Loading...
HomeMy WebLinkAboutSW8090217_Historical File_20120112MIRACLE FIELD STORMWATER & EROSION CONTROL NARRATIVE & CALCULATIONS December 8, 2011 DDEC, 0 2011 BY: GSP Consulting, PLLC. 6626 Gordon Road, Unit C Wilmington, North Carolina 28411 (910) 442-7870 STORMWATER NARRATIVE OLSEN PARK- MIRACLE FIELD NEW HANU" iVER COUNTY, NC SITE DESCRIPTION This +/- 89.4 acre site is located off Olsen Park Drive in New Hanover County, North Carolina. The site drains to existing ditches and streams surrounding the property: This phase of the project will consist of the construction of a recreation field and related site appurtenances. The proposed drainage area for this project includes 3.31 acres draining to a proposed grassed swale/dry detention system with 2.66 acres of undetained runoff. SOILS The soils for this project consist of Seagate series soils (Hydrologic Soil Group A). The Seagate Series soils consist of somewhat poorly drained, moderately permeable soils that formed in marine sediment. STORM DRAINAGE DESIGN The primary stormwater measure for this project is a grassed swale/dry detention system. The stormwater will be conveyed via overland sheet flow to the stormwater system. Existing Built -Upon Area 221,793 s.f. Proposed. Built -Upon Area 86,017 s.f. New Built -Upon Area 307,810 s.f. Permitted Built -Upon Area 934,351 s.f. Future Available Built -Upon Area 626,541 s.f. EROSION CONTROL PLAN FOR MIRACLE FIELD This +/- 4.04 acre site is located within Olsen Park and is part of a larger low -density community park project. The site drains to a ditch that runs along the property boundary before ultimately reaching Smith Creek located approximately 0.50 mile away. There are 2 proposed drainage areas for this project that will drain to the proposed dry detention basin/grassed swale. The basin/swales are design to collect stormwater sheet flow runoff from both sides of the field and collect in the middle to an outlet structure and discharge into the existing ditch. Basin/Swale #1 drainage area is 1.25 acres and the total amount of impervious area draining to the wet detention basin is 62.6%. Basin/Swale #2 drainage area is 2.07 acres and the total amount of impervious area draining to the wet detention basin is 42.1%. The proposed disturbed area for this project is approximately 4.04 acres, of which approximately 1.79 acres has been previously permitted. The primary stormwater measures for this project will be a dry detention basin/grassed swale. The stormwater will be conveyed via overland sheet flow to the proposed dry detention basin/grassed swales that are designed to control the post development peak discharge for the 2, 10 & 25-year storm events so as not to exceed the pre -development peak runoff discharge rate to meet New Hanover County Regulations. The site drains to a ditch that runs along the property boundary before ultimately reaching Smith Creek (Classification C, Sw) located approximately 0.50 mile away. EROSION CONTROL MEASURES: This project will primarily control erosion with the use of a temporary construction entrance, inlet protection and silt fence surrounding the site. The contractor shall install, maintain and remove upon completion the silt fence as necessary to prevent any sediment from leaving the project limits. This will include any temporary stockpile areas if necessary. Contractor shall clean and restore to pre - construction conditions any areas that may inadvertently be damaged due to the failure of the erosion control measures. SCHEDULING OF WORK: Clearing and grubbing shall be scheduled and performed in such a manner that fine grading operations