX 36"COP/ EX TB RT �— =X 2R4E'RC' EX WS fir_ t7 -id -CX TB LT ——EX POND //IEX BED NWSE AND WSE 220 ON 6 22F 0 2@TX6'RCBC m l BuR/ hErcT 1 kX Bko / CL CULVERT INV 1 =273.13 PRO'OS D CHANN D J SLOPE-0.219% : =L A. iii al El iii I 5 ] 5 100 �� x rwisr/ T/xo. sxefl9°. Q i \ ///// DENOTES IMPACTS IN SCALE =too' ' � �o I _ 1L,Fz, x° FG1NF,, j/' SURFACE WATER —� „6 �Y� mF=V DETAIL qs // t^+ ..r)�`. 'y - I Q41 ®P�.97.PL I \ ' DENOTES TEMPORARY Y►NAo g 2on � IMPACTS IN SURFACE WAR ." Y srE DETAIL II ex II �n WALLACE CORE MILL ROM sr..ra.s°TO sran.so-no-LT sss D qrcx 7__iADErasL tt PTM .. •xiaiaxs"Hvs•Cm ��I"" �M 1 MEND asit o C FAO._<..,,.z° T.,.> no-„ p J OMEN PERMIT D o I1 DRAWING? Q ° ° ° SHEET 31 OF 38 Q ,T.,.m_no- d rl Horn kepi u ro..0 ro sT.ii'Jeo ra 'S• °1 P -r16-POT SYo.10+00Ltl x�x :Il 1- Ili BEGIN CONSTRUCTION v�n I. x_,,,, a>. �-- 0_ __ •. a -Y16-POT SIR.II+5000 q. �. - - 491 _2+m— jl l- a , , , 's wLw. �z,z.m ® .°n.i.z �© R- aTa Si F a fl a Q �1 k^ °""v 6-Pa Sta.12+35n= cone cxrewwses Nc {' Ia SITE 19I Ne` en �w0°°s mii �m1{Xy D 5R13 POT SI°.59+7056 7,i SRI3 PC Sl 59+1858 ` III s.e mruc °Hex / -SRO-PT Sta.5/+2240 i\ egi 1 4 i:i7" -DR2-POT S1a.10+00A0 ,//�R�,�'�'!� W ^l �, moos r .9: room j e �'� n,rn wmo zee o ,R i yy ENE wE 1R1 PATRICIA AMAN LIVING TRUST O W�� a �u,r w736 ;i 2 gym, m IA °x 9-1 tr xaaos 4 _ ‘ . I:rJ I ii n AMR.NORRS rt CONE ENTERPRISES INC CORE ENTERPRISES IOC _II' lIi ri � -OR2-PT Sta.1250777 I �� 147 PSI E � \ Ili iii \\` m RI i f _ F _ , -- END CONSTRUCTION i'-^ I, unRal snot -DR2-POT Sta.12+9/bl • - R iii -DR2-POT Sta.13+7777 E6+90A/ NOTE:DRIVEWAY RADII= to' MELON Lox \ �� m seee6aur i� a UNLESS SHOWN OTHERWISE rrt _''p . I 14 MATCH TO -Y16 POC Sta.17+50.00-SHEET 25 FOR-YI6-PROFILE SEE SHEET 107 a FOR S,Vr PROFILE SEE SHEET W, �FOR-DR2-PROFILE SFE SXEFT 129 / ^. 1_`R '.\ --.1 1 s• x• s• too d ,, �: . --xx cFro I —E5,r w / / i DENOTES IMPACTS IN SCALE: =100' —�° C i ' SURFACE WATER VC —\ w`X°``°� ""�"""� DETAIL ss �-- F` �� DENOTES TEMPORARY — #NA0 g 20TI 1'1 I nHww®Pawg PLEAS Y �. A IMPACTS IN SURFACE WA R �`�L �� -." x DETAIL It cn xuLa CORE cu cv ° a , ror FROM x.1,.,0To...1,..o„o-.T murED N ',a' it "I x�°ENOILSIO`°"REs�NMI J PERMIT DRAWING ° ° ° ° SNEET 32 OF 38 nA=ss n� ,� n -- ,dy1 -r16-PNr1 so.10+o0m �a°4+aa a i • } III / ^II ! BE IN CONSTRUCTION 11 � 4 6 POT$O.II+5000_ 1"m ill S, ^.x. +k«TERPR,Es x< 1 ,,A •�E .. x I \ _.;� 1! r "WA.Lc.P.RKER.,,. � kit. L I R 54+. PO � a I:h ;tail � SR6/3 PiPo eT s is z5+9s+sT0n5=6 r �1 .f I ee ..onex 1 -SR ; I -, v 1 i ► vow. #/ 3 - A [00000111 9ii,010,0, .7-i4;-"k1 ' ''''.i'''/‘ i -'Zi'-. --,,%4 "4 ii I 41-':'':,- --- IJi � '/ ��\ \ �'''.---*,,,,,,,„\,...„,,,. j �1�� y.va Ria R NORPIS �L LOVE ENTERPRISES / f ,! E E rc\3� '�� � L i 1 .._ MR - --L._ ll o..ax �j r x. 1 oL. r P I !a I I gII: = �� E% [ EOO CONST cnoN e °Y.._- �I ,.oL -ORz-POT SI..12+9/5/� 1 r` ` 'I � 4a�� -OR2-POT. 13+77 �' s _ „Ec,' NOTE:ouvFwnr R,.oll= o• j .XE /ox o S� / ,IFi ({{ y1I Iy /] I 'o iii IlNlE55 SHOWN OTHERWISE J z� ON / \ 1 I I / '\ f \ V a P ry . a rrt I MATCH TO -Y16-POC S1a.17+50.00-SHEET 25 -- raFOR-Y16-PROFILE SEE SHEET 107 Ir a FOR:Nt PMIE SEE SHEET 119 �FOR-OR2-PROFILE SFE SXEFT 129 '775;7 1 ,'2"' kW.2E7 740 56:210' ___ —1 \ --------\\ SCALE 1=100' ____--- 1 T,9212-91 11= \, \ __-------- _-_____— \\\ \ __--- \\\ ---- DOCUMENT MOT LOINSIMALO MAL OMEN OIL SIONATURE•commurED \ \ it\\\\ ------- \ \\ \ DETAIL 1 MITA47421''' 7-7-7„ il PERMIT DItAWING SHEET 33 OF 38 ROM 27A IA LOO 70 STA.21750-TS,a 71,0711-726-a ED ITAIL 9 DETAIL 32 PROPERTIES LLC AB LINDA\ EASL \ BEY \ ALA oAto„ .--—.\ . Al2 32 ESL DOE 8 CY -EE..., Sin 21 1 i _---- ila C7127007 1\ _.------- -- 0 _---- 'i4 CFPC-17----- P " •IA----_ M'OE'TAILv3r' Nr07121?'' 8 iiiiiel.--I 44.4711-020 .'-'...- :. - 9- ..IFF f, 4 - •• ''''''' . -, -''''''l li 1 g3E,,,,,„ .c, 1 \ EcieVrc" \ ------ .__,* . \ __---- 1 si-rE 2o 1 ' . nalaca \ \ \ \ \------- ' _------------------___------------- \ \ \ , , \ \ :.: DENOTES MECHANIZED \ \ \ /y/j/ DENOTES FILL IN '... ' WETLAND \ UNLESS SHOWN I FOR-024-PROFILE SEE SHEET DT \ I ' \ tlt \ \ hi \ hi -777 I 1 \ -7 - 56:2660i0 A SCALE 1" 100 kW SREET NO I \\\ \ \, \ _-________---- litl11:017,11= \Rt\\ °MIL 1 M"Pq.q.''''' il DOCUMENT NOT LONSIOMPLO POW OMEN OIL SIONATURE•commurED 7,:I I I Mi*I IMI:'MI 21.7777.71- :",`,'4'' 1,1 PERAAIT DRAWING ROM SWOT 00 70 STA 21 SO S26-a sr&3 s YTS-a SHEET 34 OF 38 \\\ —^T.k,!..'''''''' DETAIL 19 DETAIL 32 V...\___\ REF PROPERTIES LLC \ \ _L cm RR. \\ SB LB.BEASLEY BEG ST BES T 1 / T i, SHRLES LEE ---------___------- N0L0 ' ,,) t, ,,,,,,,,:( -------_---- ----_------ 7 MI'" —0•#4 PO ' ' .-- ,t,,Z___....:i 2 ad• " ' POE---_24 1 rac.. .. ---,,,--, . 'A ItipaolzaiyipA.- ,---0,„4".,,....„..., 7 ArA EARLEY LEE 2.v.. -, _.I'N N * , ---------' „ gb (.,- - s , —„, -A.N,„E„„,,,,,,,T 0R, oN ,Ks I SITE 20 I DORIS MLA. \ \ \ \ 0 _.------t -- -- ___------ ---' _.... \ \ \ \ \ ...«.. DENOTES MECHANIZED \R ... . REG /y// DENOTES FILL IN . iWETLAND \\ \ \ \ \ \ \ \ 2'1 rat \ \ l';'7:557==s-xisr I FOR-TR,PROFILE SEE SHEET 117 «9 \ \ Ei 150 /40 /30 /20 1 100 90 80 70 6 50 40 30 00 /7 0) /7 a) 50 40 53 60 70 90 97 /00 l �l F o/./4088i F 40 %054 PERMIT DRAWING SHEET 35 OF 38250 50 0.020 0.)20 240 — --- --- ---- --- 240 �� 24C.69 270 230 250 250 0.020 0.)20 240 —— 240 \� 24C.08 ��— /4-r 0.00 230 230 250 250 0.020 0.)20 _ ......._- 2Y.36 /4+C0.00Pr 750 SITE 21 3 N 250 250 FIII IN WETLAND 0.020 0.)20 240 — 200 -- — ---- 231.?S 2$0 /3+.G 0.00 230 50 250 SITE 21 FIL IN WFnANO��II F U.IN WE JANN SITE 20 2� IX AVMION 0.020 0.)¢0 210 PA 2q0 13+00.00 230 -Y26— Lii l50 /40 /30 /20 / 100 90 80 70 60 50 40 30 50 17 0 /7 43 30 40 5 60 70 80 90 /00 /23 120 /30 /40 /50 WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I E SURFACE WA I ER IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design _ (ac) (ac) (ac) (ac) (ac) (ac) (ac) (It) (It) (ft) 1 1075+91 to 1076+34-L-LT 2 AT 48"PIPES 0.001 0.003 0.007 0.003 0.001 43 15 1A 1076+60 to 1077+41-L-LT DRAINAGE DITCH 0.020 0.006 0.001 2 1075+92 to 1081+72-L-LT POND 2.950 3 41+32 to44+84-SR14-RT DRAINAGE DITCH 0.060 0.050 4 44+86 to 48+09-SR13- ROADWAY FILL 0.050 0.001 321 8 5 21+85 to 22+21-Yt6RPC- ROADWAY FILL 0.030 248 22+21 to 24+03-Y16RPC-RT OUTLET CHANNEL 0.003 0.002 27 21 6 24+21 to 24+83-Y16RPC-LT ROADWAY FILL 0.020 7 1127+08 to 1129+43-L-LT POND 0.200 2 AT 66"PIPE 0.100 8 1128+33-L-RT ROADWAY FILL 0.002 0.001 12 14 1129+35 to 1130+03-L-RT ROADWAY FILL 0.004 53 9 1132+67 to 1132+90-L-RT ROADWAY FILL 0.004 41 TOTALS`: 0.041 0.000 0.069 0.058 0.000 3.346 0.005 745 i 58 0 'Hounded totals am sum of actual impacts NOTES: Site 6:Wetland Total Take NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04-20-2020(Rev) HARNETT COUNTY 1-5883 53083.1.1 leGsee zoierw SHEET 36 OF 38 WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I E SURFACE WA I EH IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 10 1180+80 to 1182+98-L-RT 2 AT 48"PIPE 0.040 0.070 1183+40 to 1183+72-L-RT OUTLET CHANNEL 0.070 0.003 0.002 20 10 11 1182+35 to 1185+15-L-LT 2 AT 48"PIPE 0.110 0.060 12 64+09 to 64+34-SR16- 54"PIPE 0.008 69 OUTLET CHANNEL 0.002 0.002 16 12 13 17+23 to 19+17-Y17RPC-RT 42"PIPE 0.002 0.040 0.040 14 24+28 to 24+55-Y17RPB-LT ROADWAY FILL 0.008 15 30+73 to 33+56-SR17- POND 0.760 16 34+02 to 34+89-SR17-RT ROCK FILL IN POND 0.100 17 10+45 to 11+82-Y17RPA-RT POND 0.490 _ 18 1220+34-L- 2 AT 7'x6'RCBC 0.020 37 1219+97 to 1220+81-L-LT INLET CHANNEL 0.094 0.009 26 1220+35 to 1220+55-L-RT OUTLET CHANNEL 0.009 0.006 31 15 TOTALS`: 0.254 0.000 0.110 0.170 0.000 1.401 0.010 199 37 0 'Rounded totals are sum of actual impacts NOTES: Site 14:Wetland Total Take NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04-20-2020(Rev) HARNETT COUNTY I-5883 53083.1.1 IRA..mierw SHEET 37 OF 38 WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I E SURFACE WA I EH IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (It) (ft)_ 19 53+56 to 54+86-SR13- 54"PIPE 0.007 0.002 100 22 53+56 to 53+89-SR13-LT OUTLET CHANNEL 0.001 0.002 18 16 20 12+67 to 13+62-Y26-RT 2 at 42"PIPE 0.030 0.011 _ 21 12+72 to 13+54-Y26- 2 at 42"PIPE 0.040 0.010 13+05 to 13+18-Y26-LT OUTLET CHANNEL 0.008 0.033 12+72 to 13+54-Y26-LT DRAINAGE DITCH 0.020 ---------- TOTALS THIS PAGE 0.070 0.000 0.038 0.044 0.000 0.008 0.004 118 38 TOTALS SHEET 36 0.041 0.000 0.069 0.058 0.000 3.346 0.005 745 58 0 TOTALS SHEET37 0.254 0.000 0.110 0.170 0.000 1.401 0.010 199 37 0 TOTALS`: 0.365 0.000 0.217 0.272 0.000 4.755 I 0.019 1062 133 0 'Rounded totals are sum of actual impacts NOTES: Site 18:Wetland Total Take NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04-20-2020(Rev) HARNETT COUNTY I-5883 53083.1.1 leAeeezoierw SHEET 38 OF 38 See sheet IA Far Index of sheets STATE OF NORTH CAROLINA PERMIT DRAWING N.C. 1-5883 1 See sheet le For Conventional Symbols SHEET 1 OF 11 , . / DIVISION OF HIGHWAYS ..,.__ .. - S /14,11,,,, 53083.1.1 NHPP-00951033174 P.E. J -% � ,. HARNETT COUNTY53083.].] NHPP-00 9 510 3 317 6 RrJI 8 UIIL. a &( END P'•Jk100 1-5883tril v'- I; ff� • LOCATION: IMPROVE I-95 INTERCHANGES AT SR 1808(JONESBORO ROAD) FINAL RIGHT OF WAY PLANS �/' r (EXIT 75)AND SR 1709(HODGES CHAPEL ROAD)(EXIT 77). r /of l TYPE OF WORK:GRADING,PAVING,DRAINAGE,AND STRUCTURES U !r oao 1�1l ingS Ai.W M, '� , WETLAND AND SURFACE WATER IMPACTS PERMIT ,r ttir�n�v ���#'+; ,- °"E' n W "\ UTILITY — S N 3 Via` -('GIN P' J •• -Y17-POC Sta.13+50.00 O 00-/ BEGIN CONSTRUCTION END TIP PRO ECT 1-5883 [1 1 VICINITY MAP -L-POT Sta.1232+00.00 '�) (Not to Scale) eyao` SITE 18 -Y16-POT Sta.11+50.00 eVD -5R16-POT Sta.85+93.68 51,1 BEGIN CONSTRUCTION END CONSTRUCTION m rmri r -SR13-POT Sta.59+70.56 "° �� END CONSTRUCTION diVi O DRNN 10)hi�� BEGIN BRIDGE \'� L� To eENso POT STA.26+16± �R16-POT S}a.10+00.00 T 11`�i,��r� 4 BEGIN CONSTRUCTION -�� � aiiii\�` ® m _pia �1�� BEGIN TIP PRO ECT I-883 v � �\�'\ " ' EOM -L-POT Sta.1063+00.00 SITE 5 -4 \� END BRIDGE ` GEORG.,PERRY L•E RD. BEGIN BRIDGE -Y16-POT STA.28+01= vied,`� ' YI7-POT STA.25+77± V ,(S -Y26-POT Sto.10+11.21 �74. �S � BEGIN CONSTRUCTION AV• SITE 13 END BRIDGE -SR15-POT Sta.10+13.43 jg2 •O'I ® -Y17-POT STA.27+84± BEGIN CONSTRUCTION '8, ' -Y17-POT Sta.40+50.00 -Y16-POT Sto.44+00.00 END CONSTRUCTION END CONSTRUCTION SITE 10I -Y26-POT Sta.30+84.53 CLEARING ON IRIS PROTECT SRArc BE PERFORMED 2.0 END CONSTRUCTION THE MITTS ESTABLISHED BY METHOD II Ea III re Is A coomo,!FP AAccEss PROJECT WITH ACCESS -5R17-POT Sta.10+09.89 � `I BEING u 0500 CIGNGES BEGIN CONSTRUCTION• Y1 ""°"""""`°"°` Prepared U GRAPHIC SCA!FS DESIGN DATA PROJECT LENGTH '"t,"'.,°ra,GB "W HYDRAULICS ENGINEER Michael Baker r.7)27a° M ADT 2019 = 58,000 LENGTH ROADWAY TIP PROJECT 1-5883 3.201 MILES `""" 51411110 Y ADT 2040= 75,700 INTERNATIONAL f l. K = 7 % FOR DIVISION ry OF HIGHWAYS' 1/����lyy; PLANS p = 55 % 11 50 25, 0 5,0 100 TOTAL LENGTH OF TIP PROJECT 1-5883 3.201 MILES m� a SPECIFICATIONS SUSAN SC.LANCASTER.P.E :,rw es IA ;InnT = 24 %" nwecr e .vaen ROADWAY DESIGN ENGINEER V = 70 MPH RIGHT OF WAY DATE O PROFILE(HORIZONTAU •OTST 17% + DUAL 7%) February 28,2018 IS°TILLMAN.PE • 1.49 10 5. 0 10 20 FUNC CLASS= nn°rncr cvcn "cxnnn r, INTERSTATE LETTING DATE, STEVE D.KENDALL,PE Hi`\v7 PROFILE(VERTICAL) STATEWIDE TIER July 21.2020 "''aOr`'�"'"cr eE / s___• o sp• la o• —7-7O z.Znq. m I I ...o SCALE 1"-100' E „�� DENOTES TEMPORARY I 'r4 TC`h ti° .�..z. z.a�.zzR ro roE 7i • -A IMPACTS IN SURFACE WATER II •Spx'TO R• OTES HAND ;I //N �p �,� CL NG I I p tiP j° ro DETAIL a /8 F?°C DETAILr.tr. E\ I / Sy HT NOT CONSOMME MIMS fix 2 a u :°F,. "' 4 '� '.EE�,a„ MIM�:, � �DRES COMPLETED fttiL�.� \ 0 ,a„oa,Aw.msa„= � � j />` PERMIT DRAWING? n: qEo >% � POT SST'ro.oe6+sir-Bl LT- ,' SHEET 2 OF 11 \ ec ♦ -Yl6RPB Sla C - COPE EVER..-SRO- c.S PC sia.42+Y4b1 neuw °° �! pin /¢ CORE 10 ENTERPRISES -Yl6RPB-SC SYa.I/x8900 /�i✓ E . a� own scoori�ci / ' 0 \�E i� m m 0 _ aF' --- rs so.ro66wsn m.a.--, -- — ,a�r� --- UM 'I.......'LI' o. I a, o •-- P 2(Q., % nowuzx nu ::: mF n z� — — oo RPC —x— .. x x—x—x , W^ ,. —_ __ . _ X n6 - • C1 linanaft _ /NA rT A !i I IMMIEMEMENati _S 1 Ii� I� v3f - R' I 3H..,r��„�r»arr aCAaife0'T J4-7.1l.44rfe er' Tim .! .,. .o.a._ NEY I � ET IIRi . ay y / Yv SR4 ilLrIt#11 El di MeV PC Sic 4 8+0154 _ mn .J IITE*22 ; ® pID yS R ` � c P / m, N l' , 00 BRY...VEY : OVfr..am oxaar0ans x4„ ^hP Io. M...,roa : � _ * =. -L-POT Slo.lo86+os]8-6r.W'Rr= POWER POLE -Yl6RPC-POT sto.10+00.00 OVHR POWER(CfE�EARHJ �.,- A-2'2056O r,0m na.Y+oo 109111:+o s''�_ _ y\i TELE DIR CTIbNiFL B RED• LJ :. PAIL 3x 4 i * i i t , i ty�nw aF+w DETAIL TAILp snq Lx syscw urtwLeass oncx nµDET^> EL 31p x RIVFNA RADII= iii J- i t tx 1 Hx ulRs \ mT rmm srw0re.m ra nw,0ex.m-�-n / M q ory -4 L'D 0' } } } i 1 } i Led° ,_, UNIE$$aHOWNY OTHERWISE "k •..^- wom nn H+zs,o sr,ia+sa-naxvs n OR-L-PROFILE SEE SHEET ET .. nom n.1070.ax TO ID/•0+m FOR-L-PR FILE SE SEE SHE82 ET 119 i ream sra m.x0,o na svm sn+ FOR -YYISRRPC-PROFILE SEE SHEEET 110 .,0)_., — ,./tYM-- \ ...