HomeMy WebLinkAbout20201642 Ver 1_Michael Harris - 000 Sunshine Lake Court_2021042712. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
La ke
(At Full Pond/ Normal Water Level)
ExI`Si-i DoGk
Full Pond/ Normal Water Level
Shoreline
Plan View
•
;.; .
��e4:�.t:i:riz:;• ILL::L.�✓��}ir;:.i!.ri/.'.mu.a..v.� ✓(fC'..i`:"•.r...•a
NO
No Clex,.f, v9
Full Pond/ Normal Water Level
'Men e
2 ft. z 150ft.
additional Bearing
if necessary
Plan View
Lake
(At Full Pond/ Normal Water Level)
Riprap
YY
u
Existing Dock
30ftv7ft
MPL
3fiz150ft
Below full (fond/ NWL
r MO IMIN
4Rz150ft
Above full pond/ NM.
FORM: SSGP 02-2017 Page 3 of 4
Lake
(At Full Pond/ Normal Water Lev
de View
..0
c
0
a.
i
aye-
o well
3 ft. below full pond water level 4 ft. above full pond water level
2 ft. additional clearing
`if necessary
10 ftbank
height
Side Vi
Existing bank
0?)/'
FORM: SSGP 02-2017 Page 4 of 4