Loading...
HomeMy WebLinkAbout20121021 Ver 1_More Info Letter_20121214NC6 R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Govemor Director December 14, 2012 Mr. Robert Fairbrother c/o Mr. Seth Fairbrother P.O. Box 388 Cashiers, NC 28717 Subject: Request for More Information 401 Water Quality Certification Guise Lane Lot 40 — Shoreline Stabilization DWQ Project # 12 -1021 Jackson County Response deadline: January 14, 2013 Dear Mr. Fairbrother: Dee Freeman Secretary The Division of Water Quality (DWQ) has performed a preliminary review of a 401 Water Quality Certification application submitted for the above referenced property. Additional information will be required in order to complete the review process. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. The DWQ, along with Duke Energy Lake Services, require that you evaluate the feasibility of a) bioengineered techniques (i.e., native plantings to alleviate soil erosion in lieu of or in combination with hard structures), b) rip -rap only, and c) the combination of dry stack wall and rip -rap. As discussed with Mr. Seth Fairbrother at the time of inspection (December 11, 2012) — it appears that a combination of rip -rap (only) stabilization and boulder wall (w /rip -rap) may be the most feasible option along the portion of shoreline requested. Please provide an updated sketch diagram with estimated dimensions in response to this request. If work is not conducted from a barge, Duke Energy Lake Services will require replacement in accordance with Exhibit 1, Part 5.b. of Duke Power Nantahala Area Shoreline Management Guidelines. Location: 2090 U.S Highway 70, Swannanoa, North Carolina 28778 Phone: 828 - 296-45001 FAX 828 - 299 -7043 �TOne Internet: www.ncwaterquality.org 0 Caro' a An Equal Opportunity 1 Affirmative Ae6on Employer atura!!'y Mr. Fairbrother December 14, 2012 Page 2 of 2 Permanent impervious surfaces (excluding access pathways) must be kept 30 feet back from surface waters [ref. 15A NCAC 2B.0215]. Please provide your response in writing to the addresses below prior to January 14, 2013. Four copies of the required information should be provided to: Ms. Karen Higgins WBSCP Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 and a single copy to the Asheville Regional Office at: Susan A. Wilson Surface Water Protection Section 2090 US HWY 70 Swannanoa, NC 28778 If we do not hear from you by the deadline, we will assume that you no longer want to pursue this project and we will consider the project withdrawn. This letter only addresses the preliminary application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Susan A. Wilson at 828- 296 -4665 or susan.a.wilsonna,ncdenr.gov , if you have any questions. Sincerely, V ` Chuck Cranford, Regional Supervisor Surface Water Protection Asheville Regional Office cc: Karen Higgins — WBSCP Unit Lisa Leatherman, Duke Energy Lake Services Steve Beasley — Jackson County Planning ARO File copy S:I SWPU ackson\401s\Non- DOT%Fairbrother - bank stabilization Glenville\2012 Project FrbrthMddlnfo.Fairbrother Prop. 12 2012.doc