HomeMy WebLinkAbout20210751 Ver 1_P1505F_Wetland Permit Drawings_WOR_20210423_20210426NS
Truesdale
Burgaw
Hwy.NSKellumtown
Chadwick
Peru NSNEW
RIVER
Northeast
Creek
ElizabethLake
RIVERNEW RI
VER
NE
W
Erwin
Clyde
Elem. Sch.
JacksonvilleMiddle Sch.
Elem. Sch.
Verona
Hubert
M.C.A.A.F.
Duck Creek
NS
NS
NS
NS
NS
NS
NSNS
NS
Montford Landing Rd.Montford Landing Rd.NS
Johnson Blvd.
Thompson
Swansboro
Willis
Landing
Starling
Verona
JACKSONVILLE
Pop. 77,397
Nerrissa
Great
NeckLanding
Hubert
Onslow
County
Memorial
Hospital
Coastal
Carolina
Community
College
JacksonvilleCountyClub
Bell Fork
Elem. Sch.
Hicks
Run
Hicks
R
un
Creek SouthwestCreek
Southwest
Creek
Wallace
Cre
e
k
W allaceCreekBell
QueensCreek
Bell Queens Creek Bell
Quee
nsCreek
C reek
Creek
Deep GulleyCreekB
ur
nt
House
Chaney
Cree
kChaneyCreek
Chaney
Creek
MillCree kMill
Creek
Frenchs
ParkwoodElem. Sch.
Tar
Landing
Piney
Green
Southwest
Middle Sch.
Southwest
High Sch.
Pop. 1997
CSX
CSX
CAMP LEJEUNE
RAILROAD
LEJEUNE RAILROAD
CAMP
LEJEUNE
RAILROAD
TRANSPORTATION
TRANSPORTATI
ONCSXCSXCreek
Edwards Qu
een
s
Creek
Jum
ping R
un Br.WATERWAYNEW RIVER
INLET
TRAPSBAY
CSX
CAM PTRANSPORTATION
Onslow County Game LandHicksRun
Bell
Calebs
Creek
Grants Creek
W ebCreek
Mill
CreekEverettCreekStonesCreekStonesCreekMillCreek Frenchs
CAMP
LEJEUNE
WATERW AY
INTRACOASTAL WHIT
E
Browns
Inlet
Bear
Inlet
Bogue
Inlet
Creek Hammocks
Beach
St. Park
Craig
CAMP
LEJEUNE
RAILROAD
Queens
Creek
Fulcher
Landing
Sneads
Ferry OAKRI
VERCSXTRANSPORTATIONQueens CreekNortheastCreek
Queens
Creek
Queens
Creek
STONES
BAY
FARNEL BAY
Cr.
JacksonvilleHigh Sch.
Silverdale
Folkstone
Dixon Cr
eekCowhead
Cowhead
Duck Creek
Northeast
Little Cr.
Run
Rocky
R I
V
E
R
N
E
WN
E
WRIVERCreek
W
all
aceCoydels Cr.Bearhead
CreekBeaverdam
Creek
Southwest
Creek
Hicks Run
Southwest CreekSouthwest
Road Br.Field Br.
Beaver Da
m Br.
S
o
ut
hwe
st
CreekBr.Wolf Pit Branch Wolf Swamp Branch Big N
orthe
ast Cre
e
k
School House Br.
Gabriel Br.Wolf Swamp Br.Big Northeast Cr.WHITE
RAILROAD
Cre
e
kBear
Br.
Scales
CreekScalesCreek
Creek
Town
Creek
WhitehurstCreekLewi
s
Stick
Creek
CreekBrinson
NSCreek
LeJeune Blvd.
Freedom Way
HicksRunSouthwestCree
kCS
XT
RA
NS
P
O
RT
ATI
ONWhit
eOakRiver
A TLA N TIC O C EA N
OAK
RI
V
E
R
Jumping
Run
CAMP LEJEUNE
Marine Corps Base
CAMP LEJEUNE
Marine Corps Base
BeachRd.Fe
r
r
yRd.Sne
a
ds
Ma rin e Rd .MarineRd.R
d.
