Loading...
HomeMy WebLinkAbout20200469 Ver 2_Duplin B-5639 Permit Mod request_20200420_20210426 Carpenter,Kristi From:Herndon, T. Mason Sent:Monday, April 26, 2021 9:53 AM To:Shaver, Brad ; Steenhuis, Joanne Cc:Rivenbark, Chris; Cashin, Gordon E Subject:FW: Duplin B-5639 Permit Modification Attachments:Duplin B-5639 Permit Mod request_20200420.pdf Brad & Joanne, Based on our conversation on Friday and this morning, this minor modification of 0.04 acres of temporary impacts for additional sheet pile to remove the interior bent on B-5639 (Bridge 36 over Maxwell Creek on NC 11 in Duplin County) can be handled with a note to your files and no further action is required. Can you please respond to this e-mail confirming that the information attached is sufficient for the approval by your agency for this additional temporary impact and that no further actions are required. Thank you! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Herndon, T. Mason Sent: Tuesday, April 20, 2021 4:06 PM To: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Cc: Shaver, Brad <Brad.E.Shaver@usace.army.mil> Subject: Duplin B-5639 Permit Modification Joanne, Attached is the draft Duplin B-5639 permit modification for the additional sheet piling that is needed to remove the interior bent on the existing bridge. The pre-notification e-mail was sent on 3/31, so the formal request will be th submitted on May 4 via Laserfiche. Let me know if you have any questions or require any additional information. 1 Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2 -c STATE STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY April 20,2021 Brad Shaver,NCDOT Coordinator Joanne Steenhuis,NCDOT Coordinator Wilmington Regulatory Field Office NC Department of Environmental Quality US Army Corps of Engineers Division of Water Resources 69 Darlington Avenue 127 Cardinal Drive Ext. Wilmington,NC 28403 Wilmington,NC 28405 Subject: Permit Modification Request for Section 404 Nationwide Permits 23 and Section 401 General Certifications 4140 for the replacement of Bridge No. 36 over Maxwell Creek on NC 11 in Duplin County; WBS No. 45594.1.1, TIP B-5639 USACE Action ID No. SAW-2017-00473 DWR Project No. 20200469 Dear Mr. Shaver and Ms. Steenhuis: The North Carolina Department of Transportation(NCDOT)is requesting a permit modification for the replacement of Bridge No. 36 over Maxwell Creek on NC 11 in Duplin County. A meeting was held with the Resident Engineer and contractor at the project site, and it was determined that additional sheet piling is required to remove the massive concrete interior bent of the existing bridge. The sheet pile will have to tie to the northern approach as shown on Permit Drawing 12 and 13 in the enclosed revised permit drawing packet so that the contractor can lower the water level have access to the bent and cut it off at the mud line with a concrete wire saw. This modification increases the temporary surface water impacts by 0.04 acres. To alleviate concerns with restricting the stream width,the southern end bent will be excavated and constructed prior to installing the sheet pile from the northern end bent. The sheet pile will be installed only a few feet above the normal water service elevation in various locations to allow overtopping and reduce backwater if a flooding event occurs. It is estimated that the sheet pile will be in place for approximately two to three weeks. If you have any questions or need any additional information,please feel free to contact me. Mailing Address: Telephone:910-341-2000 Location: NC DEPARTMENT OF TRANSPORTATION Fax:910-675-0143 5501 BARBADOS BOULEVARD DIVISION OF HIGHWAYS Customer Service: 1-877-368-4968 CASTLE HAYNE,NC 28429-5647 5501 BARBADOS BOULEVARD CASTLE HAYNE,NC 28429-5647 Website:ncdot.gov Sincerely, Mason Herndon NCDOT Division 3 Environmental Program Supervisor ec: Kristi Lynn Carpenter,Division of Water Resources Enclosures Hi ghway hwa North Carolina Department of Transportation gStormwater ,,,,...._ Highway Stormwater Program �' < STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 45594.1.1 TIP No.: B-5639 County(ies): Duplin Page 1 of 1 General Project Information WBS Element: 45594.1.1 TIP Number: B-5639 Project Type: Bridge Replacement Date: 9/17/2019 NCDOT Contact: Jacquelyn Bowles,PE Contractor/Designer: Sungate Design Group,P.A./Josh Dalton,PE Address: 1000 Birch Ridge Dr. Address: 905 Jones Franklin Rd. Raleigh,NC 27610 Raleigh,NC 27606 Phone: 919-707-6559 Phone: 919-710-8333 Email: jkbowles@ncdot.gov Email:jdalton@sunqatedesiqn.com City/Town: County(ies): Duplin River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 0.33 Surrounding Land Use: Rural Proposed Project Existing Site Project Built-Upon Area(ac.) 0.7 ac. 0.5 ac. Typical Cross Section Description: Paved 12'lanes with 8'shoulder section(11'shoulder with GR,2'paved) Paved 11'lanes with variable grass shoulder section Annual Avg Daily Traffic(veh/hr/day): Design/Future: 3200 Year: 2040 Existing: 2617 Year: 2020 General Project Narrative: NCDOT Highway Division 3 proposes to replace Bridge#036 on NC 11 over Maxwell Creek.The existing structure is 2@52'steel I-beams on concrete vertical abutments with (Description of Minimization of Water asphalt on concrete deck.The proposed structure is 1@55',1@60,and 1@55'24"cored slab with 4'end bent caps.Existing drainage patterns have been maintained to the Quality Impacts) extent practical,and rip rap will be used at all drainage outlets to dissipate energy and reduce erosion. Waterbody Information Surface Water Body(1): Maxwell Creek NCDWR Stream Index No.: 18-74-24-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters(Sw) Other Stream Classification: None Impairments: fecal coliform mercury(Hg) Aquatic T&E Species? Yes Comments: Unresolved per NRTR dated October 2016 NRTR Stream ID: Maxwell Creek Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) co I TOTAL See Sheet 1 A For Index of Sheets °�IS) °� ®� ®�V ll ®fie STATE STATE PROJECT REFERENCE SHEET SHEETS 0 See Sheet 18 For Conventional Symbols "1921 . 1958 �,,,0 * ' ` DIVISION OF HIGHWAYS -5P 39 N.C.. 1957 STATE PRa.NO. APROl.NO. DESCRIPTION 1737 o°aQ� , I 45594.1.1 P.E. e/'p �,'c 45594.2.1 RAN & UTL B�qo,. wn TO�,1 Rd. 1957 i 45594.3.1 CONST ridge DUPLIN COUNTY CX a 1912 B-5639 1141 PROJECTS 1955 y) LIMITS o LOCATION: BRIDGE NO. 36 OVER MAXWELL CREEK PERMIT DRAWING 0 •, Rd ON NC 11 (CLODFELTER ROAD) SHEET 1 OF 17 1918 [ 1141 '' DATE: 04-08-2021 a�a Rd' �o�.-°j TYPE OF WORK: GRADING, PAVING,DRAINAGE AND STRUCTURE V 1141 LIT44 1918 eC 9-6. Register �e9`S HAD_ 8??,h., O 0�- Brothers Rd. 19321996 � - _ VICINITY MAP (NOT TO SCALE) WETLAND AND SURFACE WATER IMPACTS PERMIT 4 & SITE 2 SITE 3 5 & SITE 4 2 BEGIN B IDGE Lu 2 B-2 B—i -L- POT TA. 22+68.75 c END BRIDGE END TIP PROJECT B-5639 J -L- POT STA. 24+41.25 _L_ POT STA. 32 +25.00 1. . . . . . . . . uj . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . NN BEGIN TIP PROJECT B-5639 ..,___, . . . _ . . . X . . . . NI INN -L- POT STA. 14+90.00 = * . * . ' . � . * . ' . . * . ' . * . ' . * . . . . . . . . . . . . . — 4 . ,__-------- . . . . . . . . . TO REGISTER � P ��allika -- NM ., Re ,. . . . . . . -L DET- . . . . . . . . ,\ 'i . . . . . . . . . . . . . . . ANA INN . d` BEGIN DETOUR B-5639 BEGIN BRIDGE END BRIDG' END DETOUR B-5639 M -L DET- POC STA. 10+2 6.46 -L-DET- POT STA. 17+91.04 +/- -L_DET- PO STA. 19+61.04 +/_L DET- POC STA. 2 6+54.80 -L- STA. 15 +06.95 -L- STA. 31 +32.22 0 SITE 1 n1 SITE 5 {R DOCUMENT NOT CONSIDERED FINAL SE,ONNG Cary NC 27 Drive NGINEERS Suite 200 Cary,NC 27518 $SOCIATES 19191 852-0468 �f7 UNLESS ALL SIGNATURES COMPLETED 4\ www 852059R gr.c {f} www.slmpsonengr.com LICENSE NO.C-2521 J PLANS PREPARED FOR NCDOT BY: HYDRAULICS ENGINEER f J GRAPHIC SCALES DESIGN DATA PROJECT LENGTH uM P° Boa 100 SUNGATE DESIGN GROUP,P.A. r;17) -V2273NC 27526 �9191552-2253 ADT 2020 = 2,617 MOT M 19,9)552-225 o',,.., ,I,i RNLEION 60050CINROLINA 2760e 50 0 50 100 ADT 2040 = 3,200 MACDDNALD LICENSE NO.F-0669 ENG054*CENSe6o.CESO ®RTe1 1- fl[1 LENGTH ROADWAY TIP PROJECT B-5639 = 0.296 MILES 2018 STANDARD SPECIFICATIONS ® (CI �o PLANS K = 9 % MICHAEL PEKAREK, PE PE. D = 55 % PROJECT ENGINEER SIGNATURE: u® I. wn � , 50 0 50 100 T = 5 %* LENGTH STRUCTURE TIP PROJECT B-5639 = 0.033 MILES RIGHT OF WAY DATE: `u_f°� NOVEMBER 27, 2019 JOSH DALTON, PE ROADWAY DESIGN ---*> �� V = 60 MPH ENGINEER I a PROFILE (HORIZONTAL) HYDRAULIC ENGINEER ��p �� New O to o l0 20 * TTST =2% DUAL 3% TOTAL LENGTH TIP PROJECT B-5639 = 0.329 MILES ®F TR��tl LETTING DATE: +0 � SUB-REGIONAL TIER FEBRUARY 16,2021 DAVID STUTTS, PE ``�J PROFILE (VERTICAL)�� MAJOR COLLECTOR NCDOT BRIDGE PROGRAM MANAGER P.E. f\ SIGNATURE: f\ Cr PROJECT REFERENCE NO. SHEET NO. cr PERMIT DRAWING e 5639 ze SHEET2 OF 17 ROADWAY DESIGN SHEET NO. HYDRAULICS ENGINEER ENGINEER DATE: 04-08-2021 NA 1850' 25' 0 50' 100' o77 hnhnn SCALE: 1"=50' 1---------'''' 4'577----------- \ DOCUMENT NOT CONSIDERED FINAL -— \ UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: Fil / .