Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0029986_Regional Office Historical File Pre 2018
Michael F. Easley, Governor William G. Ross Jr„ Secretary North Carolina Department of Environment and Natural 'Resources \Ian \V PI, Director i011 Of Water Quality March 16, 2006 Mr, Wilmer Melton, Director of Public Works City of Kannapolis 1401 Bethpage Rd. Kannapolis, NC 28081 Subject, Permit No WQ0029986 The Farm at River Point, Phase 4 City of Kannapolis Wastewater Collection System Extension Cabarrus County, North Carolina Dear Mr, Melton. In accordance with your application received on February 21, 2006, we are forwarding herewith Permit No. WQ0029986, dated March 16, 2006, to the City of Kannapolis for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein, This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference, Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee, Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12. 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, pith Carol i na Mooresville Regional Office 610 East Center Ave_, Suite 301 Mooresville, Ni. 2.81 I 5 Phone: (704) 663,-1699 Fax (704) 663-6040 Internet h2o.enr,state,nc,us Customer Service; 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycle4110% Post Consun-Fer Paper Mr, Wilmer Melton Page 2 March 16, 2006 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Kannapolis for the construction and operation of approximately 7,151 linear feet of 8-inch gravity sewer as part of The Farm at River Point, Phase 4 project, and the discharge of 65,520 gallons per day of collected domestic wastewater into the Water and Sewer Authority of Cabarrus County existing sewerage system, pursuant to the application received February 21, 2006, and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County WWTP (Rocky River Regional NPDES No. NC0036269) prior to being discharged into the receiving stream, If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. Sincerely, 7 / / r Alarr'W. Klimek, P.E. cc. Mooresville Regional Office, Surface Water Protection (WWTP Permit No, NC0036269) Daniel Latta, Stantec Consulting Services Inc. Surface Water Protection Central Files Marie Doklovic, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein, 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data, The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H ,0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H 0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200, b. A map of the sewer system shall be developed and shall be actively maintained, e. An operation and rnaintenance plan shall be developed and implemented, d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year), Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215,1C, 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC 2H .0220, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for he life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215,6A through §143-215.6C. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities, 10L The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch, 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H 0500, 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc,; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report; Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telep`',one number ) 6 6-0 68 or () -3300 Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 16th day of March, 2006, NORTHtLIP ENVIRONMENTAL MANAGE ENT COMCOMMISSION r Alan W. klime , P.., Director Division of Water Quality By Authority of the EnvironmentalManagementn ComCommission Permit a berWQ0029986 Fast Track Engineering Certification Permit No. WQ0029986 March 16, 2006 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION Partial 1 Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, 0 weekly, 0 full time) the construction of The Farm at River Pointe, Phase 4, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 0 LL 1f. NC 1g. 28081 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: , (to be completed by DWO) : I. Owner: la. City of Kannapolis Full Legal Name (company, municipality, HOA, utility, etc.) lb. Wilmer Melton, Ill - Director of Public Works Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) lc, The legal entity who will own this system is: 0 Individual 0 Federal I4 Municipality EJ State/County 0 Private Partnership 0 Corporation 0 Other (specify): d. 1401 Bethpage Rd, le. Kannapolis z 0 Mailing Address City State Zip Code lh. 704-920-4200 1 i, 704-920-4244 1j. wmeRon@ci.kannapois.nc.us Telephone Facsimile 2. Project (Facility) Information: 0. 2a. The Farm at River Pointe, Phase 4 0. Brief Project Name (permit will refer to this name) 3. Contact Person: 3a, R, Daniel Latta, PE z 0 E-mail 2b, Cabarrus County Where Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application 3b, 704-329-0900 Phone Number 3c. dlatta©stantec.com E-mail 1. Project is l New 0 Modification (of an existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. adding another phase, changing line sizeilength, etc,). