Loading...
HomeMy WebLinkAboutWQ0024119_Regional Office Historical File Pre 2018Michael F. Easley. Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, R.E„ Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality Mr. Paul Pigue, Manager ATX, LLC 605 Houston Street Richmond, Texas 77469 July 12, 2004 Subject: Permit No, WQ0024119 ATX, LLC ATX Development (Hickory Ridge Road) Wastewater Collection System Extension Cabarrus County, North Carolina Dear Mr, Pigue, In accordance with your application received on July 2, 2004, and additional information received on July 9, 2004, we are forwarding herewith Permit No. WQ0024119, dated July 12, 2004, to ATX, LLC for the construction and operation of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference, Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H ,0227 or any individual system -wide collection system permit issued to the Permittee. Also note Permit Condition 12 regarding wet well storage reliability. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1)15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. it shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 919 N. Main Street, Mooresville, NC 28115 Internet http://h2c,enr.state.no,usi Telephone (704) 663-1699 Fax (704) 663-6040 SiZA N DENR DENR Customer Service Center Telephone 1 877 623-6748 Mr, Paul Pipe Page 2 July 12, 2004 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to ATX, LLC for the construction and operation of a 50-gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms, and wet well storage; and approximately 1,170 linear feet of 2.5-inch force main to serve 320 students as part of the ATX Development (Hickory Ridge Road) project, and the discharge of 4,800 gallons per day of collected domestic wastewater into the Town of Harrisburg's existing sewerage system, pursuant to the application received July 2, 2004, and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applic.able; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Water & Sewer Authority of Cabarrus County's (WSACC) WWTP (NPDES No. NC0036269) prior to being discharged into the receiving stream, This permit shall become voidable unless the agreement between ATX, LLC, the Town of Harrisburg and WSACC for collection and final treatment of wastewater is in full force and effect. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Sonja Williams at (704) 663-1699. Sincerely, Tr-) for Alan W. Klimek, P.E. cc: Cabarrus County Health Department Mooresville Regional Office, Water Quality Section (WWTF Permit No, NC0036269) Jay Banks, McKim & Creed, PA Water Quality Central Files NDPU Files NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein, 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215,1C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5 Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shalt provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction Record Drawings," and one copy of the supporting design calculations to the Department of Environment and Natural Resources, Division of Water Quality, 919 North Main Street, Mooresville, N.C. 28115, 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8 Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable, and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C, 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10, The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 2 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (BOO) 858-0368 or (919) 733- 3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control, 12. The waters which may be impacted in the event of a power failure at the pump station permitted herein are classified as C waters. In accordance with 15A NCAC 2H .0219(h)(3), a letter of power reliability has been provided from Union Power Cooperative, and included in the application package. Additionally, sufficient storage shall be provided in the pump station wet well above the high water alarm level to hold the wastewater expected to become tributary to the pump station during maximum outage time as determined. Please be aware that selection of this power reliability option does not relieve the applicant of liability of future enforcement actions should a discharge of wastewater occur at the pump station. Permit issued this the 12th day of July, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, RE., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0024119 Fast Track Engineering Certification Permit No, WQ0024119 July 12, 2004 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are repuired for a changes resulting in non-compliance with this permit, regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION rj Partial E Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, 0 weekly, 0 full