and erosion control practices can follow immediately thereafter. Excavation and embankment operations will be conducted such that cuts and fills will be completed to final grades in a continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover in accordance with the specifications within 15 working days after completion of active construction. MINIMUM AREAS TO BE DISTURBED: Only those areas necessary for timely and proper completion of the project shall be stripped of native vegetation. The angle for graded sloped and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control devices or structures. Slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. All other areas to be stabilized within 15 working days of cease of any phase of activity. PLACEMENT OF SEDIMENT CONTROL DEVICES: All devices (temporary sediment fences, construction entrances, etc.) for sediment control shall be constructed prior to beginning clearing and grubbing on the site. FINAL COVER: As soon as practicable after finished grades have been established, all operations in connection with establishing final ground cover shall be performed. Any inactive disturbed ground area to remain denuded more than 15 working days shall be temporarily seeded in accordance with the temporary seeding schedule as noted on the plans. All slopes to be stabilized within 21 calendar days. SEQUENCE OF CONSTRUCTION 1. Install temporary construction entrance as shown on erosion & sediment control plan. 2. Install perimeter controls (sediment trap, silt fence, etc.) as shown on the erosion & sediment control plan. This step needs to be completed prior to upslope land disturbing activities. 3. Once perimeter controls and sediment trapping measures are installed clear and grub site within limits of disturbance. 4. Upon bringing the site to rough grade, stabilize all areas with temporary vegetation if left undisturbed for 15 working days and all slopes within 21 calendar days. 5. Upon bringing the parking areas and road beds to subgrade elevations, stabilize the areas by placing stone base as early as possible. 6. For temporary vegetative stabilization of all denuded areas see note referencing the erosion control program and specifications. 7. After construction operations have ended and all disturbed areas have stabilized, mechanical sediment controls shall be removed. Sediment from temporary sediment trapping devices shall be disposed of by spreading on the site or hauling away if not suitable for fill. All denuded areas are to be permanently stabilized with permanent vegetation. 8. Prior to using the sediment trap as a dry detention basin/grassed swale it shall be mucked out. 0 > v M N v > d w ry _ C-. M 0 d c+ ry > w o: o w 10 0: 0- ry cm w W � i1i M K Q O, w ri K W LD W ~ d Q J OC H z Z W Uj W LL7 J 0 } O 'y Q C u7 CL 0 a w w Ln Z LU Z o t} Z z z w w O U o Z M W M 0 U w LD Z w U M a M 0 LU ¢ Z 2LU j iz � m � � a Z � c+ 0 a u LU w Z 0 (n O co a F% E 0 w C Y w v CU GSP CONSULTING Velocity Control: BASIN #1 OUTLET Q = 4.153 cfs (See provided calculations) Velocity = 3.38 fps New York DOT Dissipater Method For Use in Defined Channels: Zone 2 For 15-inch culvert Upstream Width = 3.75 ft Downstream Width = 5.0 ft Length = 7.5 ft Depth = 18 in 33 SF CLASS B RIPRAP PROVIDED 6626 Gordon Road, Unit C Wilmington, North Carolina 28411 tel: 910-442-7870 fax: 910-799-6659 PRE -DEVELOPMENT FLOWS GSP CONSULTING PRE DEVELOPMENT FLOW RATES: DRY DETENTION BASIN Existing Drainage = 146,743 SF = 3.37 AC Time of Concentration. = 5 min Total Pre -Development Flow — (C)(I2-YR)(A)=(0.20)(5.88 IN/HR)(3.37 AC) = 3.96 CFS Total Pre -Development Flow — (C)(h0-YR)(A)=(0.20)(7.23 IN/HR)(3.37 ACC = 4.87 CFS Total Pre -Development Flow — (C)(I25-YR)(A)=(0.20)(8.15 IN/HR)(3.37 AC) = 5.49 CFS UNDETAINED AREA Existing Drainage = 116,025 SF = 2.66 AC Time of Concentration = 5 min Total Pre -Development Flow — (C)(I2-YR)(A)=(0.20)(5.88 IN/HR)(2.66 AC) = 3.13 CFS Total Pre -Development Flow — (C)(I10-YR)(A)=(0.20)(7.23 IN/HR)(2.66 AC) = 3.85 CFS Total Pre -Development Flow — (C)(I25-YR)(A)=(0.20)(8.15 IN/HR)(2.66 AC) = 4.34 CFS TOTAL Existing Drainage = 262,768 SF = 6.03 AC Time of Concentration = 5 min Total- Pre -Development Flow — (C)(I2-YR)(A)=(0.20)(5.88 IN/HR)(6.03 AC) = 7.09 CFS Total Pre -Development Flow — (C)(Ii0-YR)(A)=(0.20)(7.23 IN/HR)(6.03 AC) = 8.72 CFS Total Pre -Development Flow — (C)(I25-YR)(A)=(0.20)(8.15 IN/HR)(6.03 AC) = 9.83 CFS 6626 Gordon Road, Unit C Wilmington, North Carolina 28411 tel: 910-442-7870 fax: 910-799-6659 POST -DEVELOPMENT FLOWS Drainage Area TOTALS Drainage Area TOTAL Drainage Area 262,768 sf Drainage Area 6.03 ac Impervious Area Calculation Parking/Roads 31,881 Existing Impervious 5,220 Miracle Field/Playgrounds 41,361 Concrete/Walks 12,775 Total 91,237 sf Total 2.09 ac % Impervious 34.7% CN CALCULATIONS Dry Detention Basin Total Site Area 146,743 Impervious 77,077 1.769 A -Soils 69,666 1.599 146,743 3.369 Undetained Total Site Area 116,025 Impervious 14,160 0.325 A -Soils 101,865 2.338 116,025 2.664 98 39 70 98 39 46 13SP CONSULTING PRE/POST SOTRMWATER CALCULATIONS: Storm Evert 2-Year 10-`Fear 25-Year Pre Development Runoff 7.094 8.723 9.833 Post Development Runoff Dry Detention Basin #1 3.242 4.153 4.632 Undetained 10.335 3.110 4.863 Totals 1 3.577 1 7.263 9.495 6626 Gordon Road, Unit C Wilmington, North Carolina 28411 tel: 920-442-7870 fax: gio-799-6659 DRY DETENTION BASIN #1 DRY DETENTION BASIN Drainage Area Drainage Area Drainage Area Drainage Area Impervious Area Calculation Parking/Roads Existing Impervious Miracle Field/P!aygrounds Concrete/Walks/Buildings Total Total % Impervious DA 1 1.46,743 sf 3.37 ac 18,621 4,629 41,361 12,466 77,077 sf 1.77 ac '52.5% Hydrograph Return Period Recap Hydraflow Hydrographs by I ntelisolve v9. 1 Hyd. No. Hydrograph type (origin) Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 2 SCS Runoff Reservoir ------- 1 ------- ------- 6.246 3.242 ------- ------- ------- ------- 13.88 4.153 17.29 4.632 ------- ------- ------- ------- DRY DETENTION BASIN DRY DETENTION BASIN Proj. file: DRY DETENTION BASIN.gpw Thursday, Dec 8, 2011 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 6.246 2 724 19,195 ---- ------ ------ DRY DETENTION BASIN 2 Reservoir 3.242 2 732 19,194 1 36.01 2,948 DRY DETENTION BASIN DRY DETENTION BASIN.gpw Return Period: 2 Year Thursday, Dec 8, 2011 Hydrograph Report Hydraf low Hydrographs by Intelisolve v9.1 Hyd. No. 1 DRY DETENTION BASIN Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 3.370 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 4.50 in Storm duration = 24 hrs * Composite (Area/CN) = [(1.769 x 98) + (1.599 x 39)] / 3.370 3 Thursday, Dec 8, 2011 Peak discharge = 6.246 cfs Time to peak = 12.07 hrs Hyd. volume = 19,195 cult Curve number = 70* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 DRY DETENTION BASIN Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 ...,., Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 DRY DETENTION BASIN Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 1 - DRY DETENTION BASIN Reservoir name = DRY DETENTION BASIN Storage Indication method used. 4 Thursday, Dec S, 2011 Peak discharge = 3.242 cfs Time to peak = 12.20 hrs Hyd. volume = 19,194 cuft Max: Elevation = 36.01 ft Max. Storage = 2,948 cuft DRY DETENTION BASIN Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 - Hyd No. 2 ---- Hyd No. 1 U-I ; I_ ! ; Total storage used 2,948 cuft Time (hrs) Pond Report 5 Hydraflow Hydrographs by Intelisolve v9.1 Thursday, Dec 8, 2011 Pond No. 1 - DRY DETENTION BASIN Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation 34.77 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 34.77 00 0 0 0.23 35.00 513 39 39 1.23 36.00 6,195 2,830 2,869 2.23 37.00 24,565 14,364 17,233 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 12.00 0.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 0.00 Span (in) = 15.00 12.00 0.00 0.00 Crest El. (ft) = 36.77 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 34.77 34.77 0.00 0.00 Weir Type = Broad Length (ft) = 91.80 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.30 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) 0.000 (by Contour) Multi -Stage n/a No No No TW Elev. (ft) 0.00 Note: CulverVOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Civ C PrfRsr Wr A Wr 18 Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 34.77 0.00 0.00 --- 0.00 --- --- --- 0.00 0.02 4 34.79 0.00 0.00 is --- --- 0.00 --- 0.00 0.05 8 34.82 0.00 0.01 is --- --- 0.00 0.01 0.07 12 34.84 0.00 0.02 is --- --- 0.00 --- 0.02 0.09 16 34.86 0.00 0.04 is --- 0.00 --- --- 0.04 0.12 20 34.88 0.00 0.06 is --- --- 0.00 --- --- --- --- 0.06 0.14 24 34.91 0.00 0.08 is --- --- 0.00 --- --- --- 0.08 0.16 28 34.93 0.00 0.11 is --- 0.00 --- - 0.11 0.18 31 34.95 0.00 0.15 is -- 0.00 --- -- --- --- n IS 0.21 35 34.98 0.00 0.18 )c --- - 0.00 --- -- 0.18 0.23 39 35.00 0.00 0.22 is - 0.00 --- --- 0.22 0.33 322 35.10 0.00 0.44 is 0.00 --- -- 0.44 0.43 605 35.20 0.00 0.72 is --- 0.00 --- --- 0.72 0.53 888 35.30 0.00 1.05 is --- 0.00 --- --- --- --- --- 1.05 0.63 1,171 35.40 0.00 1.41 is --- 0.00 --- --- --- --- --- 1.41 0.73 1,454 35.50 0.00 1.79 is 0.00 --- --- --- --- --- 1.79 0.83 1,737 35.60 0.00 2.16 is --- 0.00 --- --- --- --- 2.16 0.93 2,020 35.70 0.00 2.50 is --- --- 0.00 - --- 2.50 1.03 2,303 35.80 0.00 2.75 is --- --- 0.00 --- --- --- --- 2.75 1.13 2,586 35.90 0.00 3.00 is --- 0.00 - - 3.00 1.23 2,869 36.00 0.00 3.23 is --- 0.00 --- --- --- --- --- 3.23 1.33 4,306 36.10 0.00 3.44 is --- 0.00 --- --- --- --- 3.44 1.43 5,742 36.20 0.00 3.65 is --- 0.00 --- --- --- --- --- 3.65 1.53 7,178 36.30 0.00 3.84 is --- 0.00 --- --- --- --- --- 3.84 1.63 8,616 36.40 0.00 4.02 is --- 0:00 --- --- --- --- --- 4.02 1.73 10,051 36.50 0.00 4.19 is --- 0.00 --- --- --- 4.19 1.83 11,488 36.60 0.00 4.36 is --- --- 0.00 --- --- --- --- --- 4.36 1.93 12,924 36.70 0.00 4.52 is --- 0.00 --- --- --- --- --- 4.52 2.03 14,360 36.80 0.29 oc 4.68 is --- 0.28 --- --- -- 4.95 2.13 15,797 36.90 2.51 oc 4.83 is --- 2.50 --- --- 7.32 2.23 17,233 37.00 5.43 oc 4.97 is --- 5.43 s --- --- --- --- 10.41 Hydrograph Summary Report Hydraflow HydroRraohs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 13.88 2 724 41,498 --- ------ DRY DETENTION BASIN 2 Reservoir 4.153 2 744 41,496 1 36.48 9,720 DRY DETENTION BASIN i rDRY DETENTION BASIN.gpw Return Period: 10 Year Thursday, Dec 8, 2011 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 DRY DETENTION BASIN Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 3.370 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 7.00 in Storm duration = 24 hrs * Composite (Area/CN) _ [(1.769 x 98) + (1.599 x 39)] / 3.370 7 Thursday, Dec 8, 2011 Peak discharge = 13.88 cfs Time to peak = 12.07 hrs Hyd. volume = 41,498 cult Curve number = 70* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 DRY DETENTION