Loading...
HomeMy WebLinkAboutWQ0031081_Regional Office Historical File Pre 2018Michael F. Easley., Governor William G. Ross Jr,, Seeretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, RE, .Direetor Division of Water Quality January 3, 2007 Mr, Carl Palmer, Town Administrator Town of Harrisburg 4100 Main Street Harrisburg, NC 28075 Subject: Permit No, WQ0031081 Abbington Subdivision Phase 4 Town of Harrisburg Wastewater Collection System Extension Cabarrus County, North Carolina Dear Mr, Palmer, In accordance with your application received on December 12, 2006, we are forwarding herewith Permit No. WQ0031081, dated January 3, 2007, to the Town of Harrisburg for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein, Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, Mooresville Regional Office 610 East Center Ave., Suite 301 .Moores vil le-, NC 28115 Internet, www.ncrnwaterquality,org Customer Service, I-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Phone: (704) 663-1699 Fax: (704) 663-6040 . .one. .NovhCarolin.a ,Vatunilly !Irirr*Mr. Farmer Page 2 January 3, 2007 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Harrisburg for the construction and operation of approximately 5,353 linear feet of 8-inch gravity sewer and the discharge of 18,360 gallons per day of collected domestic wastewater into the Water and Sewer Authority of Cabarrus County existing sewerage system, pursuant to the application received December 12, 2006, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River WWTP (NPDES No. NC0036269) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. Sincerely, for• Alan W. Klimek, P.E. cc: Mooresville Regional Office, Collection System Permit File Tim Foley, Latham -Walters Engineering, Inc. Surface Water Protection Central Files Tom Asenzo, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1, This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable: and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data 3, The wastewater collection facilities shall be properly maintained and operated at all times, The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L ,0200 or the surface water standards in 15A NCAC 2B 0200, b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented, d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year, g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6, Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form, A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T, the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable: the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities, 10 The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B ,0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCGO10000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H ,0500, 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc,; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 55-0or (919) '733-3300, Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS -SS (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the proiem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 3rd day of January, 2007, NORTH CAROLINA ENVIRONMENTALMENT OMI #ISSION r Alan VV. Riimek, P.,, Director Division of Water Quality By Authority of the Environmental anageManagement Commission Perm Nu ber WQ0031081 Fast Track Engineering Certification Permit No. WQ0031081 January 3, 2007 Carl Parmer, Town Administrator Town of Harrisburg 4100 Main Street Harrisburg, NC 28075 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION Partial Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (El periodically, E] weekly, El full time) the construction of Abbington Subdivision Phase 4, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T, the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1995 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAS- TKACK APPLICATION for AtAVITY SEWERS, PUMPSTATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO F(FLD Owner: 1 Town of Harrisburg Full Legal Name (company, municipality, HOA, utility, et • lb. CartParmer, Town Administrator O Signing Official Name and Title (Please review 15A NCAC 2H ,0206(b) for authorized signing officialsI) - lc. The legal entity who will own this system is: ICC 0 Individual 0 Federal Municipality 0 State/County 0 Private Partnership Ej Corporation 0 Other (specify): CCld 4100yain Street O Mailing Address LL Application Number: (to be cornplet4+ by DWQ • If, NC _ State O 1h, 704-455-5614 11. 704-4551205 1j, 4:( 'Telephone FacsimileE-mail (,) 2, Project (Facility) information O. - 2a, Abbington Subdivision Phase 4 a. Brief Project Name (permit will refer to this name) O 3. Contact Person. 1 e Harrisbulg_ City lg, 28075 Zip Code Cabarrus County Where Project is Located <4. 3a. Timothy a Foley,P E. Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 704-895-8484 3c tmwe99@bellsouthnet Phone Number E-mail z 0 re 0 z Ce w CL 1 Project is Ej New 0 Modification (of an existing permit) If Modification, Permit No,: For modifications, attach a separate sheet dearly explaining the reason for the modification (Le. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(1O-11) that has already been included in the original permit. 2. Owner is El Public (skip to Item B(3)) 0 Private (go to Item 2(a)) 2a, If private, applicant will be: 2b. If sold, facilities owned by a (must hoose one) EJ Retaining Ownership (i,e, store, church, single office, etc) or 0 Leasing units (lots, townhomes: etc, - skip to Item B(3)) Ej Selling units (lots, townhomes, etc - go to Item 8(21,)) 13 Public Utility (Instruction III) Ej Homeowner Assoc./Developer (Instruction IV) WaterandSewer Authority of Cabarrus County__ Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a, Rocky River Regional Wastewater Treatment Plan 4b, NC 0036269 Name of WVVTF WWTF Permit No, 5a, Town of Harrisburg _ _ 5b8" Gravity 5c, Owner of Downstream Sewer Receiving Sewer Size El Force Main Permit Number of Downstream Sewer (if known) 6, The origin of this wastewater is (check all that apply): Residential Subdivision 0 Car Wash El Apartments/Condominiums 0 Institution 0 Mobile Home Park Ej Hospital Ca EI Schad 0 Church El Restaurant 0 Nursing Horne 0 Office 0 Other (specify): 100 % Domestic/Commercial % Industrial % Other (specify): 7 Volume of wastewater to be a located for this particular project 18360 gallons per day *Do not include previously permitted allocations 8, if the permitted flow is zero, indicate why 0 Interceptor Line - Flow will be permitted in subsequent permits that connect to this line 01 Flow has already been allocated in Permit No, D Rehabilitation or replacement of existing sewer with no new flow expected FAST-TRACI{ APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AN FORCE MAINS PAGE 4 9, Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H 0219(1)(3) 51 houses @ 360 gpd = 18,360 god 10, Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8 Length (feet) 5353,66 a ENTER TOTAL LINE LENGTH IN MILES 1.014 0 11, Summary of Pump Stations to be Permitted (attach additional sheets as necessary) z 0 2 0 u.. th Location ID (self chosen - as shown on plans for cross-reference) Design Flow Operational Point (MGD) GPM @ TDH Gravity or Force Main (use the pull down menu) Gravity Power Reliability Option (1- dual line feed; 2- permanent generator w/ATS; 3- portable generator wltelemetry; 4-wet well storage) 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H ,0200 as applicable? El Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13, Have the following permits/certifications -en submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? Yes El No El N/A Sedimentation and Erosion Control Plan? Yes El No Li N/A Stormwater? Yes 0 No El N/A 14 Does this project involve aerial lines or siphons? 0 These lines will be considered high priority and must be checked once every six months FAST -TRACK APPLICATION GRAVITY SEWERS, PUMP STATIONS, AND FORCE AINS PAGE 5 rIi z 0 1. Use the Division's guidance document entitled, ""DETERMINING STREAM CLAS IFICA'I'1ONS FOR FORM F`i'A 02103 (FAST -TRACK SEWER SYSTEMS)" to attent and record the stream ssiication data below (attach additional sheets as. necessary). This document is available from our v+ b site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) Q$ indicate the following: 0 A Stream Classification is not needed because all parts of tie project are at least 100 feet away from any down slope waterbody; , 0 A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map leen chosen - as shown on Name of `V a+tsrrbody Smarm Wei eerbody map for cr©wreferencel Waterbody County River Basin Index Classification Site A UT to Fuda Creek Cabarrus Yadkin 13-17-7-1 C Submit the 8.5" x 1"t" COLOR toprr++graphtc map as t°sr ulred to t regardless of whether a classification is provided! Applicant's Certification: I, Cart Parmer, attest that this application for Abbingfon Subdivision Phase 4 has been reviewed by me and is accurate and complete to the beset of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included this application package is subject to being returned as incomplete, Note' In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who know npty makes any false statement, representation, or certification in any application shall be guy of a Class 2 misdemeanor which may include a fine not to exceed $10, 000 as welt as civil penalties up to $25, 000 per viola 2. Professi •e1E-v•v%•ii mature Engineers Certification: I attest that this application for Abtingtan Subrkvisirsra ilaase 4 has beers reviawi by me and is accurate, complete and consistent with the krformallon In the engirread�Mans, c�a Arad : " supporting documentation n to the best of my knowledge, I further attest that to the best oairy knowl the pr ra ed ra sign has been prepared In accordance with the applicable regulations, Gravity Sewer Minimum Desna Criteria for Graty Sewers adopted February 12. 