--------- \ ,,, irxre.F--v 1 -. � LSHFFT OF1I I \ HG o i l d \ „V b 4 _ mA -v .s.,c x - -- -_- o IM" 11 _ ta ii �tr ripfrF' 1 '. Jam;F �� _c \ — - -' 1414\,, .40,----- . ,..--- , .\ \_„-- ,,,,0099"-ai-- Ni6L: 0 g..e 11.111i0 414\ —� \ imr�cn it w^hRNURGEMENT VIEW +� ` �.f/ SEE SHEET OF 11 e^��� —trop F f a. \ \\% ^' gel \ • 25'12.5 isr5986B�urawE "'''rvo. �1- SCALE.1"=5 E�ew... Me x.emeex O, ,0M1 \ DOCUMENT NOT COM MPERED AL MUM/111-SIGNATURES COMPLETED Nk SPEC.LAT V DITCH , -. ,,k� \\ ��� PERMIT DRAWING? SEE DETAIL 1 }\ \\Wit* I�� SHEET 4 OF 11 H\ _ � .5'BASE DITCH cod \\\ ,R \'',, \ DETAIL42 CCCy�yyq 4I ,__ H.;,.;, W 'W �� �SLOP 07% ♦rA � �GQT �� `f' EST.DbE 169 � r OP `' \`w\ �a� REMOVE ` \'` , SPEC.LAT.5'BASE DITCH \\--\\_\_\= \\ SFF DFTAII 22 SITllir '.. 15„ S av tiX�C ` IIIIIII S� ] s. N6 Hiw LA, REM L <IF 7 >m \ '. • -ems t �. - / 'J ,tit �trof _11 Q _t-f'�' EIP 1 � ,_1� 'vis- k REM�,`� Nt — . .. __=\\ %� DENOTES TEMPORARY O ro" i '�� /�// IMPACTS IN SURFACE WATER TEMP IMPACTS pGF ' -����_�l` ,. TO SURFACE WATER O;H( POWER CLEARING) IIII�lPOWER POLE j/ PUE— o PROP OIx POW 1 PUE LAT.4'BASE DITCH PUE-� PUE SEE DETAIL 16 om II - DEraL I F - �NG..r. NG. rNGN E. + osa� /58n 1iiL__ii a-- a w.nwAY�k«r+ �� ems,• -- „. .a � �GT � so x DOCUMENT NOT NCONSOMME R`+�_. _ „o o M -T SCALE:r=too• PERMIT DRAWING �\ R- OTES TEMPORARY SHEET OF 11 F / „' IM' CTS IN SURFACE WATER �E ,, IC \ DEN aTES HAND R ess es TONSter' ` \ LOV0 MaAIAD C•EARING MC eNRu HEIRS . RT RENTALS so,sc �,z..s.GNc� wiL..rw R.R� D 2 ar Fr a{\ G,cX Tons rMe ,. aN,Nq.G wo,..rE• SAME Ga / �II _ y� c .r -•r•r-w-r.-•r•r�.�T. •t . ry 1Hi - RES .Ir.coPPer F `.� _ -x n ,. n ^san• n --x�-n`z— w H a WELDED STEEL 0 1 FLow...s N.4...,n.,.�• um xw� _ _ o srG s<ooir - - - o r o cw..oL.m ME ,�:a s.an e �� nor o. o o ��I ,..WELD I-95.Ka, / rLa,..MLr.�G c n . 1410=- .!— 11111•If - =F1 D 1:- ■ - 1. _ 2 F ajl .,.. ' u, f1,G'�:1„pf i_V,I I11E I Q� CS8/ L^o, 1 --- _-. _ - - - III / .a _`moo 0 -€� v,,, " . * 't V .r.u.. � �� /�� \ I. g,N:r Gr \ cL a BURL NE HEIRS oNs l TOE-' �a m - , MM... /CI a I� w I C3 w cx.RLEs WEBS mms `I I Q ix OWER NLE Anl.sSWIMooR�s seweu OVH P+W R(CLEARING) SaeORA Asxm wT s s.NGR. nww,n lye\ p .NDERGROUND T E,CAN,WATER (D ECTIONAL BORE) srr DEraL1S cn \\ cu,�/.wur S-PTSYa.33+54Z1 -'"- CE I \\\ mu / o .sz.esrosr.s..ws., ! I 1,.......„„ _„„„„,,,,_ / NOTE:DRIVEWAY RADII= 10' \ FOR{_PROFILE SEE SHEET Bd UNLESS SHOWN OTHERWISE �•`,FO0.SR15-PROFILE SEF SXEET 120 6 121 DENOTES HAND PERMIT DRAWING Rro"*;s; 8Mo I ,x.jxo CLEARING II SHEET 6 OF 11 xxIIR /j" VA DENOTES TEMPORP\RY t4,9 2pT\ IMPACTS IN SURF...PPPddd������CE WATER Pp a I h 2 5621606....1.... 0' 10 DOCUME NEM I N.PROPERTIES uc SCALE:1.-100' ED .ITN ,.AuNOTARR"RRReR�-L-ST Ste.Il8l+9/59 16-21Fi{I LAT ALL --POTSolSte./0/JI-%ovLT=-/1RPB- T S)a.IO+Ltl00 snc-SRl6-PT Slo.57007.068' se-5R16-PC Sfo.60+98g9 I DARE TARO ,R I IIID \p\ L L CS Ste.//8694359 to °.a au ' 1 .,.q EVF— °� . a a } i . . . a ..,g. aka py� I I- ..PI!€„IQ.ollv�_n F Rol.,.r- o ii°5 r x . ,F ..o. m w.8k r -- '^ EJ vim. ';rldy`k� goiter S x—x—x—x—x ,-- ,—x s 1 mi SA ImimIE g 1110111111111M- 1 t , IMEMMIMM1111——— :I:- aE of ��r.o la �q ___ — �,-,s e - p si, - - — R _ — ©W tea` —� �a'�'51 • t x . x . x yGl i0 uw r sEE o TI L°I . an „ s d� .. Ste s3,64 3.rz PUE \ ciuur,,xARnr R ' ' ' � 00/5-PT Ste 9396493 \ <RE+Foote*�. -SRIS-PRO S1v.88W3.12ur '', \ SITE 10 I :fo arc :. •/ I \ uugoo,wr al.,. m ^ -L-POT Sto.n8B+1666-6/00"RT= \ /e,,,v 1 ss T l i yt,� -YURPC-POT SIo.10+0000 1 MOPES TART 1' �+�F_ r A.-3'S6S9A' - ,sNa ,-.,NW. ..,-.I. o rs` it . II$ e[xTou Axo SO.ovxn PROPERnFs LLc o O aPF PROPERnEs a■I :-a r, >* JI'°L \\I III �L,STA_e..TO SI°.20O.,m ® U O OV POWER(CLEARING) pFruL�' ■ , U ERG V,UND WATER sacra. >mu "x R I!. L CAN,WATER °u (DI ECTIONAL BORE) wu.u�a R NOTE:DRNEWAY RADII= 10' FO0.-L-PROFILE SEF SXEET 86 9 z=omR zN 4'''''°nn OR IM-PROFILE SEE SHEET Ili 8 Il FOR SR16-PROFILE SEE SHEET T 1 . s room sn.m.ae ro srn.00.3 sPIS LT vT+°s sxls n IESS SHOWN OTHERWISE FOR-MRPCC--PROFILE SEE SHEET 115 •Z. °17�5°..,�.w„E° /I w ..a�.. a "a, I^�,r. i ` / �/� �� / I �JDRAWING — ENVII .m8&6E I ' s 'J �.0 d h:HEEEET 7 F 11 ,�.... .. / / -- yr. o:"� d O d 1 0 .. —_....w....... v,�j /— �C \f and 1, /i / a \ \^� - SEE SHEET 8 OF 11 __ -- — .. , -- f N �` rdf a a ' L ��\i4 =,. •/. ; \ N � __iLs �r � :::-471;1,:#141:0://.4„... A` � $, /� i\ ; , .4..,47:yfuSiiEtOOV s.... J /1 �� --sxoe ' \� 4 .ra mi � ;<�X /i./-. / zxen ro. ,ate\.,-. PROJECT c.no...,..,,, ,,,,,,T: ..7,,,,, H _ % 59868 vnen.o —Y17RPB— // E"cv one« -- _ _-- INCOMPLETE PL NS �FLOWABLE FILL _`— s't25 �,s' s4' �� 9 SCALE:1"=50' OOLUME N� 42"RCP-V —2G1-� - - MAL .�iaiaxs'�s'sem 2GM� 42"RCP-IV i PERMIT DRAWING SHEET 8 OF 11 -----------__._ 'SPECIAL DETAIL ..:... \_'M1N DEPTH TYPE'h" 2GI AA _- --- - ��� J � > ' -8 •-lV •- Po CMP U IEDJ __-_ �� �` b' 77R�j�\\ 000a we.E �c:: _���c�Pc,LINE � � WI,caw ,oE i CL B RIPRAP 1 _" w ANN,,,��!%��,�!ij�n a► E L •' ^ SPEC.CUT D �• 7��► �Yr� I \�� \ rip k PUE T 7 SY G'" DETAIL .��-•�i" rA. �i7►�#I a o PRo y7 W \VP DITCH PROP�,�GRAVITY SEW a .. .� 1 SITE %...• ,q�GO _..• _� - LC) SEE DET>IL 32 // y e‘ --_w_ X X X ewe<E: 'I BENTO'I AND // 'I 1 SONS NUNN § X PROPERTIESXLLC �\ x � F:::.: Iss �- SANITARY SEWER /O.PVC _E x DENOTES LIFT STATION .S LLC 1/ x %� `E X0 CLEARING I n x ss �� �v�v E- iti. t-$�, II " X°°� X X OVH POWER(CLEARING) / I UNDERGROUND / �\ I I I TELE,WATER \ I D°') I I (DIRECTIONAL BORE) �. di I I I OVES TRAVEL STOPS INC I I I I / L\ 50' 2�5' 0 50' 00'\ EEO�E�/F5877 HMO zxe55 s DETAIL 24 D,aIL�d ® \ wrarvn Ere 0.n oGuuFFa ,.4 M o M SCALE 1"=100' ,.,< Yw. <M „�•`�, .. INCO PoERTµE oLANS sEdsE Imo:FAMILY LTD - ��,.. ,... s Zo�� P j �DEma3e DETAIL 40 u`Hi`eas eu NOT CONSIDERED COMPLETED MN. I �roE TOE- v<�a.. o R4�'R.M..r�1 Lam 7:2 , R PERMIT DRAWING I; °oaHr°H° .,,.,,O,r..,P. a,_.r FOUNDATION BIBLE,°LLL,E P.�e .„d.,,_4„ / / SHEET 9 OF 11 �1DEsr. ------- ens —c7 \\ \ O -L-POT$lO./230/5D4-6/qp'LT= / C7 \ L/ 1\ m W YIIRPA-POT Sia IO+OOA9 7 erc. ( �� D- E o-.rs3 zoa I /� o IIII -TPRPA- '... II 1 I. PE —{SITE 18 ,EE«�r or<M ,EE o�w,,. ,. ', 4I illi.....R � — . . eP � t ; � r MN, roE . . ° W I .ue a a_°m� I —SR/1—PT Sio.39+qb8 roE _ E i \ I CO RLL°M FdMINC ROBIN wHITTLY HOOD II DETALId9 DETAIL 46 rw ac T. st M�� ,,. ..n.,,,o..,-UEr ' 0,,0r I,al° %I,a \ OVH POWER(CLE.�.RING( / DENOTES TEMPORARY Pw„ "^�__,•,, it UNDERGROUND I /�° IMPACTS IN SURFACE WATER V - E— l�(DIBEGJIQM I.BORE)NLARGEMENT VIEW . SE SHEET 10 OF 11 No E:oRl EWA.RAoll_ 10• UNLESS SHOWN OTHERWISE 1 FOR-L-PROFILE SEE SHEET 07 FOR-YITRPA-PROFILE SEE SHEET 113 OR SR12-PROFILE SEE SHEET 127 50' 2¢¢' 0 50' 100' wp SCALE.1"=100' ITAM E PLPL�S NPR 3 PERMIT DRAWING `° — SHEET 10 OF 11 — — =m.1I. = I_ SITE 18 -- -Yl7RPD- ---- — I 2L — 111111.11 ._ 73 * _ IIBI� ---- - ---- SPEC.CUT DITCH - SEE DETAIL 24 s 15" --r _--_- -- _ --(IWT-- = VJ y+l,:.� r i 7" — REM �jQ;s ii WOODS Ire4 WooDS _— iii t., d5,B d4 d$j=Q :,,, \i ds �,r EL 0,,,,, . �O .R -_-� >YN,',X� E DETAIL ;' CL B RIP RAP -L- POT Sta.120+%•. _ � s y EST.2 TONS -Y/7RPD�5 Sta./0+00.00woo �--,t 0� 4 CL I RIP RAP EST.7 SY GF 0 LB: EST.40 TONS O e oM PDX L ► •M EST.-8 SY GF mI /e �'' 1.OILI ff' CI L_TDE-TDE� d W CL RIP RAP ��B I N BANK STABIL 'TION EST.4 TONS RO K FILL SIN POND J I EST.132 .Y GF TLEY HOOD II - SEE'�,ETAIL 52 Do Op ROBIN WHITLE HOOD II ST.14 TONS O I-O _} O OVH POWE' (CLEARING) / H p. V+ I w gr.) D N DRAIN POND .N O TELE(DIRECT•NAL BORE) FILL TO NATURAL GROUND SITE 6 0 �-1 �1 N V7/y/ DENOTES TEMPORARY %// IMPACTS IN SURFACE WATER iii _� z II \ WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I E SURFACE WA I ER IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (It) (ft)_ 3 41+32 to44+84-SR14-RT UTILITY 0.181 5 22+21 to 24+03-Y16RPC-RT UTILITY 0.004 40 9 35+16 to37+39-SR16-RT UTILITY 0.102 0.002 31 10 15+33 to 18+90-SRISRT UTILITY 0.190 0.002 14 13 17+23 to 19+17-Y17RPC-RT UTILITY 0.301 16 34+02 to34+89-SR17-RT UTILITY 0.010 19 18 1220+35 to 1220+55-L-RT UTILITY 0.008 19 22 39+98 to41+67-SR14-RT UTILITY 0.094 0.004 23 TOTALS`: 0.000 0.000 0.000 0.000 0.868 0.000 0.030 0 146 0 'Rounded totals are sum of actual impacts NOTES: Ste 6:Wetland Total Take NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3-20-2020 HARNETT COUNTY 1-5883 53083.1.1 le,,i„e xoieew SHEET 11 OF 11 Highway North Carolina Department of Transportation Sicutl7WraFtwr .-. Highway Stormwater Program STORMWATER MANAGEMENT PLAN \ d (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 47532.1.3 TIP No.: I-5986B County(ies): Harnett Johnston Page 1 of 6 General Project Information WBS Element: 47532.1.3 ITIP Number: I-5986B I Project Type: Roadway Widening IDate: 12/5/2019 NCDOT Contact: Paul Atkinson,PE Contractor)Designer: William H.Hines Address:1590 Mail Service Center Address:Sungate Design Group,P.A. Raleigh,NC 27699-1590 905 Jones Franklin Road Raleigh,NC 27606 Phone:919-707-6707 Phone:919-710-8454 Email:patkinson(a�ncdot.00v Email:whines@sungatedesign.com City/Town: Benson County(ies): Harnett Johnston River Basin(s): Cape Fear Neuse CAMA County? No No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 3.456 mi. I Surrounding Land Use: 'Urban and Agricultural Proposed Project Existing Site Project Built-Upon Area(ac.) 84.7 ac. 46.8 ac. Typical Cross Section Description: Concrete median barrier.4 paved lanes with a 12'paved shoulder in each direction. Grassed median with 2 paved lanes in each direction. Outside grass roadway ditches with 6:1 sides.Cut and fill slopes have a maximum 3:1 slope. Annual Avg Daily Traffic(veh/hr/day): Design/Future: 92900 Year:2040 Existing: 66700 Year: 2020 General Project Narrative: The North Carolina Department of Transportation(NCDOT)has proposed to widen 1-95 from north of SR 1709(Hodges Chapel Road-Exit 77)to 1-40(Exit 81).There are 5 (Description of Minimization of Water proposed major structures involved with the improvements to 1-95 that are to be constructed at existing stream crossing locations.The first proposed structure,along Mingo Quality Impacts) Swamp,is a 1 @ 72',1 @ 101'-10",1 @ 72'45"Florida I-Beam Bridge with 4'tall end bents.The proposed bridge is replacing a 4 @ 12'x 9'Reinforced Concrete Box Culvert (RCBC)with a square edge headwall.The bridge construction will include channel improvements underneath the structure.The second proposed structure,along UT to Hannah Creek,is an 84"Trenchless Installation Welded Steel Pipe with a headwall.The proposed pipe is replacing a 72"Reinforced Concrete Pipe(RCP)with a headwall.The pipe construction will include downstream channel improvements.The third proposed structure,along UT to Hannah Creek,is a 84"RCP-III with a headwall.The proposed pipe is replacing a 72"RCP with a headwall.The pipe construction will include upstream and downstream channel improvements.The fourth proposed structure,along Driving Branch, is a 1 @ 105'45"Florida 1-Beam Bridge with 4'tall end bents.The proposed bridge is replacing a 2 @ 6'x 8'RCBC with a square edge headwall.The bridge construction will include channel improvements underneath and downstream of the structure.The fifth proposed structure,along Driving Branch,is a 2 @ 6'x 9'RCBC with a 6"beveled headwall.The proposed culvert will be buried 1'.The proposed culvert is replacing a 2 @ 6'x 8'RCBC with square edge headwall.The culvert construction will have channel improvements upstream of the culvert.A channel change downstream of the culvert is being proposed to correct a disruption in the path of the natural channel caused by beaver dams.All the above structures have been designed to have as little environmental and surface water impacts as possible.Velocities at jurisdictional features and wetlands are non-erosive. Waterbod Information Surface Water Body(1): Mingo Swamp NCDWR Stream Index No.: 18-68-12-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters(Sw) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: I N/A Project includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) 1-IighwaV North Carolina Department of Transportation Sior[TnvdtY Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 47532.1.3 TIP No.: I-5986B County(ies): Harnett Johnston Page 2 of 6 Additional Waterbody Information Surface Water Body(2): I Hannah Creek NCDWR Stream Index No.: 27-52-6 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters(NSW) Other Stream Classification: None _ Impairments: None Aquatic T&E Species? No Comments: _NRTR Stream ID: Buffer Rules in Effect: I Neuse _Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? IN/A Dissipator Pads Provided in Buffer? IN/A Deck Drains Discharge Over Water Body? N/A (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) IIII Surface Water Body(3): Driving Branch NCDWR Stream Index No.: 27-52-6-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters(NSW) Other Stream Classification: None _ Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: I Neuse Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Highway North Carolina Department of Transportation -( SioYLTlwdtel' ,...,,. Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element:47532.1.3 TIP No.: I-5986B County(ies): Harnett Johnston Page 3 of 6 Swales Station&Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated wi No. Projects) Body (ft) (H:1) (H:1) (ac) (ft) (ft) (%) (cfs) (fps) (cfs) (fps) Used Buffer Rules? 39 1300+50-L-RT (2)Hannah 0.0 6.0 5.0 0.3 30 243 0.35% 0.9 0.7 1.1 0.8 No Yes 1302+43-L-RT Creek 39 1302+43-L-RT (2)Hannah 0.0 6.0 5.0 0.8 80 157 0.96% 3.1 1.5 4.0 1.6 No Yes 1304+00-L-RT Creek 40 1306+50-L-RT (2)Hannah 0.0 6.0 3.0 1.5 150 573 0.41% 4.7 1.2 6.1 1.3 No Yes 1312+23-L-RT Creek 40 1307+50-L-LT (2)Hannah 3.0 6.0 3.0 1.8 180 350 0.30% 4.7 1.1 6.1 1.2 No Yes 1311+00-L-LT Creek 40 1311+00-L-LT (2)Hannah 3.0 3.0 3.0 12.0 1200 590 0.30% 13.9 1.6 18.9 1.7 No Yes 1316+90-L-LT Creek 40 1313+50-L-RT (2)Hannah 0.0 6.0 3.0 1.2 120 332 0.45% 3.9 1.2 5.1 1.3 No Yes 1316+82-L-LT Creek 41 1318+50-L-RT (2)Hannah 0.0 6.0 4.0 1.4 140 550 0.30% 4.8 1.1 6.2 1.2 No Yes 1324+00-L-RT Creek _ 41 1324+50-L-LT (2)Hannah 0.0 6.0 3.0 0.9 90 250 0.32% 1.8 0.9 2.4 1.0 No Yes 1327+00-L-LT Creek _ 41 1326+00-L-RT (2)Hannah 0.0 6.0 3.0 0.4 40 187 0.30% 1.5 0.8 1.9 0.9 No Yes 1327+87-L-RT Creek 42 1336+00-L-RT (2)Hannah 0.0 6.0 3.0 1.2 120 535 1.28% 4.3 1.9 5.5 2.0 No Yes 1341+35-L-RT Creek 42 1339+85-L-LT (2)Hannah 0.0 6.0 3.0 5.9 590 125 0.40% 10.7 1.5 14.4 1.6 No Yes 1341+10-L-LT Creek 42 1345+00-L-RT (2)Hannah 5.0 6.0 3.0 21.0 2100 215 2.00% 54.1 4.0 70.7 4.3 No Yes 1347+15-L-RT Creek 1347+46-L-RT (2)Hannah 42 0.0 5.0 3.0 3.8 380 H 129 1.20% 13.1 2.5 17.2 2.6 No Yes 1348+75-L-RT Creek 42 1350+00-L-RT (2)Hannah 0.0 6.0 4.0 0.2 20 100 0.23% 0.7 0.6 0.9 0.6 No Yes 1351+00-L-RT Creek 42 1351+00-L-RT (2)Hannah 0.0 6.0 6.0 0.2 20 50 0.40% 0.5 0.7 0.7 0.7 No Yes 1351+50-L-RT Creek 42 1351+50-L-RT (2)Hannah 0.0 6.0 6.0 0.1 10 50 1.60% 0.3 1.0 0.4 1.0 No Yes 1352+00-L-RT Creek 42 1355+00-L-LT (2)Hannah 0.0 6.0 4.0 1.6 160 400 0.38% 4.7 1.2 6.1 1.3 No Yes 1359+00-L-LT Creek 43 1359+00-L-LT (2)Hannah 0.0 6.0 4.0 1.7 170 426 0.40% 4.9 1.2 6.3 1.3 No Yes 1363+26-L-LT Creek 43 1359+00-L-RT (2)Hannah 0.0 6.0 4.0 1.1 110 426 0.40% 3.0 1.1 3.9 1.1 No Yes 1363+26-L-RT Creek Additional Comments Highway North Carolina Department of Transportation SIOYLT1wdtPT' Highway Stormwater Program ;4;.7' . STORMWATER MANAGEMENT PLAN �`----- (Version 2.08;Released April 2018) FOR NCDOT PROJECTS _ WBS Element:47532.1.3 TIP No.: I-5086B County(ies): Harnett Johnston Page 4 of 6 Swales _ Station&Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Projects) Body (ft) (H:1) (H:1) (ac) (ft) (ft) (%) (cfs) (fps) (cfs) (fps) Used Buffer Rules? 43 1363+26-L-LT (3)Driving 0.0 6.0 6.0 0.5 50 247 0.53% 1.6 1.0 2.0 1.0 No Yes 1365+73-L-LT Branch 43 1363+26-L-RT (3)Driving 0.0 6.0 3.0 1.5 150 574 1.21% 4.5 1.8 5.8 2.0 No Yes 1369+00-L-RT Branch 43 1365+73-L-LT (3)Driving 0.0 6.0 6.0 1.1 110 363 0.91% 3.1 1.4 4.0 1.5 No Yes 1369+36-L-LT Branch 441369+36-L-LT (3)Driving 0.0 6.0 4.0 0.9 90 364 1.38% 2.5 1.6 3.3 1.7 No Yes 1373+00-L-LT Branch 441374+00-L-LT (3)Driving 2.0 6.0 3.0 12.4 1240 200 1.60% 21.6 3.0 28.4 3.2 No Yes 1376+00-L-LT BranchNM 441376+25-L-LT (3)Driving 0.0 6.0 4.0 1.1 110 375 2.01% 3.2 2.0 4.1 2.1 No Yes 1380+00-L-LT Branch 441380+00-L-LT (3)Driving 0.0 6.0 4.0 1.6 160 300 2.01% 4.4 2.2 5.7 2.3 No Yes 1383+00-L-LT Branch 45 1383+00-L-LT (3)Driving 0.0 6.0 4.0 1.0 100 400 1.67% 3.1 1.9 4.0 2.0 No Yes 1387+00-L-LT Branch 45 1395+50-L-LT (3)Driving 0.0 6.0 6.0 0.1 10 50 0.46% 0.3 0.6 0.4 0.7 No Yes 1396+00-L-LT Branch 46 1396+00-L-LT (3)Driving 0.0 6.0 4.0 0.4 40 200 0.45% 1.3 0.9 1.7 1.0 No Yes 1398+00-L-LT Branch 46 1398+00-L-LT (3)Driving 0.0 6.0 4.0 1.0 100 400 0.44% 3.0 1.1 3.8 1.2 No Yes 1402+00-L-LT Branch 47 1400+00-L-RT (3)Driving 2.0 6.0 3.0 9.2 920 1528 0.70% 15.5 2.0 21.4 2.2 No Yes 1415+28-L-RT Branch 47 1408+50-L-M (3)Driving 0.0 5.0 5.0 0.5 50 181 1.19% 1.7 1.4 1.8 1.4 No Yes 1410+31-L-M Branch 47 1410+31-L-M (3)Driving 0.0 5.0 5.0 0.6 60 400 0.73% 1.8 1.2 2.3 1.3 No Yes 1414+31-L-M Branch 41 19+00-Y28-LT (2)Hannah 0.0 4.0 3.0 2.0 200 231 1.49% 3.2 1.9 4.2 2.1 No Yes 21+31-Y28-LT Creek 42 12+93-Y18RPB-LT (2)Hannah 0.0 3.0 3.0 0.1 10 50 2.27% 0.3 1.3 0.4 1.4 No Yes 13+43-Y18RPB-LT Creek Additional Comments Highway North Carolina Department of Transportation sd ` SIOYLT1�VdtPT' Highway Stormwater Program € STORM WATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element:47532.1.3 TIP No.: I-5986B County(ies): Harnett Johnston Page 5 of 6 Swales Station&Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Projects) Body (ft) (H:1) (H:1) (ac) (ft) (ft) (%) (cfs) (fps) (cfs) (fps) Used Buffer Rules? 42 12+00-Y18RPC-RT (2)Hannah 2.0 6.0 3.0 3.7 370 524 0.30% 8.1 1.3 10.5 1.3 No Yes 17+24-Y18RPC-RT Creek 42 19+42-Y18RPD-RT (2)Hannah 0.0 4.0 3.0 2.6 260 390 5.03% 8.1 3.8 10.5 4.1 No Yes 23+32-Y18RPD-RT Creek 42 12+81-Y18RPD-RT (2)Hannah 0.0 6.0 4.0 1.6 160 400 0.63% 4.7 1.4 6.0 1.5 No Yes 1359+00-L-RT Creek 42 12+81-Y18RPD-RT (2)Hannah 0.0 6.0 4.0 0.6 60 234 0.96% 2.0 1.3 2.6 1.4 No Yes 15+15-Y18RPD-RT Creek 40 9+50-Y29A-RT (2)Hannah 2.0 3.0 3.0 7.6 760 2473 0.30% 12.2 1.5 16.6 1.6 No Yes 34+23-Y29A-RT Creek 39 12+00-Y29A-LT (2)Hannah 0.0 4.0 3.0 0.6 60 316 1.16% 1.1 1.4 1.5 1.4 No Yes 15+16-Y29A-LT Creek _ 39 15+16-Y29A-LT (2)Hannah 0.0 4.0 3.0 0.5 50 184 1.34% 1.1 1.4 1.4 1.5 No Yes 17+00-Y29A-LT Creek 40 34+29-Y29A-RT (2)Hannah 0.0 3.0 3.0 0.5 50 515 1.27% 1.4 1.5 1.8 1.6 No Yes 39+44-Y29A-RT Creek 4414+00-Y33-LT (3)Driving 0.0 4.0 3.0 0.1 10 253 2.25% 0.2 1.2 0.3 1.3 No Yes 16+53-Y33-LT Branch _ 4416+53-Y33-LT (3)Driving 0.0 4.0 3.0 0.2 20 210 1.18% 0.5 1.1 0.6 1.2 No Yes 18+63-Y33-LT Branch 4418+15-Y33-RT (3)Driving 4.0 3.0 3.0 23.7 2370 161 0.31% 40.4 2.1 54.7 2.2 No Yes 19+76-Y33-RT Branch _ _ 4418+63-Y33-LT (3)Driving 0.0 4.0 3.0 0.2 20 65 1.78% 0.5 1.3 0.6 1.4 No Yes 19+28-Y33-LT Branch _ 4419+43-Y33-LT (3)Driving 0.0 4.0 3.0 0.5 50 457 0.33% 1.4 0.9 1.8 1.0 No Yes 24+00-Y33-LT Branch 45 1378+00-L-RT (3)Driving 4.0 3.0 3.0 9.9 990 1413 1.65% 26.9 3.4 34.9 3.7 No Yes 35+56-Y33-LT Branch 45 25+94-Y33-RT (3)Driving 0.0 4.0 3.0 0.4 40 357 3.88% 1.3 2.2 1.6 2.3 No Yes 29+51-Y33-RT Branch 45 35+87-Y33-LT (3)Driving 2.0 3.0 3.0 3.3 330 519 1.45% 10.6 2.6 13.7 2.8 No Yes 41+06-Y33-LT Branch Additional Comments Mill I Highway North Carolina Department of Transportation SIOY[TRVdtPT' Highway Stormwater Program '� STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element:47532.1.3 TIP No.: I-5986B County(ies): Harnett Johnston Page 6 of 6 Swales Station&Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Projects) Body (ft) (H:1) (H:1) (ac) (ft) (ft) (%) (cfs) (fps) (cfs) (fps) Used Buffer Rules? 45 40+10-Y33-RT (3)Driving 0.0 4.0 3.0 0.3 30 346 1.49% 1.0 1.4 1.3 1.5 No Yes 43+56-Y33-RT Branch Additional Comments See Sheet IA Far Index at Sheets STATE OF NORTH CAI';OLINA PERMIT DRAWING See Sheet IB Far ConventionalSymbols" e N.C. I-5986B 1 (B ", SHEET 1 OF 37 \ \ ;1 DIVISION OFHIGHWAYS -. -- -aw �- 47531.1.3 � 47531.1.3 RAN 8 UTIL. /:o 7 '• iI1eil HARNETT AND Aill- a 1 JOHNSTON COUNTIES In 11 eENso D PRO C1 15986E i TYLINITi1* FINAL RIGHT OF WAY PLANS ///jjj������ LOCATION: IMPROVE 1-95 INTERCHANGES AND WIDEN TO EIGHT LANES l _ FROM NORTH OF SR 1709(HODGES CHAPEL [y ROAD)(EXIT 77)TO 1-40)(EXIT 81). Oi Aal:fg11►I��(-L��++ C r; TYPE OF WORK:GRADING,PAVING,DRAINAGE,SIGNALS,CULVERT �r�'r►:gel• 41,E �i -: AND STRUCTURES rib �t•h)�t ti.47� O b 7 To ` -Y28-POT S10.15+75.00 -Y28A-POT Sta.15+60.85 eyM1" rA.t -Y29-POT Sta.20+00.00 BEGIN CONSTRUCTION BEGIN CONSTRUCTION B.` IN PROJE BEGIN CONSTRUCTION BENSON .� ♦ CITY LIMIT -Y28-POT Sta.31+00.00 [1 VICINITY MAP BEGIN BRIDGE END CONSTRUCTION "4 (NOt to Scale) -Y29-POT STA.27+40.46 -Y18-POT Sta.10+00.00 BEGIN BRIDGE / BEGIN CONSTRUCTION END TIP PRO ECT I-5986B,� -L-POT Sta.1414+50.00 -L-POT STA.1259+11 t P yam- 1 BEGIN BRIDGE [� SITE 1,2,3 �� a ' SITE 6 -L-POT STA.1390+66m END BRIDGE Y -L-POT STA.1261+56± 11 -�1��./l ` B t—i� END BRIDGE -Y27-POT Sta.10+11.60 �—11 l �_ BENSON -L-POT STA.1391+72+ BEGIN CONSTRUCTION \ -� ,1 '-.=/i" © CIN LIMIT ��1 + •i 744,11 -Y19RPB-POC Sta.23+00.00 �A`�•��������� � \��� BEGIN CO. , —�'�I' " SITE 8Tp ouH la MINGO SWAM 1.14r44.4Ap),k.*, ��� 9,11 ° ° �" SITE 7 r �a� 1� ou -Y27-POT Sta.10+92.32 END BRIDGE BENSON 1111 _ END CONSTRUCTION SITE 4. -Y29-POT STA 29+37.96 CITY LIMIT -Y18-POT Sta.37+38.58 �.;1►��/� END CONSTRUCTION BRANCH ��l� BEGIN TIP PRO 'CT I-5986B -Y29-POT Sta.35+50.00 -Y30-POC Sta.19+00.00 v 7,4II'\\ -L-POT Sta.1232+00.00 END CONSTRUCTIONBEGIN CONSTRUCTION a,�. ' SITE 5 -Y29A-POT Sta.39+88.01 �� END CONSTRUCTION -Y33-POC Sta.10+50.00 SITE 10 ] r xG Ox rmUS,,En gvI N.00 rc,,,.Sep ro BEGIN CONSTRUCTION -Y33-POC Sta.45+50.00 0 mph F(p MS GISd coxr,iroErmlccs,s rsolecr WITH ACCESS TLAND AND SURFACE WATER IMPACTS PERM! END CONSTRUCTION A PORTION OP THIS PROJECT IS WITHIN BERSON MUNICIPAL BOUNDARIES SECTION 4 (NORTH) -Y19RPCA-ST Sta.18+12.13 ` END CONSTRUCTION 1"r<s.,"LLa,o..."..."."� U GRAPHIC SCA!FS DESIGN DATA PROJECT LENGTH "Z-Ta'�^".. HYDRAULICS ENGINEER ADT 2020= 66,700 TERa ,,.. vc 50 15.-.-�-.-.UFO '1Q0 ADT 2040= 92,900 LENGTH ROADWAY TIP PROJECT I-5986B 3.390 MILES INTERNATIONAL f R-R-R-R-R-�— K = 7 % FOR DIVISION OF HIGHWAYS PLANS D = 55 % LENGTH STRUCTURES TIP PROJECT I-5986B 0.066 MILES _ 11 5I 15, 0 50 l00 T = 18 %" TOTAL LENGTH OF TIP PROJECT-5986B 3.456 MILES s SUSAN C.IANC SUER.P.E ROADWAY DESIGN ENGINEER ill �� V = 70 MPH RIGHT OF WAY DATE: IIIA PROFILEPROFILE IHORI2DNTAL) '(1'TST 13% + DUAL 5%) August 30,2019 PROJECT RICK STATONi lI 5. 9 10 20 FUNC CLASS= urea ucrm"�cr" INTERSTATE LETTING DATE: STEVE D.KENDALL,PE »»N`��7 PROFILE(VERTICAL) STATEWIDE TIER July 21.2020 "''aO"'�"'"cr eE —7598,7 O. :xx7 . / �NO. 2¢' p S 100' ovara"N xmuwc / 1I1iC\// - DE WETLSAND IN / SCnLe:t'=tSOoo' Im��PRere PLU S �'/ DENOTES MECHANIZED // + . + . CL EARIN NOD 5'4° / DETAIL 31 PERMIT DRAWING / "°°4"" SHEET 2 OF 37 END CONSTRU of N — rxowrns xoocEs -SRl9- 28+98,68 _ woos // 1 . ; ; ra.uv nr O.s.1x.. iO nw,x' .+-. . . x x . + . . A . . A x . . . • • • • A A A Tp '.e$u ErsxO'rtcx' 8 Oar oRE x /.. wxxo,w � � .fix 31 . . . . SITE 1 ,x 1,11 o.o r xEx 2. RC 3 O -�`�...�g_- - jai +� 'x Faoa `. I; R GITt" ^.. i " ...aa z . .r a 6 - ,R " —.x¢ L r .ti Q if o /.'- caa °. .a,a. ly,, . cc .... ,a. a. sa ... s. .R ewe s TRACY a.Onus ADAMS :I -n 4PI F B b 6 Q QQ J CT O 8 0 Ci 88 Q 8 8%1 ° OWED BARBOUR Mx oR 1 a .ow, R«.n snxoRA PAR R Bur P.RxER ® x,r.,,r�E "EB'xnxo roxz END CONSTRUCTION -SRI7-POT S/¢65+99.36 sr wcTirr�w a cn �`M1� / \. \ / INOTE�DRNE`NAY RADII= 10' lll"` UNLESS SHOWN OTHERWISE .— / SEE SHEET 81 FOR-SRI,PROFILE SEE SHEET 128 ..,. FOR-SRI,PROFILE SEE SHEET.2 / r.ae I-5966BN0. 75o. / PAY SHEET NO. 2 S 100' owwar"" amuwc //C/ DENWETLLANDL IN / SCALE:1"=too' IZTVII JA PL0 S �' DENOTES LEARIN MECHANIZEDG // + . + . C N' p\‘ DOCUMENT MT CONSIDERSO ANAL UNLESS all SISINATUNE3 COMPLETED 7. ova:NooN: � t® L1�6F —'. PERMIT DRAWING N / """''rreT``"" SHEET 3 OF 37 END CONSTRU of N 8 Txowrns xoocEs -SRl9- 28+98,68 �� R �(_ �x.. Q' 1 .,.�.1. .5�� _ ;SITE fi� �. ... _ti :.� ear l-- `*-s :'�. , . . c R : * ���.,� — - —".. 1�:. row-.� 0,1��-i �i' .�O,�i''!',sa3fLtT I — 'a m�W �L— s „ z_ -� — c 8 �e e�- a�" xn.�xox ,:- �„ ., ,LL = s --., -... ti�ei i�7„,,,,,,,,,,,-.......„.> Ali:7,�4 7 i0.- ff'l �l �.+,p4 ei fin%heat! x oas�i _ vm - .v /t �Y ,s...a . .=. .as.?MttlF !+t, , r u E �aEaw:" �T�iF�' / VS .aa v, ��Mait,7 d W s I: IIa . .M . '� �� ,l; �, & 1 qN a °a . jt g • � , : c . ca ,m e 0 . Oka ", p. ¢ .a. i R ) ' �� a a� ilte� i � aaa ! a6a a a „,aic ' r g, H- - # ' m .1 , a eu.PARKER ® EnFem."'""An' °.. PEG,.o roar END CONSTRUCTION kl -SRI7-POT SIC 65+9936 wcTirr�w cn I^v \ / I NOTE:ORNFNAY RADII= 10' UNLESS SHOWN OTHERWISE is .— /`. FOR-SRI,PROFILE SEE SHEET 128 FOR-SR19-PROFILE SEE SHEET 1,12 n o a .aereaanca 59101 n aoll-5986Bno X-811 150 1.0 1:0 120 110 100 90 80 20 60 50 . 30 20 1) 0 13 23 30 40 90 60 30 80 90 100 110 1 0 110 010 150 PERMIT DRAWING SHEET 4 OF 37 2 5 I SITE 3 „n Z n „n SITE 1 S ',I; F n A 0.�., ee25 j a._ u.ur r� _2 , FILL IN WETLANDS —I FILL IN WETLANDS / \ ten 1256+00.00 Inn CI „n 3 g ,0 3 rLr FILL IN WETLANDS — _ �\ —"I FILL IN WETLANDS 200 a� 20'.51 \ 200 T1 1e0 1255+50.00 n 2 ,,n z A 2 n 5 t 3 0.025 0025 --,10 S 0.015 0.07, iia FILL IN WETLANDS i oil FILL IN WETLANDS RW / 0'1 ,00 ,e0 1255+00.00 ,9n I0 z 2 I SITE 3 I .0 SITE 1 I �5„ 2N N 5 I „0 $ _S 0.025 0025 _ 4 0.0'5 0.02, .2 3 510 FILL IN FILL IN WETLANDS / 'N.. I WETLANDS ~ 206.W a:\ 200 / \ \ 200 IT .w 150 1w 110 130 1)0 100 90 00 TO 60 50 .. 