BASIN Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Deport Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 DRY DETENTION BASIN Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 1 - DRY DETENTION BASIN Reservoir name = DRY DETENTION BASIN Storage Indication method used 8 Thursday, Dec 8, 2011 Peak discharge = 4.153 cfs Time to peak = 12.40 hrs Hyd. volume = 41,496 cuft Max. Elevation = 36.48 ft Max. Storaae = 9,720 cuft DRY DETENTION BASIN Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) ----- Hyd No. 2 --- Hyd No. 1 CAT-- � Total storage used = 9,720 cuft Hydrograph Summary Report HydraflowHydrographsbylntelisolvev9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 17.29 2 724 51,692 - -- ------ DRY DETENTION BASIN 2 Reservoir 4.632 2 746 51,690 1 36.73 13,292 DRY DETENTION BASIN DRY DETENTION BASIN.gpw Return Period: 25 Year Thursday, Dec 8, 2011 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 DRY DETENTION BASIN Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 3.370 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.05 in Storm duration = 24 hrs *Composite (Area/CN) [(1.769 x 98) + (1.599 x 39)] / 3.370 10 Thursday, Dec 8, 2011 Peak discharge = 17.29 cfs Time to peak = 12.07 hrs Hyd. volume = 51,692 cult Curve number = 70* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Q (cfs) DRY DETENTION BASIN Hyd. No. 1 -- 25 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 I< r 9.00 9.00 6.00 6.00 3.00 3.00 0.00 "004 0.00 ... .riw�wc._... sa.a-max '► 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 DRY DETENTION BASIN Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 1 - DRY DETENTION BASIN Reservoir name = DRY DETENTION BASIN Storage Indication method used. 11 Thursday, Dec S, 2011 Peak discharge = 4.632 cfs Time to peak = 12.43 hrs Hyd. volume = 51,690 cuft Max. Elevation = 36.73 ft Max. Storage = 13,292 cuft Q (cfs) DRY DETENTION BASIN Hyd. No. 2 -- 25 Year Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 U 2 4 6 8 10 12 14 16 18 20 22 24 26 - Hyd No. 2 Y ---- Hyd No. 1 ���w'=; Total storage used = 13,292 cult Time hrs ) UNDETAINED Drainage Area UNDETAINED Drainage Area DA 2 Drainage Area 116,025 sf Drainage Area 2.66 ac. Impervious Area Calculation Road 1'3,260 Existing Impervious 591 Concrete/Walks 309 Total 14,160 sf Total 0.33 ac % Impervious 12.2% Hydrograph Return Period Recap Hvrlmflnw Hvrirnnranhc F... ,, ..n 4 Hyd. No. Hydrograph type (origin) Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description 1-Yr 2-Yr 3-Yr 5-Yr 107Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- ------- 0.335 ------- ------- 3.110 4.863 ------- ------ UNDETAINED 8, 2011 Proj. file: UNDETAINED.gpw Thursday, Dec Hydrograph Summary Report Hvdraflnw Hvrtrnnrnnhs by Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.670 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 4.50 in Storm duration 24 hrs * Composite (Area/CN) ((0.330 x 98) + (2.340 x 39)] / 2.670 3 Thursday, Dec 8, 2011 Peak discharge = 0.335 cfs Time to peak = 738 min Hyd. volume = 3,026 cuft Curve number = 46* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution Type III Shape factor = 484 Q (cfs) UNDETAINED cfs Hyd. No. 1 -- 2 Year Q ( ) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 ii G i r ti Ay,,, WIR,y.�.l1�RM 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Summary Report z :.._ ..., . Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 2.670 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 7.00 in Storm duration = 24 hrs 61 Thursday, Dec 8, 2011 Peak discharge = 3.110 cfs Time to peak = 726 min Hyd. volume = 11,997 cuft Curve number = 46* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 * Composite (Area/CN) [(0.330 x 98) + (2.340 x 39)] / 2.670 UNDETAINED Q (cfs) Q (cfs) Hyd. No. 1 -- 10 Year 4.00 —r 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 �-- — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Summary Report HydraflowHydrographsbylntelisolvev9.1 Hyd. No, Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 I SCS Runoff 4.863 2 724 i 16,939 ---- --- ------ UNDETAINED UNDETAINED.gpw Return Period: 25 Year Thursday, Dec 8, 2011 Hydrograph Report 7 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 UNDETAINED Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 2.670 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.05 in Storm duration = 24 hrs Composite (Area/CN) = [(0.330 x 98) + (2.340 x 39)] / 2.670 4.00 3.00 2.00 1.00 IZu ;e4u 360 Hyd No. 1 UNDETAINED Hyd. No. 1 -- 25 Year Thursday, Dec 8, 2011 Peak discharge = 4.863 cfs Time to peak = 724 min Hyd. volume = 16,939 cult Curve number = 46* Hydraulic length = 0 ft Time of conc. (TO = 5.00 min Distribution = Type III Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 000 480 600 720 840 960 1080 1200 1320 1440 1560. Time (min) 100-YEAR Hydrograph Return Period Recap HydraflowHydrographsbylntelisolvev9.1 Hyd. No. Hydrograph type (origin) Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 2 SCS Runoff Reservoir ------- 1 ------- ------- ------- ------- ------- ------- ------- ------- ------- ------- ------- ------- ------- ------- 23.77 22.51 DRY DETENTION BASIN DRY DETENTION BASIN Proj. file: 100-YEAR.9pw Thursday, Dec 8, 2011 Hydrograph Summary Report G Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 DRY DETENTION BASIN Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 3.370 ac Basin Slope = 0.0 % . Tc method = USER Total precip. = 10.00 in Storm duration = 24 hrs * Composite (Area/CN) [(1.769 x 98) + (1.599 x 39)] / 3.370 3 Thursday, Dec 8, 2011 Peak discharge = 23.77 cfs Time to peak = 724 min. Hyd. volume = 71,391 cuft Curve number = 70* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 DRY DETENTION BASIN Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 it 8.00 8.00 C 4.00 tt 4.00 0.00 =� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 4 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 DRY DETENTION BASIN Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 1 - DRY DETENTION BASIN Reservoir name = DRY DETENTION BASIN Storage Indication method used Thursday, Dec 8, 2011 Peak discharge = 22.51 cfs Time to peak = 726 min Hyd. volume = 58,466 cuft Max. Elevation = 36.97 ft Max. Storage = 16,776 cuft DRY DETENTION BASIN Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 2 ----- Hyd No. 1 C- �Tl Total storage used = 16,776 cuff Pond Report 5 ` Hydraflow Hydrographs by Intelisolve v9.1 Thursday, Dec 8, 2011 Pond No. 1 - DRY DETENTION BASIN Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begininq Elevation 34.77 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 34.77 00 p 0.23 35.00 1.23 39 0 39 . 3600 6,195 2.23 36.00 2,830 2,869 24,565 14,364 17,233 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) 0.00 Crest Len (ft) = 75.00 0.00 0.00 0.00 = 0.00 0.00 0.00 No. Barrels = 0 Crest El. (ft) = 36.77 0.00 0.00 0.00 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Length (ft) = 0.00 0.00 0.00 0.00 Weir Type Multi -Stage = Broad = No No Slope (%) = 0.00 0.00 0.00 n/a No No N-Value = .013 .013 .013 Na Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) 0.00 Note: Culvert/orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv ft tuft C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 34.77 - --- 0.00 0.02 4 34.79 --- --- 