Loading...
HomeMy WebLinkAboutSW6201004_Plan (SCM Detail)_20210427�'STORMWATER MANAGEMENT NOTES: I. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED. 2. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL STRUCTURES. 3. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS. 4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE PROJECT ENGINEER. 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(s) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY. 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 11, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION OF NCDEQ 30" RCP WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 3 3' MIN APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 42'-30" RCP 0 2.38% SILT FENCE AS NEEDED 8' MIN. EMBANKMENT WIDTH 6' TOPSOIL FOR ALL - AREAS ABOVE THE NORMAL POND ELEVATION 6" CLAY SOIL- - LINER ON INSIDE 6.5'x6.5' SEEPAGE FACE OF COLLAR. SEE EMBANKMENT DETAIL 6FT LITTORAL 6" TOPSOIL ABOVE 6" CLAY LINER ON LITTORAL SHELF 3 1 ELEV=183.0 - 1 4' MIN. ASTM C-923 SEAL KEY BETWEEN BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"X8"Xl"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4' A307 BOLTS FROM ANGLE TO RISER AND 2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. "J" HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL /---FILTER MEDIA (SEE NOTE 2) FLU- (lnl PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. BMP POND DEWATERING SEEDBED PREPARATION: i. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE). S. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CUL11PACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8 INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED. RE-ESTABLISH FOLLOWING THE ORIGINAL UME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WiTH THE NCDEQ BMP REQUIREMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEMENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASNE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGUNG) OF ALL WOODY PLANTS. SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED WiTH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: - CILL IDE NATIVE PLANT NURSERY 919-662-5566 - GROWING WILD NURSERY 910-259-6361 - NC FOREST SERVICE 919-731-7988 - PLANT DELIGHTS NURSERY 919-772-4794 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABUSHED, THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. LANDSCAPING NOTES: i. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 2. iT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAID OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERALS, AND OBTAINED FROM A WELL DRAINED, AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES 1' OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDERANCE TO PLANTING OPERATIONS, TOPSOIL SHALLCONTAIN AT LEAST 4-6X ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANTING MATERIALS DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PUNTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECDND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO BE SODDED. 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD III- NEW TOPSOIL, OR TILL AND AMEND THE TOP 18' OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES. 9. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND unutiEs (SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL LINES.) STORMWATER MANAGEMENT SYSTEM DETAILS NOT TO SCALE F`0/Y LOW POINT L 6 �1 LEVEL J a I L_ FI T •e TOP OF STRUCTURE (MANHOLE ACCESS) REFER TO DETAIL FOR INCREMENTAL WEIR 4'x4' PRECAST CONCRETE RISER (INSTALL STEPS AS NECESSARY) PVC ELBOW SEE DETAIL `- 5'x5'xl.5' CONC. BASE AND BOTTOM OF EACH BETWEEN EDGE OF CON PROFILE OF WET s CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION. 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING. 4. CONSTRUCT OUTLET STRUCTURE. 5. REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION. TOP OF EMBANKMENT ELEVATION=193.0 1 YEAR STORM ELEVATION=188.13 INTERMEDIATE WEIR ELEVATION=187.7 1.0-INCH STORM ELEVATION=185.62 7 NORMAL POND ELEVATION=185.0 2 NOTE: PUMPS SHALL BE USED TO DRAIN -� 1 THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. EXISTING GRADE=195.0t BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=175.5 CONCRETE SHALL BE - PLACED IN RISER AFTER ._ ANGLES ARE SECURED - " (BOTTOM OF SEDIMENT STORAGE)=174.5 TO BASE AND RISER. �- 6" CLAY SOIL REINFORCE WITH #4 BARS AT 12" O.C. TOP LINER DIRECTION PROVIDE 3" MIN. CLEARANCE MAIN POOL C. AND STEEL REINFORCING. TOP OF EMBANKMENT ELEV=193.0 POND DETENTION SYSTEM 8' 1. WTI. - 3' 3 1� B 8" (3..