30 20 13 Y 13 20 30 40 90 60 A 130 90 100 110 ISO 130 1.0 150 I DENOTES FILL IN DENOTES EXCAVATION �E�xF,5,,98„eFFNO E aF�36" //� WETLAND ////./ IN WETLAND sp a• o so• i4o I 11611 i otr y, aro awc DENOTES MECHANIZED DENOTES IMPACTS IN SCALE:1^-100' CLEARING SURFACE WATER iINSgfun fills'/// M AOCTSS INE SURFACE WATER �p .0'‘ IDETAIL JB UNLESS all$1141111TUNIE3 Inr:/ ? .M 5 id6T1 COMPLETED I PERMIT DRAWING \ 90 Fa:�^-�iro... ,o,.. SHEET 5 OF 37 . .v: e . ® . v : fi v v . { cwcoPEc wc. C9 a.a. . p 9.�D +a . a s a b a a *,a ,� ,I, 1 Tam a * PP‘'' ''''''''' - ' F V ¢i', .} _ E+ Y �� `I�. � '`.x F r r7 , Goo,-C7 h1A, � i'S , 3511lIhi PAT 0 .w. I � � s , .� s µ dirmiminwaift RCP, R i. E� i ro FLOWAGE F, 1,11 — � E a mg **®a M i SITE Zh' .,r.✓`- * SITE 3• , . . . . . . . :ff In a 07n, rterrAYR c�u.a s.ao i 00: . ae� ..L To ort L.ac REAL ESTATE Ix.Fs*aE.*,7*1 uc o� / IMIF DkTNL 0 SF DITCH w5 I FOR-L-PROFILE SEE SHEET 82 I DENOTES FILL IN E/ DENOTES EXCAVATION -Tax- E„° E«G�aff.N //� WETLAND ////jj/ IN WETLAND spp z�s• o so• E I-,5,,98NFETao. �F36 o. I 11111` o.w,..x- as � DENOTES MECHANIZED DENOTES IMPACTS IN SCALE:1"-100• CLEARING SURFACE WATER i INS gran PLC S '/// IMPACTS OS INE SURFACE WATER �p 0'1' IDETAIL se EL I T .E,°s� id1T „: I PERMIT DRAWING \ .aol"-�i90rog ao... SHEET 6 OF 37 gg il SITE 1 I ////77 J SITE 2{ { 7 sT m 'W t x,r a °n? : ` Vx m� 1k 4. ym yLY Lxm x a ` t a Q• {� a I �(Iy i a .: '°` m /. H) / i+�d�Cis .� r . yJ L qE x x x m m m��i S y 4 c� tt'l AZ N cti+tle3,4. MIl RZ� ins s+ 4w+ i Eri-Ci ia� aw��.,r ,:.,_*�.W__ s ,N = in ,y W fsfRe a > a����6 �1fllie� I�f •Yi��s1����I ����� o� '7 }_ .4. M .Pf � �_--4 / !,�_A_.__ � a000 G AF° "�' _ c -���,L1� �� mom' =-- a:=---��:�''' ''1 $ ., _ sue „ }` __ --�= —4 F ��I I L. RFNOiLFSS "�To .'' �f2�si ''9 �i Cii 7iY. , s�.,,,:7 ALMpN tli" - O ''�#ae•e.`'s'"^`' '+ ' .1�/1 4.'i= 1-.... `rl/t• a— ` t far -----�� I►`-- ' „%x STE.oa<P �® * SITE 3 • , �J L� KL % ., —r+- / `�•.'�:• • ..L To L.ac aE.�FST..F„aFSTw�.T.ttc G / $� DkTNL 0 V. FROM n..1265.e0ro ST61267.50.-.. h.; I FOR-L-PROFILE SEE SHEET 82 N BR,E/CE HY?-A//JC DATA P7RCN"'rc "B xo. zxo..z""830. DESIGN DISCHARGE =1590 'RS DESIGN FREGG/NC( =5E 1 RS DESIGN IV EL.VATAN -/'53 !T 9ASE DISCHA/IC /03 KS' I W s LFT6 PLANS RASE FREQUENCY =109 1RS SASS HW LL51 Al IUN - 00 AVERTOPP NG DISCHARGE=/7 4000 )Fs PIPE HYJR'I.1C DATA 300000F2 NG/rceuOeON=J_40 I 3C S/' 12CDAT E- NER70PPNG E LEV<TION=2043 !T DR,NAGE AREA -I4J AC DE--N PttEOCENCI -,O CAR DOCUMENT o ` FT DES GN DISCHARGE -32 CFS e�� - �Rl c yr>m =OE<OJ 2W/S I,-I263+/S<JD DCS: ,DV CdCV ION 2 5.5 CT I- NS.EY£VArION L EL=203b5 ' 100 EAR DISCHARGE =A4 CFS ='I ,vo,r _ = PERMIT DRAWING -v.. . ,r1lw.l OK,900A gC'0PPiN DS.- '. 40 0- SHEET 7 OF 37 OVE-DOPING ELEIMT/0 -2056 FT 220 /-0. 990 BEGIN BR DOE END BRIDGE ' —,-L"I , 5m.i3ei Tao s 210 iow cxa,o / �PxpPoSED ——— =_— —————— 910 / GPADE 700 / _=_----J-W3083Y.A74-i46 ----- E%IST. DW 200 GROUND fI A o D 190 Is. I. - a.v PEG,ITCH Lira Off-Di/ 190 PIST.1265+35-L-RT FI STA 1267+85-L-RT EEV zse = 180 au.. n.zoo co v e is.i�ouw 190 <i.o-s,,-wao—, 160 I FOR-0-AIIGNME1lI,III SHEET 36 170 1258 1259 1260 1261 1262 1263 1264 1265 1266 1267 1268 1269 1270 1271 N Pl=1275K0 • PI=1211/00 • Pl=128 hO0 EL=216.46' EL=22Ib0' EL=22+0 VC=2I0 VC=ZIO VC2I0' 2d0 K=/50,T K=I K=636 240 EG J/TCh PI,TA 42Po+f 5 t-IT 230 EIEV=o29]4 r+,029 yY.4OC, 230 220 2EG . ——�a— \-EXIST. 210 GROUND 210 ,8 200 200 tlt Eirr 190 I FOR 1-ALIGI{MElII,SEE SD.37 190 Hi 1271 1272 1273 1274 1275 1276 1277 1278 1279 1280 1281 1282 1283 1284 71:141:I10 P .REFERENCE SHEET N 2-22, ROJI 5986B No X-813 2n 150 1.0 1:0 120 110 100 90 80 < TI 60 50 . 30 20 1) 1 12 20 30 40 90 60 70 80 90 100 _1{0 1 0 140 40 150 2 n I SITE 2 13n 0.030 0020 1k 0.020 0.030 n g PERMIT DRAWING — — — 2S Excnvnr• / 4 3 SHEET 8 OF 37 .... 20.3L19 r 1260 100.00 130 0 100 0 L „n I SITE 2 I ; g7. ,n 'OD FILL IN WETLAND. _ 0020 _ t� ; MD� 20.19 �------__- ten — _ _ _----n T259-F 50.00 ta 5 0 5 n I SITE 1 I ► FILL IN WETLANDS z n,n I 3 0.02 A n mn 0.090 l — — y � / 20-.48 °° "259-11.08 un ,n 4 n O „n ; ,n FILL IN WETLANDS 3 0.090 0020 ,l 0.020 0.090 1 -- 20:.55 — 9n 1259+00.00 el 220 Z I SITE 3 I I SITE 1 I 5 z,n ;° d< 210 FILL IN WETLANDS uoz9 0023 1 0.0'3 _ 0.02 2 3 0 / \ FILL IN WETLAND 100 190 IT L „ 150 10-0 00 130 110 100 90 00 TO 60 50 .. 30 20 13 j 13 30 30 40 90 60 TI 130 90 100 1 0 ISO 130 140 150 No r .aereaE,aoe men 9 ao1I 5986B 8o X-815 150 140 130 120 110 100 90 80 20 60 50 40 30 20 1) 0 13 20 30 40 90 60 70 80 90 100 110 1 0 40 40 40 PERMIT DRAWING SHEET 9 OF 37 ,zn I SITE 1 I p j nn 5 .57n L. i ,1n FILL IN WETLANDS Ioms o025 0.035 nn, — ,00 �� / z 700 2M.61 ��__— S.:l ,9n 1263-*50.00 100 a S „0„n 5 ti m 3 3 ,ln FILL IN WETLANDS • �a� m '� \ 0025 — oozs a.03 _ , 1 200 ` 1p0 ----- 1263+00.00 1911 „0 c i „n 5 5 „0 ,10 ,13 FILL IN WETLANDS on,s. oozs —=— ams oa,, A 200 g:\ A., ,00 140 12A2 t 50 00 1. .04 D IIR Z zlo I SITE 1 I z10 FILL IN WETLANDS ^—.— 0,030 oozo 0 0m0 3030 \-------��••gg}77�k..,\\\ 190 T262+00.00 z".Y IT L Lii 150 140 130 130 1)0 100 90 00 TO 60 50 40 30 20 13 j 13 20 30 40 90 60 70 130 90 100 1)0 120 130 140 150 ��A,, PERMIT DRAWING `L"`I-59 66,9— I v38° ° x' " ° „ SHEET 10 OF 37 °tw,,v°7„ Ram STA xx,,.T°VA x,,.x,x-n.AT Si ¢ in.._ p DETAIL gip, ,l "�.m, �Aii�l 112111\51� H 1 r„F N, ` SCALE:1"=100' ax sa ALLsioxenq CO MPLETED r/:T .DENOTES IMPACTS IN "EMI+x< .xxoEra& / kr PO TyT �// SURFACE WATER ,,*' ' ' ' ' ' ' ill SFF yZs� yz9 / DENRY IMPACTS OS IN SURFACE WATER „ Z///// ���°° u o T°E� L�l - - L''1�cur ,E 'YE'All LonL I� �x-ru � x . x x 0//,w\ x x r� �//---x- k ). Ie w�N _ __/ -- , _ �.,�:rxa °" J """`so o -ENLARGEMENT VIEW - r r --- SEE SHEET 12 OF 36 _ ,. - 12 _ "°"' srFALn v. Rom. si I VI -leav PO 5T 4 4.ws xwu-r-r _ ----�_— —_ aowuu FILL --_O J_ s a a Ts r.„ _ o -y- li :r F 'apt .x-.o.�x` x -x Ly x tlj� - L POT SY 1294 89J6 U �� �—E rJ W� r� /1 Y29-POT S1a 2i39, �� � L 26 6 xxx°LrAL� a\ STA F11113? ry/r ar ,„,�„ � �`°�1.`�'' SITE 4 �T0 r-`�'. LOC REAL ESTATE INVESTMENT,uc �l�To /,�/ :o s: y.� �li�T ' aCAPiTAL,LLC 1 ..,,,,,w r°xr,,,,,“-vxc-LT jl i s° o k $n - %/� -Y29-PC SY°.3IiO5J2 Lxxy �1 • /�// -Y29A-PT Sta 1,95J29086 6 °r`a � /�/ 20009,vTn,n ksr �//6 eo ir ��roe :ff°P.fL a1 �E 1, #70 / " 40 b. 3x ,$Tfcy/' »a Po�x sR°FSY TO -Y29A-PC Sta.IIs39.74 y o LD S FOR-Y29�PrZWL SfE SHfET5 13)AND'CS en. �Q!$� FOR-M9A-PROFILE SEE SHEEP 130 ��A,, PERMIT DRAWING ""`I-5986E„o. I '„380. ° =,A„ ° „ SHEET 11 OF 37 p��y°„FF„° „ w 1yv LgP .FROM STA 1290,0 TO "" r" I/ !1 a 7.7. WV�vRere a�< s0.51 FROM STA 2,m ro VA.2,43.az 2,R. (y/ y`gj,-'\ 5'x2' O 5' 100' u7"a—NT' -A- cLoe,' x.w 1 \I)�� 1 ) <,,SCALE:1"=100' T. i i ,L1 f ROM....1,royo:/,,...DENOTES IMPACTS IN <Rw..nA.z,.aa.,O n.'.z,...-.,v-:, . _ _ =1I / / f I : a`�� / STyT ////// SURFACE WATER a'' EE d• �� , �, ry it SFP,,zo,,, /79/ DENOTES TEMPORARY if, 1'�: i �� //� ���������° IMPACTS IN SURFACE WATER /f ; g// \'' t; �� ^��/.5, :°"�":�'��,`o,. .o 4„ �'"_',� �.,�' �.-"`,g am` ,,//// J `;,. 14*. s N -' ' . �_ ��'3 - -<va- mot— 1, _ Y // '6 ,In • \ _ ' —� -- Cir'}Tf `�` - 24 x4 �x x � f jr .EE SH L2 •. ..., - _ I, R�,�,77:_ CV .! !! i 7 rJ jd^ z9 Po Sa28+J92 V P E� j �: , , '1 ° ._ `E� \ ��_�' '� y/L ,, ,Ro,.nA.,,ro,o nA.3„ro-�,- ,✓ A <. <. '? 1�� r29 PC s0.r/os/2 �Y�t�" 4,�rC /,,, i _-0, e O SD �.,:/// '/� S wv� E 6 Its 6�hq,�0� 'Try 1 e F .,o o ,.,c o,< 4. • V- Po� 'ID fY l0 Q -Y29A-PC Sta.1I+39.T4 �, / yF o LD PROFILE - S FOR—M9—PROFILE SEE SHEETS 137 AND 138 «a �Q!�� FOR—MA—PROFILE SEE SHEET 138 g PERMIT DRAWING m°' =s8r 1 '''Em' SHEET 12 OF 37 SURFACE WATERTS IN w`"`"``°� "'o""""� // INCOMPLETE PLANS DENOTES TEMPORARY Npo s3 /, IMPACTS IN SURFACE WATER Il 5'6.{5'1fl�135'il�' 111a1 R Q SCALE:1"=25' DOCUMENT MOT LOINSIMALO MAL OMEN OIL SIONATURE•commurEo LVI I, 2GI—A 6 TRENCHLESS INSTALLATION " -0" WELDED- STEEL .j MR IMPACTS IN /�H -/ 1_( - SURFACE WATE0. __ TIN UR ACE WATER , REMOVE 77' 1W9.9DS___ _\ .go,,,-.• , 36" RCP u�X' I X - �� X�� X E- ESP C. CUT V—DITCH SITE 4 SE DETAIL 1 CIL I RIPRAP EST. 48 TONS iii EST. 89 SY GF p—vsem.a Ho. —. PERMIT DRAWING SHEET 13 OF 37 60"WCP QA 19R5+4B-L- L SITE 4J V JB _----� 2GI 2G1-A " ��LAT'V'DITCH L � 15"RCP lr_ 60"RCP 36 RCP 60"WCP INV OUT=223.3 SLOPE-0.54% 644"PIPE SLOPE-6.43% s I 3V0 J00 0 IL .11I J00 10.01E75PE976BE NO 1 SM40Er NO. / X RCTZEIL5"4'T N° II ovew // \ SCALE:1•=100' "Alttr 2,500 i INCOMPLETE PL S 14,43 • z I 4ET4LIT0, '72 PERMIT DRAWING SHEET 14 OF 37 •. — ....VA 35,13 7,S TO SU 39+44-119,0.r 4/ --,30.-TO S141,11,00.LI '741.TZTC" (7 1 41 :::..t: ., ji 9' INKTgl• S.P., f Prop.*, -L-SC Sta.151499975 5,131,47-L-PT -L-TS Sta.1312-F0375 ,NLA4EM NT VIEW, ' •EE S ET Alfs F 37:Alt°,°,"" ‘,:, ——— Wilt —alai, SPEC CLIT 3;4= TO 1. ToE , , TOE---TOE TOE----TOE TOE 111 P 4 TOE---TOE ' '''11 I t_ ___,, ,,_2_ ,--____ --.,.- -.-'..---= • 7-'-- -.- 44/011.,1WAWAW..-- -tf7a-r4.-.,----W0,—"-..MW AMVA.±.7.3•"A' r—.-r...-Miliiiitatlk111141/11/6"11.11- ,"1...."-Id au _ ,,,,,Sly___---NT.Thaika,..WrwrijMumMeran.71MilMil=.WMIONFulal•,. •.,.a .kiggi...-aw 13,a, ' ,,, .p,.,.. . ... .MIIIMMM.141.Mik*--16.1rial.. - : - IMMEMINIEr _PPA ikiiiiLIFIll + -- -j i- -- - --__IIMIIM g __ __ — _ i• •=1.1.1.1===.1- c0T,,_,,, --1.„-0--- .--.— --1- --0,a, _xo-,-—,—,:,,,'',—,-,.—e-.—x ,.1- 4 x—'''',,-;,:"R—E7-mo' ''','' '`,F000ki—,— “v. g4o,,,, r` o 0 - — . ,._.__ .„.„.. __.v__ '-WIWI ,5—..................-5—.-----_,— __ _.__ __—.- -- 1 Firff."-ffffXr ":ar.ir.-%-----------AWAwar.wAiriMINirar-4/ArAPAPAYAFTAF— IL/FARM ntaih ...m.1 bir-MIL \L !-.s.MM. litea.M. 101114.t.i/. 1 alige-a1414; 1:1 M11„7-i, -,.::1 ----- . le PUF PUE PUE PUE PUE NE PUE PUE ME--i ZEE V. ri T, I DEUR 25 MAIL 6 EST 14 SY OF 61E1A"C" SITE 5 T ET ' ,f CAPIAL,LLC I NLAITnevErvrp 7,--- : E • -77- .:,,..,„,„ :Vs'''." ,,0,0„ -Y 29A-PC Sta.30*963/ .17). ' -------- Er a,Elii,IFEEKA X0f. DENOTES IMPACTS IN c,„ „ ,T0,0 000 ro 0,,,40„,,,,,,_, SURFACE WATER /ff* DENOTES TE RY ,,,... IMPACT SURFACE WATER Zal __------ ::3 ---- I rn=;,-.-Lozsgl Irma 1.1',,3, I-5986B 1 40 / \ scALE r too .. \ E1.1. ------ C2114612J1 ,VDpOAISloZeI DISE a f:A-F,a e P I SOOLOODSPPROP EA 44j Do El-p p E. PERMIT DRAWING SHEET 15 OF 37 4, rom Esc.sEA ss Es Es To sEA',LEE vs',o 17 B-30 P ROM STA-1300 SO TO STA.1,11 00-L a ``````t:Ur` if 41 Tanue'e! 41 "C" ( /I ``rt`ts setdilligia.._"- . BP LE a OT -L-SC St 4,- II995,/,A.s .' I r EM N VIEW il ,mfbk,q,,,ry,4 A F-37'ME MEE E'EEC' —_- L TS Sto 1312,0375 .,../'1 TWE ..... .E / .F. r'-----'D' 16:7 t AriZitil'4(4010111,04...a/Aall 1.'" AIRIO.4 TOP -- (---TM .---'-'4,..e'',WP/WF'—Alr----'P.Tai.Aik•'-'....-W4 -PP,P''F'a6--.F.1-r—.: ..TLF''Al•-.VINATAlair - . _.,...- - 'F.". =•V -'-- "F _.,••-.?"5161Pri.M.,==-------ValP.plirikalhalni171Vaa•m•liwn., ..4W,pi,..k... .... . . -- --....-"ax•-w-ww............. _ r.,-.. jimiwiri .=-4--^---,-..• '"'" ' .......k",_.- -- . ------_-_•_-,- _. — ne _ l' -------=--'..........,zz j ,..•_; '----- _ . .=,:p ........i.. ..w s_A •.'r 5 D 840D ..-t W-----V------ -FL61!----- - _--,-K,1; .A0 • ii -OA„...„. __,, .„<, M kia-al _. ..... .....idiax,„,- __•-.3.... .-- ii—in gz... .-4,k it.. on 2 2 0_ Makiosena . .- ---- - -. -Nr .W N r IIMIIMIE:itialICIffliummAINFANA _A17-, ,._ _._MIBI .A,... -.T. .._a',. 1... .,1••,. ---u 1----IF ' Air' rIVAEWAIWAW-r-05,------ raiMANINMOMMWMal114_Itttallfa,4,4'':.2:4Pm.aMb V al 41-1[1.IL--Niligk‘ .. -Xl ....eillaiL,4 ..=•A-. V" „larairt,, ALF Ak-11161\1\111. vaf. L.. = PUF F.MI PUE FU ..L. 1 Epl —. _ TOE TOE-I---pp M . TP411 4 L Li-1` - - E.----- ---1.11E a esr es sr OF 61ETErrEll gr t %, TAL LC I I DEUR 25 '...Mr.' .“'tL'il.''''' . ENLAItElaRT• " I ''''.KU / Y29A PC Ste 30,8631 X0i/ DENOTESIMPACTS IN ,. a7"..r TocS EA,tA SURFACE WATER ..-- `,`` le. ,, A tq DENOTES TE RY 21'...i '/9/./ A IMPACT SURFACE WATER EPS 83 8 84......i PERMIT DRAWING —7787B— 1 '"`A"°. j DENOTES IMPACTS IN %�// DENOTES TEMPORARY SHEET 16 OF 37 E"°,N.E "° �°a // SURFACE WATER �j' /, IMPACTS IN SURFACE WATER tIMMET6 oL�S W's)03 /I ) 125'6.{5' 0 125' 2�' 111�1�2 i SCALE:1"=25' TEMPO' 'Y IMPACTS y 0 " ; dry ° . M IN SLY ACE WATER / ,, . ' LAT. 3' BASE DITCH SFF DETA{to TEE o .��� IM...CTS IN 'St ACE WA •I1TER if '�; � - A �*��. SITE 5 H * --- 7' 0 :MI* � . TRENCHLESS INSTALLATION „,.---7� __6D" WELDED STEEL FLOWABLE FILL ' — 7 2GI—A — 1$" RCP—III = = 2GI—A_ — (zp" RCP—III PERMIT DRAWING -i7878- 1 -E"- DENOTES IMPACTS IN %�// DENOTES TEMPORARY SHEET 17 OF 37 E 1E "° �°"EE. SURFACE WATER 'IS W' IMPACTS IN SURFACE WATER 11.72 8T6 MILT NO'03 125'6.{5'IaI0�125'i2�' III SCALE:1"=25' SPEC. CUT V-DITCH °�"`�==.7aa,,. SEE DETAIL 6 a, :°'�`I a K X - Y X X llk X X ak eA 48" WW ISBIN '‘iikair 1 auirc--3—3 4 H_P__G_-_7__4__1 3__r_=__-_-iii-.m„im,.a,.,.WtiMO. .R 35+iI •.- -Y29A- - ►f.,/c LATION �!�� ' WELDED STEEL __ ___ Ar_.„.....-.,,-, ,, -...„, ,„,„,,.. :,.........,,,, .,,,,,, _:....„en .,..,...