0.00 --- 0.00 0.05 8 34.82 0.00 - - 0.07 12 34.84 "" 0.00 --- 0.00 --- - - 0.00 - - • 2 20 34.88 0.00 ---�' --- �' 0.00 -- 0.14 24 34.91 -- --- 0.00 - -" --- 0.00 - - - 0.16 28 34.93 - _ 0.00 - '-- --- "---- 0.00 - --- 0.18 31 34.95 0.00 ----- -" --- -- 0.00 -- ___ 0.21 35 34.98 _�-__- 0.00 -- "-" "-- "' ---0.00 0.23 39 35.00 --- --- -- 0.00 --- --- --- -- --- 0.00 - 0.33 322 35.10 -- 0.00 --- --- --- "' --- 0.00 0.43 605 35.20 -'- -" "' 0.00 0.53 888 35.30 --- _- --- -- - 0.00 0.63 1,171 35.40 - -' 0.73 1,454 35.50 _ -- - 0.00 -" --- 0.83 1,737 35.60 __ 0.00 - - " --- 0.00 0.93 2,020 35.70 --- 0.00 --" --" -- 0.00 1.03 2,303 35.80 --- 0.00 --- --- 0.00 1.13 2,586 35.90 - - 0.00 --- --- --- 0.00 1.23 2,869 36.00 -_- - 0.00 _ --- 0.00 - --- 1.33 4,306 36.10 --- 0.00 -" - --- 0.00 1-43 5,742 36.20 0.00 --- --- --- 0.00 '- 1.53 7,178 36.30 --- 0.00 '"' --- 0.00 - 1.63 8,615 36.40 - 0.00 --- 0.00 1.73 10,051 36.50 __ - --- --- 0.00 --- --- 0.00 --- --- 1.83 11,488 36,60 --- --- 0.00 --- "---- 0.00 --- --- 1.93 12,924 36.70 --- - 0.00 "-- '"' --- 0.00 2.03 14,360 36.80 --_ ti _ 0.00 __ -- '-' --- 0.00 -- -- 2.13 15,797 36.90 1.30 - -1.30 --- --- 2.23 17,233 37.00 - --- 11.70 - - 11. --- --- --- 27.55 _ -- -- 27.55 SWALES Drainage Area SWALE #1 Drainage Area 54,292 sf Drainage Area 1.25 ac Impervious Area Calculation Parking 13,284 Miracle Field 16,357 Concrete/Walks 4,320 Total 33,961 sf Total 0.78 ac % Impervious 62.6% 10-Year Post Dev. Peak Flow Intensity 7.23 in/hr C-Factor 0.69 Q=C*I*A 6.20 cfs Drainage Area SWALE #2 Drainage Area 90,050 sf Drainage Area 2.07 ac Impervious Area Calculation Parking/Roads 5,643 Existing Impervious 4,628 Miracle Field/Playgrounds 21,623 Concrete/Walks 6,022 Total 37,916 sf Total 0.87 ac % Impervious 42.1% 10-Year Post Dev. Peak Flow Intensity 7.23 in/hr C-Factor 0.54 Q=C*I*A 8.14 cfs SWALE #1 Worksheet for Trapezoidal Channel Project Description Worksheet SWALE #1 Flow Element Trapezoidal Cha Method Manning's Formi Solve For Channel Depth Input Data Mannings Coeffin.011 Channel Slope 0.50 % Left Side Slope 5.00 H : V Right Side Slope 5.00 H : V Bottom Width 11.00 ft Discharge 6.20 ofs Results Depth 0.18 ft Flow Area 2.1 ft2 Wetted Perim( 12.84 ft Top Width 12.80 ft Critical Depth 0.21 ft Critical Slope 0.31 % Velocity 2.90 ft/s Velocity Head 0.13 ft Specific Enerc 0.31 ft Froude Numb. 1.25 Flow Type Supercritical SWALE #2 Worksheet for Trapezoidal Channel Project Description Worksheet SWALE #2 Flow Element Trapezoidal Cha Method Manning's Formi Solve For Channel Depth Input Data Mannings Coeffic).011 Channel Slope 0.41 % Left Side Slope 5.00 H : V Right Side Slope 5.00 H : V Bottom Width 11.00 ft Discharge 8.14 cfs Results Depth 0.22 ft Flow Area 2.7 ft2 Wetted Perim( 13.28 ft Top Width 13.24 ft Critical Depth 0.25 ft Critical Slope 0.29 % Velocity 3.00 ft/s Velocity Head 0.1^ ft Specific Enerc 0.36 ft Froude Numb, 1.17 Flow Type Supercritical Baker, Chris From: Wolf, Cindee (CWolf@withersravenel.com] Sent: Thursday, January 12, 2012 1:52 PM To: Baker, Chris Subject: Olsen Park Permit #SW8 090217 Attachments: Olsen ParkExhibit. pdf Chris, The current request for plan revision to the last permit, issued November 1, 2010, is to: 1. Move the location of the "Future Playground Area" from adjacent to the picnic shelter to the northern area of the site between ball fields # 4 & #5. 