---______ I1/,I PO Bor Jma \piT M Fvquoy-VariL,NC 37526 _ _ \IWLTONNID www.mon <.wmbmvncoa — g SUNGATE DESIGN GROUP,P.A. IROAD s JONES ESo Ua ,s� ,_______ ________. m / 0 T____ KILPATRICK FARMS,INC. A.M.E.ZION CHURCH / CV IL-------, I CO -------\.4 N A.M.E.ZION CHURCH / I ± Y ± Ac + ± LLJ ANTHONY K.DEVANE A.M.E.ZION CHURCH \\ LLI EVELYN J.DEVANE _w�B— - w000s V) POSSIBLE • Oki E OVERLAP AREA FN -" v/ EXISTING R/W —T—— -.-TO SR 19/6!LANDFILL RDI I O J I T 0 EIP NC HWY 11S 22'BST CD H EXISTING R/W — —E FO———— ———--- .. _. .. .. .. --- — �- — — J6 E � r' ro T ro WOODS EIP /-0`�/ WOODS / \E ,l— ± ± ± Q HC / ± SITE 1 I -L_DET- PC Sta.10+00.00 = * ± ± LLJ -L- Sta.14+80.49 0 I WETLAND WC j� AN I HUN" K.DEVANE EVELYN J.DEVANE LJJ Z J U 6 DENOTES TEMPORARY FILL IN WETLAND ��if DENOTES HAND ::t CLEARING }�� FOR -L_DET- PROFILE, SEE SHEET 7 .01- ..4 FOR -L- DESIGN, SEE SHEETS & 5 *6+60 0` PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING 8-5639 2B-/ SHEET 3 OF 17 ROADWAY RW SHEET EET NO. HYDRAULICS ENGINEER ENGINEER DATE: 04-08-2021 NAB- ',,,a,,,...„,_ 50' 25' 0 50' 100' IIIIIIIIII \/ SCALE: 1"=50' m r-------2 \ DOCUMENT NOT CONSIDERED FINAL —— UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of. M - t�/,I PO Box Jma 00 .N., I,VU Fuquoy-Vonna,NO 3J526 _ _ \IWLTONNID www.mon <.wmbmvncoa — g SUNGATE DESIGN GROUP,P.A. 1222 A„s' l - n BNSBNaGB� � - m O KILPATRICK FARMS,INC. in T____ A.M.E.ZION CHURCH / (NIa COI W N A.M.E.ZION CHURCH — -- J= 41_, ±,_,'/ �,•� / JEY . AEA.M.E.ZION l s 6 s N J.DEVANE \ 6 WLB �� \ \8g \C WOODS 9� � ' El OVERLAP AREA J � '� ���� \ \ - ,+I EXISTING R/W ✓�� '- L- li —TO SR 19/6(LANDFILL RDI \ C S �' \ \ I_ T 0 EIP , NC/WY//5 22'4ST / / I — — O H EXISTING R/W ` - 65 • . O e fti,6 T "may r .► �//' //'' .4....1 —�- •� Chi �/� WOODS / / / //-- EIP /, ,`. = j WOODS/7_,,,,,---- J/ ./ ..,..---;_,,,,,,-.1 �' —� I- HC y / // ± SITE 1 I -L_DET- PC Sta.10+00.00 = * ± ± ± LLJ -L- Sta.14+80.49 / 0 1 WETLAND WCO JI AN I HUN" K.DEVANE EVELYN J.DEVANE W Z J U 9+ // FFILL IINEWET WS ETLAND z ... DENOTES HAND ::t CLEARING �6+2 >E9Z FOR —L_DET- PROFILE, SEE SHEET 7 .01 .444 FOR -L- DESIGN, SEE SHEETS *ENO +9+9 o, \ PROJECT REFERENCE NO.cr SHEET NO. 8-5639 28-2 co RW SHEET NO. 50' 25' 0 50'Ildfir 100' ROADWAY DESIGN HYDRAULICS \/ ENGINEER ENGINEER SCALE: 1"=50' N--"gam 011 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M t�/,I PO Bor J00 piT �V� Fvquoy-Varina,NC 3J516 WCDONNID www.monma<.wmbmvncoa I SUNGATE DESIGN GROUP,P.A. 0 N a* ,oGENN�a, ouNn�,sw \in olria: E..ceeo R.J.& CARRIE ROBINSON HEIRS N C/0 NATHANEL BONY PERMIT DRAWING 0 SHEET 4 OF 17 CO KILPATRICK FARMS.INC. `�' DATE: 04-08-2021 ~ TEMP. SHORING \ \ LJJ (SEE TRAFFIC MANAGEMENT PLANS) CL A RIPRAP a EST 1 TON SHOULDER BERM GUTTER W Yn 7µ EST 4 SY GFD APPR.SLAB TO STA.19+78-L DET-LT W i i A A i i i i A i A A A ± A A A A A A A A A N A ± A A A A ± 's A A A A A A A A A A A _ i ± A 4 i i A A A A A A A i A 4 A A ± ± A A A A ± A ± ± i ± O \ • �'Y\ ± 'x 'Y 'Y 'x 4 A i i�. A A ± A A A A A A A A A A 'A 'A A A A A A A 4< A A A A w vifions A A A A. w y O: • fl 1 Jc A A A A A A A A A A A A O �T EXISTING Fi/ 1 --r—i ----- _ --- W.. --. — �' 24'�ONC. -_ aka /� _ - —64� _ - - _ 24'CONG - — 1--T-— —N— —T— — i T_ _— r -- � BRI�ONC)36 _ I �IIL iv NC Id14Y ll5 22'BSTI „�„,�,��„�„�.,�nn,c�lui �� —__-- Tilt_ F ---rro—____ _4_.�,Fi� _ _-- —� -- F' --- .. . ----- — �_ - r rro ;Fo INK —r ro i www maps AG AC Fo6 UNK J CF t /_ :am �� a� ' __ ����� `� ./��ri�'s-�is��:7t , �iiii==:f"- EWLB, ..—" "_® .__ �a�Ea®�.���� ._ ® - , /Mr C -sue u�. :.�..��;c.�rrcra� E—�—� A I r4-..v,V�,�rS 'p fecf�fY '. #.' ��/�4���rgIAWA��i/� 7"-___. F w E —� Y A A A A ± i A A A A w►r!�rri:L ssm. I— E CODS F- -WLB F I / .