„ta 0 LAT. 2' BASE DITCHINVIII 7 W N �— SEE DETAIL 2.5 P __ i ` . _N IMPACT�JJN * s PUE 'URFACE CIFR N N TEMPO'•RY IMPACTS co IN CO co WATER -- TDE SITE 5 \ / \ �1 A YAM CAPITAL, LLC INS a era PERMIT DRAWING CL STA 1316+96-L- SHEET 18 OF 37 If SITE 5 2GI-A 2GI-A PLOP TB A, EXST TB 3.0'BASE I-TAD DITCH INV IN=230.9 60"WELDED STEEL INV 04_17=229.0 SLOPE-1.2996 bD"VV��//ttWtu SItkL 60"RCP SLOPE=0.96 3vU ,'tP' °° p°-- =2.m-° PERMIT DRAWING -"°" "`" �� SHEET 19 OF 37 -i t - w ''''" H 4 Al sloosiellillg o _. .ate.. \_/i �,-- - vigil r.«.erg _ e nery ..=li „,...,,,,\,/ -, '17 Z's-7,,',- \k. , 4 ,,,,4,..00 7 i I . 4.47.?,,:W/ 4•111..../.ffilli I d NI-- ..rpiiiniiii [I _ ,._ ,,,o.t....trai,-. , ii , z N 4/ UH / \ a d'/ p \\„ w . _�/ ENLARGE. VIEW '��lv� \`\ _ � �'�1 �•�4EF SHEFf 22 F 3]� _ a ���._ / fy/- ,� 1 - '.Ke/ ._..__ C" �� W $.�...M°b.2% uw: \ PERMIT DRAWING --.2:44-..... " _.' SHEET 20 OF 37 I 1 ,, Via: 01 1 ,k ' _ ®�, L. _____ .,.,,,,,„-, ,,00, . T, \ iiff _ �F l 4 m �F s. �./w._ f \i :\1 :G 7.'. „1..,...1°J ".,.., ._.n„-.W H PERMIT DRAWING "D'i=s9e6B.' 1 '''Em' SHEET 21 OF 37 /O DENOTES IMPACTS IN w`"`"``°z E� "'o""""� �j' SURFACE WATER N ®PLETE PLPL NS // IMPACTS DENOTES IN TEMPO SURY RFACE WATER 3 0 3�5'12�5' 0 3I5' 5P' �R2�R�I I COMPLETE TEMPORARY IMPACTSWATER SCALE:1^=50' " DOCUMENT MOT TEMPORARY IMPACTS IN SURFACE IMPACTS IN MILE.All axREieam IN SURFACE WATER SURFACE WATER7:41 c�. r \ �p £T r \ o *=i'` / i I ^ DRAPE(GTD) ?,�-.:z•w- / f I I ' ' H 444441444441,FV J(` /S V ��svp JB rW ` \A ScO I IMPACTS IN , i SURFACE WATER JB H 7GI`SITE 6 y/$ QL ' /-95 SBL 37'PAVED ��Z I---- ROADWAY (� ----- ——- Z I - -- �___ o � _ �FLOWARLE FILL c= PAVED ROADWAY L 4111111111.11Ne ----- IP ---- __ Z —__�Ric CHLESS INSTALLATION �� _ —=zI 6 33 V\ — ___ S PLOWABLE FILL �� _- \\ - --- —£ \\ IMPACTS IN - - -,- - PLOWABLE F SURFACE WATER �- f� -95 NBC_.. IQ LTA . --- -1A �-MT{__-0 RENCHLESS-INSTALLATI N—`16 J \ \ / � \� I� \� / h��� .. HW ".• 0 c.. 4 0 ,� 24" PERMIT DRAWING �'/5986E 1 '"° SHEET 22 OF 37 •° ////// DENOTES IMPACTS IN w`"`"``°zE� "'o`w'"'""� ��' SURFACE WATER //M Ql ®PLET6 PLPL�S DENOTES TEMPORARY /, IMPACTS IN SURFACE WATER 3 ��rr// 0 3�5'125' 0 3' 5P' ////// DENOTES EXCAVATION �R��R�5 i IN WETLAND SCALE:1^=50' DOCUMENT MOT LOINSIMALO NMI OMEN OIL commurEo DENOTES MECHANIZED °'nul 116 * * • * CLEARING �p�4 -LO�ABLE FILL ��_ �" //�' • �� __ — innr .........------"""" 3,_2--,----_- ,,,,,--willitir--- __ 13=1 --j' ,_. fro -4.,-,-, ,--- : — SI RIP RAP ITC. /^ -��„.i - END WALL :, -.�/- EST.90 TONS.. / /v+�F ''` STREAM'glia START HERE ` EST.150 F __>,.„, !• li �'` BASED TY SOILS MAP EST D •00 Y' /* % " �'- SPEC.CUT V-DITCH 'T / 7:41 01 SE AIL / SEE DETAIL 1 g // �. LL G �/ IR Ao�// 1 . QY „! it' %/ 11; , ''i > '1)— IINWATE TD :Z44/ . .yid. �II1� V*,' ti� o o tp Si00.41.3-•- \ /4474 4\4<, 'r'' Y TONS - i CJ i 1 TEMP.RARY MPACTS / 'LEN 25 SY GF ram'✓ IN S RFACE WATER / LENGTH=15 FT SITE 6 s^. ,t,,t/ 2UI i-P,,,A0 - )\ IP 1WIP� ti QVE PEpRTNERSHIP H MECHANIZED CLEARING m ao1 P annErace 8o mn90 H I 5986B X- 3 150 1.0 1:0 120 110 100 90 80 20 60 90 . 30 20 1) 0 1) 20 30 40 90 60 70 80 90 100 110 1 0 110 110 110 PERMIT DRAWING SHEET 23 OF 37 J/n >4n 0.020 0P1n ' 0Jan 30:1 — --- 1/ 230 _r � — /' J90 _ 22l.56 _ / 790 `-->10 1?125.00 J >10 Jon ZI SITE 6B I240 ru 0.020 0.020 J80 61 -- >yp EXCAVATION __ -- 210 18+73.00 701 0 2411 z 240 5 t 280 3 0.020 0.020 280 Rtn 22:.96 _ 220 210 1 8+20.00 710 250 250 tn El R40 Z 5 O 240 4. W Ran 3 3 0.020 0090 220 - - - - 6:1 99:1 �10 17+75.D0 510 2;1 -YISRPD- .w 150 1.0 1:0 130 1)0 100 90 00 70 60 50 .• 30 20 1) f 12 20 30 40 90 60 70 00 90 100 110 120 130 140 150 g r5986B �eI—ca—59868ao. " PERMI1 DRAWING CI-IFFT 24 OF '17 CL STA 1346+83 4- 114"WFJ DED STEEL SITE 6 V JB W/MH / \ �� -- / \ EAST TB-\ - / I \ ' EAST WS / _ - ___ --' �/ 84"WELDED STEEL Y /y - � 84"RCP 7L � INV=212.8 / NV IN=21:4.0 /f INV OUT=212.OJ INV IN=211.9 84"PI'E J 84"WELDED STEEL ;LOPE=026% SLOPE=0.33% "BASE DITCHA. Eli3vU 'tP 0 r I-5986B INSa rra a" PERMIT DRAWING CI-IFFT25 OF Z7 CL STA 19+B8-Y18RPD- R4"RCP SITE 6 PROP TB `a / 'ROP TB 84"WELDED STEEL 7L \ INV IN=211.9SLOP=0.34% `\\\`T BASE DITCH INV OUT=212.) IIIJJJ/// SLOP �7 B4SE DITCH INV OUT=211.2 L2. JVU 'tP° b PERMIT DRAWING 1-559868 44 DETAIL " _ SHEET 26 OF 7 ...rail:— Ea a O INS trim,PLU S —aC°a' wo.0 nw za+u.so ro nw az+sa-na-n 0 SCALE:1'=100' rw.Er.va..Wro n.uaa,ro-Un •Ji.�e*°=a µ 2P n E. ODADADAEPT NW CONSIDDRED ANAL i \ " anMEs" s,Ewa"a WALESA DLL$11411INTYPIED COMPLETED Qtiz ro .°� a�6a 430 ° 7. ° �oM n.z.,.anao sa.aa+eo-.aa-.. \I w n — aE.o mittOti„ .A wows* '' .E n ,_ ,.®,% Q ig_ �.�E"- wro ate, ri" ��. n — s As o w 8 REMOVE ro o= ,7',Etfi_L,7 "`"moo a F, w .am u,a"„ o gm sue ° E , P _—�_ � .�: 2 ��.�, s wow �� • aww E "�"\ r W DO PaP DUE. 1� „,E � � WE 46,c' , �. a.,".Z �E *. \�\ ,\\e a."E .r siEw.R, OFF 9 Q !! s a.� \, ' syFsa f3�,i' n;:r"� SITE 7 ©9/ \ ��?` �+ nEviry wnr PlncE -Y33-PT Sta.17,9269 / • //� DE WETLANDL IN \\\\ \ z°,�M. / /�.✓///// DENOTES EXCAVATION � _ '"a j` IN WETLAND '\ •\ s aoM n..a..a=o n.w j*** * • DENOTES MECHANIZED \\ CLEARING \ _ O ///// DENOTES IMPACTS IN N\ \\\\— °+.� N ".e� �j' SURFACE WATER %� DENOTES TEMPORARY \\ \\ \ / �// IMPACTS IN SURFACE WATER \ en we n Ee zs� \ \PAY STEWART \ HoiE:oRlvswA RADII= i — \\��33// \\ IuH S sHowHY 0=IISE Er «a _ \ \ RorR.E r s ti se FOR-Y33-PROFILE 3FE 3HEFi 1J0 PERMIT DRAWING I-559868 NO SHEET u ...v,. DETAIL z _ SHEET 27 OF 7 ..rag... .ESE: K.°M��.o — � 50' '' SIp' 9°' ry $ Y I�I I `Y� INS 21,M PENS C°' ROM 3,34,3.30 TO nw 3z+sa-na-n — 0 SCALE:1"=100' O 12 7/S„-( ri ~\\' \F_ p� womn xa r.— ? cnMsWr siEwanr rv-, s:1,A l ` "'��� r a)7 ,fie E.m� �M jo s. �V I: / _ u , — _ .�onu x 4�r , - -- t. , 6 - — � 0 n R a n .•rO. r. 1 -ate 'gyp - �'�—O OF — Frel�� 3- .fir=, .i1z 1 * `2 J IL ryyti »t\ & M. "> q y � i ,,,� .ems .E n : ���.7 T \\ va sFF•P Qo,,,A" \�Y\ Ni l'ers7GF\ _ _.e a a SITE 7 � .. y P4 F� ,<:- �(c:�, 1..?' °C,b.-\ 1 \erg ' .�\ \�\\ _�� \ \. DENOTES WETL FILL IN \\ / _ ND - �°,�1;L 12 / //.✓///// DENOTES EXCAVATION �" M -/ j` IN WETLAND \ \�f� \? uo• DENOTES MECHANIZED \ `� `I , .-..o .". » » CLEARING \a� /*� » DENOTES IMPACTS IN \ \,\ L._6 N aoM n..�,.,:=O n.19 ry: � //�y SURFACE WATER JAM ES \ / //// DENOTES TEMPORARY \\ \ /, IMPACTS IN SURFACE WATER \\ .ns zn \A rroTE:° xovmT orx u1+iEss s ;,, -/ \\ N; \ \ xOEaE SEE sMEE2 eb FOR-Y°°-PROFILE SEE SHEET 1,0 7.4�10 ao1I 5986B REFERENCE No. SHE T N X953 150 140 130 120 110 100 90 80 70 60 90 •. 30 20 1) 0 1) 20 30 40 90 60 70 80 90 100 40 1 0 40 40 150 PERMIT DRAWING • • m SHEET 28 OF 37 223 Cl S ZI 5 __ _ - I SITE 7 --- FILL IN WETLANDS� �� _ o.ozo 0.0 20 21n ——� r—TEMP IMPACTS IN SURFACE WATER 7 0 207.56 _� \3') 100— �— 19+93.50 190 190 900 Z b 310 S a t -- ———— ———— J(C®V&ION— FILL IN AN DS 910 0\ W ,` — o o.O 0- IDIPAC7 IN SURFACE WATER 210 ti�-- 3:) � EXC VA11ON 207A0 980 00 19+43.50 199.51 2.10 i 713 a 01 I SITE 7 I Zoo 370 _---_--- ---- EXCAVATION z10 `` \ \` FLL N WFbT�N)otz0 zln 20724 _ R00 18+93.50 19).66 220 210 I 230 2t0 i-- — ----\ I. 210 \ 70721 _ _____ --- -- Mi200 10�T 43 0 199.81 200 w 150 140 130 130 1)0 100 90 30 70 60 50 .• 30 20 13 j✓<. 13 ID 30 40 90 50 30 90 I 0 110 ISO 130 140 150 1::EP::,..4::z::::°:N":,,ol':': so• zyooloo// DENOTESETL AVATION vw3E -P5 SOFNa.e45 oDETAIL ap INWETLANDs� rmSCALE:Y=100NOSo- F / "F /// DENOTES IMPACTS INn ,9er4 0 . SURFACE WATER Fao".n. a .e-r.,,-n Y �:�°�`ooN "Eroo,.wrnu. FROM 3.a.,1.,.w,o na3,543 531 0 wo,.nay ro+nJ// DENOTES TEMPORARYSSPETAL. 6'2 / IMPACTS IN SURFACE WATER `""'o e.' / ul'n°CVeonntueNaocoDETAIL. ��n..o.o n nr Ew ro"o^aNE ,.3a jPERMIT DRAWING SHEET 29 OF 37 o 1 ettt AMES PM STEWART PET l °c SI 8 ' © { ®.. na 39 ' _<;3� ofMOSIC M n,4Y r EOM T' 444 1411 I 4111111 4 11"II 0 I IP twilim'IM i!Lb 511* I 1 in"N r * ! pr-'-- s',,,,,,- will=- ----,..-Eu - i-m xm m..mmares aw..°r^ 3o 3c.N E _� ° -ArRe,.Ardisv-.-- ....-....-.A62...-,geszt..".2a-rarozw..-Arogiam•---- N. 7.41, ........,._,_ ___,..,,. „„....___......,,, 4,.. --- __ ._ , E. XE�� axa E _` 5Ls1L �..._2,,�__,,, �J Milk _....,_„,„,____.-- r .___,,.. " SITE 10 J ".41 r v.Q1�,► , . . a .3Y33^PT 9Sb.30f637 rsa�, Y33 PC Slo.32f35.9)onu /' ��... "4,-;-.4 'm �:. t x ,, * * :\ Igo' N -Y33-PC S1a.29+2022 CEP IE H 'EMU W a A * x 4 //C/ DENOTES FILL IN .•a» p - EE o". a * Y LEs4.45 \ y3 �/ WETLANDDETAIL 47 ¢ *+^ S E wLso" * m `'' sE .iu` TAOLISHING 1 i • DENOTES MECH • _� LFLIL;;L _m• '�> 1 RAL CHANNEL «: \ m ® *�*� " CLEARI n -LA PBr sra.r39s+asss a9 y ° iB9 611 a -YI9RPCA-T5 Sia.10,00.00 � .+a -.M n^�� q P DENOTES ND w a�s'�°o- - - .0.na 3s.6,Sq S1,,..7 e-via n NOTE:DRNEWAY MDII= 10' FOR 1-PROfILE SEE SHEETS B6 8 g) «. //// CLEAR!�• _�-� - uNLEss snow.omEm,,,; oR li_I PRofIIE r ar u FOR-V19RPCI.PROFILE SEF SXEEi 13641 AWL 50• 315' P 0• 1P0' /✓//// DENOTES ETL AVATION vw�e --6- a.e45 o. RETAIDETAIL ap " IN WETLAND \ a� o�rm SCALE:Y=100' --- L "F /// DENOTES IMPACTS IN C ,9er 8 0 . / SURFACE WATER Fao".n. e .e-..,,-n Y �:.°a`oo" "EroMwr IN��PReeE PLUS wo,.n......,..: n.».:-:,°n —n..- . ..-- To DENOTES TEMPORARY S.SPETAL 17 6 �/e / IMPACTS IN SURFACE WATER Ali a". e ao". -\ ED ANAL / OHMS sloueNEno co ,°n,.aa.a- - raL ,.o.,a..�3. ; ,�� d46f :4 ��n..o.,o o...,IL.,. n °^E.o aw ro"PPa"aa.a. \ j PERMIT DRAWING r„ ' T a^a^"°.e^"•,M^ "� SHEET 30 OF 37 MUSS PAY STEM, PET I; ° / 4 . ,nu:\ (t. LIJ f — ums[ — .§ oP EI LH t (\c'Lit:''. :2.7 1P M.xN z Ma TV hu r % Vitt �� I alik E t ent . �w® AnW 1 i\ A ' —,t -✓ / h �� 041 '4v.- -1 it ta, o�� v#P e�µ ��- "- yea, ,§=L e -v I . .a� � � — —=-�1 GIN - J � _41tr rw' — °now EN, N o r T �l .,e � - —e-_..zio M� ,,--_ ,f a • 1 r "‘ia ii 11� � � I c A � ' 1 1 ::) Airse , � � rs . , {; saws { ' ,_15EiAT, D ,�ma�yy' i ►' .1' i i095Y.30 - Y33 PC SYo.3Pf359)u —na1 .T1i�PI� '' }$A I � Z , t ..�Ls. .1EiS FILL IN I / L.L17.' - "a. , CNETLAND �a / an �EmDENOTES MECH L _� � .�� RE*E.TABLISHING \ ini n *.. . . CLEARI ,A � a,.PPBT sra 1355+aea5 a5,7NAT RAL CHANNEL `,in ' # -YI9RPCA-TS Sia.I0+00AO \� w..•��—' ma.nw Ps IIIIII... c DENOTES ND nwv o- ..�6q Hass ae-vaa Lr NOTE:DRNE:NZ MDII 10' FOR 1-PROfILE SEE SHEETS B6 b g) «� //// CLEAR!�• _��� ��� uHLEss snowH omEmvlsE oR-r33-PRoflls sEE sHEEr 1 FOR-VI/MA PROFILE SEE SHEET 13641 IPE l{Y.E•,•�:.uc an A Al nu 'AT• 1111/11AT ..5�B E .• mo o. " 30'P S..13•F+38-L-RT l5 WSP 3.1 96: - LT :�«'++� eHeFEex UH,NAG AH.A 'AlAC VAIN t LA 05 - DES N REF EN R YRS D.SIG FR DUE CY 10 Y'S F E ..1 U.S/G I u t,5 FF . I IN.-MU 51 DES GN111111 D SIG HW EL ATI, 1IIIuuIIIiiiiii F 2to mr YiiIY�YY if�r� Iiii1IIiIiIIiIIIIIi1iI F�i'!,��—_ 1�� 190 IRO "i�®� ��igi .: •- c_ rl•.2FF•__ 18o OR•MO ift 170 pry .,�,.moo lkk-- -I --I F+i D H 170 U E. I:.43 160 a'..« ,oo.,,Z. 160 150 FOR L- ON ENT,SEE'WEIL 45.46 150 1388 1389 1390 1391 1392 1393 1394 1395 1396 1397 1398 1399 1400 1401 1402 PI F Ir Y/) I/F ' PIP inn in n A 2 WS- Sta.-F2 FF--L 2 WSP .a.l F.FF-L R A/N A 3: A 47 AC i SIG FR QUE ES 50 Y'S CIO 16N FREF E 50 YR. D, L C.S T_� DISF n Cr: SIG hW EL ATIF IBF3 HW FTIO /78. FT 3 12 9' E,EVA IDN 18F 94 4.S -EL. AT FN na.:4 FT FR F-P 0 DI H'NE F + Y'S H. E' /8 + CF. F FER-`IPPI G DI•GH E 13 A C'S -FPPIN DI• A,, I8 FT. J90 1'P!;El • HA l8.42 IN.Fly ATl IB2.'2 FT 220 Fry I= EL 184'5 irF END•T9 C 184:5' --•T SIa l4 n+Orl.m _ vc z F ■ l/9 a 710 'I I K . =GIN GRADE N:U/0SBU •E 210 ,•, T S1o.I41n+00.00 8L a 1 i 200 .I. 200 I- - 190 -I r-,r. Fr r-. ,,.. iiiiiiill 190 180 # F �__ ■■■■ ■■iiiiiiiiii■ii■■i■■■lo■■1■Ili■■1180 yS ii x 160 PERMIT DRAWING 160 SHEET 31 OF 37 IIFOR-L_A1.icN4LENT,1555 4NEET#46 IL 47 150 150 1402 1403 1404 1405 1406 1407 1408 1409 1410 1411 1412 1413 1414 1415 1416 0. /:.4�10 I vxal REM NO, rE868 150 140 130 120 I 0 100 90 80 )0 60 50 30 20 1) 0 1) 20 30 40 90 60 20 80 90 100 1{0 I 120 130 1,i0 150 PERMIT DRAWING PSITE 9 SHEET 32 OF 37 RBB z 9n - _ n o.03 o.a2 .�� 1 o.cz 0.0: n �/ yy 1 ,9n �FILL N WETLAND LS 18o a \ ,BO / \ 180 ,,n Ion 1391+0 SITE 9 20o I SITE 8 I 800 III 1 l D D.03 D.02 A 0.02 0.03 IMPACTS IN SURFACE WAIF �� TF �p/A/ ,no on — -- ,\3, tHO9:1 �' XCAVVAI UN190 —____J 1Ta 1390-+50.00 160 ,60 200 200 7, 0.03 (.02 0.92 0.04 190 II'— — 190 _�/ 190_11 3:, 3V \ 170 1390+00.00 170 200 200 0.029 0025 ^ 0.025 0.02-1 90 ton � �� 9.30:1 i 19(.62 \ IL LR. Rio "I 170 1389+50.00 170 L Lii 150 140 130 130 1 0 100 90 80 TO 60 50 40 30 20 13 j 13 20 30 40 90 60 10 80 90 100 110 120 130 140 150 /:.4�10 I P .REFERENCE 5986B No. SHEET n RaI X960 0. 150 1 0 130 120 110 100 90 80 70 60 50 40 30 20 1) 0 13 20 30 40 90 60 70 80 90 100 110 I 120 130 1,0 150 PERMIT DRAWING SHEET 33 OF 37 0 200 5 i MD SITE 10 I 3 100 \ 1y0 \\ FILL IN WETLAND - EX:AV 110N 60 0.060 � ))�,, 80 9 17n 17.41 —1 0 ,I u8 33+50.00 0 0 �zY S of. C5P 3 3 C6 ton \ FILL IN WETLAND IILL IN WEI LAND—..- \ 180 \ 0.060 0.C60 180 170 17297 175.33 170 32+90.00 o' 0 z z I SITE 10 I 5 5 3 3 wo \\\ EXCAVATION . 