Loading...
HomeMy WebLinkAboutWQ0032571_Regional Office Historical File Pre 20184 Nlichael F. Easley, Governor WiHiam (3. Ross Jr., Secretary North Carolina Department of Environment and :Natural Resources January 10, 2008 Mr, Wilmer Melton, Dir. Of Public Works City of Kannapolis 1401 Bethpage Road Kannapolis, NC 28081 Coleenli, Sullins, Director Division of Water Quality 1.1 - Subject: Permit No, VVQ0032571 South Village Phase 1 Infrastructure Wastewater Collection System Extension Cabarrus County, North Carolina Dear Mr Melton In accordance with your application received on December 20, 2007, we are forwarding herewith Permit No. WQ0032571, dated January 10, 2008, to the City of Kannapolis for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Ave.„ .Suite 301 Mooresville, NC 28115 inter -net: univvitncmwaterqualityorg Customer Service: 1-877-623-6748 An Equal OpportunitylAffinnative Action Employer -50',4 Recycled/10% Posl Consumer Paper Phone: (704) 663-1699 Eav (704) 663-6040 one No Carolina Mr, Mellon Page:2 January 10, 2008 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Kannapolis for the construction and operation of approximately 4,278 linear feet of 8-inch gravity sewer and the discharge of 45,360 gallons per day of collected domestic wastewater into the City of Kannapolis existing sewerage system and the Water and Sewer Authority of Cabarrus County existing sewer system, pursuant to the application received December 20, 2007, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County WVVIP (Rocky River NPDES No. NC0036269) prior to being discharged into the receiving stream, If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit, This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714 Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699, Sincere y, r Coleen H. Suilins cc: Mooresville Regional Office, Collection System Permit File Thomas Bach, WSACC Todd M. Gingerich, LandDesign, Inc, Surface Water Protection Central Files Tom Asenzo, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .040a a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 4. This, permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may 1pe appropriate. The approval of this request shall be considered on its merits and may or may not be approved. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2T ,0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities, 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H ,0500. 11 Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility, Voice moil messages or faxed information is permissible, but shall not be considered as the initial verbal report, Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300, Persons reporting any of the above occurrences shall file a .spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence, This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form - (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the t 0th day of January 2008. JOFTH CAROLINA ENVIRONMENTAL MANAGE ENT COM COMMISSION Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Inag en ent Commission 'r°rrrttNuru br° V+t007 Fast Track Engineering Certification Permit No. W00032571 January 10, 2008 OwnerANQCS PE Wilmer Melton, Dir, Of PW Todd Gingench City of Kannapolis LandDesign, Inc 1401 Bethpage Rd 223 North Graham St, Kannapolis, NC 28081 Charlotte, NC 28202 VWVTP/WQCS Thomas Bach, Util. Sys. Eng. WSACC PO Box 428 Concord, NC 28026 Complete and submit this form to the permit issuing regional office with the following • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater coection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-com hence with this ermi e ulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION 11 Partial Elj Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (LI periodically, 11 weekly, El full time) the construction of South Village Phase 1 Infrastructure, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, FAV-TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! 1. Owner: la. Cty of Kannapohs Application Number: (to be completed by DWQ) Full Legal Name (company, municipality, HOA, utility, etc.) 0 lb. Wilmer Melton Ill, Director of Public Works Signing Official Name and Title (Please review 15A NCAC 02T ,0106(b) for authorized signing officials!) lc. The legal entity who will own this system is: CC 0 Individual 0 Federal 4 Municipality State/County 0 Private Partnership El Corporation 0 Other (specify): 0 ld. 1401 Bethpage Road le. Kannapolis LL Mailing Address City if. NC lg. 28081 0 lh. 704-920-4200 li. 704-920-4244 1j. wmeItonecLkannapolis.nc.us 11-- < Telephone Facsimile E-mail (..) 2, Project (Facility) Information: ...I 2a. South Village Phase 1 Infrastructure 2b, Cabarrus Ci. Brief Project Name (permit will refer to this name) County Where Project is Located State Zip Code a. < 3. Contact Person: 3a. Todd Gingerich LandDesign, Inc 0 0 z u_ ai Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 704-376-7777 3c, tgingerich landdesign.com Phone Number 1. Project is New 0 Modification (of an existing permit) If Modification, Permit No,: For modifications, attach a separate sheet clearly explaining the reason for the modification (Le. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in :(7) and B(10-11) that has already been included in the original permit. 