time) the construction of the ATX Development (Hickory Ridge Road), Cabarrus County project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS WATER QUALITY MOORESVILLE REGIONAL OFFICE 919 N. MAIN STREET MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineers Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Permit tt ber Program Catoctorv" Non -discharge' Permit Type Gravity Sewer Etenslon, Pump Stations, Pressure Sever Extensions Primary feviev�rer son.wiilarrrs 90 4119 Permitted Flow 4900 Faci Facility Name ATX C)eveloprnnt (Hickory Ridge Road) Location Address Owner Owner Name TX, LL Penni Tracking ii Deter/Events Ong Is App Received 077 2/04 Regulated `i Activities scheduled aced issuance+ Status P oie t Type In review New Project Version Permit Classification Individual Permit ConContact Affiliation nor Foci: 07/09 4 nor Region Mooresville; County Cabarrus y Contact Affiliation Owner Type Non -Government Owner Affiliation Paul 605 Houston St Richmond PublhL Notice SchoN Iuttal Remise Pigue, tyi n g TX ctia edhRecerv:d Events dditirrno6 urr rittrf iti ana's 77469 Expiration 07/07/04 07/ / 4 " aterbod N tme Stream Index Number Current Cta;+. subbain 1'13 (7C1;) 795-5448 Box 366 1 21V 1 Ak, t1.A. Entity Nantes state.nc.uslcorporate s/ os b/Corp.asp''04682 NC North Carolina Elaine F Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807.2225 Date: 7/9/2004 Click here to: View Document Filings Print a pre u[atd Anrtaai Re rt Fort Corporation Names Name Fite an Annual Report Name Type ATX LLC Legal Limited Liability Company Information SOSID: Status: Date Formed: Citizenship: State of Inc..:. Duration: Registered Agent Agent Name: Registered Office Address: Registered Mailing Address: Principal Office Address: Principal Mailing Address: 0725647 Current -Active 5/13/2004 Domestic NC Perpetual Blurrber Excelsior Corporate Cervi 2605 Scrible Court Raleigh NC 27615 2605 Scrible Court Raleigh NC 27615 605 Houston Street Richmond TX 77469 No Address or question olina Seer For questions or eommePnls concerning the iTorpor`ations 1 I of 1 7�`312: 't4 2M 1 PM W. EARL. COCHRAN & SON, INC. 191 Eastover Drive, SE Concord, North Carolina 28025 CONSULTING ENGINEERING William E. Cochran, Jr., RE Ms. Sonja Witliams Division of Water Quality 919 North Main Street Mooresville, North Carolina 28115 Dear Ms, Williams: June 23, 2004 Subject: Carolina International School Proposed Sanitary Sewer System Harrisburg, North Carolina Phone: (704) 782-1456 8-2709 This is a private system consisting of a pump station and force main, Harrisburg required a small storage facility to be constructed. Harrisburg will submit the Fast Track form for the storage facility. We have been asked by the engineers, McKim & Creed, to submit the information they prepared to you. We are enclosing per your requirements, two copies of the plans, onecopy of the specifications, the original and one (1) copy of the Fast- Track Application for Gravity Sewers, Pump Stations, and Force Mains. Also included are two (2) copies of a letter from the Water and Sewer Authority of Cabarrus County (owners of the Rocky River Regional Wastewater Treatment Plant) stating that they will accept the waste for treatment. We have included a check to cover the processing fee of $400 00. This fee covers the installation of the pump station and 1,170 linear feet of 2,5-inch force main. If there are any questions concerning this project, please contact Jay Banks at 704-841- 2588. W. E. Cochran, Jr., P. E. enc cc Mr. Cart L. Parmer, Town Administrator Mr. Jay Banks FAST-TRA APPLICATION for GRAVITY Pil✓�' tiTal 0i+l$ ,NII IiRG GAINS PAGE 3 THE TAB KEY TO MOVE FROM FIELD TO FIELCH r 1c The legal Individual (b) for authorized signing officiaisi) Private Partnership Id, 605 Houston St, Iie. Richmond City ,1 h. 281-341-1308 Telephone (F 2a, ATX Devel pip Brier Project Name . -Cvntiet Person: Jay Banks - McKim Name and A ;3b. 7O4-841-2586 Phone Number 2Ef1-341-1 Facsimile Creed, PA - E Project Is w.__ f_ env n_eftfic iOre wr+ edanother phase, changing line elzelleng i, etr*.). Only Include t e t rsdlfted infonnatton in this perm"ft tlpplication do not duplicate project information in R{T) and I (10-y been included in the original per 2. Owner Is Cl Public (slip to Item Prisrrite 2a. If private, applicant will be. 2b. Iby a (must choose one) Retaining -Ownership (i,e, stare, church, single off, etc.0 Public Utility (I don Ill) Z El Leasing units (lots, tovmhomes, etc. - skip to Ham BM) Homeowner Ass e . eveloper (1 ct1on IV) 0 S ISna imitt (Intl, tnwnhnm . etc. - go to Hem 8(lbl) 774S9 Zip code bank E-ma th ei CC u ondo cane Park di i nerd n�ineer n Answertuestitns A ex sting pit} ?ram*^gistst Foci tv tWW F) Traeetin Q Restaurant © Office n niur? Receiving Sewer