19n \\\ 0.0 42 0.f 42 \ 5/2:1 174.62 170 32+40.00 170 280 2. SP ——— 104 90 \ 190 \\\ 0916 0.016 \l 179.29— ------------ iii 7f.92 ?lug 170 31+85.D0 ,70 -Y33— Lii 150 1• 130 130 1)0 100 90 00 70 60 50 40 30 20 13 j 13 20 30 40 90 60 20 130 90 100 110 120 130 140 150 n 0 9 .annElace . men H ao1I 5986B No X-962 150 140 130 120 110 100 90 80 70 60 50 40 30 20 1) 0 13 20 30 40 90 60 70 80 90 100 40 110 40 40 150 PERMIT DRAWING SHEET 34 OF 37 28 no SITE 12 Z S I SITE 8 I 9n 0 3 3 9n FILL IN WETLANDS '' TEMP IMPACTS IN SURFACE WATER ,e o 4 0.cz0 0.(30 a 180 ��--------]-- 3j- - IMPACTS IN SURFACE WATER 17n : —_— ———————————————— 172.02 -37+62.U0 160 160 /W 0 200 3 SITE 8 I IG 190 — \\ CA'ION—RA I SITE 12 I ; 180 Rto ��\\ - FIL0(30.INW0320E1LANDSi 66PA�'15 IN IRFACE WATER 180 — ------ % �3., EXCAVATION 3y • 1]0.39 3\ — _ ——— — t]n 17138 37+12.00 MO Z z 190 ; I SITE 12 I t 19n — EXCAVATION sP C .ILL IN WE—LAN DS — SITE 12 SITE 8 180 --.. 0.[2u OAeo ——IM°ACT S-1 N SURFACE U RFPCE WATER teo - 3j a1 E%CAU•TION . — — ------__ ---- 170 s 11711 72.84 36+60.00 ,60 8 ,60 0 I SITE 12 I Z 3 5 I SITE 12 I ,g----�-. EXCAVATION SITES 190 9ro IMPACTS SURPACF WATFR I ILL IN WETLANDS Y IV \�� 4 0320 0320 IMPACTS IN SURFACE WA71E9 ----------- • 3, EXCAVATION 44 172.69 3E+10.00 t ,eo . -Y33- Evi 150 140 130 130 110 100 90 00 70 60 50 40 30 20 13 j 13 20 30 40 90 60 A 130 90 100 110 120 130 140 150 g ca- CI o. SNen NO 5986 . 5986E til INS I LEIX PL,a3 x-ru PERMIT DRAWING CI-IFFT 35 OF '17 SITE 8 7W6',0'RCBC CL STA 35+91-Y33- SKEW-68 DEG 190 _--- 31 NOqRMAL / 3�2M SKEVJ� 4 3:1 NORMAL / BEVELED HW 3.24.1 SKEWED \ NWS AND WS PONT 180 / OM 6-3-19=172.4 7, ex TB LT \ EX TB RT EY9FAYER EX B LT / \` S DAM TOP 3 Ri —� \i 95 BETOND -- IL- ✓ BEAVER DAM ----------- ON 6-25-19=171.3 EX BED ----------------- /� .`\ 1 L A CL II RIPRAP CL 1NV-163.5 \_PROPOSED CHANNEL c/ Lf� SLOPE=0.30% SL•PE=0.30% TOE WALL `—EX BED WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I S SURFACE WA I ER IMPAC I S I Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 1253+22 to 1265+83-L-LT ROADWAY FILL 0.656 0.232 2 1259+11 to 1261+57-L- BRIDGE 0.018 0.002 0.209 0.051 0.091 45 70 0.049 3 1252+49 to 1262+32-L-RT ROADWAY FILL 0.256 0.153 4 1285+01 to 1285+34-L-RT ROADWAY FILL 0.002 0.001 24 10 5 1316+76 to 1316+89-L-LT 60"RCP INLET CHANNEL 0.001 0.003 3 10 34+13 to 34+31-Y29A-RT 60"RCP OUTLET CHANNEL 0.008 0.001 73 10 6 1344+53 to 1344+68-L-LT 30"RCP 0.001 0.001 11 10 1345+63 to 1346+46-L-LT 84"PIPE 0.007 0.001 79 10 1346+77 to 1348+18-L-RT ROADWAY FILL 0.013 143 1348+18 to 1349+61-L-RT ROADWAY FILL 0.037 176 17+00 to 18+38-Y18RPD-LT 0.039 0.005 175 15 18+16 to 19+12-Y18RPD-LT 84"RCP OUTLET CHANNEL 0.050 0.020 7 18+82 to 20+22-Y33-LT 36"WSP OUTLET CHANNEL 0.041 0.048 0.013 0.018 0.003 92 49 TOTALS': 0.971 0.000 0.100 0.676 0.000 0.177 0.106 821 184 0 'Rounded totals are sum of actual impacts _ NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3-5-2020 HARNETT/JOHNSON COUNTIES I-5883 53083.1.1 s"rom201e Fab SHEET 36 OF 37 WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I S SURFACE WA I ER IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (e) (e) (e) 8 1390+32 to 1391+00-L-LT BRIDGE 0.001 0.010 0.068 0.012 29 BANK STABILIZATION 18 35+91-Y33- 2 AT 6'x9'RCBC 0.003 63 35+50 to35+93-Y33-LT INLET CHANNEL 0.003 0.020 31 35+89 to 36+36-Y33-RT OUTLET BANK STABILIZATION 32 35+78 to 37+86-Y33-RT OUTLET CHANNEL 0.139 0.104 0.086 0.010 207 16 9 1390+91 to 1391+43-L-LT ROADWAY FILL 0.004 0.011 10 32+25 to 33+76-Y33- ROADWAY FILL 0.090 0.050 11 1387+71 to 1388+79-L-LT ROADWAY FILL 0.006 0.002 105 29 12 33a94 to 38+27-Y33- ROADWAY FILL 0.332 0.080 0.025 TOTALS THIS SHEET 0.427 0.000 0.282 0.208 0.000 0.115 0.024 456 74 TOTALS SHEET 35 0.971 0.000 0.100 0.676 0.000 0.177 0.106 821 184 0 TOTALS': 1.398 1 0.000 0.382 0.884 0.000 0.292 0.130 1277 i 258 l 0 'Rounded totals are sum of actual impacts _ NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3-5-2020 HARNETT/JOHNSON COUNTIES I-5883 53083.1.1 s.romsoiarm SHEET 37 OF 37 s�s Sheet e For In exi sheets b� STATE OF NORTH CAI';OLINA PERMIT DRAWING N.C. I-5986B 1 \ \ ¢1 _. DIVISION OF HIGHWAYS SHEET 1 OF 10 �. __ 47532.1.3 w P.E. foli 47532.2.3 i RAN 8 IHIL. •Co 7 '♦ Y ' HARNETT AND AO00 ON .'` JOHNSTON COUNTIES l/y ,�CENSO D PRO CTI I-5986B TyuNlni. FINAL RIGHT OF WAY PLANS LOCATION: IMPROVE 1-95 INTERCHANGES AND WIDEN TO EIGHT LANES ' _ FROM NORTH OF SR 1709(HODGES CHAPEL [y ROAD)(EXIT 77)TO 1-40)(EXIT 81). 1�r� 1a►♦ eL-++ co) qW� i�tInev A�� 44, � � r; TYPE OF WORK:GRADING,PAVING,DRAINAGE,SIGNALS,CULVERT �t�'rr►:��nq� �r�„�;�J� iqG- AND STRUCTURES ���4.�#�=+"7 O "i/ ^-',��® -Y28-POT Sta.15+75.00 -Y28A-POT Sta.15+60.85 ey,,55 r�t -V29-POT Sta.20+00.00 BEGIN CONSTRUCTION BEGIN CONSTRUCTION `B. IN PROLE BEGIN CONSTRUCTION BENSON \.' ♦ CITY LIMIT -Y28-POT Sta.31+00.00 04 VICINITY MAP BEGIN BRIDGE END CONSTRUCTION '�1 (Not to Scale) -Y29-POT STA.27+40.46 -Y18-POT Sta.10+00.00 BEGIN BRIDGE BEGIN CONSTRUCTION END TIP PRO ECT I-5986B -L-POT STA.1259+11' ia,„' -L-POT Sta 1414+50.00 `. V., / BEGIN BRIDGE e4 END BRIDGE ,Y _ _ . SITE 6 -L-POT STA.1390+66 -L-POT STA.1261+56± , ,:.,,1 ,i���i f� END BRIDGE -Y27-POT Sta.10+11.60 11111 ��_ ' ..". BENSON -L-POT STA.1391+72± BEGIN CONSTRUCTION . b' V*� ^� CITY LIMIT �11• . 6 �,��� 11v�� BEGIN CONSTRUCTION -Y19RPB-POC Sta.23 00.00 Du � ;0 . j�T° -^'� MINGO SWAMP,' i u BENSON SITE 7 ����`�� ' -Y27-POT Sta.10+92.32 END BRIDGE CITY LIMIT -Y18-POT$ta.37+38.58 11 \ /1i�: END CONSTRUCTION -Y29-POT STA 29+37.96 END CONSTRUCTION DRIVING ���`_ . BEGIN TIP PRO 'CT I-5986B -Y29-POT Sta.35+50.00 -Y30-POC Sta.19+00.00 BRANCH ��`\\' -L-POT Sta.1232+00.00 END CONSTRUCTIO BEGIN CONSTRUCTION SITE 5 -Y29A-POT Sta.39+88.01 -Y33-POC Sta.10+50.00 SITE 12 \ O � END CONSTRUCTION ] 'alga'c ON TRSuIB0150 ySM]i N.s rextawS+e0 ro BEGIN CONSTRUCTION -Y33-POC Sta.45+50.00 ,,,F(O 155515 1cong], 51 NokrsoJecr wRIH ACCESS ETLAND AND SURFACE WATER IMPACTS PERM( END CONSTRUCTION A PORTION or 1555 PROJECT Is wDRIN BENSON MUNICIPAL BOUNDARIES UTILITIES SECTION 4 NORTH —Y19RPCA—ST Sta.18+12.13 ` ( END CONSTRUCTION °r<s.+".ca,o...�...�o... U GRAPHIC SCA!FS DESIGN DATA PROJECT LENGTH 1n.:,"B..�d: 9v eo HYDRAULICS ENGINEER ADT 2020= 66,700 IIGP54®0 03E B00° ?^we.''^'�' 50 45 10� 5Ia ,1 I. ADT 2040= 92,900 LENGTH ROADWAY TIP PROJECT I-5986B 3.390 MILES INTERNATIONAL '-'RO c�^„a. rd L�T] �L- K = 7 % FOR DIVISION OF HIGHWAYS PLANS p = 55 % LENGTH STRUCTURES TIP PROJECT I-5986B 0.066 MILES ^tT ,11 __ - 11 50 15 Ian 50 10a T = 18 %" TOTAL LENGTH OF TIP PROJECT-5986B 3.456 MILES SUSAN p�c(ANC STER.P.E ROADWAY DESIGN ENGINEER iiiiiii'll' /C, I I I I I I I I I I -I_ V = 70 MPH RIGHT OF WAY DATE O PROFILE(HORIZONTAL) '(TTST 13% + DUAL 5%) August 30,2019 PR RICK STATON PE10 5 I0 10 20 FUNC CLASS= oJccr ocrmH ENGINE. U I I 1 I 1 I 1 I 1 I I \I INTERSTATE LETTING DATE: STEVE D.KENDALL,PE P£ ai., PROFILE(VERTICAL) STATEWIDE TIER July 21.2020 NLO°'`'�"'"cr pr /, _`- / rsas I-5986Buuo. I sxE40 o. 5' 25' 0 50' 100' PM SHEET / IIIIIIIII�I0' \ tn.r: Erw�„ff? SCALE: 1_ sz°u��uti OWN.' / D 2;01\ D..IL, DETAIL2 PERMITrsDRAWI ail NG^m DEGILI3 '"""'"E'EEE SHEET 2 OF 10 zvE ,.w„ww u � ����.o s �/zz+a.-n ri: rFoM s�.zs+rsraros�. naw xr v a • 26 Horn n..'zoa+zo TO sw 1an.w a-LT C Dr!iNLq DFTNL Iq ur, -L-SC Sla.1314+9915 i II P.rop -L-TS S1a.1312f0315 s-o.xn saP. nw ui:.as+n mtl[WI ui'A5v ME ROM ne.n1i.m TO nn 1a1e.so+u szz oaru:i. � I ., zso1"r, Er rM E e DE TOE ii, roe m TDE TOE 0° 011004reiWi, .b _ N o W .all. T„ III_ o fi o ' �R.Throe r �+ a cyaar a�i °x ire` � ��I w I {. i�iZmaw _..`�� r z n ��.. PM - --..UE P E PUE ME ?LIE E PUE-ZrDE n * >oc.:°:��r, PUF of PU Par.14 E.G. 602 WE EF.,, I SITE 5 DErAIL6 CAPITAL.LLC ,.� � y�LDETOR°'�`. \�` _- I STREAM HANNAH CREEK.,,, - ' II �* J "_°;a-""- `9u.Rr eusx e 'o cu',„D.,,". -Y29a-PC Sta.30,8631 eEs7:�,EE / OVH POWER a-4 (CLEARING) iiw FROM Er..1e.eero:,.o.,�:-n.>.r r.o.:..i�ia.Eo ro:r..�.n�.rrei+ar n /// wi / I0-U-PROFILE SEf vans&04 FOR-Y29M PROFILE SEE SHEEPS 130 8 139 µ °p.W.�_a�u_-° \ PERMIT DRAWING �,-u' _.e "`" !\ SHEET 3 OF 10 5. \ "' r11; - -' m \._ :ip , _ivy ill ``iiiv '' '\ lit \,...�i t _ 1 M. � , ,,.,, ;'''' co,4•44kN,--...-..., 7,1711t -1AV- — 1;1 tat -c. � u� �g ¢y_ ! ate � "� 5 141 _ — __ r .. g VIM'e ,, ,. ,4--\ . vt 40.. 7:Ai ,,, ' - —11 ___,---siovorwismoma, .. • ,.. °'C' H.. )N.' V/ ire I Ii \` we itlip 1A a NW* 0: .%._ tvisap,•, ‘ ,,,,,-.40-010 1 ,.7,7 .-1,4,4" , ..:i' ,4' 4,4*. ' ' . MA \�� �, "",'7.• - . , , - 4.4t- ....ro,i Ti-,.4--ii. .17.4411007-,T;; --- , , mi -3: a s. .�, .� _ ,�x \ �\ DETAIL 12�.e PERMIT DRAWING ,~w""s"986Bxxo. I x�xx o o'sF _ SHEET 4 OF 10 w"^^; woHnx. Isnx„ Kau M x.:x ox so' zs o so' oo• o - C- sPx '''ron.xx« 1111111111�� m`,s` -} SCALE:1"=100' O FEW nw»x..m TO nn u,s«m+n vwrn nw, I[avn[n saxes uc n xisR ULs,ox� 1e 0 ©° e �_ 0 1 @� mo �� � � (C+� t wan na xa a x«so a.,n \I E /T / E v ,TONS _ _- — E— aa, 'I_ „1 e1,, zf -, 1.\a�o.±sc� _ _ ,. . N / \ °� 09E,......., *F wH . cc�. _ � -"x ' �Pa� � " 0p ° "i®. Pw tx o_— UNDERGROUNDFl - '—TM ��^' w.s"a s.e" - "®s. w.a" =SEWER 8"SS(BORE AND JACK) wno,o shE, _ "-- ____ -- _____ an oi — - a OVH POWER(CLEARING) rc � „,x�,",rw a I cE \\ I UNDERGROUND Jy. ,1 ® ?zN TELE(DIRECTIONAL BORE) xE.v� E.Rxs,uc 'PI.I> 1I a® , Mi \ HC SEWER 8"F55(DIRECTIONAL BORE) ��F��+>`� • I Ni xEvix RAY>xkA -Y33-PT Sic.x(1+b269\ \ \mo\ \ ENLARGEMENT VIEW �„ /� • SEE SHEETS OF 10 � \ \\\ � DOS HAND \\\\ j7/y/ / LEARING �\ u�L1u / %// MAC ESI TEMPORARY WATER ON--- \ _ nn RAY PRICE \ \x \ ° N\ \ \ \\ a ,nP.xx \ \ \\ \ \\ HOTE oRI EWAY RADII— UNLESS SHOWN OTHERWISE x N, �_ �\ \ \ \ ROFaE SEE SHEE2 Rb FOR-Y33-PROFILE 3FE SHEFi 1J0 PERMIT DRAWING PROIEC 7 98B '"° SHEET 5 OF 10 DENOTES TEMPORARY /. /, IMPACTS IN SURFACE WATER zs•izs on zv s � �� DENOTES HAND CLEARING ���� ��I \ 2c SCALE:1"=50' DOCUMENT NOT CONSIDEEED FINAL UNLESS ALL MONETUREE COMPLETED -„ TRENCHLESS INSTALLATION UNDERGROUND 36"WELDED STEEL SEWER 8"SS(BORE AND JACK) /- . -- -_ MT I fl m€i 1dy fl L7 A fl —— a _— 2 ELBOWS X X X Cb FS� --A N WALTON AVE 20.5'PAVED ROADWAY 36"RCPA --—,ax . 00 ■1 r� e�eaaoe: R,R __ a Iro L eae�e YUE I. JE WILSON,3R CL I RIP RAP \s�\ LAY.4'BASE DITCH '- EST.20 TONS OVH POWER(CLEARING) SEE DETAIL 17 TEMPORARY IMPACTS EST.39 SY GF UNDERGROUND IN SURFACE WATER TELE(DIRECTIONAL BORE) SEWER 8"FSS(DIRECTIONAL BORE) SITE 7 HAND CLEARING\ DEraL i) 50' 25' Io so' loo' r n 7987 n ry 1 DETAIL Lp ,R.A4L ,— or., Iiu ISCALE:1"-10� AEI-IN�6F„No. 91r45 o. 3o Cj Po rLaw xr. 05.x DENOTES HAND RETAIL n.c wo.x..v.nw ro s,..,,.w�r„:n wo.x,.i . . ..ro+., /DETAIL 12 CLEARING .. °vv-Lr 9666.8 - p,,. W.1 DENOTES EXCAVATION _ '- P:, DOCUMENT NOT CONSIDERED/////j� IN WETLAND ro.s,..,,o ro:r.)`)« - UNLESS AL .ES COMPLETED DETAIL. 35 o Oro511; ':}� _ D:,o:w roN°DUN: PERMIT DRAWING oDQAL'a:}t? D'.' \ SHEET 6 OF 10 „ x::DDNL. r.N. .366666..6.3.66.1B8ON 2 a KORNER EARNS.LLT Dt_aL.ss NP i s mn '{ 1LINTS / p 0 L. 3 © ,,u a LD +d fSpa , •_, pu a s w _J E wn src aaw.s L - .. .. aw PP E E a°► ... { . w -A- -," '' "io�v,tx�R,x,ELr—� M — - !iH ,.ow.::rLx .S.,�mw av,..0 ru ,°�ry — - ��� II a V e-° o,caas< - Iq C5 . WWW110.. � It Ali s _ .,L _.IRE1040.1ViritTial, '4.•rea•-•'':— A,,,..-7,-aa-— ,Deo w....aft-Ng' .ice a .-..-}.-..'°-rti-i-d-61'"—g.eilit. r°42.-.'rEgb"--":46 '-'-`1,11104"1- lit --.aavoolatiar. ,. aVair, irk.. „ Y33-'33 PT TSYD.30467.97 r'}v r33 PC SYo.32f35.9)ar' I /, E y&UND POWER(CL RING ',,,,"4; -Y33-PC 5'1a.29r2092 uRUE x I / "x,4 a UNDERGROUND \ N M P s. T➢E TELE(DIRECTION L BORI)l Q .. D I « oN I / ➢Erai�a SEWER(OPEN C =�_ R . . —i 2 ,.,, t/IfilMIN. .1 -Drk105.xXiBG 10Ad RT =•STREAM DRIVING BRANCH V P 221 502 r mns.x9-r:a—. rvoM nw,x.er fg xr.."6'6-vxx-D NOTE:DRNEWAY MDII= 10' FOR 1-PROFILLE SEE SHEETS B6.g) N`aa _�— —� LESS SHOWN OTHERWISE FOR-M PG.PROFILE SEE SHEET 13641 PERMIT DRAWING —. ..7a6e- 1�GI„Fp�� SHEET 7 OF 10 o. K✓///// DENOTES EXCAVATION �i` IN WETLAND 9 m 2rIlll�llll�il DENOTES HAND CLEARING 2c� SCALE:1"=50UNLESS ALL MONETUREE COMPLETEDDOCUMENT NOT CONSOMME/FINAL J .fig A- 0; Fi 28oO.. P,1 _`o., GTD SE DETO ` . A291TCH 04 1 p` , w t ( atAZ,Ltp4k 2ff Tr& , _-- III _ �s7p 1\� _�r .�_, It, ,, 152iNKw.WN �II � �� `�'�isgi , --a...--- � l UNK II i1 IIL - Qom a�_�E "q _—�. H.R�fJD et* _ `® „ CLEARING ,,r po.„. � • ii . ........... r__ ....„ —CLEARING �HAND �{�`_,C '^:. ,��'q �IE.TIA --I"vI P P we IFm e� rs�e ,.. s\ w,. e OROP OM POW 514; M1- —rxo, , S i. . ems- ± s' . {'A. CLEARING e� -G ii,\ F,. Jf , l � N I ± lm / 4' HAND dr x' " OUTLET CHANNEL 4 T ..OVH POWER(CLEARING) ON a / / CLEARING c, \ W/CL I RIPRAP l`' UNDERGROUND a EST.50 TONS TELE(DIRECTIONAL BORE) JAMES E.WI / o\\ EST.D100 40 CY 'HANNEL CHAENGE(OPEN CUT) \1H: WETLAND WBR SITE 12 SEE AIL 42 9 EST.E. 0 CYO ± ± / Aga SEE . AIL 43 „rNicnN CITY LIMITS ± T Jr gl PERMIT DRAWING "7-s97N° I i4ao SHEET 8 OF 10 ROMWAYF«cN� E= -Y33- PIPE HYDPAULIC DATA Jr OLP 510.r rJ3 IJJ UNLESS All SIONINIIR.COMPLETED ORA/NAGE AREA oIN AC :MW' lay - , OCS/GN FREQUEIL' -25 YHS ,...,..i DESIGN DISCHARGE =55 DES Ocslvw on eeevAlnry =/0a5 rT PIPE HYDRAULIC DATA 100 YE4R DSCHARGE =65 CFS P=222750 P=1E 425.00 If/J 1E4R/N✓E[EVATIDE-lOG 5 FT -TAREA m Iq, 4-4 3- EL-M.75 EL-220.79 0✓ERTOPPING FREQUENCY=I00+/- YRS DRANAGE AREA =W5 AC VC-100 VC-125' OVCRTOPPING ELEVATION 65 I/ DES DESCN TRCHARGE A YRS K=155 K=In OVERTOPPING ELEVATION=21038 FT SESON DISCHARGE =44 CFS Pl= +SOLO DESGN IAN E EV IT ON - II O4d FT cs r50 IIm1 03>..