Loading...
HomeMy WebLinkAboutSW6201004_Supplement EZ-Form_20210427SUPPLEMENT-EZ COVER PAGE NUMBER AND TYPE OF SCMs: 11 System 0 12 tInfiltration yBloret 13 . .......... ......... ......... ..-.....--- Wet Pond ....,. .. ,. . 1 14 Stormwater Wetland 0 15 Permeable Pavement....... �..... 0 _--- - 16 _ Sand Filter ..ter 0 Harvesting(RWH) � 0 m 18 Green Roof 0 .. .....,, 19 ®f��ye!,§preader-Filter _ Strip (LS FS� ... 0 20.. Disconnected Impervious Surface _ _.. _..-_ 0 _ ... 21 . Treatment Swale 0 _ 22 Dry Pond ...... ......... ....... _.0__„ 23 �� StormFilter .......__ ._ m 0 ----- _ _._ . _ _ a. ...... ., ... n . 24 Silva Cell _ �w m .... �. 0 25 Ba filter - __ . 0 26 Filterra 0 Certification Statement: I certify, under penalty of law that this Supplement FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Qes�er ,fir ��"rFFF o Signature of Designer Z/,1, P-. Date DRAINAGE AREAS __�--__ �p s proje 1 Is this a hi h denct? Yes 3 If so number of drainage areas/SCMs 1 2 Is all/part of this project subject to previous rule versions? No rCYVdP�a„ILQ�9d�i�1N�V� a DRAINAGE AREA INFORMATION Entire Site 1 �.waaaM 4 Yp of� Wet Pond u..Wet Pond ., mSCM .... --Type 5 Total BUA in project (sq q 485392 sf 433196 sfm n New BUA on subdivided lots (subject to permitting) 6 (sq ft) — _....... ... ... ` ........ . ....... ..... ...... ........ .... ... -------- New BUA outside of subdivided lots (subject to 7 pmi,n�) s 8 Offsite -total (sq ft......-.. ._ 2� 9..-0-5-.6_ 2_ sf w...... 29:.0562 sf -a..rea Offsite BUA (sq 10 Breakdown of new BUA outside subdivided lots: Parkinq (S9 ft) ----------- Sidewalk_ s ft - 17090 sf w 15114 sf _ a : Roof s� ft1 .......: w......:_.n ..�._ ..m m .e.365000 sf 330000 sf......_ Roa _(sq Jift 100062 sf.m _-w...84842sf ..... . Future (s9 ft)_ ,_....� ..o.. ... ........ ..�...,I Other, please specify in the comment box below.. �� 3240 sf .. .. 3240 sf New infiltrating permeable pavement on 11 subdivided lots�..- .... New infiltrating permeable pavement outside of 12 subdivided lotssq Exisitng BUA that will remain (not subject to 13 permitting�(sq ft) - , 14 Existing BUA that Is already permitted (sq ft) 15 Existincj BUA that will be removed (sic ft) 16 Percent BUA 27.29% 69.62% 17 Desi n storm in ohesj _, 1.0 in 18 f Deslpn volume of SCM (cu ft) 58614 cf r__.... ..... ,, 19 Calculation method for design volume 1 KKM�UMVY�tlM'�'AmNw �mm � Simple Method ' ADM' IkRFtO Please use this space to provide any additional information about the 20 drarnage area(s)_ Line 10 - There is offsffe BUA draining towards the SCM This includes the residenhal areas end open space along Marcus Place 'Drive and Rockfish Road, apartments along Rockfish Road and a portion of Rockfish Road This offsite BUA will be factored with 100 % Build -Out Potential in the post developed peak now runoff to the SCM The SCM has been ow designed to overcompensate �Ihe off -site drainage area to balance out the impervious area not directly draining to the SCM by Lots 3842 and Lots 72-73 The drainage area has decreased and without changing the sae of the SCM now has a design wlume of 58.614 cf The previous :drainage area yielded a design volume of 66,893 (ddference of 8,279 cf) In addition there is a postal kiosk on site with 3240 sf rtmpervrous am WET POND g volume o 2 Design ....1 rains o area number mTTm� ... ..� �� f SCM (c+a ft) GENERALr a to treat the SW from all surfaces at build out? Is the SCM sized5 aI'are the osi�9..� .� 3� ed away from contaminated soils? e slopes of the SCM (I 11f)? — ........ ._--,.....—........ ..................... Does the SCM have retaining walls, gabion walls or other 6 engineered side slopes? Are the inlets, outlets, and receiving stream protected _ from erosion 7 (10-year storm)? ..,is there overflow or bypass f„3 nfl--ow "..- vo_-lum-..e ._ in ... e excess of the -th... 8'design volume? 9 What is the method for dewatering the SCM for maintenance? ._ . -.pp— tP .-.b-. - ...- .-- ucti;_..- 10 If a tiblo wigd .�e SCM Nao cloan�ed overt after oonstructlon? 111 D es the maintenance access comply with General MDC (8)? 12 Does the drainage easement comply with general MDC (9)? .."' m . If the SWis on -a single family kot, does (will?) the plat comply -wit 13 General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)' _. — - rea_ .' ...... iron. a m._ 15 is there an C)&M Plan that comploos wrGh General MDC 16 Does the SCM follow the device specific MDC? 1 7j Was the SCM designed by an NC licensed ptofessional7 ELE'N µMMIZOR 18 Method used 15�Ka-s a sia gelstorage table provided in the calculatio Elevation of the excavated main pool depth (bottom dim g .. i p p ( ttom of sediment 20 removal) (fmsl) 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) Elevation of the bottom of the vegetated shelf (fmsl) _.._ P.. pool fmsl mrrr... 23 Elevation of the permanent p (fmsl) Surface area of the main permanent pool (square feet) Volwtme". ._._ __-_._n _ _.._ _ of the main t�ermar�ent pool fosa6ic feeft If using equation 3, main pool perimeter (feet) Nf usieug equation 3 width of submerged veg. Volume of the forebay (cubic feet) in pooh Is this 1 s-20 oof the volume m the m s Clean out depth for forebay (inches) Design volume of SCM (ou ft) — Is the outlet an orifice or a weir? II 67if'ico, caoofare dtaiiueter (inches) - - - — If weir, weir height (inches) if wear., weir length (inches) a manner 41 circuiting? 42 Are berms or baffles provided to tmprov_ the flow path e 43 Depth of forebay at entrance (Inches) 44 Depth.of., _forebaytray at exit (inches) -- .... ... .... _ ......... 45 D. _ oes water flow out of the forebay in a non --erosive manner? 46 Wid ' the vegetated -shelf (feet) 48 permanent pool? Does the pond minimize impacts to the receiving channel from the 49 yr, 24-hr storm? Are fountains proposed? (If Y, please provide documentation that 50 MDC(9) is met.) 51 Is a trash rack or other device provided to protect the outlet system' 52 Are the dam and embankment planted in non -clumping turf grass? 53. SeEIe-i-of turf th-it will be used on the danii i-nd embankment 5' '-H5s -�FpTi6tr6-g-"oien been proved for e, veg—o t-ea sik76t ADDITIONAL INFORMATION P p P y...., _.. about lease use this space to rovtde an additional in—formationmm. 55 the wet ands : Responses to Lines 34, 43 & 44 are for East Forebay. 'West Forebay: Line 34 = 72 in, Line 43 = 84 in, Line 44 = 36 in 'See Drainage Area additional information for clarification on oversizing of 'SCM. Yes Yes LL Yes Yes"" SA/DA Yes 174.5 175.5 ...184.5 �185.0 .. _ ..._....187.3 m p 15710.0y+ 101359-cf 7.07 ft Equations 486.0 ft _ 30ft 15496 cf 60 inm 58614 cf Onfice 3.50 in 2.14 Yes Yes 72.0 in Yes Yes No Yes Yes Hybrid Bermuda Wet Pond 1 3:19 PM 4/26/2021