S
nea
ds
Ferry
Lym
an
R
d.
Holcomb Blvd.Holc
o
mb
Bl
v
d.
53
172
24 24
24
24
24
172
210
210
172
172
210
172
172
172172
210
258
17
BUS
17
17
17
17
17
17
17
17
24
Hubert
Bell
LEJEUNE RAILROAD
CAMP
LEJEUNE
RAILROAD
QueensJum
pi
ng Run Br.
Calebs
WebCreek
CAMP
LEJEUNE WHI
T
E
OAKRI
VERSilverdale
WHI
T
E
RAILROAD
COVER SHEETXXX XXX XXX
AS NOTED
G-001
F. M. LAST
NORTH
CONTRACT NO. N40085-20-C-8505
MARINE CORPS BASE CAMP LEJEUNE
RAILROAD TRESTLE REPLACEMENT, PROJECT P-1505F
CAMP LEJEUNE, NC
LOCATION MAP - U.S. MARINE CORPS BASE
VICINITY MAP - CAMP LEJEUNE, N.C.
INDEX OF DRAWINGS
NAVFAC NO.
XXXXXXXX
STRUCTURE DRAWINGS
TRACKWORK DRAWINGS
EROSION CONTROL DRAWINGS
CIVIL SITE DRAWINGS
DEMOLITION PLANS
BORING LOGS
SURVEY DRAWINGS
COVER SHEET
46 - 91 OF 91
20 - 45 OF 91
2 - 19 OF 91
TBD
TBD
TBD
TBD
1 OF 91
SHEET COUNT SHEET NO.SHEET TITLE
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
V.C.
TYP.
T.O.R.
STA.
SQ.
PREST.
N.T.S.
FIX.
EXP.
EXIST.
EL.
CONC.
VERTICAL CURVE
TYPICAL
TOP OF RAIL
STATION
SQUARE
PRESTRESSED
NOT TO SCALE
FIXED
EXPANSION
EXISTING
ELEVATION
CONCRETE
1
S-001 TO S-046
CT-001 TO CT-026
CG-002 TO CG-019
CS-001 TO CS-???
CD-001 TO CD-???
BB-001 TO B-???
V-001 TO V-???
G-001
SITE LOCATION MAP NOT TO SCALE
LEGEND
ABBREVIATIONS
NEWDESCRIPTIONEXISTING
BRIDGE S882
SITE
LOCATION
SITE
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACKSONVILLE, NCIN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG001.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
##
SHEET 1 OF 14
PERMIT DRAWING
DATE: 04-23-2021WETLAND AND SURFACE WATER IMPACTS PERMIT
RAILROAD TRESTLE S-882
CG-009
0 50'25'50'
SCALE: 1"=100'
100'STA 590+00MATCHLINENAD 83SHEET 2 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG009.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GPS-11
STANDARD GAUGE RAIL
18" RCP
18" RCP
SITE 1
WETLAND
DENOTES FILL INFF
WORK BRIDGE
SITE 2
Liner=Grass Lined
n=0.04
s=0.4%
d=0.8 ft
V(10yr)=1.7 ft/s
Q(10yr)=9.4 cfs
Sta.=586+76 RT
404 WETLAND WC
WETLAND WA
COASTAL
HC HC
CLEARING
DENOTES HAND
TEMP. WORK BRIDGE
METAL SIGN
BULKHEAD METAL WALL
RR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES GRAVEL
GRAVEL
RR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES
GRAVEL
GRAVEL
C/L DITCH
C/L DITCH
WHITE OAK RIVER
S
T
A 5
7
6
+
9
6.1
6BEGIN
T
RACK WORK575
576
577
578
579
580
581
582
583
584
585
586
587 588 589 590
T
S
S
T
A 5
7
6
+
9
6.1
6
S
C
S
T
A
5
7
7
+
8
9.
1
6 CS STA 587+78.26ST STA 588+71.26N 41 56'57" E
16' LENGTH
GRADE CROSSING
RECONSTRUCT GRAVEL
DAYLIGHT DITCH
SEE DETAIL #1
SPEC. LAT. 5' BASE DITCH
18" RCP-IV 3:1D
B
( NOT TO SCALE)
FLATTER2:1 OR
SPECIAL LATERAL BASE DITCH
FROM STA. 580+20 RT TO STA. 586+76 RT
DETAIL #1
B=5 FT.
