Loading...
HomeMy WebLinkAbout20111101 Ver 1_Inspection_20121212I- Beverly Eaves Perdue Governor YF ij= NCDENR North Carolina Department of Environment and Natural Resources , Division of Water Quality FC Charles Wakild, P E Director Mr J B Setzer, P E Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr Setzer December 12, 2012 t z" z" ✓' `�> Y �� )O,? qT�A Y eR�yC H Subject Inspection NCSR 1006 Howard Gap Road DWQ Project 2011 TIP No R -5207B Henderson County On December 6, 2012, I inspected the construction work on Howard Gap Road in Henderson County Construction work has started with clearing, grubbing and installation of sediment and erosion control measures There was no work taking place at the time of inspection � 1, Dee,Ereeman f- %Secretary Please ensure that all sediment and erosion control structures are being maintained as required and that seedmg and mulchmg are being performed as needed, to protect State surface waters Refer to the attached copy of the inspection report for additional comments regarding the inspection If you have questions, please call me at 828 - 296 -4500 �Si✓innccerely, .//"/ -�_� '/-z - p�_ Michael R Parker Environmental Senior Specialist Attachment cc Aaron Powell Mark Davis, Division 14, DEO Ben DeWit, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office Howard Gap Road R -5207 Inspection Letter December 2012 SURFACE WATER PROTECTION SECTION —Asheville Regional Office 2090 US 70 Highway Swannanoa NC 28778 -8211 Phone 828 296-45001 FAX 828 299 7043 Internet www ncwaterouality oro An Equal Opportunity 1 Affirmative Acton Employer NorthCarohna Aaturattrl Wetland Inspection Report Project Num 20111101 Version 1 Project Name NCDOT- SR 1006 (R- 5207B) County Henderson Location NCDOT- SR 1006 (R- 5207B) Latitude +35 °23'44" SW Plan Location Site Owner Name NC DOT Division 14 - Sylva Inspection Date 12/06/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title On-Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Status Issued Project Type Road /Highway Widening Region Asheville Longitude -82 °29'16" Facility compliance Status N Compliant 0 Not Compliant Program Area 401 (includes isolated /non -404) Question Areas 0 Permit (401 WQC) Inspection Summary Inspected project with NCDOT staff Clearing and grubbing have been performed over most of the projet Sediment and erosion control structures have been installed Continue to maintain sediment and erosion control devices as required Seed and mulch all bare areas as required No construction activity was taking place at the time of inspection Phone Phone 828 - 296 -4500 Page 1 Project Num 20111101 Owner NC DOT Division 14 - Sylva Inspection Date 12/06/2012 Inspection Type Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit Are the culverts and /or filled areas installed properly'? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment Reason for Visit Routine V— ni„ nie nic ■nnn ■nnn ■ n n n Page 2 tJ v