�4il;��'��►7Wyv�:y..7�.}a.l.1:r��'�r E EA A A A A A A A A A A A A A A A A A Q \ .�,\ 1 - A -'y 'y k A A A A A A A A A A A A A A A A A A A A A A Aa/E - A A E A E I A A A A A — — A A A '—'-; A • `' \\ A A A A A A A A A A A A A A A A A A A A A A A A . .. —— \ A A A A A A. A A A A A A A A A A A A A A A A A A A A A A TS SITE 1AA . —WLA \ C S II RIP RAP \. A A A A SITE 5 A A A A A A A A A A A A A A A A Z LIP A A A A A A i A A A A A A �' A A A A A A A' , °>,y CLASS II RIP RAP- \ A A A A A A A A A A A A A A A A A A A A —1 SITE 3 -L_DET- PC Ste.21+68.02 -L_DET- PT Ste.27+54.95 = I HC -L- Ste.32+32.36 U -L_DET- PT Ste.15+86.93 WETLAND WC -L_DET- PC Ste.19+88.37 WETLAND WA Q -L_DET- PC Ste.16+74.93 -L_DET- PT Ste./7+66.58 O / -L_DET- PT Ste.20+80.02 ANTHONY K.DEVANE DENOTES HAND EVELYN J.DEVANE / 0 / CLEARING KILPATRICK FARMS,INC. 4 / 0 GARNETT McCALOP j�///// '/ DENOTES TEMPORARY 4. & LOIS CHASTEN,HEIRS /� IMPACTS IN SURFACE WATER z ////// FILL INO DENOTES WETLAND TEMPORARY //// DENOTS WETLANDTION Z 4444. EeE 0 >�� FOR -L_DET- PROFILE, SEE SHEET 7 FOR -L- DESIGN, SEE SHEETS 4 & 5 o,cr \ PROJECT REFERENCE NO. SHEET NOco 8-5639 28-2 RAY SHEET NO. 50' 25' 0 50' 100' ROADWAY DESIGN HYDRAULICS \/ ENGINEER ENGINEER SCALE: 1"=50' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M LK PO Bo,700 .N., ... Fuquoy-Vonna NC 27526 \in WCDONALD www.monmac.cam/ammo's SUNGATE DESIGN GROUP,P.A. L I 0 N\ t oTaIM E Dc AIN eeo,sw R.J.& CARRIE ROBINSON HEIRS N C/O NATHANEL BONY PERMIT DRAWING 0 SHEET 5 OF 17 coKILPATRICK FARMS.INC. -- \ \ DATE: 04-08-2021 W TEMP. SHORING W (SEE TRAFFIC MANAGEMENT PLANS) `.1, CLA RIPRAP W w EST 1 TON SHOULDER BERM GUTTER Yn �; EST 4 SY GFD APPR.SLAB TO STA.19+78-L_DET-LT m W ± A ± ± ± A ± A A ! _55..N I i i A ± A A ± A A ± i A A A A A ± A A A----______4A A A A A ± ± A ± A ± ± ± ± ` 1 \ r, } 4 A i A i i 'i 7/// \ \( , O ± 'x 'x 'r 'x ± 4 \s \ II r7.......„±\,,NA A 6 954 ± ± A A I Y'/ •— ± 'A i A A i iLS , i iO ��. s •cl VI• t g5 � O '' S z wed �l Ir s es�' _ —— *6 �` ,� L � v:>—`- --'_.,---..i, R,p, �l 29 J ± ± TING aiw± �� -- — — — —'0 , Wak 59 1'ONC) iv NC YIIS 22'BST 8 •, Q �` �� _ � � 7--F- — — - Ira �nD i • 1 �es" ' - ii�f�fi7I1 �a f�'— - _ / �� `/ ��iiiiiii „. wee �' �.� .�' �rn� _ _ < l "II�'iT� — s� '��'�i�[� � a�.�'.�i ,=ae�.� � .tom.�... � � E v 'W� i:L.- �f1/ % 144.. ,✓ 1I I MTFArgIIIgiarrA•74�i714; F w. :_ E eg\LLJ _ f / w_B F II i. ��IF 0 r/� E J NW A :� �i �� ` I A 'x 'r A A — \y`� _ yi TS A A A A A 'r �\ # 'z A 'x A A A A SITE 1 A A A ± A A -—wc C • I RIP RAP \ A A A A SITE 5 A A A A ± A A A A A A A A A A LU CLASS II RIP RAP— A A A A A A A A A A A L A A A A A A A —1 SITE 3 -L_DET- PC Ste.21+68.02 -L_DET- PT Ste.27+54.95 = rHC -L Sto.32+32.36 U -L_DET- PT Ste.15+86.93 WETLAND WC -L_DET- PC Ste.19+88.37 WETLAND WA Q -L_DET- PC Ste.16+74.93 -L_DET- PT Ste./7+66.58 O / -L_DET- PT Ste.20+80.02 ANTHONY J. DEVANE DENOTES HAND EVELYN J.DEVANE / O / CLEARING KILPATRICK FARMS,INC. 4 / 0 GARNETT CHASTEN. j�/ DENOTES TEMPORARY & LOIS CHASTEN,HEIRS /�° IMPACTS IN SURFACE WATER / FILL IN DENOTES TEMPORARY WETLAND // DENOTS WETLANDTION it j` >e,Lo FOR -L_DET— PROFILE, SEE SHEET 7 FOR —L— DESIGN, SEE SHEETS 4 & 5 o" PROJECT REFERENCE NO. SHEET NO. cr 03 PERMIT DRAWING B-5639 7 CV tc SHEET 6 OF 17 ROADWAYENGINEER ENGINEER ENGINE RS DATE: 04-08-2021 -L_DET- DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BEGIN GRADE Pre efe F In the Offi-L_DET- STA 13+7167 par: ljd F a arivata,Nc 27526 EL.= 67.65' SUNGATE DESIGN GROUP,P.A. 90 90 80 PI= 14+50.0' 80 EL = 67.92' VC = 150' — _ K= 178 70 — — _ _ 70 — _ _ (+)0.3447% b)0.5000% 60 60 3ENCH MARK "1 3MI: TIE IV 13"PINE -L_DET- STA 10+83.8.3 OFF 83.20' 50 N=407712 E=2310164 50 EL.= 68.7/' 40 40 10 11 12 13 14 15 -LDET- BENCH MARK 2 BM2: TIE IN 10"OAK DESIGN D/SCHARGE = /500 _CFS -L_DET- STA 17+91.57 OFF 53.65' DESIGN FREQUENCY = 10 YRS W-408406 E=23/0027 DESIGN HW Fl FVATION = 58.9 FL EL.= 5955' BASE DISCHARGE = 300G CFS BASE FREQUENCY = /00 (FEMA) YRS I.