MIN. D=1.0 FT.
GROUND
NATURAL
SLOPE
FILL
18" RCP
REMOVE EXTG.
RETAIN 18" RCP
AREA OF ENVIRONMENTAL CONCERN
WETLAND BOUNDARY FOR CAMA
75ft COASTAL SHORELINE AND
(ARCHER WES
TERN)
S
TAGI
NG AREA(
S
UB)
S
TAGI
NG AREAP
ARKI
NGJ
OB TRAI
LERP
ARKI
NGP
ARKI
NGAREADE-MOBMOB / ACCESS DRI
VEAC
C
ESS DRI
VE
TEMP. ACCESS ROAD
DB 1938, PG 105
PIN:535701251216
SANDERS, ZETA TOLSON TRUSTEE
PARCEL #1
340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROAD
DB 5192, PG 57
PIN:535701256980
GUTHRIE, JAMES DDB 1797, PG 204PI
N:535701051145HURST FAM
I
LY LLC60' RI
GHT OF
W
AYDB 3811, PG 778DB 808, PG 692
0000000
0
000000
001111111
1
1111
111
1
1111111
11 111122222
2 2222222 2222222 222222
2
2222
222
2
22222
2
22
22
22
2
22
222
22 222222222222233333333
3
3
33
333344
444
4 444445555555555
5
55
5
55
5
555555
5
55
5555566
666
6
6
6
6
6666 66666 666677
7
77
77777
7
7
7777777
7
8 88888
8
8
8888
888
88
8
8 88888899
99
9
9999999
9
9
9
9999991010
1010
1010
101010101010101010101010
1010
10
10
10
10
10
10
1010101010101010
10 1010 10111111
11
11
11111111111111
11
11
11
11
1111111111
1111 1212121212
12
12
12
1212121212121212
12
12
12
12
12121212
12
1212121212131313
13
13 1313
13
13
13
1313131313
13
13
1313131313131313
13
14
14
14141414141414
14
14
14
14
14
14
14141414141414
14
141414 1415151
5
1515
15
15
15
15
1515
151515
15151515
15
15151515151515
151515
15
15 151
5 15151515151515151515151515151515 1616
1616161
6
1616
161
616
1616
1616
1616 1616161616
16
16
161616161616161616
161616171717171717
1717171717
1
717
17171717 171717171717171717171717171717
17171717 1717171717171717181818
18181818
1818181818
18
18
181818
1818
181818
181818181818
18 1818
18 181818
19
19
19191919
1919
19
19
19 202020202020
2
0
20
20
2021
21
22CG-009
0 50'25'50'
SCALE: 1"=100'
100'STA 590+00MATCHLINENAD 83SHEET 3 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG009a.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GPS-11
STANDARD GAUGE RAIL
18" RCP
18" RCP
SITE 1
WETLAND
DENOTES FILL INFF
WORK BRIDGE
SITE 2
Liner=Grass Lined
n=0.04
s=0.4%
d=0.8 ft
V(10yr)=1.7 ft/s
Q(10yr)=9.4 cfs
Sta.=586+76 RT
404 WETLAND WC
WETLAND WA
COASTAL
HC HC
CLEARING
DENOTES HAND
TEMP. WORK BRIDGE
METAL SIGN
BULKHEAD METAL WALL
RR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES GRAVEL
GRAVEL
RR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES
GRAVEL
GRAVEL
C/L DITCH
C/L DITCH
WHITE OAK RIVER
S
T
A 5
7
6
+
9
6.1
6BEGIN
T
RACK WORK575
576
577
578
579
580
581
582
583
584
585
586
587 588 589 590
T
S
S
T
A 5
7
6
+
9
6.1
6
S
C
S
T
A
5
7
7
+
8
9.
