Loading...
HomeMy WebLinkAboutU-5204 (4)Beverly Eaves Perdue Governor ��� ����� NCDENR North Carolina Department of Environment and Division of Water Quality Charles Waklid, P E Director December 12, 2012 Mr Michael Pettyjohn, P E D�vision 11 Engmeer N C Department of Transportation Post Office Box 250 North Wilkesboro, North Carolma 28659 /�r.� `,9�;'��� , � ��a. Natural Reso�,rce�s��C � � r �;�t�� `w�� �4� � �� � p ,��� ,�� N`��� ir � � �,� ��ee Freeman '�,�eRSecretary `yCy Sub�ect Inspection NCSR 1764 (New Fann Road) TIP No U-5204 Caldwell County Dear Mr Pettyjohn On November 28, 2012, I mspected the new construct�on pro�ect on NCSR 1764 (New Farm Road), T1P No U-5204, in Caldwell County Construction activities uiclude heavy gradmg and bridge construction activrties Please ensure that all sediment and erosion control structures are mamtamed and seedmg and mulchmg are performed as required to protect State surface waters Also, please refer to the attached inspection report for any specific rtems noted dur�ng the mspections If you have quest�ons, please call me at 828-296-4500 Smcerely, c�J�/ � � Michael R Parker Environmental Senior Special�st Attachment cc David Pomdexter, PE Heath Slaughter, Drvision 11, DEO Neal Trivette, Roadside Environmental Transportation Permittmg Unit Mike Parker, Asheville Regional Office TIP No U-5204 November 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Ashevtlle Regional Office 2090 U S 70 Highway Swannanoa NC 28778-8211 Phone 828 296-45001 FAX 828 299 7043 Internet www ncwaterqualitv orq An Equal Opportunity 1 AKrmahve Action Employer NorthCarolina ,l�il�'fll�'/,���1/ � Site Number: WT000423 Site Name: NCSR 1764 U-5204 Site Address: County: Caldwell Directions: Latitude: Site Owner Name: NCDOT Division 11 Inspection Date: 11/28/12 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Site Inspection Report Facility compliance Status: � Compliant Program Area: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) fl Not Compliant Inspection Summary: Inspected stream crossings and sediment and erosion control structures. No sediment was observed downstream of the project. Heavy grading and bridge construction was underway on the project. Continue to maintain sediment and erosion control measures. Seed and mulch bare areas as required. Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: - Phone: Phone: 828-296-4500 Yes No NA NE ■nnn ■nnn ■nnn Page: 1 Region: Asheville Longitude: