Loading...
HomeMy WebLinkAboutSW6201004_O&M Agreement_20210427Project Name Project Location BKackh@VVk Landing Rockfish Road, Hoke County NC Maintenance records shall bekept unthe following B[WP(s). This maintenance record shall bekept inalog inuknown set |ooaho Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety ofthe pub|ic, and the pollutant removal efficiency of the B[NP(a). The BK8P(s)onthis project include (check all that apply &co Bioretention Cell Quantity: Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Levm|SpreadenVFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter StonnwoharVVetland Wet Detention Basin Disconnected Impervious Area User Defined B[WP Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: ig O&M tables will Looadon(a): L000don(a): Looadon(s): Locahon(s): Locadon(s): Locadon(e): Looation(s): Louation(o): Lonution(s): Locadon(o): Lmcadon(s): Locabon(a): Locadon(s): Lonadon(o): Locabon(a): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each B[NPabove, and attached O&M tables. | agree tonotify NCDENRmfany problems with the system o/prior toany changes tothe system urresponsible party. ^ Responsible Party� Title &Organization: Street address: City, state, zip: Phonanumbor(s: Email: Sign Hendrix Brothers of Hoke LLC D. Ralph Huff 111, Member/Manager e of N C personally appeared before mathis �r day of and acknowledge the due execution of the Operations and Maintenance Agreement Witnes hand and official seal, OW My commiss2on �pi )s wv COMMISSION EXPIRES 7/412023 Op, PJJBL�G ST ve O&M Manual 4m6/2U21 Page 1of4 Wet Detention Pond, Maintenance Requirements The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one iaprovided. Important maintenance procedures Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to - matebhehUhep|enteonthevegetatedmhe|t Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should beminimized tothe maximum extent practical. Once ayear, adam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.Oinches (or i.Sinches ifinaCoastal County). Records ofoperation and maintenance should bekept ina known set location and must beavailable upon request. Inspection activities shall be performed aafollows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to rernove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand, If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant Plants are dead, diseased or Determine the source of the problern: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM-EZ 4/202021 Version /�4 O&M Manual Page 2or4 Wet Detention Pond Maintenance Requirements (Contin4ed) The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50% of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment, An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. 4�6�O21 8Toem�sc vemionl.4 O&M Manual Page aof4 Wet Detention Pond Design Summary Wet PondjLiaqLpm WET POND ID FOREBAY MAIN POND WETPONB Permanent Pool El. 185 Permanent Pool El. 185 Temporary Pool El: 187.3 Temporary Pool El: 187.3 Pretreatment other No Clean Out Depth: 6 Clean Out Depth: 9.5 than forebay? Sediment Removal El: 179 Sediment Removal El: 175.5 Has Veg. Filter? No Bottorn Elevation: 178 Bottom Elevation: 174.5 STORM-EZ 4/26/2021 Version 1.4 O&M Manual Page 4 of 4