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is El Public (skip to Item B(3)) 0 Private (go to item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one 0 Retaining Ownership (i.e. store, church, single office, etc.) or 0 Leasing units (lots, townhomes, etc. - skip to Item B(3)) 0 Selling units (lots, townhomes, etc, - go to Item B(2b)) 0 Public Utility (Instruction III) 0 Homeowner Assoc./Developer (Instruction IV) 3, Water & Sewer Authorit of Cabarrus County Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. Rocky River Regional Wastewater Treatment Plant 4b, NC0036269 Name of WWTF WWTF Permit No. 5a Kfliv.0 s 5b, 1 S " Gravity 5c. iv,46, 00 i _7-) -5 7 e Owner of Downstream Sewer t r.., 19,...1 Receiving Sewer Size Force Main Permit Number of Downstream Sewer (if known) 6. The origin of this wastewater is (check all that apply): [E] Residential Subdivision 01 Apartments/Condominiums 0 Mobile Horne Park 01 School [1] Restaurant 0 Office El CarWash El Institution 0 Hospital 0 Church Li Nursing Home 11 Other (specify): j 00 % Domestic/Commercial % Industrial (1/0 Other (specify): 7 Volume of wastewater to be allocated for this particular project:V;),5-2C- gallons per day *Do not include previously permitted allocations 8. If the permitted flow is zero, indicate why: 11 Interceptor Line - Flow will be permitted in subsequent permits that connect to this line [11 Flow has already been allocated in Permit No, 0 Rehabilitation or replacement of existing sewer with no new flow expected FTA 02/03 - Rev. 3 04105 FAST -TRACK APPLWAT ON for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 z z ce 0 z u. 9, Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H ,0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(1)(3), Z.- LT A. 3 C) tx.‘ A 0.r 2. 0 10. Summary of Sewer Lines to be Permitted (attach additional sheets necessary) Size (inches) Length (feet) 8" 7,151 ENTER TOTAL LINE LENGTH IN MILES 1.35 miles . Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Gravity or Force Main (use the pull down menu) Gravity Location ID Power Reliability Option (self chosen - as shown on Design Flow Operational Point (1- dual line feed; 2- permanent generator WATS; 3- plans for cross-reference) (MGD) GPM @ TDH portable generator witelemetry; 4-wet well storage) 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force: Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? Yes No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? Yes 0 No 0 N/A Sedimentation and Erosion Control Plan? l Yes El No Er] N/A Stormwater? 01 Yes E] No N/A 14. Does this project involve aerial lines or siphons? 01 These lines will be considered high priority and must be checked once every six months FTA 02/03 - Rev. 3 04/05 FAST-J'RAC'KAPPLfCATION for GRAVITY SEWERS, PUMP STATION'S, AND FORCE N INS PAGE 5 z 0 1- z 0 1, Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following; Ej A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody, AND, LJ A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on Name of Waterbody Stream Waterbody map for cross-reference) Waterbody County River Basin Index Classification A Rocky River Cabarrus Yadkin 13-17 B UT to Rocky River Cabarrus Yadkin 13-17 la. Submit the 8,5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! Applicant's Certification: 1, Wilmer Melton, Dir, Public Works, attest that this application for PROJECT NAME has been reviewed by me and is accurate and complete to the best of my knowledge, 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or! certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signing Official Signature Professional Engineers Certification: 1- - Date I attest that this application for has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge, I further attest that to the best of rny knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance, Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that 1 have reviewed this mated al and have judged it to be consistent with the proposed design, Note; In accordance with NC General Statutes 143-215.6A and 143-215,68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, 2a. R. Daniel Latta, PE Professional Engineer Name 2b, Stantec Consulting Services In Engineering Firm 2c. 2127 Ayrsley Town Blvd., Suite 300 Mailing Address 2d. Charlotte 2e. NC 2f, 28273 City State Zip 29, .7047329-0900 2h. 704-329-0905 2i. dlatta@stantec.com Telephone Facsimile E-mail Seal, Signature & Date FLA 024 3 - Rev, 3 04/05 CORNELIUS, NC 35080-D7-TF-024 Permit Number WQ0029986 Central FTles APS SWP 03/15106 Permit Tracking Slip R00000/1 gaccusg, Status Project Type Non discharge lo review New Project hrepret Tyne Version Per/nit Classification Gravity Sewer Extens an, Pump Stations, & Pressure Sewer A individual Extensions ruircary Reviewes Permit Contact Affiliation deetrowder auccuautest giow 65520 Facility