-0 np1 I00 YEAR LYS�HARGE - CFS 51 230 EL-29868' 39 290 VC= D '99 KE4R €dEUTION-2D55. ET ROroSEo K= OVERTOPPING NG FREOUENCY=00+ YRS —�1 °C L I ^^/ .;RADc -A,III, OVERTOPPING ELEVATION=20835 FT 220 /N6,a„� 23O,L 220 210 EXIST. !-13 0, —_2—_—_---------- 210 GROUND 0 WRv 'r^'37T.___L 200 5/ 03052% 200 O rice B_GIN GRACE -'33-POT Stu.0+5C10 awo/Nr N R H PI STA 16415-Y33-RT P/5)5 0»'-Y33- 190 f�'=199=0 E �/ FOR-1,83-ALIGNMENT,SEE MEETS 43 8 44 190 10 11 12 13 14 15 16 17 18 19 20 21 22 23 a P- +50J0 I RC Sla. 9+5 -Y 3- EL=P I32 1111111111111611 VC=3TPY 111111111 aN EA O. K=85 SIG FR USE GY 2 Y S Op-uS r�NA� PI=294000 220 EL=14767' LESION MY ELEVATION 19.0 FT 220 VC=/2 AK Wx Am,i//4 /9 4 s I K=12 li YEAR HW F E 4TON /9297 F' !+33 % 3 D5>.54,44 4 ono.,,4.F.1AISNC, :05, YRS 210 _ CVERTOPPIVG DSCHARGE 6..(( CfS 210 _ _ OOCRAT'lYNO aL-YAT,B,. /9.R59 F' P=3Fd200 !I/5200% �"_" _ l- n EL= 89z 900 BEG DITVI — • 1'1$ GUDE S` VC 5' PI "A 2aN3,6-Y„T-iT _ - V-12f=,0 K-B ELEl'-20 PI A +93 -Y 3- T -" p q- S"54, Aa.v V.w. _ E _1, r -Y31 St..35+98±\ 190 BEGM?;3=5 IP\�, -33-Sb.35+ 180 P STA 30+35 Y3" L `�S _ - _ 180 FLO,88 ¢xOuvo _, . l-3 170 PI STA 1+9C-Y33-LT E EY-I29 PI STA 35i56-Y33 LT' 4. 160 ELTV=T 837 160 EE PROPOSED J iG MCP UNDFRCUI PISTA 35+87-Y3:-LT FV,AR' =¢_`v 150 FCR.,33_,LIGN ENT,SEE:ME 44 ETP R 4s 150 23 24 25 26 27 28 29 30 31 32 33 34 I 35 36 PERMIT DRAWING "`i-s9ase"' °i4i° SHEET 9 OF 10 � °. ,161 TA Y3a_ l8"RCP •,;/a.90+03-Y D 2/K/E 'EA =03 AD 0 SIGN ERAQUE/CY 25 YRS 'U.SIGN Ul5/HAR(E =l.4 Lh5 DRSIGN If14 ELEL ATIOV /792 ET YE/K LNAHG2 '/- - ICd YE 1R EL_NAT ON=I7821 ET END OR WERTOPPI G OI7CRARGE_/20 DES -Y33-AA 5/m.45+5525 Ob CRTSP/Y C�-✓nTKN-l0/27 TT ELI83.T1' P=3'+75YK P•=40+7500 Pl=43+65LC EL=/77.42' EL=182P8' EL=/872/' VC=65' VC=l50' VC 250' K=83 K=513 gg K=76 180 B8-Y^R"� Bb i SB 1 C4tADErn 1 05 J 45"W9 190 190 �Q apull �_ _ !yC S - � �- 1R0 !-)03�6%�/V//A200/. '' _5 TTI164 PI SPA 43+74.75-Y33-RE 1-006776% _ - l+13II/ C,,yyOp pqTTCII ELEV3-RT 170 F/T ..''�33-LT 9n4 70 PI TA 3.l �3- T END mITCH ST. =nla NSrn an+5n-�z3-wr 160 G OUNJ ElEVa49.92 PI STA 4-/65-Y39- 160 raOwSeo qq/ENS L�/400 NY33- • IIl/ UN[RCM PI STA 40+,0-Y33-AT P/cTA,,,,,,,,,AND y'+JW E� RT CLCV-170.48 ELEVd80DD00 150 FOR-Y51/*IGNMfNT,S.$HffT4 45 46 150 36 37 38 39 40 41 42 43 44 45 46 47 l WETLAND AND SURACE WATER IMPACTS SUMMARY WE I LAND IMPAC I E SURFACE WA I ER IMPAC I S Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (It) (ft)_ 5 34+13 to 34+31-Y29A-RT UTILITY 6 1348+18 to 1349+61-L-RT UTILITY _ 17+00 to 18+38-Y18RPD-LT 18+16 to 19+12-Y18RPD-LT 7 18+82 to 20+22-Y33-LT UTILITY 0.013 0.001 10 12 33+94 to 38+27-Y33- UTILITY 0.043 0.109 TOTALS`: 0.000 0.000 0.043 0.000 0.122 0.000 0.001 0 10 0 'Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 12-28-2020 HARNETT/JOHNSON COUNTIES I-5986B 53083.1.1 Is,,i,fezoierw SHEET 10 OF 10 See Sheet IA Far Index or Sheets STATE OF NORTH CA I':OLINA BUFFER DRAWING N. mp 1 See Steer IB Far Conventional Symbols,."s I-5986B SHEET 1 OF 7 \ \ - _. DIVISION OF HIGHWAYS .. __ 47531.1.3 w P.E. 47531.1.3 t RAN F.HIL. • /2o 7;:'1- '• Ik1. HARNETT AND V.) 1, E� JOHNSTON COUNTIES tin 1)CENso :PRO CTI 15986E i TV LINITI♦ FINAL RIGHT OF WAY PLANS II LOCATION: IMPROVE 1-95 INTERCHANGES AND WIDEN TO EIGHT LANES l _ Ilk FROM NORTH OF SR 1709(HODGES CHAPEL [y ROAD)(EXIT 77)TO 1-40)(EXIT 81). 44041 gI.g1a►Q�W-Li�"� C, r; TYPE OF WORK:GRADING,PAVING,DRAINAGE,SIGNALS,CULVERT ���'r►:�nl• �IPI �/ �. i -, AND STRUCTURES rib �t•�ya�_`7 O 4i/ ^3'WA ` -Y28-POT Sta.15+75.00 -Y28A-POT Sta.15+60.85 e,I%s` r t -Y29-POT Sta.20+00.00 BEGIN CONSTRUCTION BEGIN CONSTRUCTION ` IN PROJE BEGIN CONSTRUCTION BENSON .� ♦ CITY LIMIT -Y28-POT Sta.31+00.00 " VICINITY MAP BEGIN BRIDGE END CONSTRUCTION �1 (Not to Scale) -Y29-POT STA.27+40.46 -Y18-POT Sta.10+00.00 END TIP PRO ECT I-5986B BEGIN CONSTRUCTION BEGIN BRIDGE -L-POT Sta 1414+50.00 _--OM_ -L-POT STA.1259+11 t 4' y - 1 BEGIN BRIDGE END BRIDGE .Y ." -L-POT STA.1390+66- -L-POT STA.1261+56, END BRIDGE BEGIN CONSTRUCTION 1► 4sll �_ " 11,rj — _� ._ l BEN LIMIT L-POT STA.1391+72+ -Y27-POT Sta.10+11.60 CITY �!�'. 6�, �� i, ' -Y19RPB-POC Sta 23+00.00 �� �_ ���iBEGIN CONSTRUCTION ��� � SITE 5 Tom° . � MINGO SWAMP , L�i -Al4 ► SITE 8 Z j ZZ �II �`v\ i o .1.1, BENSON SITE 6 � \®�fr -Y27-POT Sta.10+92.32 END BRIDGE CITY LIMIT -Y18-POT Sta.37+38.58 ♦ 1 \�_��it: END CONSTRUCTION -Y29-POT STA.29+37.96 END CONSTRUCTION DRIVING , 4` -Y29-POT Sta.35+50.00 -Y30-POC Sta.19+00.00 `\ BEGIN TIP PRO 'CT I-5986B '� -L-POT Sta 1232+00.00 END CONSTRUCTION BEGIN CONSTRUCTION �� -Y29A-POT Sta.39+88.01 -Y33-POC Sta.10+50.00 � ]O END CONSTRUCTION BEGIN CONSTRUCTION SM� c]saaxG on 11DUP oRt Sc,,,,000 s I,,.. - -Y33-POC Ste.45+50.00 h F<a ss,slicoo,00,,S aac�No sodecr cm,. cess BUFFER IMPACTS PER END CONSTRUCTION A PORTION on THIS PROJECT,s WITHIN BENSON MUNICIPAL BOUNDARIES -Y19RPCA-ST Sta.18+12.13 END CONSTRUCTION ""°" °""`°"" SECTION 4 (NORTH) • U GRAPHIC SCAT FS DESIGN DATA PROJECT LENGTH P1eO'rB""t°"...T. v"W HYDRAULICS ENGINEER • �I ADT 2020= 66,700 Michael Baker ,727a,em'I. • �L: 5007�15770 50 �1(f0 ADT 2040= 92,900 LENGTH ROADWAY TIP PROJECT I-5986B 3.390 MILES INTERNATIONAL '-IS PS �1T] K = 7 % FOR DIVISION OF HIGHWAYS PLANS p = 55 % LENGTH STRUCTURES TIP PROJECT I-5986B 0.066 MILES _ L1P1� 5g 15, 0 50 l00 T = 18 %" TOTAL LENGTH OF TIP PROJECT-5986B 3.456 MILES c SUSAN C.(ANC STER.P.E ROADWAY DESIGN ENGINEER -;15 / �� V = 70 MPH RIGHT OF WAY DATE OPROFILE(HORIZONTAL) '(7TST 13% + DUAL 5%) August 30,2019 sx RICK STATONi l0 5. 9 10 2a FUNC CLASS= urea.KENDc,. INTERSTATE LETTING DATE: STEVE D.KENDALL,PE »»N`��7 PROFILE(VERTICAL) STATEWIDE TIER July 21.2020 ALO°"'�"'"cr eE /, _` / \ rags I-598c6r I ass o. SP' 35 _ mr No / \ SCALE:1"=100' / °"a�:osvcu� xsvo.uua VI auaL�Iu° / p\\ ,I,O e' INCOMPLETE PLANS \ M1, a,l d#6L w.� D.ARI E'TAR3 / BUFFER DRAWING nr DET"i�iEo x ,....,a.`L72 n _`"" \ SHEET 2 OF 7 oewe n.,,.,,,a TO TR„+. a,., ROM nAi,oe+w,O n41,11+. DETAIL 33 DETAIL Iq 1 W. ,_ °,,''''''''"'''.,e n,." —_ .. 11 461466W. • s-p:a sro. nw i,i:.ar Un m•a o�.ry rxoM n..�a„.m.O nn La�e.so+v L-TS SYa.13/2,0315 A 111 =J/ i'��c j/\ xx x { ti J I 7 �� 9Exse x99 e "� TD —TDE E . tm.44 E 7.': TDE 0° ` ,r ` �a+lYlilp�44, o � irfli 'F yyyi;, �tF ti� _�vT_� �c x� cJ -- •tr cy _ 0 8 S LL F d- — F_ , t om t�_•°maxr. 1�ar i FO IrCC",MIlk _� P. W f _ rue n`*"�_7,Oa * �. _�e Dfgli, rDf witi._ PDE-1,LFE D--. .mo/pt m MAIL esr.usr O. r i I `', v inL. seaw srE »L.. earow ��°SITE 5 �� �C .Igll ' ,". LC y'9u.xv'kg' s� 'ice -Y29A-PC Sta.30,6631 47,1%74 // n-sun OO�O�".: �aM:...�,�..:o,°n"E.,E,tA tOs.•ts. MITIGABLE IMPACTS ZO raw..n".'x.ea,o n.."--n..x, �������� / nor, tq j � MITIGABLEAMPACTS ZONE 2 17:2wi / I FOR 1-PROFILE SEf ZETA &E4 FOR-Y39M PROFILE 3EE SHA% 8 139 $.--•_ -�—.41: BUFFER DRAWING m' "—1 SHEET 3 OF 7 1 I..-+I J ' ► \ yw. a .... fines �! remev4m w /!/ \Li4. ��\ -s„, .......!„.....e,,,,,„,....„,„ _.,.„ ..--9, .? „ =' ;‘,,;:Kilit.':,-• -.,s' ' - .tot_ _ -' 20 / , _, , , . , . ___.________ . -...,...A..,...m. w \ \ I ` � iw�trs zowe mr' gir I Ir L'„V{ - - � ,974,O •mNj /✓ g y 6 -E J\ -nII m rn ne/ � a—p__\ f \i1 •2� s YW, / d ,L �B:X.'- L,,1• x BUFFER DRAWING P''''7=s;e6e'° 1 ''"'°° SHEET 4 OF 7 "° .�.�.�.�.1 MITIGABLE IMPACTS ZONE 1 k•����*9 1 p1T®PL8T8 1�S j//// MITIGABLE IMPACTS ZONE 2 / / 3�5'12�5' 0 3I5' 5P' iiiii_I SCALE:1"=50' DOCUMENT MOT LOINSIMALO MAL OMEN OIL SIONATURE•commurEo � — '4 FLOWABLE FILL _ n // __— i ,i2sP �.'" of ♦• s►iii♦ � 1 < � � i �!c .� � i• ♦ ♦� ��B�E TAIL DITC. iii ����i� ®' (iWiCL I RIP RAPAii� 41 c0/ �o END WALL � �� EST 90 TONS.� iiiiii� �% �_ 1 EST 150 F ►i rsr♦� ET D° 00 .� . i�i+°i`ii NV STR : FFERS START HERE �"��' SE Ali .y . :A> . ••ft.9.ii•4 1 - I� SPEC.CUT V-DITCH � / ` . �� L, G . ,EA� � f � BAS� ON COUNTY SOILS MAP SEE DETAIL 1—ITCH 8 �� io" gii�� I �esiQ'e►4.� ' .y%f �'7- �I�'yi .iiia♦,s s Q TDE • �e/� I ✓I!� �o,� :. tia. �- / ��t °cse ►�iiei►� '• 4e�?" /fir,. ///'0Otiii►Oi` i �4� ., lAli •4 ,• • �,.®- gip, . .1' TONS / QJ / i.EN TH 1 GF ram✓ \ / \: LENGTH=15 FT SITE 6 s. - UtU\ty' "Wia.J ty/ QVE PEARTNER9H4 9 H l �E�Emo so• d o so• 00• ��...♦.. vwsE I-59 DIEETN �E��o. Pii**iiii MITIGABLE IMPACTS ZONE 1 DETAIL 44 " R �� , srcu oum SCALE:1'=100' NO ",,C � � ,9 wmvaI osx86B xmuwc - �� / Po j//� MITIGABLE IMPACTS ZONE 2 FTeni n.C.v-., Y � �`�"`�` xwNS „a..on. nr izzo�vifEt fills naa 4.2...ro 4.224.T.-„ S'MAIL II e :DETAIL a". oxa a f.-: T. / WIILMS ALL sloueNEno CO ,a n,.aa„ZIP DETAIL reo.,.,.a,. '�o � ,2I lira COMPLETED ��n..o.oro..xtlw�y r n o^E,o.w roxoxax, DE1B BUFFER DRAWING =PQrE;` E T .n,^"w'„°," .E^ axe,.` SHEET 5 OF 7 JAMES RAY STEWART ag#17-ss b`_ s 4 sl e mo,x n. .,.. :. rue E o" Vahan mom SE DO.32 x l 1�1 11: 6 b L '.• .y aw.. �,tea., 1® A� .+s sr�-'r.'r"� En ro ---- O \ aowa.n ru 1 --- �� O o s+EI+EIa 111111r Cr at G - A m .�C) CS L'' ^.x GF ili xzt�s A tfEAR":�z -s�NA - 41 '114141.1111/ rue PUE- I-- e� _ice /IDi>f��`' i\ .. V111 u VA A. ramm"ww Ia o V.... .7 5 Exl4k�\ a Y33 I Rom^PT 9SYa 304.6797 rs " Y33 PC SYo.32+359)6.DOE u / /E �' e , k'. x x a a * *\�?�.P}4Nb -Y33-PC SY0.29f2082 cARCF ry a=ME P S.a > ., z . . x • \54 ', Q h wr \ ➢STAR 41' - s aAMEs E w LT jaEs.wRSax roe aN «o a , , s V *a. -L.YI PC SiT53St°16B5I0.0 3d RT l'n.\ :«$ m rea -YI9RPCA-TS Sia.I0+[pA0 ra F - _. i 2 wa su-a5,evraa�� �.nw as..,Sq na ss.ae-vaan NOTE:DHOWS RADII= 10 FOR.3-PROFILESEESHEETSR6Sg) N� _�� UNLESS SnowN OTHERWISE OR-Y33-PROFIIF SEE SEE S EE - FOR-V19RPCA-PROFILE SEF SXEEi 13641 RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size/Type CROSSING BRIDGE IMPACT ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 (ft) (ftc) (ftc) (ftc) (ftc) (ft2) (ft2) (ftc) 5 1316+27 to 1317+55-L- ROADWAY FILL X 8305 7395 15700 6 16+61 to 18+88-Y18RPD-LT ROADWAY FILL X 10843 6639 17482 8 1389+81 to 1391+84-L-LT ROADWAY FILL X 6408 3708 10116 35+01 to 37+97-Y33- ROADWAY FILL X 15346 6199 21545 TOTALS*: 0 0 0 40902 23941 64843 0 0 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3-5-2020 HARNETT/JOHNSON COUNTIES I-5986B SECTION 4 47532.2.3 aa„aa zma�e SHEET 6 OF 7 WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN BUFFERS SITE ZONE1 ZONE2 NO. STATION (FROM/TO) In=) (f) 6 16+61 to 18+88-Y18RPD-LT 3034 3224 8 1389+81 to 1391+84-L-LT 2040 66 35+01 to 37+97-Y33- 13411 6810 TOTAL: 18485 I 10100 NC DEPARTMENT OF TRANSPORTATION I DIVISION OF HIGHWAYS 3-5-2020 HARNETT/JOHNSON COUNTIES I-5986B SECTION 4 47532.2.3 Revised 2018 Feb SHEET 7 OF 7 Rev.Jan 2009 P7 sr s eeSheet e Sheet teIAForomext sheets STATE OF NORTH CAI':OLINA BUFFER DRAWING N.C. I-5986B 1 \ ¢7 DIVISION OF HIGHWAYS SHEET 1 OF 6 ,,.,,__ 47531.1.3 w P.E. llii 47531.1.3 i RAN 8 IHIL. �o 1? HARNETT AND 00 .'` JOHNSTON COUNTIES In 1 an' D PRO CTI I-5986B i i n'LIMITi,. FINAL RIGHT OF WAY PLANS LOCATION: IMPROVE 1-95 INTERCHANGES AND WIDEN TO EIGHT LANES ' _ FROM NORTH OF SR 1709(HODGES CHAPEL [y ROAD)(EXIT 77)TO 1-40)(EXIT 81). 1��� 11►♦ iL-++ U IBI qW� ��� r; TYPE OF WORK:GRADING,PAVING,DRAINAGE,SIGNALS,CULVERT �t��:r►:��nq� �r�„�;�J� - AND STRUCTURES 41104.�#t=+"7 O �°'*u-'�® -Y28-POT Sta.15+75.00 -Y28A-POT Sta.15+60.85 ey2 s` r�t -Y29-POT Sta.20+00.00 BEGIN CONSTRUCTION BEGIN CONSTRUCTION`B. IN PROLE BEGIN CONSTRUCTION BENSON � ♦ CITY LIMIT -Y28-POT Sta.31+00.00 VICINITY MAP BEGIN BRIDGE END CONSTRUCTION (Not to Scale) -Y29-POT STA.27+40.46 -Y18-POT Sta.10+00.00 BEGIN BRIDGE (I' BEGIN CONSTRUCTION END TIP PRO ECT I-5986B kl -L-POT STA.1259+11' wl.'... -L-POT Sta 1414+50.00 y.,,,,------ 1 ritr BEGIN BRIDGE END BRIDGE .Y _ -- • -L-POT STA.1390+bb -L-POT STA.1261+56± A t/�1 !�I� �� I � END BRIDGE -Y27-POT Sta.10+11.60min 11,ri -T� � ®k BENSON -L-POT STA.1391+72+ BEGIN CONSTRUCTION �- �t►` � �7�5 �©k CITY LIMIT �!111 �� � . -V19RPB-POC Sta 23+00.00 R i�` SITE 5 I `� BEGIN CONSTRUCTION IP TfO � Z MINGO SWAM lit ����� Zj Y^Z ��' `i \ 00 `., BENSON AIMSITE b ���\+�� -Y27-POT Sta.10+92.32I END BRIDGE CITY LIMIT -Y18-POT Sta.37+38.58 '1 \�\ It- END CONSTRUCTION -Y29-POT STA 29+37.96 END CONSTRUCTION DRIVING ���` BEGIN TIP PROTECT I-5986B END CONSTRUCTION 00 BEGIN PCCONSTRUCTION OC Sta.19 0 BRANCH \\- -L-POT Sta 1232+00.00 -Y29A-POT Sta.39+88.01 -Y33-POC Sta ] .10+50.00 !SITE 8 \` END CONSTRUCTION nsxc ox 11Duoosn gysMrr N.�rext'owi+ep ro -Y33-POC Sta.45+50.00 BEGIN CONSTRUCTION O mph F(p li coxrnro„ lc No1.lo oEr WITH access BUFFER IMPACTS PERI". END CONSTRUCTION A PORTION OP THIS PROJECT Is BOHM BENSON MUNICIPAL BOUNDARIES UTILITY SECTION 4 NORT —NDRPCA—ST Sta.18+12.13 ` ( END CONSTRUCTION s.