HomeMy WebLinkAbout20130022 Ver 1_401 Application_2013011320130022'
Office Use Only
Corps action ID no
DVVQ project no.
Form Version 14 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a Type(s) of approval sought from the Corps-
Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Pernd (NWP) number. or General Permit (GP) number.
1c. Has the NWP or GP number been verified by the Corps?
Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply)*
9 401 Water Quality Certification - Regular ❑ Non404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization
1e Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes No
For the record only for Corps Permit:
❑ Yes ( No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in-lieu fee program.
❑ Yes 0040
1g Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below
❑Yes ,�No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes KNo
2. Project Information
2a Name of project:
&
La7
2b County-
2c. Nearest municipality / town.
bu j
2d Subdiftionimm:
3. Owner Information
3a Name(s) on Recorded Deed.
3b. Deed Book and Page No.
/.3 6
3c. Responsible Party (for LLC if
applicable):
3d Street address
P? O 464S W- 14-AA-291"S 120 .
3e City, state, zip:
NL Z8 Z
3f Telephone no.:
X28 2GS-J/92 >D T,M46
LluF
3g. Fax no..
8 Z 8 2 &T- OS-08'
3h Email address:
STupleY Q i»PR./N'rs /NC tart
EE
Wetlan ` _ ds S mwaty Branch
— -- - --
Page 1 of 10
PCN Form - Version 14 January 2009
[ �
., `' 1 �
.: J
�^
- - --'"`:
4. Applicant Information (if different from owner)
4a Applicant is:
❑ Agent ❑ Other, specify:
4b. Name
'
4c Business name
(if applicable)
4d. Street address:
4e City, state, zip:
4f Telephone no.-
4g. Fax no..
4h. Email address-
% ~�•,
5. Agent/Consultant Information (if plicable)
5a Name.
5b. Business name
(i applicable): ' ,-
5c. Street address:, f "
5d. Cdy, state, zip:
5e. Telephone no.:
5f. Fax no..
5g. Email address
Page 2 of 10
B. Project information and Prior Project History
1.
Property Identification
1a
Property identification no. (tax PIN or parcel ID). 1pip
21917- 34.5894 SD 0'70 21 ZZ_
lb
Site coordinates (in decimal degrees)
Latitude: Longitude:
1c
Property size
/ . 7. acres
2.
Surface Waters
2a. Name of nearest body of water to proposed project:
2b
Water Quality Cla"cation of nearest receiving water.
2c
River basin
reclk-1
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application -
3b
List the total estimated acreage of all existing wetlands on the property. Nt\
3c
List the total estimated linear feet of all existing streams (intermittent and perenniaQ on the property:
3d
Explain the purpose of the proposed project.
RECREA-nwAL FAQnn PoiJb -
3e. Describe the overall project in detail, including the type of equipment to be used:
'b IG FARrX Pea b r-01Z P ZI VAsZ RECk447 #0A1C- LA 5 ar (A 51 -)4.
'17R-Ac Hot AVB A ULL Do
4.
Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property !
ro'ect indudin all ases in the
Yes ❑ No ❑ Unknown
Comments:
4b
If the Corps made the jurisdictional determination, what type
mi
of determination was made?
Preliminary ❑Final
4c. If yes, who delineated the jurisdictional areas?
Name (d known). f jl le_ i'pr v- vj 0L>4—
Agency/Consultant Company:
Other. T)L -.
4d
If yes, list the dates of the Corps jurisd cUonal determinations or State determinations and attach documentation
1Z'2���tZ
S.
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
[]Yes ,�No Unknown
5b
If yes, explain in detail according to °help file" instructions.
Lions.
6.
Futuna Project Plans
6a. Is this a phased project?
❑ Yes MNo
6b
If yes, explain
Page 3 of 10
PCN Form —Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply).
❑ Wetlands (,Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this questi each wetland area impacted.
2a
Wetland impact
number
Permanent (P) or
Temporary
T impact
2c.
Type of nd
2d
Forested
2e
Type of jurisdiction
Corps (404,10) or
DWO (401, other)
Zf
Area of
impact
(acres)
W1 -
Choose one j
Yes/No
-
W2 -
Choose one -
Choose one
Yes/No
-
W3 -
06se one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
-
W5 -
Choose one
Choose one
esMo
We -
Choose one
Choose one
Yes/No
-
2g. Total Wetland Impacts:
2h. Comments _
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f
Average
stream
width
(feet)
39
Impact
length
prnear
fit)
S1 -
Choose one ].
OT
-
- k VN
1 LAI r
S2 -
dose one
-
S3 -
Choose one
S4 -
Choose one
-
S5 -
Choose one
-
-
S6 -
Choose one
3h. Total stream and tributary
impacts
LA el 1
31 Comments:
Page 4 of 10
PCN Form — Version 14 January 2009
4. Open Water I�Wcts
If there are proposed i ftacts to lakes, ponds, estuanes, to es, sounds, the Atlantic Ocean, or any other open water of
the U.S then individuallylistall open water imiacts cm -acts bel
4a.
Open water
impact number
Permanent (P) or
Temporary
4b. %
Name waterbody��
(rf a ��
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
,-
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g Comments: -
5. Pond or Lake Construction
If pond or lake construction proposed. the complete the chart below.
5a
Pond ID number
5b.
Proposed use or
purpose of pond
5a
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
I Filled
Excavated
P1
Choose one
l LV C
P2
Choose one
5f. Total:
1
5g. Comments.
5h Is a dam high hazard permit required?
❑ Yes No If yes, permit ID no.