__- I "' ...p LEVEL SPILLWAY CREST ELEV=190.9 CONCRETE SECTION 2' A 2' TOP OF EMBANKMENT ELEV=193.0 _ I_I: SPILLWAY ELEV=190.9 INS=1I�,;.m. SPILLWAY A B BASIN 15 FT 2.1 FT 3 1 SPILLWAY CREST _... 2'-0' COMPACTED;._._ SUBGRADE 5" THICK 4000 P CONC. W/ 6X6, 10/10.:e._ ICI WWF 2" FROM TOP CONCRETE SPILLWAY Tpp OF STRUCTURE ` ' 190 /�fR'Uf0/q , 2 1 2'-0" CLASS B RIP -RAP d 50 MEDIAN DIA.=8" ON FILTER FABRIC RIP -RAP APRON -� FOREBAY WEIR 9 % / I J -INLET PIPE WITH WEIR - // 1 "- --� 197 RIP -RAP APRON_ - -- - -- ° o° a a° It i °aa a / o a REFER TO i ° i / / � / / / / / �• ./ / / / FOREBAY / ° 'FOREBAY ' / 1 GRADING PLAN / AREA \ n ° a n AREA \ \ I BY OTHERS / „ FOREBAY WEIR I I I I I I I ° REFER TO GRADING PLAN BY OTHERS 1 \ 1 1 I I I \ - MAIN POND AREA - - TOP OF EMBANKMENT 9 _ - - _ °a a a ° _ <--- ELEV=193.0 r SOD AREAS ABOVENORMAL ` __ . - _ _-1 H � _ ELEVATIONPOOL , - / / / / / J CONCRETE /� SPILLWAY CONCRETE SEEPAGE - `-- �.. -..,, _.- TOTAL LITTORAL SHELF COLLAR •r OUTLET CONTROL _ AREA=2,985SF _ REFER TO DETAIL 42'-30" RCP _.., STRUCTURE �' REFER TO DETAILS ' '- FOR PLANTINGS / 02.38% \ - 'THIS SHEET V(WATER-TIGHT) \ \ / / / INV=185.0 5 �• \ �- �- - FES \ \ \ '" INV=184.0 LIN .� GRAPHIC SCALE WET POND PLAN VIEW 1 INCH = 40 FEET "'RUCTURE NOT SHOWN FOR CLARITY kCCESS) OUTLET CONTROL STRUCTURE _ INCREMENTAL WEIR 6" TOPSOIL ABOVE- 6" CLAY LINER ON LITTORAL SHELF 6FT LITTORAL SHELF 3CY CLASS B RIP -RAP 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM 3:1 5' MIN. GRASS FOREBAY WEIR AT ELEV=184.0 FOREBAY TOP ELEV=187.5 WIDTH AT TOP=2.0 FT RISER STRUCTURE 4' PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. P 4"x4" PVC TEE PERM. POND ELEV.=185.0 SEDIMENT STORAGE TOP FOREBAY BOTTOM ELEV=179.0(W)/180.0(E) BOTTOM OF SEDIMENT STORAGE/EXIT ELEV=182.0 3)"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN THE FOREBAY WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. 'S1 NORMAL POND ELEVATION FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT SHALLOW LAND ZONE HERBACEOUS PLANTS TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE �- 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=178.0(W)/l79.O(E) SHALLOW WATER ZONE HERBACEOUS PLANTS POND (NORMAL POOL) SPACING PLANTING SEASON Joncus effusus Soft Rush SHALLOW WATER 125 PEAT POT 6' O.C. SPRING/SUMMER Iris virginica Blue Flag Iris SHALLOW WATER 125 PEAT POT 6' O.C. SPRING/SUMMER Schoenoplectus tabernaemontani Soft Stem Bulrush SHALLOW WATER 125 PEAT POT 6' O.C. SPRING/SUMMER EupatorPadelphus maculatus Spotted Trumpetweed SHALLOW LAND 125 PEAT POT 6' O.C. SPRING/SUMMER Eupotorium purpureum Joe -Rye Weed SHALLOW LAND 125 PEAT POT 6' O.C. SPRING/SUMMER IllRhynahospora colorota Starrush Whitetop SHALLOW LAND 1 125 PEAT POT 6' O.C. SPRING/SUMMER CONCRETE SEEPAGE COLLAR SCALE: N.T.S. STORMWATER MANAGEMENT DESIGN WET DETENTION POND RIVER BASIN: CAPE FEAR RECEIVING STREAM: BEAVER CREEK STREAM INDEX: 18-31-19-5 STREAM CLASS: C HUC: 03030004 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 23.87 ACRES SITE IMPERVIOUS AREA TO POND: OFF -SITE DESIGN IMPERVIOUS AREA TO POND' 9.95 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 6 67 ACRES 16.62 ACRES PRE -DEVELOPED TO POND POST -DEVELOPED POST DEVELOPED DRAINAGE AREA: 23.87 AC TO POND THROUGH POND 23.87 AC CURVE NUMBER: 59.7 85.5 TIME OF CONCENTRATION: 19.0 MIN 12 MIN 1' STORM EVENT: 2.999 CFS 0.222 CFS 1-YEAR STORM EVENT: 5.094 CFS 56.88 CFS 3.375 CFS 10-YEAR STORM EVENT: 39.71 CFS 129.58 CFS 37.33 CFS 100-YEAR STORM EVENT: 96.31 CFS 216.08 CFS 110.04 CFS TYPICAL LITTORAL SHELF PLANTING SCHEDULE #4 REBAR 0 12" OC IN FRONT & REAR FACE OF COLLAR. REBAR TO HAVE 3" MIN. CONC. COVER FROM EDGE OR FACE OF COLLAR NOTES: 1. ALL CONCRETE TO BE 3000 PSI NON -FLY ASH. 2. APPLY J" THICK WRAP OF ASPHALTIC CEMENT AROUND DISCHARGE PIPE 6" BEYOND PLANNED SEEPAGE COLLAR ON BOTH SIDES. 