rocilay %pita The Farm at River Point, Phase 4 L.scalion Address °Mier Major/Minor Region Minor Mooresville County Cabarrus Facility Contact Affiliation Ow /ler Name City of Kannapolis Pates/vents Owner Type Government - Owner Affiliation Melvin Rape, PE PO Box 1199 Kannapolis Scheduled °flu Issue And Received s Draft initiated issuance Public Notice issue 02/21/06 Regulated Activities Additional information requested apiatitaiiii Aadaionai information received Outlet! NL Sesterherly Nurse Stream index Number NC 280811199 Effective Expiration Current Class Subbasln D.R. HORTON, INC. PERMIT ACCOUNT 1901 ASCENSION BLV©.,SUITE '100 ARLINGTON, TX 76006 (817)856«82.00 DOLLAR BANK OF AMEPICA, NA u'L006000 1:06 11 2788i:3 299 100 265o 400600 CHECK AMOUNT February 17, 2006 KANNAPOIAS 02501-65 4%. JEPL OF ENVTROmNv NC Div of Environmental Management 4,1;44 Department of Environment and Natural Resources — Division ofWater Quality 610 East Center Drive, Suite 301 Mooresville, North Carolina 28115 Re: River Pointe Sewer Extension —Phase 4 City of Kannapolis Cabarrus County Dear Sir or Madam: T.' FEB 2 Please find attached for your review and approval the original and one copy of the permit application and a check for $400.00 for the processing fee for the above reference project. Also enclosed is the flow acceptance letter from the Water & Sewer Authority of Cabarrus County stating they will accept and treat the additional wastewater at the Rocky River Regional -Wastewater Treatment Plant. The Water and Sewer Authority' of Cabarrus County Standard Specifications for Wastewater Collections Systems were approved by your office and are being maintained by the Division of Environmental Management. This project will be installed in accordance with these Standard Specifications. Please call me at 704-938-1519 if you have any questions. Sincerely, to, Stephen J. Bissinger, PE Assistant City Engineer .81,15!..f4 02501-65 Riverpointe phase 4 Sewer Permit Letterdoc Tv el:1N) CT: I T V 0 0 K A N N A I0 1, 1 S Engineering Department T 70,1,938,1519 P 704.938.6810 PA„)„ Box 1248 Kannapolis„ NC 28082-1248 120 S. Main St, Kannapolas, NC 28081 WATER & SEWER AUTHORITY OF CABARRUS COUNTY February 15, 2006 Mr. Michael. Legg City Manager City ofKannapolis PO Box 1199 Kannapolis, NC 28082-1199 Subject: Flow Acceptance The Farm @ River Pointe Subdivision — Phase 4 Sewer Extension Office: 232 Davidson Hwy. Concord, NC 28027 Mail to° P.Q. Box 428 Concord„ NC 28026-0428 Phone: 7047861783 Fax: 704.195,1564 Dear Mr. Legg: This is in response to the City's request for flow acceptance received 1/27/06. The Water and Sewer Authority of Cabarrus County (WSACC) has or currently expectsto be able to make available capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the wastewater from the proposed project. WSACC agrees to accept wastewater for the proposed River Pointe Subdivision - Phase 4 (The Farm), which will consist of 182 residential lots, This is based on the information provided by Stantec Consulting Services, Inc. (Engineer for the Project) using North Carolina Department of Environment and Natural Resources (NCDENR) wastewater flow guidelines. The projected flow is 65,.520 gpd; however WSACC expects the actual wastewater flow to more closely approximate 45,500 gpd based upon Master Plan engineering data. By requesting flow acceptance, the City of Kannapolis acknowledges that WSACC may need to upgrade, expand, or construct new facilities to accommodate the increased flow volume granted by this and previous flow acceptance. Appropriate design and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or control. Based upon flow of 65,520 gpd and cost of $8.126/g,pd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of $532,415. For your information and based upon NCDENR wastewater flow guidelines, WSACC has approved 2,687,684 gallons of flow acceptance for the City of Kannapolis from 1992 to present and 264,214 gallons of flow acceptance year-to-date including this request. Based upon the approved flow acceptances, WSACC has committed capacity valued in excess of $21,840,120 for the City of Kannapolis since 1992 including $2,179,506 for this calendar year. Downstream facilities from the proposed project are.scheduled in WSACC's current six year Capital Improvement Program (CIP) to increase available capacity. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The following schedule of CIP projects is tentative and may be delayed by unforeseen circu.msta.nces: Kings Grant Rocky River interceptor relief sewer. Scheduled completion date: 2010 city ofiUntiapolis The Farm(.T.. River Pointe Subdivision - Phase 4 February 15, 2006 Page 2 of' Please note that if construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when construction of this project is initiated, If you have any questions, please call rne at 704-786-1783. Sincerely., Evander H. Rowell, RE. Engineering Director cc: WSACC Engineering Staff Mr, Jeff Moody, P.E.,Ratmapolis City Engineer Wilmer MeltorilKannapolis R. Daniel Latta, RE./Stantec Consulting Services, Inc. Fast Track Engin�+i ri t+i C rt Ott Permit No. WQ0029966 March 16, 2006 Complete and submit form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modif(cat(ons are reaulred for any changes resulting in non-compliance with this permit. regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent In a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION Partial 1, ,�Aw+65' ft`i 51vt 15 , as a duly registered Professional Englneer in the State of North Carolina, having been authorized to observe ('periodically, D weekly, 0 full time) the construction of The Farm at River Pointe, Phase 4, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's , and date: Final 767--T7 i 7SZ MIS GU 1 75 SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. other supporting materials. North Carolina Professional Engineer's seal, signature, and date. Fast Track IEnctneertn Permit No. W000296 March 16, 2006 Complete and submit form to the permit issuing regional office with the lotlowing. • One copy of the project record drawings (plan & profile views of sewer fines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the rrd drawings ur in written summary �. Permit mgclitipativns are ret aired for any changes re uit rectaiations ar minimum des criteria. Ain nq 1jange Y+ t thisJAermit, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, It is highly recommended that this certification be sent In a manner that provides proof of receipt by the Division. ENt INEER'S CEiRTIFICATION Partial . 0 Final h 55 P. /tl NN 5 , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ( periodically, 0 weekly, 0 full time) the construction of The Farm at River Pointe, Phase 4, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1SA NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 asicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and ''( SEND THIS FORM & SUPPORTING DOCUMENTATION REQUIRED ATTACHMENTS TO' THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 61a EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Alley, Williams, Carmen 8e King, Inc. Post Office Box 1248 120 South Main Street Kannapolis, North Carolina 28082-1248 Phone 704/938-1515 Fax 704/938-6810 To: NCDENR Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 WE ARE SENDING YOU THE FOLLOWING: DATE NO. Letter of Transmittal DUSPS DUPS DFE'D-EX DOVERN;IGHT DHAND DELIVER Date: September 11, 2013 Attn: Dee Browder Job No, 02501-65 Re: The Farm @ Riverpointe Phase 4 (W00029986) DESCRIPTION Construction Record Drawings (Partial Certification) Engineer's Certification (Partial Certification) THESE ARE TRANSMI I I ED as checked below: © For approval 0 Approved as submitted 0 Resubmit copies for approval 0 For signature For your use EJ Approved as noted E Submit copies for distribution 0 As requested © Returned for corrections 0 Return corrected prints El See Remarks REMARKS cc: Wendy Patterson — Public Works rtfltrs1025O1 GerteraflO2501-65 RP Ph413 Map3 seweres built trara,s.doc other supporting materials. North Carolina Professional Engineer's seal, signature, and date: Fact Track Engineering Co t l c Lion Permit No. WQ0029986 March 16, 2008 Complete and submit t is form to the permit issuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generators) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. permit modifications are reouired for any changes resulting in non-compliance with this permit. regulations or m nimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, It is highly reco nrnended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTI9ICATt9N Partial d Final ,P6S p /4'i4§,EIVN 15 , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, 0 weekly, © Bali time) the construction of The Farm at River Pointe, Phase 4, a Cabarrus County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and 152-3511 1144 60 - 7C) 7e.- 7 "a(" 7Z-?3 SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Ailey, Williams, Carmen & King, Inc.. Post Office Box 1248 120 South Main Street Kannapolis, North Carolina 28082-1248 Phone 704/938-1515 Fax 704/938-6810 To. NCDENR Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 WE ARE SENDING YOU THE FOLLOWING: Letter of Trans rni tal ❑LISPS UPS ©FED-E,X [OVERNIGHT EIHAND DELIVER Date: November 19, 2012 Attn: Dee Browder Job No. 02501-65 Re: The Farm @ Riverpointe Phase 4 Yf 0029986) COPIES DATE NO. DESCRIPTION 1 Construction Record Drawings (Partial Certification) Phase 4 Engineer's Certification (Partial Certification) Phase 4 THESE ARE TRANSMITTED as checked be © For approval' 0 For your use [i As requested a See Remarks REMARKS © Approved as submitted C] Approved as noted Returned for corrections 0 Resubmit Submit [J Return _ copies for approval ❑ For signature copies for distribution corrected prints cc: Wendy Patterson — Public Works G:llwordltrs402501 Genera1102501-65 RP pb 4 sewer as built trans. doc