2. Increase the line -item for "Other On -site" (which was to include the playground & Miracle field) from 50,318 s.f. to 86,017 s.f. due to increase in the size of the field & addition of an access drive and parking area. 3. Reducing the line -item for "Future" to 626,541 s.f. Please do not hesitate to contact me if you have questions or need additional information. Thanks for your assistance. Cindee Wolf WITHERG 6CRAVENEL 1410 Commonwealth Drive, Unit 101 Wilmington, NC 28403 Phone: 910.256.92771 Fax: 910.256.2584 Direct: 910.509.65051 Mobile: 910.620.2374 cwo�withersravenel.com www.vAthersravenel.com NOTICE OF CONFIDENTIALITY AND NONDISCLOSURE: This electronic message, which includes any attachments and other documents referred to herein, contains information from Withers & Ravenel, Inc. that may be proprietary or confidential. The information is intended for the use of the addressee(s) only. If you are not the addressee, note that any disclosure, copying, printing, distribution, or use of the contents of this message is prohibited. If you received this message in error, please advise the sender by reply and delete this electronic message and any attachments. COPYRIGHT NOTICE: Copyright 2010 Withers & Ravenel, Inc. All Rights Reserved by Withers & Ravenel, Inc. This electronic message, any attachments thereto and all documents referred to therein are provided for the recipient's information only, and no rights are licensed, transferred or otherwise granted by the transmission of this electronic message by Withers & Ravenel, Inc. or receipt of this message by the recipient or any other party. Co [etenessi Review Checklist Project Name: ACt,� X44:-CD /Oso2--��-�.r Received Date Project Location: ki�N i�cn::'�%1� Accepted Date Rule(s) M2008 Coastal F-11995 Coastal Type of Permit: New or Mod or PR Density: HD or LD" Type: omi : _](% OK?)\'--1 Stream Chat" Subdivided?: Subdivision or Single Lot Phase II (WiRO ) Existing Permit # (Mod o P or Residential MSA Map — I �^ORW Map � it "Universal [D1988 Coastal TR)--F--lPECert on File? MNCG: r7Offsite to SW8 Exempt Paperwork ppiement(s) (1 original per BMP) BMP Type(s): &M with correct/original signatures (1 original per BMP except LS/VFS and swales) pplication with correct/original signatures Corp or LLC: Sig. Auth. per SoS or letter Note to Reviewer: $ 5 (within 6mo) I�i L�ilnC. JC`�,'"n �c R"144LLCCYc " Soils Report with SHWT CIculations (signed/sealed) No obvious errors EiDensity includes common areas, etc Deed Restrictions, if subdivided: ned & Notarized L_JCorrect Template (Comm/Res & HD/LD) or Dec Covenants & Rest Plans -- 2 Sets Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) ❑Grading ®Wetlands: Delineated or No Wetlands Vicinity Map 11 Layout (proposed BUA dimensions) Legend ElDA Maps El Project Boundaries Infiltration Wet Pond Offsite _ Soils Report Soils Report PE Cert for Master Lot #: SHWT: SHWT:Deed Rest for Master Lot # M atches Master Bottom: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional Information: Permitted Proposed: Proposed: OrnnncmA- BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) GSP CONSULTING TO: 6626 Gordon Road, Unit C WILMINGTON, NORTH CAROLINA, 28411 (910) 442-7870 FAX (910) 799-6659 NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 2840 LETTER OF TRANSMITTAL DATE 12 08 11 JOB NO. 2011-000 ATTENTION PHONE# RE: "Miracle Field Stormwater permit OTU WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ® Fee Check ® Permit Applications ® Plans ® Calculations ❑ Specifications ❑ Copy of Letter ❑ Change order ❑ Diskette ❑ COPIES DESCRIPTION 2 Sets of plans & calculations for state stormwater permit 2 Stormwater Management Permit ,,., � s, _ �; �- � ^„ts��` l c. z Grassed Swale Supplement & Checklist THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: COPYTO: File SIGNED: - Garry S. Pape, P.E. If enclosures are not as noted, kindly notify us at once.