+"1.7=..�...�o...E. U GRAPHIC SCA!FS DESIGN DATA PROJECT LENGTH 1n.°..�d: ..eR HYDRAULICS ENGINEER �I ADT 2020= 66,700 IIGMI®0 03E Br,r;,77-- 50 15 10� 5Ia ,1Ir ADT 2040= 92,900 LENGTH ROADWAY TIP PROJECT I-5986B 3.390 MILES INTERNATIONAL '-'0 1°c�e„a.�...u�.ro.. PS �1] �L- K = 7 % FOR DIVISION OF HIGHWAYS PLANS D = 55 % LENGTH STRUCTURES TIP PROJECT I-5986B 0.066 MILES © _ 11 5a 15 50 100 .4114 T = 18 %" TOTAL LENGTH OF TIP PROJECT I-5986B 3.456 MILES SUSAN C.(ANC STER.P.E _ROADWAY DESIGN ENGINEER ` iF. /> I I I I I I I I I IIan ,I_ � V = 70 MPH RIGHT OF WAY DATE OPROFILE(HORIZONTAL) '(TTST 13% + DUAL 5%) August 30,2019 PROJECT RICK STATONi 10 5 I0� 10 1a FUNC CLASS= oiccr ucrm��cr. U I I1I1I1I1I I -.I� INTERSTATE LETTING DATE: STEVE D.KENDALL,PE P£ ai 10 ,. PROFILE(VERTICAL) STATEWIDE TIER July 21.2020 NLO°'`'�"'"cr Er /, _.`_ / rags I-5966Buuo. a�so. SI' 25' 0 50' 100' P/SHEET / I I I I�I I I I�� 40 ��"ram =1:Ie II 6wc'vP uu / \ SCALE:1" 00' 5 2,.,0 \ I�D . DOCurm NOT CONIMERED FINAL UNLESS RES DTA . x a / ruCOMPLETED eME.. � ..«w. DETAILE nr w°x E ` n °� "Rx BUFFER DRAWING _ \ SHEET 2 OF 6 • o n ,. Lt° �aM ., ,,,a To ,,n. +.. e.ar °O M" it DfiAIL 33 noM nw isoE+zo To nw�snE.Er.°0 DETAIL Iq (7 / 41 ° `ROM n,.31.2,.ro TO n.......OE-n,.RE \ .. II £ `"E PB Ca' -L-SC Sta.1314,9975 I -L-TS Sta.13/210375 s-o.xn sa.. nw ui:..r+n mtl oMry OEM VO' vEwn nw�a�i.m To nn�a�e.sE+u zu o...."" I ., zron-sox sv rw E E DE- TDE 1pE1� TDE u p OE TOE °E dIY1YII�iYY� .. Mom.,.. _ ._ �— .4''-,A , CS o W 8 o - - -- - --- —---- -- - -_- o--—---- , EET.-oo x .n ,�� i4` �—�— er>�—a_ ""�as �Er;_o Y °" 2 6 — — Oil i ////�is�� I _ $ t1 W _ .,. PUE ME ?LIE Pue — CI � PUE P*Ili: .r W E PUE rue rue we �TOE E "`;r.. MAIL OVH POWER E SITE 5 nPiTn� ,a �.:.G. (CLEARING) a I'lPP e 6 II E/ - py"1,"14 eusx "ice D E„„.„n. -Y29A-PC Sta.30,8631 ar.rs'i ct / E. -fi w FROM nn.ie.eerona za.�Ea-rn>n vxorn nwiziE.sE ro nnivE.rreiar n /// it : / w� / IPOR 1-PROFILE SEf vans&04 FOR-Y29M PROFILE 3EE SHEEP3 130 8 139 5-,==b: r- BUFFER DRAWING o._.,.,n \._., SHEET 3 OF 6 ....0 ri,,,,,,\L‘,t_......;:.,,,,,;1°:,3,7!;,}4::,_17:11:7reism.rri:"4::!::°:' g A. vp� \0 rMil I ' .--":0.: .-:. /• Ole-1 I I*4.' ' '7°'-77'3/ '-''.' -"M''I'6. 41 // i st - li ' --e- -_....1,---- t . \ ..ti,r.„ -,-,„‘ v. • , - _...... ._ A t ''..*,-- -''' '."--7-1-1 \ '°' '-2 4 \-- ilki.o, _ m _ram_ .< .. �3i � �� �. —_ 8 e as � lit i ' a .F 7" „pith sa� i t /" - .irk Ipi______----------: _,,,,,,,,---- A - /44,- i...--- ,—....._ ---41—.1 1—' ""441.11" rI Wilk %........ 4'N<' //4 e; 1,„„'- ..7:0.;. .,0757 Ilk\0.'.._'_,h,,.„-.o-.....0t,..'a M-h4.. ,41 ter 7 i 4i1011;10.„11.1 I,ll.k 4 4\''4'0''',''c-'-''''''a'l.,it,I a 1 0 ..- ' a '�F�, qu " .o..m.-.a. ..A. DETAIL i) 5`0`�' 2I5' I0� 50' l00' r n areaxce n ry DETAIL ap TOE rxmsrnox src W.- ■LI I I SCALE:1"-10� s I-5R.µ986�rvrvo. �s450. No R Too LT now,vTwv...1.L.„,.ni-,T S,fiAIL I) e DETAli D. ry o'xs sso rv. / UDOCUMENTLEE LEIGTxEEDREE`a MPLETED DETAIL. FROM MOOD 50 TO 56 re'e ��n..o.o 01,61-... _ x,.o.w roxrvrvax, �5 BUFFER DRAWING oDQAL'o:}t? T ,„„,• SHEET 4 OF 6 as„a FROM,,.T.. ,,.°;c'• LT To To 0elei - mom om,m T To To of se no .o nw,,.,,Tan ,,..etttox sa HUMMER FARMS LLC Dt_aL-ss °os , „4 W fi \ ; , III `"' 1 elti - -- - 1B _ Ma 9 �+T.! 'iir=gg qf '7 := = ====Fg:W..:,‘,_.,,..,„,,,:...„.v... . --,—,--,- ' '' 11 iit 11 o „owuu r u ,o xcx ry . � G�' _ E �oo,rroEF I P - >c / �` � Al —��. i �..mow-� - _,."..yam W — ''+ 1\ _� ` �l /.7xo_ e ,r r.M.©re a ems � t o d la It-- --or -• -yr ,, ,„.. r -HEARTIER FARMS LLCnilp * . tiL4 / 6 a114040,1 d -Y33-PT 9Sla.30s631.s-L. -Y33-PC so.32,3.' ry / `y OVH POWER(CLEARING) 'q`'�`:, -Y33-PC 610.29r2092 uxue x aEMI ,*,, a e UNDERGROUND N M p pe*Zo* a* TUE TELE(DIRECTIONAL BORE) Q Tay 4 ¢ s u SEWER(OPEN CUT) \ L.b —�� '��' �� v -Li PDT SIa.1395+4685 49A(Y RT ' m STREAM DRIVING BRANCH S > w'--- v--- ,�,,nw,,,,,fg,,,,,-,,iT NOTE:ORNEWAY RADII= 10 FOR 1-PROfIOLE SEE SHEETS B6 8 g) N`. _--� —� LESS SHOWN OTHERWISE FOR-V19RPCI.PROFILE SEF SXEEi 13641 RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size/Type CROSSING BRIDGE IMPACT ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 (ft°) (ft°) (ft°) (ft°) (ft°) (ft2) (ft°) (ft°) 5 1316+27 to 1317+55-L- UTILITIES 6 16+61 to 18+88-Y18RPD-LT UTILITIES 8 35+01 to 37+97-Y33- UTILITIES TOTALS*: 0 0 0 0 0 0 0 0 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 12-28-2020 HARNETT/JOHNSON COUNTIES I-5986B SECTION 4 47532.2.3 aa„aa zma�e SHEET 5 OF 6 WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN BUFFERS SITE ZONE1 ZONE2 NO. STATION (FROM/TO) (f) (f) 8 35+01 to 37+97-Y33- TOTAL: 0 I 0 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 12-28-2020 HARNETT/JOHNSON COUNTIES I-5986B SECTION 4 47532.2.3 Revised 2018 Feb SHEET 6 OF 6 Rev.Jan 2009 Attachment C: I-5986 DMS Mitigation Acceptance Letters 29 :,4-- a _ tiY 1i g ,•\://14:". ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary TIM BAUMGARTNER Director June 5,2019 Mr.Philip S.Harris,III,P.E. Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh,North Carolina 27699-1598 Dear Mr.Harris: Subject: Mitigation Acceptance Letter: I-5877,I-95 Improvements Northbound,Harnett County,WBS Number 53077.1.1 The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on June 4, 2019,the impacts are located in CU 03030006 of the Cape Fear River basin in the Southern Inner Coastal Plain(SICP)Eco- Region,and are as follows: Cape Fear Stream Wetlands Buffer(Sq.Ft.) 03030006 Non- Coastal SICP Cold Cool Warm Riparian Riparian Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 1,208.0 1.10 0.26 0 0 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Beth Harmon at 919-707-8420. Sincerely, 0 Ai 4111111111fite v. AA' i 111 James anfill DMS As Management Supervisor cc: Ms.Liz Hair,USACE—Wilmington Regulatory Field Office Ms.Joanne Steenhuis,NCDWR File:I-5877 D E Q i ,....t,-.......„.„,„ North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 sv STAre ry' \"\ =--C.-4 , gin„ . -- ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary TIM BAUMGARTNER Director January 29,2021 Mr. Gregory W.Price,PWS Division 6 Environmental Program Supervisor North Carolina Department of Transportation 558 Gillespie Street Fayetteville,North Carolina 28302 Dear Mr.Price: Subject: Mitigation Acceptance Letter: I-5878,I-95 Improvements,Harnett County,WBS Number 53078.1.1 The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on January 27, 2021,the impacts are located in CU 03030006 of the Cape Fear River basin in the Southern Inner Coastal Plain(SICP)Eco- Region,and are as follows: Cape Fear Stream Wetlands Buffer(Sq.Ft.) 03030006 Non- Coastal SICP Cold Cool Warm 1 Riparian Riparian Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 476.0 1 0.92 0.32 0 0 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This mitigation acceptance letter replaces the mitigation acceptance letter issued on June 5,2019. DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Beth Harmon at 919-707-8420. Sincerely, C.---4:Ta45.2,Z 7/4W. James Stanfill DMS Asset Management Supervisor cc: Ms.Liz Hair,USACE—Wilmington Regulatory Field Office Ms.Joanne Steenhuis,NCDWR Ms.Linda Fitzpatrick,NCDOT—EAU File: I-5878 Revised D_EQ)NORTH Mperbnent d Environmental Ouail\ North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 sv STAre ry' \"\ =--C.-4 , gin„ . -- ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary TIM BAUMGARTNER Director January 29,2021 Mr. Gregory W.Price,PWS Division 6 Environmental Program Supervisor North Carolina Department of Transportation 558 Gillespie Street Fayetteville,North Carolina 28302 Dear Mr.Price: Subject: Mitigation Acceptance Letter: I-5883,I-95 Improvements Northbound,Harnett County,WBS Number 53083.1.1 The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on January 27, 2021,the impacts are located in CU 03030006 of the Cape Fear River basin in the Southern Inner Coastal Plain(SICP)Eco- Region,and are as follows: Cape Fear Stream Wetlands Buffer(Sq.Ft.) 03030006 Non- Coastal SICP Cold Cool Warm 1 Riparian Riparian Marsh Zone 1 Zone 2 Impacts(feet/acres) 0 0 1,042.0 1 0.85 0.01 0 0 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This mitigation acceptance letter replaces the mitigation acceptance letter issued on June 5,2019. DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Beth Harmon at 919-707-8420. Sincerely, gi/aAln,BrL James Stanfill DMS Asset Management Supervisor cc: Ms.Liz Hair,USACE—Wilmington Regulatory Field Office Ms.Joanne Steenhuis,NCDWR Ms.Linda Fitzpatrick,NCDOT—EAU File: I-5883 Revised D_EQ)NORTH Mperbnent d Environmental Quails"..." North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary TIM BAUMGARTNER Director June 5,2019 Mr.Philip S.Harris,HI,P.E. Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh,North Carolina 27699-1598 Dear Mr.Harris: Subject: Mitigation Acceptance Letter: I-5986A,I-95 Improvements,Cumberland County,WBS Number 47532.1.2 The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on June 4, 2019,the impacts are located in CUs 03030004 and 03030006 of the Cape Fear River basin in the Southern Inner Coastal Plain (SICP)Eco-Region,and are as follows: Stream and River CU Stream Wetlands Eco- Wetlands Basin Location Region Cold Cool Warm Riparian Non- Coastal Riparian Marsh Impacts Cape Fear 03030004 SICP 0 0 647.0 5.88 2.15 0 Impacts Cape Fear 03030006 SICP 0 0 161.0 1.29 0.74 0 *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. DMS commits to implementing sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Beth Harmon at 919-707-8420. Sincerely, James . S anfill DMS , Management Supervisor cc: Ms.Liz Hair,USACE—Wilmington Regulatory Field Office Ms.Joanne Steenhuis,NCDWR File: I-5986A North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 : v STATE'.. .5\ = is ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary TIM BAUMGARTNER Director January 29,2021 Mr. Gregory W. Price,PWS Division 6 Environmental Program Supervisor North Carolina Department of Transportation 558 Gillespie Street Fayetteville,North Carolina 28302 Dear Mr. Price: Subject: Mitigation Acceptance Letter: I-5986B,I-95 Improvements,Johnston County,WBS Number 47532.1.3 The purpose of this letter is to notify you that the Division of Mitigation Services(DMS)will provide the compensatory stream and wetland mitigation for the subject project. Based on the information supplied by you on January 217,2021,the impacts are located in CU 03030006 of the Cape Fear River basin and CU 03020201 of the Neuse River basin in the Northern Inner Coastal Plain(NICP)Eco-Region, and are as follows: Stream Wetlands Stream and River CU Eco- Wetlands Basin Location Region Cold Cool Warm Riparian Non- Coastal Riparian Marsh Impacts Cape Fear 03030006 NICP 0 0 69.0 1.58 0 0 Impacts Neuse 03020201 NICP 0 0 1,132.0 1.09 0 0 *Some of the stream and/or wetland impacts maybe proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. All buffer mitigation requests and approvals are administrated through the Riparian Restoration Buffer Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR's Buffer Authorization Certification,DMS will transfer funds from the NCDOT 2984 Fund into the Riparian Restoration Buffer Fund. Upon completion of transfer payment,NCDOT will have completed its riparian buffer mitigation responsibility for TIP Number I-5986B. Subsequently,DMS will conduct a review of current NCDOT ILF Program mitigation projects in the river basin to determine if available buffer mitigation credits exist. If there are buffer mitigation credits available,then the Riparian Restoration Buffer Fund will purchase the appropriate amount of buffer mitigation credits from NCDOT ILF Program. D_E Q.) NORTH ��` Department dE iro mental Dual) North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976 Mr. Price January 29,2021 Page Two NCDOT TIP I-5986B Revised Eco- Buffer Impacts Buffer River Basin CU Region Zone 1 Zone 2 TOTAL Impacts Neuse 03020101 NICP 40,902.0 23,941.0 64,843.0 This mitigation acceptance letter replaces the mitigation acceptance letter issued on June 5,2019. DMS commits to implementing sufficient compensatory stream,wetland, and buffer mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28,2010. If the above referenced impact amounts are revised,then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information,please contact Ms. Beth Harmon at 919-707- 8420. Sincerely, C%cyaeaii yi/aAmte-e... James B. Stanfill DMS Asset Management Supervisor Cc: Ms. Liz Hair,USACE—Wilmington Regulatory Field Office Ms. Joanne Steenhuis,NC Division of Water Resources Ms. Linda Fitzpatrick,NCDOT—EAU File: I-5986B Revised NoanHcnRou ��` Department ofE iro mental Uua11 North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh,North Carolina 27699-1652 919.707.8976