HomeMy WebLinkAbout20210751 Ver 1_ePCN Application_20210426 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form April 4,2021 Ver 4 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Orange only if needed. BIMS#Assigned* Version#* 20210751 1 Is a payment required for this project?* ✓ No payment required G Fee received Reviewing Office* ✓ Fee needed-send electronic notification Wilmington Regional Office-(910)796-7215 Select Project Reviewer* Joanne Steenhuis:eads\jhsteenhuis Information for Initial Review 1a.Name of project: P-1505F—White Oak River Trestle Replacement 1a.Who is the Primary Contact?* Terry Burhans lb.Primary Contact Email:* 1c.Primary Contact Phone:* terry.burhans@mbakerintl.com (919)481-5775 Date Submitted 4/26/2021 Nearest Body of Water White Oak River Basin White Oak Water Classification SA;HOW Site Coordinates Latitude: Longitude: 34.772466 -77.152295 A. Processing Information County(or Counties)where the project is located: Onslow Carteret Is this a NCDMS Project ✓ Yes f No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* ✓ Yes 0' No Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes r No ID# Version 20210751 1 Pre-fling Meeting or Request Date 12/10/2020 Attach documentation of Pre-Filing Meeting Request here: aick the upload button or drag and drop files here to attach docurrent P1505FPrefiling Notification Documentation.pdf 105.04KB Ale type crust be FCF la.Type(s)of approval sought from the Corps: f7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) f-Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No Please provide the date of the previous submission.* 4/13/2021 lb.What type(s)of permit(s)do you wish to seek authorization? (7 Nationwide Permit(NWP) f-Regional General Permit(RGP) f-Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes r No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: (7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express f-Non-404 Jurisdictional General Permit r Riparian Buffer Authorization f- Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: C Yes r No For the record only for Corps Permit: f Yes r No lf.Is this an after-the-fact permit application?* ✓ Yes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes (7 No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes C No Acceptance Letter Attachment I h.Is the project located in any of NC's twenty coastal counties? ✓ Yes rNo 1i.Is the project located within a NC DCM Area of Environmental Concern(AEC)? ✓ Yes r No r Unknown 1j.Is the project located in a designated trout watershed? ✓ Yes r No B. Applicant Information Id.Who is applying for the permit? f-Owner 17 Applicant(other than owner) le.Is there an Agent/Consultant for this project?* Yes C No 2. Owner Information 2a.Name(s)on recorded deed: United States of America 2b.Deed book and page no.: 240-605 in Onslow County 2c.Contact Person: Neal Paul,Deputy Director MCBCL Public Works Dept. 2d.Address Street Address 1510 Gilbert Street Address Line 2 city State/Rovince/Region Norfolk VA Postal/Zip Code Country 23511-2738 USA 2e.Telephone Number: 2f.Fax Number: (910)451-3228 2g.Email Address:* Jessi.Baker@usmc.mil 3.Applicant Information(if different from owner) 3a.Name: Neal Paul,Deputy Director MCBCL Public Works Dept. 3b.Business Name: United States Marine Corps 3c.Address Street Address 1005 Michael Road Address Line 2 atY State/Province/Region Camp Lejeune NC Postal/Zip Code Country 28547 USA 3d.Telephone Number: 3e.Fax Number: (910)451-3228 3f.Email Address:* Jessi.Baker@usmc.mil 4.Agent/Consultant(if applicable) 4a.Name: Terry L Burhans Jr. 4b.Business Name: Michael Baker International 4c.Address Street Address 8000 Regency Parkway,Suite 600 Address Line 2 Oty State/Province/Region Cary NC Postal/Zip Code Country 27518 USA 4d.Telephone Number: 4e.Fax Number: (919)481-5775 4f.Email Address:* terry.burhans@mbakerintl.com Agent Authorization Letter* WOR_Trestle_PCN_Agent_Authorization_Form.pdf 93.47KB C. Project Information and Prior Project History O 1. Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Stella,NC 2. Project Identification 2a.Property Identification Number: 2b.Property size: 532600966503(Onslow County) 373.79 2c.Project Address Street Address Camp Lejeune Railroad Address Line 2 Dty State/Bovine/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* White Oak River 3b.Water Resources Classification of nearest receiving water:* SA;HOW 3c. What river basin(s)is your project located in?* White Oak 3d.Please provide the 12-digit HUC in which the project is located. 030203010203 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project site has an existing railroad trestle bridge carrying a single track of the Camp Lejeune Railroad over the tidal portion of the White Oak River and its associated wetlands. Land surrounding the site is rural in nature and largely undeveloped with some residential,institutional,agricultural,and transportation uses. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C- Yes r No Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) P1505F_USGS.pdf 350.33KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) P1505F_SOILS.pdf 921.64KB 4f.List the total estimated acreage of all existing wetlands on the property: 10.51 4g.List the total estimated linear feet of all existing streams on the property: 300 4h.Explain the purpose of the proposed project:* The project purpose is to replace the White Oak River Railroad Trestle Bridge(Bridge S882)along the Camp Lejeune Railroad line.This bridge was damaged during Hurricane Florence. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Bridge S882 is an existing trestle bridge carrying a single track of the Camp Lejeune Railroad over the White Oak River.The railroad line is 34 miles long,including sidetrack segments, and serves as the primary heavy logistics supply route transporting heavy military freight between Camp Lejeune and Cherry Point.The design build restoration effort includes the replacement of the existing railroad bridge that was damaged by Hurricane Florence.Rail traffic will be terminated for the entire rail line during construction.Recreational water vessel access through the White Oak River will be maintained in the deeper portions of the river and may be temporarily relocated to facilitate construction operations.The bridge replacement will follow the existing alignments and involve the removal of existing structures followed by the installation of replacement trestles.Construction is anticipated to begin in 2022 and expected to last for two years. In its current state,Bridge S882 is a 194-span structure that carries a single railroad track of the MCB Camp Lejeune—MCAS Cherry Point line over the White Oak River(tidal).The bridge has 193-spans each measuring 12'-6"±and a single navigable main span measuring 24'±at Span 150.The overall bridge length is 2436'-6"±,center-to-center of end bents. The out-to-out bridge width from curb to curb is 9'±.The bridge deck consists of open timber railroad ties(8"x 8")placed 1'-2"±on center.The superstructure consists of four W16x50 simple-span steel stringers.At the main span the longitudinal members are W33x141 painted steel girders. The substructure is comprised of two timber end bents with steel piling and 195 timber intermediate bents.Bents 150 and 151 are double bents located at the supports of the main 'channel'span.All the bents have five to seven 1'diameter timber piles.The piles at each bent are braced transversely and longitudinally by timber cross-bracing members.The bridge was severely damaged during recent storm events and will be removed and replaced in its entirety except for portions of the embedded piles which are to be cut off at the streambed or 1'-0"below the ground line on the channel banks. The replacement of the White Oak River railroad trestle will first involve the removal of the existing structure.A temporary work trestle bridge with extensions to access proposed piling locations will be installed with temporary driven piers adjacent and upstream of the existing White Oak River trestle.The temporary work trestle will cross the White Oak River and adjacent wetland complex with access on either side of the river.The temporary trestle will be used during the demolition and construction phases of the project and will be removed in their entirety upon completion of the project. Once the existing structure is removed,the construction of the replacement trestle will involve spanning the White Oak River and the associated wetland complex along both banks of the river.The permanent trestle support system will consist of 24-inch prestressed concrete piles that will be driven into the the wetland complex with an alternating layout of 5-pile bents and 10-pile bents every 37.5 ft for the length of the trestle.Proposed spans for the trestle are 37.5 feet wide,which will provide 33 feet of horizontal clearance in the river channel. The permanent trestle will also be constructed with a concrete closed ballasted deck with ballast curbs,which is industry standard and allows for better load distribution and better structure longevity.The proposed bridge deck is 20 feet wide with 10 feet draining to each side(normal crown).Scuppers(slots in the ballast curb)will be spaced approximately 6 feet apart along the length of the trestle(actual spacing will depend on the final location of bridge support beams and expansion joints).At this 6-foot spacing,the flowfrom each drain has been calculated to be 0.005 cubic feet per second(cfs);therefore,a very low amount of stormwater will discharge from each scupper.The proposed bridge grade across the wetland and White Oak River is 0%(flat)at approximate elevation 14.3 feet.Mean high water(MHW)is at elevation 1.1 feet;therefore,deck drains will be approximately 13.2 feet above MI-IN. This elevation combined with the low amount of stormwater drainage cfs from each scupper would be considered diffuse flow. The replacement of the existing White Oak River