2. Owner is Public (skip to Item B(3)) D Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must chooseone) 0 Retaining Ownership (i.e. store, church, single office, etc.) or O Leasing units (lots, townhomes, etc, - skip to Item 8(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) Wate & Sewer Authori Cabarrus Coun Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. Rocky River Regional Wastewater Treatment Plant 4b. NC0036269 Name of WWTF WWTF Permit No. 5a. City of Kannapolis 6b. 15 Gravity Owner of Downstream Sewer 'Receiving Sewer Size LJ Force Maini Permit Number of Downstream Sewer (if known _ 6. The origin of this wastewater is (check all that apply): O Public Utility (instruction III) 0 Homeowner Assoc./Developer (Instruction IV Residential Subdivision 0 Apartments/Condominiums 0 Mobile Home Park 0 School 0 Restaurant Office El Car Wash D Institution 0 Hospital 0 Church O Nursing Home O Other (specify): % Domestic/Commercial 'X) Industrial °,/,, Other (specify): 7. Volume of wastewater to be allocated for this particular project: 45,360 gallons per day *Do not include previously permitted allocations 8. If the permitted flow is zero, indicate why: 0 Interceptor Line - Flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit No, Rehabilitation or replacement of existing sewer with no new flow expected FTA 02/01 - Rex. 1 avns AST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAJNS PAGE 4 0 8. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 02T .0114(c) for Rem B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC must be supported with actual water or wastewater use data in accordance with 15A NCAC. 2 BDR UNITS - 84 x 240 gpd = 20,160 gpd 3 BDR UNITS - 70 x 360 gpd = 25,200 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) Gravity or Force Main use the pull down menu) , 4278 8 Gravity ENTER TOTAL LINE LENGTH IN MILES 0.81 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID Power Reliability Option (self chosen - as shown on Design Flow Operational Point (1- dual line feed; 2- permanent generator w/ATS; 3- plans for cross-reference) (MGD) GPM ? TDH portable generator w/telemetry; 4-wet well storage) 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 02T as applicable? Yes D No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? 0 Yes El No N/A Sedimentation and Erosion Control Plan? Yes 0 No 0 N/A Stormwater? 14. Does this project involve aerial lines or siphons? Check if yes:'n . „ Yes ENo CD N/A FT A CP/03 - Rev 3 (14/115 FA, -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS oes this project have gravity sewer lines designed at minimum slopes? ., ware that the Division will not accept installed (fines more than t a /a+ fiatier than the mtnimur d prior to submitting the final engineering certification slta Ines installed outsi this toter PAGE hould be 02103 - Rear. 3 /0 FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 6 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 , (FAST -TRACK SEWER SYSTEMS)* to collect and record the stream classification data below (attach additional sheets as , necessary), This document is available from our web site or by contacting the appropriate Division of Water Quality z regional office (see instructions for addresses) OR indicate the following: 0 --, 0 A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope I- waterbody; AND, oCE 0 A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on Name of Waterbody Stream Waterbody map for cross-reference) Waterbody County River Basin Index Classification Afton Run Afton Run Creek Cabarrus Yadkin 13-17-6-6 "C" CC Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certification: 1, Wilmer Melton, Ill, Dir Public Works, attest that this application for South Village - Phase 1 infrastructure has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215,6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, 1 a, Signing Official Signature (f) 2. Professional Engineer's Certification: z Date I attest that this application for South Village - Phase 1 Infrastructure has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that have reviewed this material and have judged it to be consistent with the proposed design.: Note: In accordance with NC General Statutes 143-215.6A and 143-215,68, any person who knowingly makes any false i statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Todd M. Gingerich, PE Professional Engineer Name 2b, LandDesign, Inc A R q Engineering Firm 2c, 223 North Graham St Mailing Address 2d. Charlotte t ,:-• Date te 2e. NC 2f, 28202 City State Zip 29. 704-376-7777 2h. 704-376-8235 ". tgingerich@landdesign,com Telephone Facsimile E-mail Sea, Sgnat:re8: HA 02/03 - Rev. 3 04/05 North Carolina Research Campus South %/Wage Phase I Infras-tructure Castle and Croke North Carolina, LLC, Kannapolis, North Carol=na USGS Topographic Map 1 N fl,kfte Cntrornik, 2O,0O 8a411177e F MA1,,AT% Program ate my Non -discharge Permit Type Status Project Type In review New Project 'er i an Permit CIasera atrcrn Gravity Sewer Extension Pump Stations, Pressure Sewer A Individual, Extensions Primary Reviewer dee.browder Permitted no 45360 Facility Nam South Villas Phase Infrastructure LocationAd( Owner Marne City of t annapolis P rrrrtt Contact t li Lion Major Minor Fac lemur y Conta Region Mooresville County Cabarrus t Owner Type Government - Iuniaipa1 n Owner Affiliation Wilmer Melton, II1- DIR PUBLIC WORKS PO Sox 1199 fannapalis NC 201 119 chedrled Or lsue App Received a I Uan e Public Notice I sue Effective Expira n 01/1010 12/2+ 1) 01f10/0 01/10/08 e a Ia tel Antl hies divislon Outfrr body Name ail ued/ teed Events ddidlnr al informs eque strxd ,rid itirarn Stream Index Number Current Class crtabasin ALCM C `HA ': .LOR D OUND.'; IT C&C North Carolina Residential LLC 226 Oak Avenue PO BOX 28, Kannapolis, NC 28082 TO ERE T T C : NOLOGY MICR Gb'I INT/NCa"kit"TNT R Rc 0• "N6 a d i A' ='MA_ (Kt^CRd1� ank"ofAme/ a'" Delcalb County Atlanta, Georgia R HUNDRE©`EIGHT ? AND;NO/100 DOLLARS *,"* N DEPT OF ENVIRONMENT NMENT AND NATURAL RESOURCES 64-`f 7 61 DATE CHECK NO. AMOUNT 1/ 7/0 ` 080017 `480,00* 008001,70 I:06 ,1 / 1 2 788i: '?329 80 2911' KANNA O S December 1 , 2007 NC Div of Environmental Management Department of Environment and Natural Resources Division of 'aQuality 610 East Center Drive, Suite 301 Mooresville, North Carolina 28115 Re: South Village Phase 1 - Sewer Extension City of Kannapolis - Cabarrus County Dear Sir or Madam: 05501-42-013 Please find attached for your review. and approval the original and one copy of the permit application and a check for S480.00 for the processing fee for the above reference project, Also enclosed is the Clow acceptance letter from the Water & Sewer Authority of Cabarrus County stating they will accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant. The Water and Sewer Authority of Cabarrus County Standard Specifications for Waste water Collections Systems were approved by your office and are being maintained by the Division of Environmental. Management. This project will be installed in accordance with these Standard Specifications, Please call me at 704-938-1519 if you have any qu Sincerely,. Stephen ;l. Eissinger, PE Assistant City Engineer 05501-42-01? South Village ph 1 sewer permit letter,doc DEC 20 2007 APO Pick r. y Engineer PC). Box 124) Kai F K t N N 1 1' d.) F 1 5 F 704 938,08 10 ACC ATER & SEWER AUTHORITY OF CABARRUS COUNTY December 12, 2007 Mr. Michael Legg City Manager City of Kannapolis P.O. Box 1199 Kannapolis, NC 28082-1199 Subject: Flow Acceptance Request South Village Phase 1 Sewer Extension °face: .232 Davidson Hwy. Concord, NC 28027 tali to: P.O. Box 428 Concord, NC 28026-0428 Phone:704,786.1783 Fax: 704,795,1564 Dear Mr. Legg: This is in response to the City's request for flow acceptance received December 6, 2007. The Water and Sewer Authority of Cabarrus County (WSACC) has or currently expects to be able to make available capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the wastewater from the proposed South Village Phase 1 Sewer Extension project along Loop Road between Vance Street and F Street in downtown Kannapolis. The wastewater generated by this project will be conveyed through the City of Kannapolis' existing and proposed gravity system, and then enter WSACC's system at the existing 42-inch Irish Buffalo Creek Interceptor. WSACC agrees to accept wastewater from the proposed residential development, which will include 154 single family residential lots. This is based on the information provided by Land Design, Inc. (Engineer for the Project) using North Carolina Department of Environment and. Natural Resources (NCDENR) wastewater flow guidelines. The projected flow is 45,360 gpd; however WSACC expects the actual wastewater flow to more closely approximate 26,880 gpd based upon Master Plan engineering data. By requesting flow acceptance, the City of Kannapolis acknowledges that WSACC may need to upgrade, expand, or construct new facilities to accommodate the increased flow volume granted by this and previous flow acceptance. Appropriate design and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or control. Based upon flow of 4.5,360 gpd and cost of $8.126/gpd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of S368,595. For your information and based upon NCDENR wastewater flow guidelines, WSACC has approved 3,434,748 gallons of flow acceptance for the City ofKannapolis from 1992 to present and 528,721 gallons of flow acceptance year-to-date including this request. Based upon the approved flow acceptances, WSACC has committed capacity valued in excess of $27„910,762 for the City of Kannapolis since 1992 including $528,721 for this calendar year. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing 'bodies, regulatory approval, and funding availability. At this time there are no scheduled upgrades to WSACC facilities in the current six year Capital Improvement Program (CIP) of Kannp°lis outh Village Phase December 12, 2007 Page 2 of 2 Sewer Et, that are located do nstream oaf this proposed project. It should be noted that the list and schedule of CIP projects are tentative d are revised periodically to reflect changing conditions and needs. Please note that if construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when construction of this project is initiated, If you have any questions, please call me at 704-786-1783. incerely, Thomas A. Bach, P.E. Utility Systems Engineer cc; WSACC Engineering Staff Jeff Moody, P.EI ann polis City Engineer Wilmer MeltornKannapolis Todd Gingrich, RE/Land Design, lie.