Loading...
HomeMy WebLinkAboutNC0024872_Annual Report_20210329Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send an v other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative /1 YES ❑ NO ❑ NA 11 YES ❑ NO ❑ NA PPS Form /1 YES ❑ NO /1 YES ❑ NO SNCR /1 YES ❑ NO /1 YES ❑ NO IDSF ❑ YES /1 NO i1 YES ❑ NO Allocation Table ❑ YES /1 NO /1 YES ❑ NO Compliance Schedules ❑ YES ❑ NO /1 NA ❑ YES ❑ NO // NA Public Notice ❑ YES ❑ NO NA ❑ YES ❑ NO I NA Program Information /1 YES ❑ NO i1 YES ❑ NO ❑ YES A NO Historical SNC ❑ YES ❑ NO /1 NA ❑ YES ❑ NO /1 NA ❑ YES ❑ NO /1 NA Regional Office: WSRO POTW: Davie Co. Cooleemee WWTP NPDES Permit No. NC0024872 Report Period: 01/01/2020 — 12/31/2020 ❑ Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 days of expiration? (See Allocation Table). /1 Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) i1 Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in SNC, including those causing pass -through or interference? (See Narrative and SNCR Form) ❑ Yes ❑ No /1 NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No // NA ❑ NOD ❑ NOV n QNCR ❑ NCP ❑ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Only one SIU under permit, and their IUP was renewed 01/01/2021. No Historical SNC form was submitted because no instances of SNC. HWA due 09/30/2021. Reviewed By: Alex Lowe Regional Pretreatment Annual Report Review Date: 03/29/2021