—B4'Klwe 4 SIA.16+/6.04-L_utl- BASE HW ELEVATION =160.5 FT GRDER 90 i 1 SP4N:1@170',SKEW 90 END GRADE OVERTOPPING DISCHARGE= 16800 CFS 90 BEGIN BRIDGE 1 G/P4 EN-BE 79CA'S END BRIDGE L_DET- STA 23+97.33 OVERTOPPING FREQUENCY= )500 YRS -L_DET- STA 17+91.04 , -L_DET- STA 15+61.04 EL= 65.68' OVERTOPPING ELEVATION = 165.6 FT 80 � PI= 20+32nn 70 PI= 22+00.00 P1= P3+50.00 80 EL = 65.0E EL = 66.52' EL = 65.53' DATE OF SURVEY = 3/l8/20/(i VC = 130' VC = 200' VC = 50' W S ELEVATION K - 94 K 139 K = 92 *� � AT DATE OF, SURVEY = 56.3 h l 70 (-)065000% (+4.8824X (-)0.6600% _ __ 1 60 - - - _ � � I 60 f — � — �� — Z \ \\_.---- ::: . 50 _ CLASS RIP RAP 50_ II TO TOP OF BERM \/ CLASS II RIP RAP ��� 1.5:1 SLOPE TO TOP OF BERM rya 151 SOPF In.z OBS.ON 3-113-16 FOR -L_DET- PLAN VIEW SEE SHEETS 2B-I& 28-2 '641-13C NWS=56.3 IIW 40 40 III 15 16 17 18 19 20 21 22 23 24 25 26 27 0 I 0 5 10 _PROD.B-5639 REFERENCE NO. SHEET NO. N X-3 FAO oo 150 140 130 1:0 110 100 90 80 TO 60 50 40 30 20 10 0 10 20 30 40 50 60 Jo 80 90 100 1"0 120 1�0 1<0 150 80 °PERMIT DRAWING SHEET 7 OF 17 0.020 0.020 379 6796 0.023 0.024 DATE: 04-08-2021 1. // ........... ?'7 ?'7 RO —� / � �� 60 FINAL GRADING — - - - - _ _ _ _ — — 21+50.00 •. 8o 0 z,_ I- u~, SITE 1 0.020 0.020 MPORARr 67,96 _ 7n _ �•000 O.00T—� LL IN WETLAND 1 \ 60 / —FINAL GRADING — — _ — — - 21 +00.00 50 80 0 16 5- - - 0.020 0.020 0.020- 0 020 ,F TEMPORARY 70 � 68,09 -L IN WETLAND 1•• /- \ / \ ?7 ?;I / _ — 1�/ :\�� - - - \ 60 — 20 +SO.00 FINAL GRADING — — — — — 50 80 0 z _ it. 0.020 0,020 0.02uL 79 �.020 TEMPORARY 1, eaio FILL IN WETLAND 11 hhv) — — — — 20 I 00.00 !Nei reenwr, - - - _ 5n RO 0 ' CD LU I w 0.020 0.020 0.020 �3 TEMPC RARY SITE 1 70 g,1 681 �� FILL Its WETLAND _ — \\ 60 Z — �\ 19 +50.00 ��� -FINAL GRADING W...M. 50 �-E9a L C--z rust / — �..w C-S„, ... C-CD ... 150 140 170 1:0 1"0 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 TO 140 1 0 1�0 150 C0 0 5 10 —PROJ.REFERENCE NO. SHEET NO. N �i B-5639 X-4 CO Rn 150 140 130 120 1"0 100 90 80 TO 60 50 40 30 20 1D 0 1D 20 30 40 50 60 70 80 90 1 0 1"0 1:0 1i0 140 150 PERMIT DRAWING SHEET 8 OF 17 70 70 eeleel eleeeelleell eIeaeeleelee 0.020 0.020 DATE: 04-08-2021 60 6o ____ ___ ___ - / 50 ` - _ /�- 53.09 / .50 24 +00.00 80 Rn 7n 7n 0.020 0.020 eeleeleeleeIeelleelleeIeeleeleelee 1 , 0.020 0.020 6n )( Fl) 50 — — _ — — _ , — — — — — — — — — — — — — — — 50 - - - 5 0.3 5 Rn 23 +50.00 80 7n 0.020 0.020 70 eoqaeleeleeleelbileSTaelsslealae 1 0.020 0.020 SITE 1 6n 6n r��� — — _ — \ I ,_ TEMPORARY IMPACTS IN SURFACE WATER / / — - - 23 +00.00 - - - � 50 BEGiN RIDGE —L— 22 + 68.75 BEGIN BRIDGE —L DET— 17+ 91.04 5n Rn 80 0 C 0 0 s,Z g, _s 7n 13`, —a 0.020 0.020 3 3 3 79 — — 67.99 -� •1 7 0.024 0.024 � 6n / FINAL GRADING — — — — — — — _ 199 _ 22 +50.00 5,0 5n Rn 80 7n 0.020 0.020 70 `" — 0.040 Q.04Q 67.92 -!-1'.- 60 - — — 6n z _ _ _ — — — _ FINAL GRADING- .0 22 +00.00 ..�a VDT. L.JM. 5,0 50 '-Sc wSz 550 -L - ** 150 140 170 120 1"0 100 90 80 TO 60 50 40 30 20 10 0 10 20 30 40 50 60 7�0 80 90 100 1"0 11.0 1'0 1 0 150 co 0 5 10 -PROJ.REFERENCE NO. SHEET NO. N �i B-5639 X-5 150 140 130 1:0 110 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 JO 80 90 100 1'10 170 1i0 140 150 PERMIT DRAWING SHEET 9 OF 17 DATE: 04-08-2021 •• :,9 0 7 . SITE 5 w 0.020 0.020 E TEMPORARY ,L01` 67,36 _ 0.006 0.007 FILL IN WETLAND FINAL GRADING 26 +00.00 II 50 As 0 80 z I- LU W 3 _ 70 0.020 0.020 TEMPORARY FILL IN WETLAND 1.• 67,58 0.029 0.030 /// \\ 2—I 27 60 _ _ _ / FINAL GRADING- — — - - - - 25 +50.00 50 • — 80 0 I- LL, 163• 0.020 67si 0.020 0.040 �—_TEMPORARY 70 1 / 0,040 FILL IN WETLAND / \ 3;7 2.7 / GO_ — 25+ 00.00 -FINALGRADI� � - - - - \1 ___ ___ _ 80 0 Z ~ SITE 5 c. 0.020 0.020 z 3 70 ti, 68.02 0.020 0.020 TEMP RARY / � 3. WETLAND Z /// \� I ?I F0 *o _ — — -FINAL GRADING- — — — — — _ — *. _ _ _ _ _ _ _ - - - - ... 24 +50.00 '-Sc END BRIDGE-L- 24 +41.25 END BRIDGE -L_DET 19 + 61.04 ,50- .�w.S _L = SS «.. 