1
6 CS STA 587+78.26ST STA 588+71.26N 41 56'57" E
16' LENGTH
GRADE CROSSING
RECONSTRUCT GRAVEL
DAYLIGHT DITCH
SEE DETAIL #1
SPEC. LAT. 5' BASE DITCH
18" RCP-IV 3:1D
B
( NOT TO SCALE)
FLATTER2:1 OR
SPECIAL LATERAL BASE DITCH
FROM STA. 580+20 RT TO STA. 586+76 RT
DETAIL #1
B=5 FT.
MIN. D=1.0 FT.
GROUND
NATURAL
SLOPE
FILL
18" RCP
REMOVE EXTG.
RETAIN 18" RCP
AREA OF ENVIRONMENTAL CONCERN
WETLAND BOUNDARY FOR CAMA
75ft COASTAL SHORELINE AND
(ARCHER WES
TERN)
S
TAGI
NG AREA(
S
UB)
S
TAGI
NG AREAP
ARKI
NGJ
OB TRAI
LERP
ARKI
NGP
ARKI
NGAREADE-MOBMOB / ACCESS DRI
VEAC
C
ESS DRI
VE
TEMP. ACCESS ROAD
DB 1938, PG 105
PIN:535701251216
SANDERS, ZETA TOLSON TRUSTEE
PARCEL #1
340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROAD
DB 5192, PG 57
PIN:535701256980
GUTHRIE, JAMES DDB 1797, PG 204PI
N:535701051145HURST FAM
I
LY LLC60' RI
GHT OF
W
AYDB 3811, PG 778DB 808, PG 692
CG-009WETLANDFILL IN WETLAND
SITE 1
WETLANDSITE 1
SHEET 4 OF 14
PERMIT DRAWING
HAND CLEARING
HAND CLEARING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG009b_xpl.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
583+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
584+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
585+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
586+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
587+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
588+00
0
10
20
30
-10
TR- 14.89TR- 15.27TR- 15.69TR- 16.10TR- 16.45TR- 16.52EX TR- 13.92EX TR- 13.75EX TR- 13.49EX TR- 13.36EX TR- 13.28EX TR- 13.2140:1 40:1
40:1 40:1
40:1 40:1
40:1 40:1
40:1 40:1
40:1 40:1
2:1 2:12:1
2:12:1
2:12:12:12:1
2:1
0 50'25'50'
SCALE: 1"=100'
100'STA 590+00MATCHLINESTA 604+00MATCHLINECG-010NAD 83SHEET 5 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG010.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SITE 2WORK BRIDGE
TEMP. WORK BRIDGE
COASTAL WETLAND WA
CONC.
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
CONC.
CONC.
WHITE OAK RIVER
590 591 592 593 594 595 596 597 598 599 600 601 602 603 604
340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROAD
-1-1-1-1-1-1
-100000000
000 000000000
000000000000000
000
0
0
000000000
00 0000000000 000 0000000000
0000000000000
000
000 00000000000000
00000000011
1
1
1 111
111
11111111111111
1 11 1 111111
11
111 11 11
1
111111
1111
11111
1 1 1111111
1
1 1111111
1
111 111111111
111111
1111
111
111111111111111
111
11
1111
1
11
1
1 11 11
111 111111
111 11111111 11
1111111
1 1111111111
111111111111
111111
1 111111 1111122
22
2222222222222222222222
2
2
2
2 22 2 222 2
2
2222
2
2 22
2
22 222
2
2
2
2
2
2 2
2 22222
22222 22222222
222
2 22222
22
222
222222
222222 222
22
2
2
2 22
2 22
2222 222222 22222222 2222 22222222222
22 22
2
2 2222222222
22
2
2
2 2222
22
22222
22
2 2222
222
222 2
22
222
222
22
2
2222
222222
22
2
2
2
2
22
222222
2
2 222
22
222222222
2 222222 333333333
0 50'25'50'
SCALE: 1"=100'
100'STA 590+00MATCHLINESTA 604+00MATCHLINECG-010NAD 83SHEET 6 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG010a.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SITE 2WORK BRIDGE
TEMP. WORK BRIDGE
COASTAL WETLAND WA
CONC.
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
CONC.
CONC.