3. APPLY ADDITIONAL ASPHALTIC CEMENT AT PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES. 4. TO BE FIELD INSPECTED BY GEOTECHNICAL ENGINEER. ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION SS-153 TYPE 1: ASTM-D-2822-75 TYPE 1. STAGE/STORAGE TARE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 185.0 21940 0 0 0.5 185.5 24355 11574 11574 1.0 186.0 26000 12589 24163 20 187.0 29305 27653 51815 2.3 187.3 30305 8942 60757 (WOv) 2.5 187.5 30975 6128 66885 3.0 188.0 32980 15989 82873 4.0 189.0 36255 34618 117491 5.0 190.0 39585 37920 155411 6.0 191.0 42960 41273 196683 7.0 192.0 46390 44675 241358 8.0 193.0 49875 48133 289491 IF OPERATION & MAINTENANCE BMP element: Poton al robiem: How I will romediate the e entire BMP Trash/debris la present -problem Remo" the trash/debris he Perimeter of the w sterdfon basin Areas of bar# soil and/or erosive gullies have formed Regrade the soil If necessary to remove the gully, and then plant a ground cover and water until If established. Provide lime and a one-time fertilizer application Vegetation Is too 0 or long almaln vegetation at a height of approximately six inches. e Inlet device: pipe or Iwole The pipe Is clogged. nc e pipe, Dispose of the sediment off -site. The pipe is cracked or otherwise damn ed Replace the pipe. roe on s occurring In the swals. Regrade the swa a If n scesaary- to smooth it over and provide erosion control devices such as reinforced turf matting or Mprop to avoid future problems with erosion. e forebay Sediment has accumu o a depth greater than the original design depth for sediment storage. Search for the source of the sediment and remedy the problem If possible. Remove the sediment and dispose of H In a location where it will not cause ira cis to shams or the BMP. We co roe on as au a na erosion protection such as reinforced turf matting or Mprop if needed to prevent future erosion problems. Woods are present. Remove the woods, preferably hand. If pesticide is used, wipe it on the plants rather than a n. e vegetateds professional proces show that pruning is needed to maintain optimal plant rune acco ngto beg professional practices health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a sob test indicates it Is n . Beds are present. emove e w s, profero y by hand. If pesticide is used, wipe it on the plants rather than spraying. e man treatment Oren men co as aumu a depth greater than the original design sediment storage depth. eorcTi o the source of ifie sediment and remedy the problem If possible. Remove the sediment and dispose of it in a location where It will not cause Impacts to streams or the BMP. Algal gmvih covers over 5OX of the area. Consulta professional remove and control the algal row1h. Cattails, p rogm or other inwsive plants cover SOX of the basin surface. Remove pan w p ng them with pesticide (do no s e embankment Shru aw Started to grow on the embankment emow shrubs mmed a y. v ante o M.or beaver activity is present. Use traps to remove muskrats and consult a professional to remove beavers. A tree has started to grow on the embankment. Consult a dam safety specialist to remove the tree. n annual nns on by an appropriate professional shows Makea needed repaint. that the embankment needs n Ir. e outlet device ncob. can o e o ce.ogg Dispose of the Sediment off -she. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the outlet. Water Quality Regional Office, or the 401 Oversight Unit at 919-733-1786, W z J � UC0 ZQ W EMISSION L~ W 1 ess- CONSULTANT: Triangle Site Design, PLLC 4004 Barrett Drive Suite 101 Raleigh, NC 27609 (919)553-6570 mlowder0trionglesitedesign.com NC License #P-0619 ,eeeeeeeee je S,Z40 o 9 SEAL 24 ,,•� %Was: OWNER/DEVELOPER: Lee Humphrey Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 (Office) 910-206-1808 (cell) Iee@doubledeng.com � U 0 o z z Q \-� N cr) S � � U w Q 1z O J = the concepts and designs presented herein, as an instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Triangle Site Design, PLLC shall be without liability to Triangle Site Design, PLLC, q a .m m W c c.> z v 0 T e m v o c a c z Z 40 a. a. n H H N ce N N N M N N M Drawn Checked Approved Project No: 048008 Date: September 4, 2020 STORMWATER CONTROL MEASURE DETAILS -PHASE 1