HomeMy WebLinkAbout20201642 Ver 1_Memo to file_20210427Memo to file
3-4-2021
Charlie Washburn with Marine Construction called to discuss the proposed wall.
The concrete block wall will be installed on a floating footer of rip rap. The footer will be 2' x 220'. There
will be a 2' x 220' rip rap toe placed in the lake bed at the bottom of the wall.