WHITE OAK RIVER
590 591 592 593 594 595 596 597 598 599 600 601 602 603 604
340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROAD
STA 604+00MATCHLINECG-011STA 612+00MATCHLINEDATE: 04-23-2021
SHEET 7 OF 14
PERMIT DRAWING
NAD 830 50'25'50'
SCALE: 1"=100'
100'
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG011.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SITE 3
WORK BRIDGE
SITE 2
TEMP. WORK BRIDGE TEMP. WORK BRIDGE
COASTAL WETLAND WA
OPEN WATER
WHITE OAK RIVER
BRIDGE AS CONSTRUCTION ALLOWS
TO BE PROVIDED UNDER WORK
EXISTING NAVIGATION CLEARANCES
WOOD DOCK
WATER LOGGER DEVICEAT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
WHITE OAK RIVER
WHITE OAK RIVER
CONC.
604 605 606 607 608 609 610 611 612
WHI
TE OAK RI
VER340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROAD
STA 604+00MATCHLINECG-011STA 612+00MATCHLINEDATE: 04-23-2021
SHEET 8 OF 14
PERMIT DRAWING
NAD 830 50'25'50'
SCALE: 1"=100'
100'
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG011.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
-5-5
-
5
-
5
-5
-5
-5
-5
-5-5-5-5-5-5-4-4-4-4
-4-3-3-3-3-3-3-2-2-2-2-2
-2
-1-1-1-1-1-1-1-10
0
0
000000
00
00000000000000000
00000000001 111
111111
1111 111
1
1 11111111 11
1
11
11
111
11111111
11222222222
22
2 2
222222222
22222 22222
222
2
2
22222
2
2
2222 2222222 22 222 2222
2
2
22 2222
22222 22
2
22
2222
22223 333 333333333 SITE 3
WORK BRIDGE
SITE 2
TEMP. WORK BRIDGE TEMP. WORK BRIDGE
COASTAL WETLAND WA
OPEN WATER
WHITE OAK RIVER
BRIDGE AS CONSTRUCTION ALLOWS
TO BE PROVIDED UNDER WORK
EXISTING NAVIGATION CLEARANCES
WOOD DOCK
WATER LOGGER DEVICEAT TIME OF SURVEY
THIS AREA UNDER WATER
AT TIME OF SURVEY
THIS AREA UNDER WATER
WHITE OAK RIVER
WHITE OAK RIVER
CONC.
604 605 606 607 608 609 610 611 612
WHI
TE OAK RI
VER340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROAD
DB 1625, PG 112PI
N:535702575924000CATCHI
NG UP CAM
PDB 1035, PG 171PI
N:535702571948000BATES, ALBERTDB 1568, PG 132PI
N:535701479938000ODOM, JUDY BARKER ETVI
R JOELDB 1636, PG 5PI
N:535701479861000ODOM, JUDY BARKER ETVI
R JOELDB 1636, PG 5PI
N:535701478714000J
OHNSON,DW
I
GHT ETUX
W
ANDADB 1660, PG 259PI
N:535701478549000SW
I
NARSKI,STEVEN ETUX PHYLLI
SWHI
TE OAK RI
VER340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROADWETHERINGTON LANDI
NG RD0 50'25'50'
SCALE: 1"=100'
100'
CG-012NAD 83STA 612+00MATCHLINESHEET 9 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG012.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
STANDARD GAUGE RAIL 18" RCPSITE 4
WETLAND
DENOTES FILL INFF
WORK BRIDGE
SITE 3
TEMP. WORK BRIDGE
COASTAL WETLAND WB
404 WETLAND WD
HC HC
CLEARING
DENOTES HAND3'
C
H
AIN
LIN
K FEN
C
EA
SPH
A
L
TRR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES
GRAVEL
GRAVEL