5i Expected pond surface area (acres)-
*z r 2 RCRt`
5j Size of pond watershed (acres):
5k Method of construction
I f y-eA VA-rt CO l Tµ Jr.40r,K de p
6. Butter Impacts (for DWO)
If project will impact a protected riparian buffer, then complete the chart below Af yes, then individually list all buffer impacts
w if
belo - an im ds miti . then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
r
❑ Neuse ❑ Tar-Parrigpd ❑ Catawba ❑ Randleman ❑ Other.
6b.
Buffer Impact
number —
Permanent (P) or
Temporary
6c.
Reason for il;�
6d. //
S"m name
6e
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
6g
Zone 2
impact
(square
feet
B1 -
Yes/No
B2 -
Yes/No
63 -
YesMo
84 -
Yw4No
65 -
Yes/No
B6 -
Yes/No
6h Total Buffer Impacts;
6i Comments-
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
"- i��v►�r-.�1 <<v- .P4�t -� fit✓ wi�'i' .
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes P(No
impacts to Waters of the U.S. or Waters of the State?
2b If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
❑ - gation bank
2c If yes, which miQrtion option will be used for this
Payment to in -lieu fee program
project' `..�
�
/
❑ Permittee Responsible Mitigation
3. Complete if Using a !!! n Bank
3a Name of Mitigation Bank
Type;/'Choose one
Quantity:
3b Credits Purchased (attach receipt and Mier)
TO: Choose one
Quantity:
T, : Choose one
Quantity:
3c Comments:
4. Complete if Making a Payment to In4le Fee Pro ram
4a Approval letter from in -lieu fee program ' attached.
❑ Yes
4b Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream to perature:
C
4d. Buffer mitigation requested (D /only):
square feet
4e Riparian wetland mitigation req ed:
4f Non- ripanan wetland mfiga ' requested:
49 Coastal (tidal) wetland m' lion requested-
acres
4h. Comments
5. Complete if Using a FArrnfte Responsible Mitigation Plan
5a. If using a permittee ponsible mitigation plan, provide a description of the proposed midge ' plan.
Page 6 of 10
PCN Form — Version 14 January 2009
6. Buffer MitigatioW(State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
es ❑ No
buffer mitigation?
6b. If yes, then identify the square feet ohlygMct to each zone of the riparian that requires mitigation Calculate the
amount of mitigation required. ``� ,
6c.
6d.
6e.
Zone
for impact
Total im d
ultipGer
Required mitigation
(square fee
(square feet)
Zone 1
X(2 for Catawba)
Zone 2
- —
- - - - 6---- - -
- - - --- - - -
6f Total buffer mitigation re fired:
fag. If buffer m Ration is required, d' what type of mitigation is proposed (e..
yment to private mitigation bank,
permittee responsible dpariarbuffer restoration, payment into an approved iM
fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
la
Does the project include or is it adjacent to protected riparian buffers identified
O Yes ,b�Vo
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2.
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
0%
2b
Does this project require a Stomhwater Management Plan?
O Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain wiry:
2d.
If this project IDES require a Stormwater Management Plan, then provide a brief, na
ive description of the plan
2e
Who will be responsible for the revi of the Stornw ater Managemen n?
3.
Certified Local Government Stormwa Review
3a
In which local ovemmenYs " risdicdon is this ect?
❑ Phase II
❑ NSW
3b
Whicth of the following locally - implemented stomnaat nagement programs
USMP
apply (check all that apply).
Water Supply Watershed
❑ Other.
3c
Has the approved Stormwater Management n with proof of a 1 been
[]Yes O No
attached?
4. DWQ Stortnwater Program Review
OCoastal counties
48
Which of the following state -ir *emented stomhwater management programs
(check all that apply):
OHQW
❑ORW
n Law 2006 -246
�/
[]�
4b
Has the approved ormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5. DWQ 401 Unit Stirmwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ . Q No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 14 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federallstateliocal) funds or the
Yes
JKNo
use of public (federallstate) land?
lb If you answered °yes° to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes
❑ No
(North Carolina) Environmental Policy Ad (NEPA/SEPA)?
1c. If you answered 'yes° to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter.)
Comments.
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Weiland Rules (15A NCAC 21-1.0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Weiland Standards,
XYes
❑ No
or Riparian Buffer Rules (15A NCAC 213 0200)?
2b Is this an after- the -fact permit application?
)KYes
❑ No
2c If you answered 'yes' to one or both of the above questions, provide an explanation of the violations)
'EGA#�j c*o& RKe-„eN ax pwb w /T"v"-r
S6erro--J
11 o N P6901 S I - NA t To 4 4Cfe of X.#J oW LfAGE 001C ABdvE W
4rz4opUb
RItt.GS AND NLGLiSi OF SLCT -1011 44041 Peon I'r.
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
[_-]Yes
No
additional development, which could impact nearby downstream water quality's
3b If you answered °yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered °no; provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
_
Page 9 of 10
PCN Form — Version 1.4 January 2009
I Y • . . ,
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
habitat's
❑ Yes ❑ No
5b Have you checked with the USFWS concerning Endangered Species Act
impacts?
❑ Yes ❑ No
5c. If yes, indicate the USFWS Field Office you have contacted.
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑ No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement'
7a. Will this probed occur in or near an area that the state, federal or tribal
governments have designated as having historic or ailtural preservation
status (e.g., National Historic Trot designation or properties significant in
North Carolina history and archaeology)?
0 Yes ❑ No
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
B. Flood Zone Designation (Corps Requirement'
8a Will this project occur in a FEMA- designated 100 -year floodplam?
❑ Yes ❑ No
8b If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
-SAM CS — 5rU0X'r / r &W,"fik
Applicant/Agent's Printed Name
p icant/Agent's Sig
(Agenrs signature is valid only if an aftenafton
letter from the awlicant is provided ) —1
Date
Page 10 of 10
Q
3
l