150 140 170 1:0 10 100 90 80 70 60 50 40 30 20 10 0 1D 20 30 40 50 60 710 80 90 100 1"0 1:0 1.'0 100 150 o, PROJECT REFERENCE NO. SHEET NO. 0- 50' 25' 0 50' 100' 8-5639 4 m � 11 111 -------------------- RAMSHEET NO. SCALE: 1"=100' ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER NAD /8� 017 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of. M rAhl PO Box 700 \piT .V. Fuquoy-Vonna,NC 27526 pss„, MCDO 515 - IGNEDS FROU ,P.A 3Po06 corn/cinemas _ � SUNGATE DESIGN GROUP,P.A. / ___________ PERMIT DRAWING -�-� / --------7-7,' SHEET 10 OF 17 / ________ m DATE: 04-08-2021 7________________ KILPATRICK FARMS,INC. I,O A.M.E.ZION CHURCH W LLJ -L- POT Sto.10+00,00 N END OVERLAY LJJ L- POT 18+00.00 LLI A.M.E.ZION CHURCH m I� � ,_± �� * � � � I to we i ± J ANTHONY K.DEVANE A.M.E.ZION CHURCH \\ 0 EVELYN J.DEVANE _w�a——— 0 WOODS O POSSIBLE oq, - EI OVERLAP AREA CD 0 LIP EXISTING R/W -- -- - -- ' AJ_ _� T _ B5639-2 —T—==T— — ,__, '— T 0 —TO SR(9(6(LANDFILL Rm o N 12 09 40.3°W EIP NC(OW IIS 22'BST 6 uNK T F� I- - X EXISTING R/w E .. .. .. .. .. .. .. - - ;m ARM ca- F T FO a W 71 WOODS EIP /--Y —— "-- WOODS / LLI l ± \ iA ± ± ± A Z /± ± A ± 1 ± A / ± SITE�1 i V -L_DET- PC Sta.10+00.00 = ± A A ± ± ± A -L- Sta.14+80.49 Q WETLAND WC0 AN I HUNY K.DEVANE EVELYN J.DEVANE 4, o. z z cp /�/ DE WETLAND L IN 0 LiLE ... He,a SE»z �� FOR —L— PROFILE, SEE SHEET 6 .01 �� FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 Cr 0, PROJECT REFERENCE NO. SHEET NO. 50' 25' 0 50' 100' 8-5639 4 m 1 11 1 1 1 -------------------- RAM SHEET NO. SCALE: 1"=100' ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER '3/2017 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of. M tM PO Bor J00 r-7;—----- -------________ - IGNEDGROU ,NA3Po06 mvncva _ SUNGATE DESIGN GROUP,P.A. oFIaIME sEo�� / -..... PERMIT DRAWING —�—� Lo ---------7 SHEET 11 OF 17 / ........._____ m / DATE: 04-08-2021 KILPATRICK FARMS,INC. 1-0 A.M.E.ZION CHURCH —-------------1 / LLI LLJ -L- POT Sto.10+00.00 7--------- / it---------, END OVERLAY LLJ -L- POT 18+00.00 LLJ A.M.E.ZION CHURCH —=L— _� . ± - S N A.M.E.ZION F{l� �- s £.9 \ O ANTHONY K.DEVANE / \ ± _9 O EVELYN J.DEVANE 9 WB-_ �9 �� WOODS 9���_ O El OVERLAP AREA /�� a ��/��� \XV 65 O EXISTING R/W ��n ✓ /9 o LIP k �:_ — — - .7 - - 0 B5639-2* T — - _�' �.. — - 5 — -- —TO SR 19/6(LANDFILL ROl �`eB \6' /2°09'-0.3'W,,�`'• a , ,^ 1 -- F -- -- N - _ x .. .. -. .. -. .. .. .. .. .. .. '—_ _ _.z—fin,__; N EXISTING R/W / E—— — 65 . — —,' — T EO •_ — —_ WOODS �� j// Eie \ / J / WOODS tr-...: \L l� / 51 y: , LLI �i 7 J J i 4 A, A, 4 ± i ± J SITE I Al Ac 0 V -L_DET- PC Sta./0+00.00 = A ± A ± ± ± ± -L- Sta.14+80.49 Q WETLAND WC0 AN I HUNY K.DEVANE z EVELYN J.DEVANE 0, 0, En z z cp /�/ DETES WETLANDL IN 0 ..� V)E»z tm�D_ FOR -L- PROFILE, SEE SHEET 6 ** FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 +9+9+9 SOS 25' 50' 100' PROJECT REFERENCE NO. SHEET NO. B 5639 5 m ]II[1 In I I _--/ RAM SHEET NO. SCALE: 1" lOO ROADWAY DESIGN HYDRAULICS 111111116........._ \ ENGINEER ENGINEER 0)/ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of. M rAg PO Box 700 \MM rV. 1.6uoy-Varina,I<27526 WCDONNID www.monma<.wmbmvncoa I SUNGATE DESIGN GROUP,P.A. N M OAD ` 11, .� Pe. "r:oLINA:TsoB -4111 O PERMIT DRAWING R.J.C/CARRIEANELNBON�YEIRS O SHEET 12 OF 17 KILPATRICK FARMS.INC. DATE: 04-08-2021 I— WETLAND WD w LJJ P RAP T SH SHOULDER CLASS 11 IPO POINT CLASS II IP RAP WETLAND WB I STA.19+75 TO BE IN BRIDGE LT& RT TO SHOULDER POINT -L- POT Sta.33f0000 NiROCK PLATING=1,470 SY FROM STA 19+753 END IDGE TO STA.25+00 LT TO 22+70 LT& RT IS RUCTURAL PAY ITEM) END RIDGE TO STA.24+50 RT CARRY ROCK PLATING TO 2.5:1(HA)SLOPE 5 P (STR CTURAL PAY ITEM) W USE ROCK PLATING DETAIL NO.1 OF a CL B RIPRAP BEGIN OVERLAY (/ ROADWAY STANDARD DRAWING NO.275.01 W m EST 1 TON -L- POT 27+00.00 v I SITE 2A ± N N- I ± A A A A EST 5,SY GFD iy 'r 'Y 'r 'x 'A A ± A A A A A ± A A A A A ± A A A A A 1 1 SITE 3 f r. A A A A SITE 4 A A A A A A A A A A A A A A A A A A A A 'A 'A 's \., 15 WiELBOWS • SHOULtER BERAt GUTTEl 0 y yRA A A A A A A A ± A A A A A A A &�APR.SLAB O STA. 4+65.5, A A A A A ± A A A A A A A A A A A A A wn®ns y i, * O 1 P J J 0 / ` ,,s F **..**iE** , iB iN*iE iE*9R iE iE * *6R.* jR',i. RX1 1Fel+it.-- _ lA .f I NVI ± A A A A A A A A A A A A A A A _._ Al-- - EWA,.f r`s s t,i — — -_ dam'wikA/` <s`_._ -- l: ± ± * —WLB ,.i -i :i4:1- N N 12°09'40.3"W firtff4t---47.A 40120. o .— Qs� {s�fitt a -- o o �2 NK -Eow- (n .y `_.-�-- 'w �•� /� vii� fi — x tM'sIG"i''i — LB—_.--1—_. �� --- wLa—————— -r- WLB - .. �-3.-- -� ��.�.�♦�, ^h'4PW. AI, ' �.