RR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES
GRAVEL
GRAVEL
BUILDINGDILAPIDATED
W/GUY
PP NO #STA 624+95.00END TRACK WORK612 613 614 615 616 617 618 619 620 621 622 623 624 625 626
RETAIN 18" RCP
AREA OF ENVIRONMENTAL CONCERN
WETLAND BOUNDARY FOR CAMA
75ft COASTAL SHORELINE AND ACCESS ROADACCESS ROAD(SUB)STAGI
NG AREAAREADE-
M
OBM
OB /
(ARCHER
W
ESTERN)STAGI
NG AREAAW PARKI
NGAW PARKINGPARKI
NGSUB/VENDORPARKI
NGSUB/VENDORJ
OB TRAI
LERAW PARKINGM
EETI
NG AREAOW
NER PARKI
NG/TRESTLE ASSEMBLYW
ORK AREA / WETHERI
NGTON LANDI
NG RD (SR 1101)MOLLY LNSTERNCREST DR (SR 1780)TEMP. ACCESS ROAD
-5-5-5-5-5-
4
-
4
-3-
3
-2
-2
-2
-1
-
1
-1-10
0
0
0
0
0
01111111111 1
1111111
1111111111
11111122
22222
22
22 222
22
2222 22
2
222
222
22 2222
22222222
2222
2222222222222
2222222222222222
2
22222
23
33333 333 333333
33
3
3
33333 33
33
3
3 3333
333
3
333333333333
33333333 33333
33
3333
33333344444 4
4444444 44
4
4
44
4444
4444 4
4444
44
4
44
4
44
444
4
4
4
44
44
4444444444
4
444 44444444444
4444455555
55 5555555
5
555555555555
5
5 5 5
5 5 5 5 5555555
55555
5
5
555555555
5555
5
5 55555555555
5555
5
5
555
5
55
5
5
55
55
5555 5
5 5555555 55555555555
5556666
66
6
666
6666666 6 6 6 6 66666
6 66
66
66
6666
66666
6666
6 666 6666666666666
66
66
66 66777
77777777
7
7 7 7 7
77
7777 777
7 7
7 7777
7
7 7777 7777
7
7 77
7
777 777
777777
777888 88888888 8 8 8 8 88888888
88888
8 88
888
8888888888
88 8
8 88888888888888999999999 9 9 9 9 99999999999999991010101010101010101010101010101010101010101010101010101010101010101010
1
0 10
10101010101111111
1
111111 11
1111
1111111111 11 11 11 111111111112121212
1
2
121212121212 12 12 12 1213
131313
1313
1414
141515 151
5
15
1515 1516
16
1
6
16
1616161
7
17
1818181819DB 1625, PG 112PI
N:535702575924000CATCHI
NG UP CAM
PDB 1035, PG 171PI
N:535702571948000BATES, ALBERTDB 1568, PG 132PI
N:535701479938000ODOM, JUDY BARKER ETVI
R JOELDB 1636, PG 5PI
N:535701479861000ODOM, JUDY BARKER ETVI
R JOELDB 1636, PG 5PI
N:535701478714000J
OHNSON,DW
I
GHT ETUX
W
ANDADB 1660, PG 259PI
N:535701478549000SW
I
NARSKI,STEVEN ETUX PHYLLI
SWHI
TE OAK RI
VER340' RIGHT OF WAY
CAMP LEJEUNE CHERRY POINT RAILROADWETHERINGTON LANDI
NG RD0 50'25'50'
SCALE: 1"=100'
100'
CG-012NAD 83STA 612+00MATCHLINESHEET 10 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG012a.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
STANDARD GAUGE RAIL 18" RCPSITE 4
WETLAND
DENOTES FILL INFF
WORK BRIDGE
SITE 3
TEMP. WORK BRIDGE
COASTAL WETLAND WB
404 WETLAND WD
HC HC
CLEARING
DENOTES HAND3'
C
H
AIN
LIN
K FEN
C
EA
SPH
A
L
TRR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES
GRAVEL
GRAVEL
RR TRACKS
EDGE OF RR TIES
EDGE OF RR TIES
GRAVEL
GRAVEL
BUILDINGDILAPIDATED
W/GUY
PP NO #STA 624+95.00END TRACK WORK612 613 614 615 616 617 618 619 620 621 622 623 624 625 626