railroad trestle will reduce the overall number of required spans from the current structure of 194 to the proposed trestle 66.This will also reduce the number of support pilings needed for the structure and allow for the increase in span distance between bents from 12.5 to 37.5 feet.The existing navigational opening will be increased from 24 to 37.5 feet. 4j.Please upload project drawings for the proposed project. P1505F_Wetland Permit Drawings_WOR_20210423.pdf 4.47MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No r Unknown Comments: Initial fieldwork for delineations was carried out on September 14-16,2020 by Terry Burhans(PWS, CPSS)with Michael Baker International.Representatives from the USACE,NCDWR and NCDCM visited the site to verify extents on December 10,2020 and December 23,2020.Preliminary Jurisdictional Determinations were issued by the USAGE. 5b.If the Corps made a jurisdictional determination,what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown C N/A Corps AID Number: SAW-2009-02140 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Terry L Burhans Jr.PWS,CPSS Agency/Consultant Company: Michael Baker International Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 1/12/2021 5d1.Jurisdictional determination upload P1505F_Prelim_JD.pdf 2.75MB 6. Future Project Plans 6a.Is this a phased project?* C Yes 6 No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory u 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): fJ Wetlands r Streams-tributaries r Buffers fJ Open Waters r Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 1 Railroad Fill- P Bottomland Hardwood Forest WC Yes Corps 0.050 Permanent Fill (acres) 1 Hand Clearing T Bottomland Hardwood Forest WC Yes Corps 0.060 (acres) 2 Work Bridge- T Bottomland Hardwood Forest WC Yes Corps 0.001 Temporary Fill (acres) 2 Work Bridge- T Salt/Brackish Marsh WA No Corps 0.019 Temporary Fill (acres) 4 Railroad Fill- P Bottomland Hardwood Forest WD Yes Corps 0.010 Permanent Fill (acres) 4 Hand Clearing T Bottomland Hardwood Forest WD Yes Corps 0.020 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.100 0.060 2g.Total Wetland Impact 0.160 2i.Comments: The replacement of the White Oak River Railroad Trestle will result in Permanent and Temporary Impacts to Wetlands WC and WD,and only temporary impacts to wetland WA. Permanent and temporary impacts will occur to Wetland WC at Permit Site 1.The fill slope along the northern extent of the railroad will need to be widened to accommodate a raise in grade for the replacement White Oak River Trestle.The widening of the fill slope will result in approximately 0.05 acres of permanent fill to Wetland WC.An additional 0.06 acres of Temporary Impacts will result from Hand Clearing that will be needed for equipment access to widen the slope and install ditch outlet protection.Upon completion of the project,any temporary disturbance to Wetland WC will be restored to preconstruction conditions. Temporary impacts to Wetland WA and WC will occur at Permit Site 2 resulting from 129 temporary 3ft diameter steel driven piles for the installation of temporary work trestles need to provide access for the removal and replacement of the White Oak River Railroad trestle.There will be 125 temporary piles driven in wetland WA(883.8 square feet or approximately 0.019 acres)and four temporary piles driven in wetland WC(28.3 square feet or 0.001 acres).Total temporary wetland impacts from temporary driven piles will be 0.02 acres.Upon completion of the project,these temporary trestles will be removed and any disturbance to Wetland WA or WC will be restored to preconstruction conditions. Permanent and temporary impacts will occur to Wetland WD at Site 4.The fill slope along the eastern end bent of the railroad trestle will need to be widened to tie the trestle back into the existing railroad grade.The widening of the fill slope in this area will result in approximately 0.01 acres of permanent fill to Wetland WD.Additional Temporary Impacts in the form of hand clearing will be needed for equipment access to widen the slope. Upon completion of the project,any temporary disturbance to Wetland WD will restored to preconstruction conditions. 4.Open Water Impacts 4a. Site# 4a1.Impact Reason 14b.Impact type 4c.Name of waterbody 4d.Activity type 4e.Waterbody type 4f.Impact area 3 Work Bridge T White Oak River Bridge Estuary 0.01 4g.Total temporary open water Impacts: 4g.Total permanent open water impacts: 0.01 0.00 4g.Total open water impacts: 0.01 4h.Comments: The replacement of the White Oak River Railroad Trestle will result in Temporary Open Water Impacts to the White Oak River. Temporary open water impacts to the White Oak River will result from the installation of 51 3ft diameter steel driven piles for the installation of temporary work trestles need to provide access for the removal and replacement of the White Oak River Railroad trestle.The driven temporary piles will amount to 360.6 square feet or approximately 0.008 