1996, and the Minimum Design Criteria for the Fast -Truer Permitting of Pump Stations and Force Mains adopted June 1, 200 and the watershed classification in accordance with Division guidance, Although certain portions of this submittal package may have been developed by other processionals, inclusion of Mese materials under my signature and seal signifies that I have mviewed this material and have judged it to be consistent with the proposed design Note: In acconrtarrae with NC General Statutes 143-215.6A and 143-216 68, any person lift knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may indtxie a fine root to exceed f 10,000 as well as civil penalties up to $25,000 per violation. 2d. Huntersville City 2g 704-895.8484 2h. 704-89 Telephone Facsimile 2e. NC Sta all 2f. 28078 ZiP bellsouthnet November 7, 2006 Mrs. Sonja Basinger Division of Water Quality 919 North Main Street Mooresville, North Carolina 28115 Subject; Abbington Subdivision, Phase 4 Sanitary Sewer System Extension Harrisburg, North Carolina Dear Mrs, Basinger: We are enclosing per your requirements, the original and one (1) copy of the Fast -Track Application for Gravity Sewers, Pump Stations and Force Mains. Also included are two (2) copies of the flow acceptance letter from the Water and Sewer Authority of Cabarrus County (WSACC) agreeing to transport and treat the wastewater. A check for $400 has been provided for the application fee. If you have any questions concerning this project, please feel free to contact us, Sincerely, Todd Taylor, P.E. Town Engineer Enc Cc Tim Foley, P.E., Latham -Walters Engineering '.. ). Bo's. Q P€ i }'i s` l '�.�4`,3."-_, .t.�-i i ...,� - tlsl �" b;` c leTh:. ntt WATER & SEWER AUTHORITY OF CABARRUS COUNTY Mr. Carl Parmer Town Administrator Town of Harrisburg P.O. Box. 100 Harrisburg, NC 28075 November 2, 2006 Subject: Flow Acceptance Request Abbington Subdivision Phase 4 Oitice: .212 Davici,.,,onl-hvy. Concord: NC 26027 t(L RO, Box 428 Concord, NC 28026-0428 s Phone: 704,786.1783 Fax: 704 795.1564 Dear Mr. Parmer: This is in response to the Tow request for flow acceptance received 10/5/06. The Water and Sewer Authority of Cabarrus County (WSACC) has or currently expects to be able to make available capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed Abbington Subdivision Phase 4, consisting of 51 single family residential lots. WSACC agrees to accept wastewater -from. the proposed sewer line based on informationprovided by Latham -Walters Engineering, Inc, (Civil Engineer for the project), using North Carolina Department of Environment and Natural Resources (NCDENR) wastewater flow guidelines. The projected flow is 18.,360 gpd; however WSACC expects the actual wastewater flow to more closely approximate 12,750 gpd based upon Master Plan engineering data. The Town of Harrisburg understands that separate Flow Acceptance Requests will be required for the future flows, that will connect into this sewer line. By requesting flow acceptance, the Town of Harrisburg acknowledges that WSACC, may need to upgrade, expand, or construct new facilities to accommodate the increased flow volume granted by this and previous flow acceptance. Appropriate design and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or control.. Based upon flow of 18,360 gpd and cost of $8.1.26/gpd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of $1149,193. For your information and based. upon NCDENR wastewater flow guidelines, WSACC has approved 1,548,047 gallons of flow acceptance for the Town of Harrisburg from 1992 to present and 44,510 gallons of flow acceptance year-to-date including this request. Based upon the approved flow acceptances, WSACC has committed capacity valued in excess of S12,579,430 for the Town of 'Harrisburg since 1992 including $36-1,688 for this calendar year. Downstream facilities from the proposed project are scheduled. in WSACC's current six year Capital Improvement Program (CIP) to increase available capacity. Projects on the CIP are subject to approval by WSACC's Board of Directors, support 'front local governing bodies, regulatory approval, and funding availability. The -following schedule of CIP projects is tentative and may be delayed by unforeseen circumstances: • Fuda Creek Interceptor Extension. Scheduled completion. date: 2010 Town of Harrisburg Abbw ton Subdivision Phase November 2, 2006 Page _- Since this sewer correction will be made directly o the 'SACC Fuda Creek Interceptor, WSACC must be notified 48 hours rior to connection being made. Notification is to be made to Mark Lomax 704-786-1783 ext. 31. Please note that if construction of this project is not started witl is two (2) years of the date of this approval, the approval is rescinded and a second request and approval will lie required. Please notify WSACC, in write g,'when construction of this project is initiated. If you have a y questions, please call zee at 04-7 -17 , Thomas A.. Bach, P.F Utility Systems Engineer cc: W AC ; Engineering Staff Todd Taylor, P.E./Harrisburg Tine Foley, P,EdLathaz - alters I leering RE: Abbington Phase 4 Sewer - Harrisburg, NC Subject: RE: Abbington Phase 4 Sewer - larrisburg, NC "rods: "Todd. Taylor" <TT .yior@liarrishurgNC.org> Date: Tue, 12 Dee 2006 14:41:19 -0500 To: "Dee Browder' dee ro de ne CC: "'Tim Foley"' ; i a.l e9 ,b llsoutl .net Here it is, From: Tim Foley [mailto:timlwe99ta belisouth.net] Sent: Tuesday, December 12, 2006 2:07 PM To: Dee Browder Cc: 'Todd Taylor' Subject: Abbington Phase 4 ewer - Harrisburg, NC Dee, I spoke with Todd Taylor. He was going to try to get the application signed and emailed to you this aiterr:o n. Let me know if you need anything else. Thanks. Tim Foley, P.E. Latham -Walters Engineering, Inc. 16507-A Northcross Drive Huntersville, NC 28078 Telephone 704-895-8484 Fax 704-895-8485 FastTrackApp0001.pd Content -Type: application/pdf Content -Encoding: base64 1 of 1 1 L2/2007 8: 2 AM Permit Number WQ001 081 Central Files: APS SWP 011J'2/©7 Permit Tracking Slip Program Category Non -discharge Status Project Type Active New Project Permit Type 4a-- `t frik"A Version Permit Classification Gravity Sewer (Extension, Pump Stations, & Pressure Sewer 1 00 Individual Extensions Primary Reviewer Permit Contact Affiliation dee.browder Permitted Flow 18360 Facility Facility Name Major/Minor Region Abbington Subdivision Phase 4 Minor Mooresville Location Address Owner Owner Name County Cabarrus Facility ContactAffiliation Owner Type Town of Harrisburg Government - Municipal Dates!Events prig tssue App Received Draft Initiated 12/12/06 11/08/06 Regulated Activities Subdivision Wastewater collection Gutfall NUL Scheduled Issuance Owner Affiliation Carl Parmer PC Box 100 Harrisburg NC 280750100 Public Notice Issue e r t v Additional information requested Additional information received Additional information received Additional information requested Effective 12/12/06 Expiration 12/12/06 Waterbody Name Stream Index Number Current Class Subbasin Fos%r F OF SUN U T \ w,v 0 1 46-531 NCDENR ndred� and 00 00���/:� NCDENR @OEast Center Ave S30 /\ Mooresville, NC 28115 Michael F. Ease 'y Governor William G. Ross Jr., Secretaty North Carolina Deparlment of Environment and Natural Resources Colleen Sullins, Director Division of Water Quality January 22, 2008 Carl Parrner, Town Administrator Town of Harrisburg 4 00 Main Street Harrisburg, North Carolina 28075 SUBJECT: Abbington Subdivision Phase 4 Permit No, WQ0031081 Wastewater Collection System Extension Final Engineering Certification Dear Permittee: The Division received a final engineering certification for the subject project on November 20, 2007. A full review of the certification materials may or may not be conducted: It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received a copy, please contact your consultant immediately to obtain a copy: You are receiving this letter because the Division has you listed as the responsible party, if this permitted system is no longer owned by you, please complete Form PNQCF-S as this permit is not automatically transferable: Form PNOCF-S can be downloaded from htto://h2o,enr.state:nausindpu/ndpudops,htrni#Sewer, If you have any questions concerning this document or the completion of Form PNOCF-S (if necessary), please contact Ms. Dee Browder at the letterhead address or via E-mail at dee,browdergnomail,net, Sincerely, ilRobert Krebs L 'Surface Water Protection Regional Supervisor Enclosure Cci Timothy Foley, Latham -Walters Engineering Surface Water Protection Section Central Files ceritification page only) . , NorthCarolma Naturally Pretreatment, Emergency Response and Collection Systems Unit Internet http://h2o.enr,nc,state,usindpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10°A post -consumer paper Vast Track Engineering Certification Permit No. WQ0031081 January 3, 2007 Carl Parmer, Town Administrator Town of Harrisburg 4100 Main Street Harrisburg, NC 28075 Complete and submit this form to the permit ssuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve. operating point, aye' able storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form, Perrnit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division, ENGINEER'S CERTIFICATION Ell Partial :nal VA,V.)1, as a duly registered Professional Engineer in the State of North Carolina., having been authorized to observe „periodically, 1:' weekly. Li full time) the construction of Abbington Subdivision Phase 4, a Oabarrus County project for the Permittee. hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's seal, signature, and date. SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. LATHAM-WALTERS ENGINEERING, INC. 16507-A Northeross Drive Huntersville, NC 28078 704-895-8484 phone 704-895-8485 fax iames_Iwe99@bet NCDENR - Mooresville Office Surface Water Protection 610 East Center Avenue - Suite 301 Mooresville, NC 281.15 'Cc PIES ,,DATE RV AR ION Phase, 4 S-S. As-1 uilts En (Final) LETTER OF TRANSMITTAL 'DATE: 11/20f20O7154B NO: 2006.18 RE: Abbington - Phase 4 anything else, please let me know, COPY TO File uED SIGNED):