�1,rj7�n�i � .. .. .. * ± ± -4-ESE± A A A J A ± A ± / �'. W - -SHOULDER BERM UTTER .. Y x E � J 4- I / WOODS ^_ \ —— APPg,SLAB Tq STA.2i+65.5 E — T< J< le WLB Z A A SITE 5 J A _ SITE 1 _' 15"WifLBOWS CL B RIPRAP \ J< Jc ESTITON IA A A A A A AA—wL © EST 5 SY GFD \ A A A A A A A A A A A A ± A A A A A A A A A V — EIP EXCAVATE TO APPROX. \a A A J' L NG EL.AT CL=57.3' �y r EXCAVATE TO APPROX. A A A A A A A A 'x NG EL.AT CL=57.3' ROCK PLATING=230 SY FROM STA.25+25 TO 26+25 RT CARRY ROCK PLATING TO 2.5:1(H:V)SLOPE WETLAND WC USE ROCK PLATING DETAIL OF ROADWAY STANDARD DRAWING NO.O.275.01 WETLAND WA /// DETES FILL WETLAND IN O ANTHONY K.DEVANE * * ** * * DENOTES MECHANIZED EVELYN J.DEVANE O * * * *_1CLEARING © 4 KILPATRICK FARMS,INC. &LOISECHASTEN HEIRS / DENOTES IMPACTS IN / �!`�'//�j SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER .E � �� STRUCTURE EXCAVATION w�� y� /� :Ty� APPROACH SLAB HLv«,a 0., FOR —L— PROFILE, SEE SHEET 6 .01 FA4.4 I FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 Cr SOS 25' 50' 100' PROJECT REFERENCE NO. SHEET NO. B-5639 5 . ]II 11 InI I _-----/ RW SHEET NO. SCALE: 1" lOO' ROADWAY DESIGN HYDRAULICS 111116116......._. \ ENGINEER ENGINEER 0)/ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M IN M wpi-, tM %%O., V Ja0ri0 ,NC 27526 MCDONALD www.monmac.00mbmencoa SUNGATE DESIGN GROUP,P.A. ":PoLInA:JsoB` m OAD O PERMIT DRAWING R.J.C/0 NATHANELNBON�YEIRS \ - O SHEET 13 OF 17 KILPATRICK FARMS.INC. DATE: 04-08-2021 I— WETLAND WD \ \ w w RAP T SH ULDER IP PO NT CL4SS II IP RAP WETLAND WB CLASS II R= STA.19+75 TO BE IN BRIDGE LT& RT TO SH ULDER POINT -L- POT 510.33+0000 ROCK PLATING=1,470 SY R s END IDLE TO STA.25+00 LT N FROM STA 19+75 TO 22+70 LT& RT IS RUCTURAL PAY ITEM) 1_ END RIDGE TO STA.24+50 RT CARRY ROCK PLATING TO 2.5:1(HA)SLOPE7. (STR CTURAL PAY ITEM) w USE ROCK PLATING DETAIL NO.1 OF CL B RIPRAP BEGIN OVERLAY ROADWAY STANDARD DRAWING NO.275.01 N �: m'--- EST 1 TON -L- POT 27+00.00 N N J< J< ± SITE 2 ± '� �5 I, ',1 A 'r A EST SASY GFD'A A A 5? A— J< A A i ITE 3 ` h'.• SITE 4 �_� ± O � � Js \\�, &&S, vr` /\ 15"W/ELBOWS � l �'c �'e 'r 'x 's\Os \ r / AS S SHOULuerc BERt�iJIIFE In A L OCD . a r ® .� i &�APfR.SLAB JO STA.24+65.5�, y J< I± �� 9A :) + 1 'x 1- y WI10D L ' liW *AA** *:. - - BE**9E*BET*1E 1E -..-. . BE "%BE jf \ - '1._-- \- *���! r �l r� S A A A 5 A \ ws •- a.-- A� .. ,r _ _ �r T 1..� --fi r �_ 8S__ 3 - -.- _- a' e- _ t, ,.ice '- — _ _ _ 4 O —=i.@Y ;'.st, v - .rw� _ .-� _aIeA �_ t .%f_l -n — _ X — — — ~ — — —WLB -a.r. --\ ��/�iF�V� �T—T �. ! �C SS Gfli2' •"lam ....m= -- �yy� — N 89- i N I2°09'40.3„W i » mr - r i r IMIA _ I IIIMIMININIMME111 : D 1— 1-------------- ." ----- .+._. "_,°""r_+ � mJ -''',;:. 'i L����' iIIE t :.y_ - - '•— '-'Y __ f�T .e -- L w tifri/ ►191, ', 60 i 4 He ; S5 a—a—� �, �\�y - wLB T%--•-""-"^- A,_, — _ (A(,' -���� ��> F Y. "►�Al,/j7�'c i��B .. .. -. .. �/ A �A A Ems/ i EA A A 'A 51, I )1" AA 'WOODS AP', LAB Tn STA. +65.5 C -A-7 ,K- A---__ '----\k ± A A le Z • SITE 5 �� _ ls^wELeows J _ SITE 1 c \\. `- CL B RIPRAP \ A Jc A �\\ EST 1 TON \ /) I A A A A A A A A -w�B -S� EST 5 SY GFD A A 6��� U1\ A A A A A A A EIP\-- EXCAVATE TO APPROX. \'A A A J' NG EL.AT CL=57.3' �y r EXCAVATE TOAT . AA '�c 'x Q NG EL.AT CL=57.3' ROCK PLATING=230 SY FROM STA.25+25 TO 26+25 RT CARRY ROCK PLATING TO 2.5:1(H:V)SLOPE— WETLAND WC USE ROCK PRATING DETAIL ROADWAY STANDARD DRAWING NO.O.275.0101 WETLAND WA /// DE WETES FILL TLAND IN O ANTHONY K.DEVANE * * * * DENOTES MECHANIZED EVELYN J.DEVANE O **** * * *_1CLEARING © 4 KILPATRICK FARMS,INC. &LOISECHASTEN HEIRS DENOTES IMPACTS IN �j SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER .o � �� STRUCTURE EXCAVATION w�� :Ty� y� // APPROACH SLAB �f He,a N.Cc FOR —L— PROFILE, SEE SHEET 6 .01 I FOR DETOUR DESIGN, SEE SHEETS 2B-1 & 2B-2 or PROJECT REFERENCE NO. SHEET NO. m co B-5639 6 ROADWAY DESIGN HYDRAULICS In ENGINEER -L- END OVERLAY BEGIN GRADE -L- STA 18+00.00 BEGIN PROJECT EL.= 68A3' DOCUMENT NOT CONSIDERED FINAL BEGIN OVERLAY UNLESS ALL SIGNATURES COMPLETED -L- STA 14+90.00 Prepared in the IVI PO Box 700 MOT7 IVY Fupuay-VeS,,NC 27526 90 SUNGATE DESIGN GROUP,P.A. PI= 18+80.00 `II E��s sM'°s�nO Cno,�s 80 - - - - - - - - - - - EL = go3' PERMIT DRAWING 80 - - - - - - - - - - K = 135 SHEET 14 OF 17 BRIDGE HYDRAULIC DATA 70 DESIGN DISCHARGE = 2500 CFS _ _ DATE: 04-08-2021 70 DESIGN FREQUENCY = 50 YRS (-10.5000% (+10.6880% DESIGN HW ELEVATION = 60.0 FT BASE DISCHARGE = 3000 CFS 60 BASE FREQUENCY = 100 YRS 60 BASE HW ELEVATION = 60.5 FT OVERTOPPING DISCHARGE= 16800 CFS I I OVERTOPPING FREQUENCY= )500 YRS 50 OVERTOPPING ELEVATION = 65.6 FT RFNCH MARK °I 50 BM/: TIE IN 13"PINE -L- STA 15+63J4 OFF 83.78' DATE OF SURVEY = 3/18/2016 N=407712 E=2310164 40 WS.ELEVATION _ EL= 68.71' 40 AT DATE OF SURVEY = 56-3 FT 30 30 10 11 12 13 14 15 16 17 18 19 20 I-L- I BEGIN OVERLAY END PROJECT END GRADE END OVERLAY -L- STA 27+00.00 -L- STA 32+25.00 F.