acres of temporary open water impacts.Upon completion of the project,these temporary trestles will be removed and any disturbance to the White Oak River will be restored to preconstruction conditions. E. Impact Justification and Mitigation Ll 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Streams and wetlands were delineated on site to provide location of sensitive areas in the vicinity of the project.The replacement trestle and associated components were then designed to avoid or minimize impacts to these these sensitive areas to the maximum extent practicable.The bridge will be replaced on existing alignment which will avoid impacts from new construction on new location.The rail line will be closed during construction which will avoid having to construct a temporary detour bridge.Temporary laydown areas and construction access points were determined after stream and wetland delineations were completed and were selected in areas that would avoid additional impacts to waters. Regulatory agencies were notified early on in the project development process.Initial coordination with regulatory agencies was carried out in October of 2020,once the decision to move forward with the project was finalized.Opportunities were given to agency representatives to express concern about various aspects of the bridge replacement.Because the project is part of an existing rail line there was limited opportunity to explore alternative options for bridge location.The bridge was designed to avoid and minimized impacts to streams and wetlands to the maximum extent practicable.The existing trestle crosses the White Oak River at almost a 90 degrees.The replacement bridge will be on the same location. Due to the project's proximity to sensitive coastal areas,including coastal waters,an Essential Fish Habitat Assessment was completed to address the potential impacts to sensitive aquatic species and their habitat.It is attached to this document. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Hand clearing will be used instead of mechanized clearing where needed to access for construction,specifically around the areas needed to widen the railroad base on either side of the replacement trestle.This will minimize impacts to wetland areas. Temporary work bridges,as shown in the project drawings,will be utilized to elevate work equipment needed for the replacement project to avoid impacts to the White Oak River and surrounding wetlands that would otherwise occur from equipment access. An erosion and sediment control plan will be approved by NCDEQ prior to commencement of construction activities.The utilization of the existing bridge alignment will reduce final overall impacts and eliminated the need to impact undisturbed areas.Temporary work trestles will be installed to provide access to required construction areas for the installation of the bridge structure while eliminating the need for construction equipment to continually cross sensitive wetland habitats along the White Oak River. All in-water work will be conducted in strict adherence to in-water work moratoria established by regulatory agencies to account for managed aquatic species. General Best Management Practices and Spill Prevention and Control measures will be utilized during construction activities: Proper housekeeping,maintenance of equipment,and containment of fuels and other potentially hazardous materials would be implemented.Spill control kits would be provided at the work site to facilitate spill response. Water-based equipment would be cleaned and cleared of polluting substances prior to use.Equipment would be subject to daily inspections for cleanliness and leaks.If a leak is detected,the equipment would not be used until the leak is repaired and equipment cleaned.Refueling of equipment would only be permitted at approved fueling facilities.All trash would be secured to ensure it does not enter adjacent surface waters.Any floating debris generated would be retrieved.Retrieved debris would be disposed of at an upland disposal site. No petroleum products,chemicals,or other toxic or harmful materials shall be allowed to enter surface waters.Wash water resulting from washdown of equipment or work areas shall be contained for proper disposal and shall not be discharged unless authorized. Equipment that enters surface waters shall be maintained to prevent any visible sheen from petroleum products.No oil,fuels,or chemicals shall be discharged to surface waters or onto land where a potential for re-entry into surface waters exists.Fuel hoses,oil drums,oil or fuel transfer valves, fittings,etc.shall be checked regularly for leaks.Materials would be maintained and stored properly to prevent spills.No cleaning solvents or chemicals used for tools or equipment cleaning shall be discharged to ground or surface waters. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes (cNo 2b.If this project DOES NOT require Compensatory Mitigation,explain why: A majority of the proposed impacts required for the replacement of the White Oak River Rail Road trestle are temporary in nature.They result from temporary work bridge installation and removal,or hand clearing required for construction access.Permanent Impacts resulting from this project total 0.06 acres of wetland and 0.01 acres of open water.The trestle replacement project has been designed to avoid unnecessary impacts and minimize unavoidable impacts to the greatest extent practicable.The result of this ensure that individual and cumulative adverse impacts are no more than minimal and will not require mitigation to offset these minimal losses. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes 6 No If no,explain why: The project is not located within one of the watershed subject to NC Riparian Buffer Protection Rules. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ✓ Yes r No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? 6 Yes r No Comments: Through coordination with the NCDEQ Division of Energy,Mineral and Land Resources,it has been determined that since this project is a linear transportation project that will be constructed in accordance with the most recent NCDOT standards and then conveyed to the United States Marine Corps Base Camp Lejeune which has an MS4,and it will not require modifications to an existing State Stormwater Permit or common plans of development,the project qualifies for an exemption from Post-Construction Stormwater Permitting. G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ( Yes rNo 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ( Yes rNo NEPA or SEPA Final Approval Letter P1505F_NEPA_CE.pdf 210.86KB 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. The purpose of this project is to replace an existing facility that is in current operating order,however is in deteriorating condition.The replacement of the railroad trestle bridges along the Camp Lejeune—Cherry Point Railroad will allow the line to maintain its current function and purpose.There are no known additional developments that will directly or indirectly result from this project,that could impact nearby downstream water quality. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes allor N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ( Yes rNo 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes ( No 5d.Is another Federal agency involved?* ( Yes r No r Unknown What Federal Agency is involved? United States Marine Corps,United States Coast Guard 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ( Yes r No 5g.Does this project involve bridge maintenance or removal? ( Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? ✓ Yes ( No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes r No ( Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes ( No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ( Yes r No If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property. P1505F_Percussive_Activities.pdf 1.04MB 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://www.fws.gov/raleigh/species/cntylist/onslow.html,https://www.fws.gov/raleigh/species/cntylist/carteret.html, https://www.fws.gov/raleigh/PR_1.html, https://vw•w.fws.gov/raleigh/PR 17 a.html https://ncnhde.natureserve.org/ Consultation Documentation Upload P1505F_Agency_Meeting_Notes.pdf 87.08KB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* 6 Yes f No Are there submerged aquatic vegetation(SAV)around the project vicinity?* r Yes G No r Unknown 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.habitat.noaa.gov/protection/efh/efhmapper/ https://www.habitat.noaa.gov/application/efhinventory/index.html An Essential Fish Habitat Assessment was completed for the project.It is attached. 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* HPOWEB 2.0:https://www.arcgis.com/apps/webappviewer/index.html?id=79ea671 ebdcc45639f0860257d5f5ed7&center=- 8805200,4311130,102100&scale=18056514 7c.Historic or Prehistoric Information Upload 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* 6 Yes rNo 8b.If yes,explain how project meets FEMA requirements: The project will meet the conditions for a No Rise Certification. 8c.What source(s)did you use to make the floodplain determination?* FEMA Floodplain Maps at the link above Miscellaneous Comments Coordination with the United States Coast Guard has been carried out for the White Oak River replacement project.The US Coast Guard determined that the White Oak River Railroad Trestle was to be placed in the Advance Approval category as per Title 33 Code of Federal Regulations Part 115.70.Documentation of the coordination with the US Coast Guard is attached. An Essential Fish Habitat Assessment was completed for the project.It is attached. Miscellaneous attachments not previously requested. P1505F_USCG_Letter.pdf 136.91KB P1505F_White_Oak_River_EFH_Assessment_20210425.pdf 2.47MB Signature * IJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Terry L Burhans Jr Signature grft,tgoea&rk�ure�f Date 4/26/2021