RETAIN 18" RCP
AREA OF ENVIRONMENTAL CONCERN
WETLAND BOUNDARY FOR CAMA
75ft COASTAL SHORELINE AND ACCESS ROADACCESS ROAD(SUB)STAGI
NG AREAAREADE-
M
OBM
OB /
(ARCHER
W
ESTERN)STAGI
NG AREAAW PARKI
NGAW PARKINGPARKI
NGSUB/VENDORPARKI
NGSUB/VENDORJ
OB TRAI
LERAW PARKINGM
EETI
NG AREAOW
NER PARKI
NG/TRESTLE ASSEMBLYW
ORK AREA / WETHERI
NGTON LANDI
NG RD (SR 1101)MOLLY LNSTERNCREST DR (SR 1780)TEMP. ACCESS ROAD
CG-012WETLANDSITE 4 WETLANDSHEET 11 OF 14
PERMIT DRAWING
HAND CLEARING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG012b_xpl.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
613+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
614+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
615+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
616+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
617+00
0
10
20
30
-10
0
10
20
30
-10
0 10 20 30 40 50-10-20-30-40-50
618+00
0
10
20
30
-10
TR- 16.52TR- 16.52TR- 16.49TR- 16.23TR- 15.71TR- 15.15EX TR- 13.21EX TR- 13.21EX TR- 13.17EX TR- 13.16EX TR- 13.00EX TR- 12.8740:1 40:1
40:1 40:1
40:1 40:1
40:1 40:1
2:12:1
2:1 2:12:1 2:12:1 2:1
STA 590+00MATCHLINECG-013
20
10
0
20
STA 590+00MATCHLINE10
0 STA 604+00MATCHLINESHEET 12 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG013_pfl.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
576+00 577+00 578+00 579+00 580+00 581+00 582+00 583+00 584+00 585+00 586+00 587+00 588+00 589+00 590+00TR-15.30TR-15.06TR-14.82TR-14.63TR-14.57TR-14.66TR-14.89TR-15.27TR-15.69TR-16.10TR-16.45TR-16.52TR-16.52EX-TR 14.31EX-TR 15.67EX-TR 15.29EX-TR 15.06EX-TR 14.95EX-TR 14.70EX-TR 14.02EX-TR 13.91EX-TR 13.74EX-TR 13.49EX-TR 13.37EX-TR 13.30EX-TR 13.21EX-TR 13.07XG-12.71XG-14.75XG-14.55XG-14.41XG-14.23XG-13.78XG-13.46XG-13.38XG-13.22XG-12.99XG-12.80XG-12.78XG-12.51XG-2.00 576+96.16 PVI ELEV 15.31 579+25.00 PVCT/R- 14.76 581+50.00 PVI ELEV 14.23583+75.00 PVT T/R- 15.17 586+30.00 PVCT/R- 16.23 587+00.00 PVI ELEV 16.52587+70.00 PVT T/R- 16.52GRADE=-0.24%
GRADE=0.42%
L = 450.00 FT
R = 0.15
L = 140.00 FT
R = -0.30
GRADE=-0.24%
STA 576+96.16
BEGIN TRACK WORK
ELEV=8.70
PI STA 580+20 -RR- RT
BEG DITCH
ELEV=4.80
PI STA 582+00 -RR- RT
ELEV=2.90
PI STA 586+76 -RR- RT
END DITCH
(-)0.4000%(-)2
.1
6
70%
590+00 591+00 592+00 593+00 594+00 595+00 596+00 597+00 598+00 599+00 600+00 601+00 602+00 603+00 604+00TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52XG-0.73XG-1.81XG-0.60XG-0.66XG-0.59XG-0.57XG-0.49XG-0.57XG-0.51XG-0.31XG-0.55XG-0.58XG-0.59XG-0.57GRADE=-0.00%
TEMP WORK BRIDGE
TEMP WORK BRIDGE
STA 590+00MATCHLINECG-014
20
10
0
20
STA 590+00MATCHLINE10
0 STA 590+00MATCHLINESHEET 13 OF 14
PERMIT DRAWING
DATE: 04-23-2021
N O T FOR CO N STRU CTION
PRELIMINARY
NAVAL FACILITIES ENGINEERING COMMAND - MID ATLANTICHURRICANE FLORENCE RECOVERY BRIDGESMCB CAMP LEJEUNE - JACSONVILLE, NCRAILROAD TRESTLE S-882IN PROGRESS
MM/DD/YYYY
F. M. LAST
F. M. LAST
F. M. LAST
1639542
N40085-20-C-8505
L:\ProjectList\1008\20002 - NAVFAC\PERMITS_Environmental\P1505F\Drawings\Wetland\White Oak\PSH\P1505F (WO)_Hyd_prm_wet_psh_CG014_pfl.dgn4/23/2021$USER$$TIME$DEPARTMENT OF THE NAVYA
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.NAVAL FACILITIES ENGINEERING COMMANDDES DRW SYMDESCRIPTIONDATEAPPRDRAWFORM REVISION: 25 AUG 2020
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED UNCLASSIFIEDUNCLASSIFIED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
604+00 605+00 606+00 607+00 608+00 609+00 610+00 611+00 612+00 613+00 614+00 615+00 616+00 617+00 618+00TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.52TR-16.49TR-16.23TR-15.71EX-TR 13.17EX-TR 13.16EX-TR 13.00XG-12.39XG-12.36XG-12.37XG-12.02XG-9.36XG-0.61XG-0.96XG--10.72XG--20.53XG--13.35XG--8.69XG--3.00XG--3.48XG--0.28 614+55.00 PVCT/R- 16.52 615+55.00 PVI ELEV 16.52616+55.00 PVT T/R- 15.96L = 200.00 FT
R = -0.28
0'
10'
20'
30'
-10'
618+00 619+00 620+00 621+00 622+00 623+00 624+00 625+00 626+00 627+00 ELEVATIONTR-15.15TR-14.60TR-14.04TR-13.48TR-12.96TR-12.58TR-12.34EX-TR 12.67EX-TR 12.87EX-TR 12.63EX-TR 12.65EX-TR 12.59EX-TR 12.40EX-TR 12.31EX-TR 12.26EX-TR 12.34EX-TR 12.37XG-11.79XG-11.87XG-11.83XG-11.85XG-11.79XG-11.76XG-11.61XG-11.49XG-11.83 621+30.00 PVCT/R- 13.31 623+00.00 PVI ELEV 12.36624+70.00 PVT T/R- 12.27 624+95.00 PVI ELEV 12.26GRADE=-0.56%
GRADE=-0.06%
L = 340.00 FT
R = 0.15
GRADE=-0.06%
STA 624+95.00
END TRACK WORK
PROVIDED VIA OPEN SPAN OR RAISED PROFILE
EXISTING NAVIGATION CLEARANCE WILL BE
PROFILE OVER MAIN CHANNEL MAY VARY
TEMPORARY WORK BRIDGE
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1586+59 to 589+53 RAILROAD FILL0.05 0.06 2589+20 to 606+00 RT WORK BRIDGE 0.02 3606+00 to 614+00 LT WORK BRIDGE < 0.01 < 0.01 42 4613+90 to 614+96 RT RAILROAD FILL< 0.01 0.02 TOTALS*: 0.05 0.02 0.08 < 0.01 0 42 0*Rounded totals are sum of actual impactsNOTES:Revised September 2014 SHEET 14OF 14 Coastal Wetland WA (125 - 3ft Diameter Temporary Steel Piles = 125(7.07ft²) = 883.8 sf = 0.020 ac) SITE 3: White Oak River (51 - 3ft Diameter Temporary Steel Piles = 51(7.07ft²) = 360.6 ft² = 0.008 ac) Coastal Wetland WB (3 - 3ft Diameter Temporary Steel Piles = 3(7.07ft²) = 21.2 sf = 0.001 ac) 404 Wetland WD (3 - 3ft Diameter Temporary Steel Piles = 3(7.07ft²) = 21.2 sf = 0.001 ac) SITE 2: 404 Wetland WC (4 - 3ft Diameter Temporary Steel Piles = 4(7.07ft²) = 28.3 sf = 0.001 ac) WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSOnslow / Carteret CountyP-1505F (S-882)N40085-20-C-8505MARINE CORP BASECAMP LEJEUNE, NC4/23/2021