HomeMy WebLinkAboutSW3210402_O&M EZ Form_20210426Operation & Maintenance Agreement
Project Name:
Project Location:
Cuthbertson Road Townhomes
2122 Cuthbertson Road
Cover Page
Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location.
Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s).
The BMP(s) on this project include (check all that apply & cc
Bioretention Cell Quantity:
Dry Detention Basin
Grassed Swale
Green Roof
Infiltration Basin
Infiltration Trench
Level Spreader/VFS
Permeable Pavement
Proprietary System
Rainwater Harvesting
Sand Filter
Stormwater Wetland
Wet Detention Basin
Disconnected Impervious Area
User Defined BMP
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Present:
Present:
ig O&M tables will
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
oe aaaea automatical
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed
for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any
changes to the system or responsible party.
* Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
Signature:
County of
personally appeared before me this
Shannon Boling
Land Dev. Manager / Classic Neighborhood Development, LLC
1111 North Post Oak Road
Houston, TX, 77055
sboling@dwhomes.com
, a Notary Public for the State of
, do hearby certify that
day of
acknowledge the due execution of the Operations and Maintenance Agreement .
Witness my hand and official seal,
O&M Manual
Date:
and
4/15/2021
Page 1 of 6
Seal My commission expires
STORM-EZ 4/15/2021
Version 1.4 O&M Manual Page 2 of 6
Sand Filter Maintenance Requirements
Important maintenance procedures:
- The drainage area will be carefully managed to reduce the sediment load to the sand filter.
- The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches.
- Once a year, sand media will be skimmed.
- The sand filter media will be replaced whenever it fails to function properly after maintenance.
The sand filter shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches
if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon
request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element:
Potential problem:
How to remediate the problem:
Entire BMP
Trash/debris is present.
Remove the trash/debris.
Adjacent pavement (if
Sediment is present on the
Sweep or vacuum the sediment as soon as possible.
applicable)
pavement surface.
Perimeter of sand filter
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then plant a
erosive gullies have formed.
ground cover and water until it is established. Provide lime and a one-
time fertilizer application.
Vegetation is too short or too
Maintain vegetation at an appropriate height.
long.
Flow diversion structure
The structure is clogged.
Unclog the conveyance and dispose of any sediment offsite.
The structure is damaged.
Make any necessary repairs or replace if damage is too large for
repair.
The inlet device
The pipe is clogged.
Unclog the pipe. Dispose of the sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to smooth it over and provide erosion
swale.
control devices such as reinforced turf matting or riprap to avoid future
problems with erosion.
Stone verge is clogged or
Remove sediment and replace with clean stone.
covered in sediment (if
applicable).
Forebay or pretreatment
Sediment has accumulated to
Search for the source of the sediment and remedy the problem if
area
a depth of greater than six
possible. Remove the sediment and stabilize or dispose of it in a
inches.
location where it will not cause impacts to streams or the BMP.
Erosion has occurred.
Provide additional erosion protection such as reinforced turf matting or
riprap if needed to prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by hand. If a pesticide is used, wipe it
on the plants rather than spraying.
Filter bed and underdrain
Water is ponding on the
Check to see if the collector system is clogged and flush if necessary.
collection system
surface for more than 24
If water still ponds, remove the top few inches of filter bed media and
hours after a storm.
replace. If water still ponds, then consult an expert.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.
STORM-EZ 4/15/2021
Version 1.4 O&M Manual Page 3 of 6
Wet Detention Pond Maintenance Requirements
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if
one is provided.
Important maintenance procedures:
Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the
basin should be watered twice weekly if needed, until the plants become established (commonly six weeks).
No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to
establish the plants on the vegetated shelf.
Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention
basin.
If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the
emergency drain should be minimized to the maximum extent practical.
- Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event
greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a
known set location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
BMP element:
Potential problem:
How I will remediate the problem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the BMP
Areas of bare soil and/or
Regrade the soil if necessary to remove the gully, and then plant a
erosive gullies have formed.
ground cover and water until it is established. Provide lime and a one-
time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of approximately six inches.
long.
The inlet device
The pipe is clogged.
Unclog the pipe. Dispose of the sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to smooth it over and provide erosion
swale.
control devices such as reinforced turf matting or riprap to avoid future
problems with erosion.
Stone verge is clogged or
Remove sediment and replace with clean stone.
covered in sediment (if
applicable).
The forebay
Sediment has accumulated to
Search for the source of the sediment and remedy the problem if
a depth greater than the
possible. Remove the sediment and dispose of it in a location where it
original design depth for
will not cause impacts to streams or the BMP.
sediment storage.
Erosion has occurred.
Provide additional erosion protection such as reinforced turf matting or
riprap if needed to prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional practices
show that pruning is needed
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the problem: soils, hydrology, disease, etc.
dying.
Remedy the problem and replace plants. Provide a one-time fertilizer
application to establish the ground cover if a soil test indicates it is
necessary.
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used, wipe it on
the plants rather than spraying.
STORM-EZ 4/15/2021
Version 1.4 O&M Manual Page 4 of 6
Wet Detention Pond Maintenance Requirements (Continued)
The main treatment area
Sediment has accumulated to
Search for the source of the sediment and remedy the problem if
a depth greater than the
possible. Remove the sediment and dispose of it in a location where it
original design sediment
will not cause impacts to streams or the BMP.
storage depth.
Algal growth covers over 50%
Consult a professional to remove and control the algal growth.
of the area.
Cattails, phragmites or other
Remove the plants by wiping them with pesticide (do not spray).
invasive plants cover 50% of
the basin surface.
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and consult a professional to remove
beaver activity is present.
beavers.
A tree has started to grow on
Consult a dam safety specialist to remove the tree.
the embankment.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. (if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Department of Environment and Natural
damage have occurred at the
Resources Regional Office.
outlet.
The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments.
STORM-EZ 4/15/2021
Version 1.4 O&M Manual Page 5 of 6
Wet Detention Pond Design Summary
rvcL rUnu vIaL110h.
WET POND ID FOREBAY MAIN POND
SCM A Permanent Pool El. 515 Permanent Pool El. 515
Temporary Pool El: 515.86 Temporary Pool El: 515.86
Pretreatment other No Clean Out Depth: 7 Clean Out Depth: 7
than forebay? Sediment Removal El: 508 Sediment Removal El: 508
Has Veg. Filter? Yes Bottom Elevation: 507 Bottom Elevation: 507
STORM-EZ 4/15/2021
Version 1.4 O&M Manual Page 6 of 6