—BRIDGE I) STA.23 55.00-L- Fl = FiFi Of)' 24"COREC SLAB 3 SPANS:W56.19,1@60.3',1@56.19',SKEW 90 W/4'END BENT C PS GP ELEV.=68.63' 90 BEGIN BRIDGE END BRIDGE -L- STA 22468.75 -L- STA 2444/.25 RFNCH AA,PK •2 90 5 2: TIE IN 10"OAK -L- STA 22+70.53 OFF 95.90' PI= 21+30.00 I N=408406 E=2310027 80 EL = 59.75' EL.= 59.55' 80 VL = aO' K = 227 PROPS At®GE E _EXIS—\ C, BP,DGE T EE R E7��J MI�f5""6'-,IVED 70 (+)Q.6R80x „ (-1Qe5o oz 70 = 60 . • ��e. 60 o 41 EXCAVATE TO APPROX. EX VATE TO APPROX. 50-en NG EL.AT CL=57.3' -6,, EST.840 CY I V 1 s—NG EL.AT CL=57.3' EST 700 CY f» 50 CL II RIP RAP / I :L II RI RAP ot TO TOP OF BERM BERM TO OF BM y0 1.5:1 NORMAL I .5:1 N RMAL z CUT EXISTING CUT EXIST �CD VERTICAL ABUTMENT VERTCAL UTMENT �+0x 40 TO EL.=57.3' TO EL.=573' 40 er�w vry -a-16 *cc* NWS=56.3 eL >..� FOR —L— PLAN VIEW SEE SHEETS 4 & 5 �,w 30 30 ... 20 21 22 23 24 25 26 27 28 29 30 31 32 33 '00 0 0 5 10 PROJ.REFERENCE NO. SHEET NO. N �i — B-5639 X-3 150 140 130 1:0 110 100 90 80 TO 60 50 40 30 20 1D 0 1D 20 30 40 50 60 70 80 90 100 1"0 120 1�0 140 150 RD Ro PERMIT DRAWING E SHEET 15 OF 17 0.020 0.020 TO 67.96 L o.023 0.024 DATE: 04-08-2021 y. // \ ?'7 ?'7 — L ....„ 60 60 — FINAL GRADING — — 21450.00 . .50 c o 8o z z E I- 3 _ 11 SITE 1 0.020 0.020 �c�.► ILL IN WETLAND TO FILL IN WETLAND ► — — 67,96 - _ DOD O.VU _ _ \\ Fi/) FINAL GRADING — — — — — — — — — _ — — — 21 +00.00 50 CI — 80 z SITE 2 g 3 W % 70 0.020 0.020 0.02� 0 020—► � -FILL IN WETLAND FILL IN WETLAND 1"� - - 6809 - _ SITE 1 \ // \ 2-1 ?y 60 _ _ _ _ FINALGRADING� �� - - - - - - - - - - - - — 20 +50.00 50 80 0 z it. 0.020 0 020 Q s 79 —�.020 68,10 y / ----- 'I— \ 21 ?.7 199 20 I 00.00 FWM C:RAIIINC; -- — _ 50 Ro _ 0.020 bs.11 0.020 _ —T0.020 70 \\ 60 19 +50.00 *n" — - - - FINAL GRADING wow M-� 5n ,0a �E9z CDCDC -L - ** 150 140 170 1:0 1"0 100 9I0 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 1/0 1.0 140 150 C0 0 5 10 —PROJ.REFERENCE NO. SHEET NO. N �i B-5639 X-5 150 140 150 1:0 110 100 90 80 70 60 50 40 30 20 1D 0 1D 20 30 40 50 60 70 80 90 1 0 1'10 170 1i0 140 150 PERMIT DRAWING SHEET 16 OF 17 DATE: 04-08-2021 •• a :,9 _ z o SITE 4 7 3 g SITE 5 1 0.020 0.020 E 3 FIB IN WETLAND FILL IN WETLAND ,�01 e736 _ 0.006 0.007 2 6 +00.00 FINAL GRADING- I 50 1 — . 80 C o z g I- W 3 3 70 0.020 0.020 E FILL IN WETLAND L'1 �_� — 67,58 0.029 0.030 _ il i60 _ — / FINAL GRADING — 25 +50.00 — 50 — 80 0 0 • . z$__ I- 3 79 0.020 0.020 -• 67.81 0,040 0.040 / / \ 3:7 ft 25+ 00.00 -FINAL GRADIFIG — — — — \ _ 5(J • Rn 0 z g_ ,� SITE 4 g -3 0.020 0.020 L 3 3 70 i FILL IN WETLAND / �, es.os \1 0.020 0.020 �o - - - - - - - �/ -FINAL GRADING— - - - - � - - - - - - - - - - - - 24 +50.00 ... N END BRIDGE —L— 24 +41.25 END BRIDGE —L_DET— 19 + 61.04 50 .., _L -5- 55= ** 150 140 1-0 1:0 10 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 710 80 90 1 0 1"0 1:0 1y0 100 150 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design ' ' (ac) _ (ac) _ (ac) _ (ac) _ (ac) (ac) _ (ac) _ (ft) _ (ft) (ft) 1 I 19+50 to 19+86-L-RT ROADWAY FILL < 0.01 20+11 to 21+09-L-RT ROADWAY FILL < 0.01 14+62 to 16+65-LDET-RT ROADWAY FILL 0.08 0.02 17+22 to 17+38-LDET-RT ROADWAY FILL < 0.01 2 20+21 to 22+85-L-LT ROADWAY FILL 0.02 0.06 3 22+85 to 24+25-L- 170' BRIDGE * < 0.01 < 0.01 0.13 99 17+46 to 19+61-LDET- 170' DETOUR BRIDGE < 0.01 < 0.01 < 0.01 27 4 24+22 to 25+34-L-LT ROADWAY FILL < 0.01 0.02 26+01 to 27+49-L-LT ROADWAY FILL 0.03 0.03 5 , 25+81 to 27+17-L-RT ROADWAY FILL 0.02 19+61 to 26+42-LDET-RT ROADWAY FILL 0.19 < 0.01 0.08 TOTALS*: 0.07 0.27 < 0.01 0.11 0.10 I 0.14 0 126 0 *Rounded totals are sum of actual impacts NOTES: * Site 3 Interior Piers are 2(8- 14x73 (14.6in x13.6in)) =2(8 (198.6 sq in)) =2(1588.8 sq in)= 22 sq ft(0.0005 ac) NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04-08-2021 DUPLIN COUNTY B-5639 45594.1.1 Revised 2018 Feb SHEET 17 OF 17