l that apply):..._ Car Wash institution Hospital Church Q Nursing Home Other (specify). Volume of wastewater to be permitted in this project: CM) galbns per day QQ % Domestic/Commercial Industrial % Other (specify): If the permitted flow is zero, indicate why: Q Interceptor Line - Flow will be permitted is subsequent permits that connect to this line Q Flaw has already been allotted In Permit No, © Rehabilitation or replacement of existing sewer with no new flow expected LO/t70 ' d L9 t 8 P®L Q33b0 1 W'maw Eli -L -lfi ':" TACK :PP 3C A TTON far vP ! VrTY SEWERS, venurw car ON , a FORCE MAINS Q z Provide titer wastewater flow calculations n ltwm R(7) nr the derskin man fat urn nr n rmry NCAC 2H .0219(I)(1-2) must be approved prior of Water duality, Non -Discharge Permitting Unit,. with 15A NCAC 2H .02190)(3). Linder 3cporatc cover -4Za 48 he permitted flow In a5A NCAC 211 siring if kern flow,' in the apace t irw,+r- Values other than uubmittnI of this appfication. Submit a separate request to 617 Mail Service Center, Raleigh, NC 27699-1617 in 4 10,. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) _._iir7a. (Inchon) 2.5 ENTER TOTAL UNE LEN+ITIai IN MILES Oh (feet) 1170' ummary of Pump Stations to be Permitted (attach additional sl to as necessary) on ID -._.. Power Reliability Option (serf chosen - as shown national Point (1- dual line feed; 2- permanent generatorw/ATS; plans for cr ►s i,r+efarvnce �� GPM it TUH portable Wrator wltelemetrrp4-wet vier stare 12. Does the sewer system oo Mains (latest version), the Yes D No if no, please refs variance is rt'qu OF PUNS, S 3. Have t ROMP OR CAL U ATi'ON 4 wet well storage Track Permitting of Pump S ion) and 15A NCAC 2H .0200 as applicable? iteria or regulation and indicates why a PERTUIFNT g permits/certifications bar submitted for approval? Weigand/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Storrnwater? CE YItrR AP PLICAT1ON Yes ©No 0' N/A Yes 0 No 0 N/A Yes © No ©N/A LEVSi'd FAST-`I'IIACK A.TION for GRA SE ion's guidance document T-CK SEWER SYSTEMS)" to necessary). This document is available from our web s`r o n ._ canal office (see InstructionsInstructions for scfdr+assaa) OR indica A Stream Classification is not needed because all pa STATIONS, A81i FORCE MAINS PAGE 5 waterbody; NG STREAM CLASSIFICATIONS FOR FORM FTA 02r03 stream classification data below (attach additional sheets as contacting the appropriate Division of Water Quality e following; the project are at least 100 feet away from any down slope 0 A Stream Classification is not needed because the design does not depend on any pumpslope waterbody.. option for vrn station near a Class C down slP on Map shorn on ferenCe)w_.;,. Applicants Catlic+ Narns of Waterbudy. Reedy Creek County Cabarrus. River Basin Yadkin rbody 8t Index 13-17-8 COLOR topographic map as required In inrtructton of whether a classification is provided! rel""}ability Waterbody Classification C 1, Paul W, P gtirr, attest that this appficataan for ATX development — Hickory id fv d has bean reviewed by me and is accurate and complete to the best army knowledge. t understand that if alt required parts of this application are not completed and that if all required supporting documentation and attachments am not included, this application package is subject to being zetumed as incomplete, Note: In acconlance with North Carolina General Statrrhes 14.3-2f 5.6A and 143-215 : B, any person who knowingly makes any false statement representation, or cey application shill beg a Class 2 misdemeanor which may Include a fine not to exceed $10,000 aides up le $25 O O vIation. al Sig ature Prr asions1 Engineer's Certification° t attest ttaat this° application for ATX development — complete and consistent with the information in the engin to the best of my knowledge, t .further attest that to the best of rtry design ire air b pr accordance with the applicable regulations, Gravity Sewer Minimum esign Cate»a fttrGravtty Sewers adopted 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of➢ump St s and Force Mains adopted 1, 2000 and the watershed classification In accordance wttth Division guidance. Although certain portions of this submr package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that i have reviewed this material and have judged it to be consistent with the proposed design. Note. In ace rdance with NC General Statutes 143-215, 6A and 143-215, 65, any person who knowingly makes any false statement representation, or certification in any appficati©n shall be giritly of a Class 2 miter which may include a fine not to exceed $10,000 as well as civil penalties up to $25000 per violation. Professional Engineer Name 26. Moldm A Creed, PA ring Firm 2c. 2d s Road North, Suite A 2d. C 29. 704-841-2588 2h. 71 U1 1*L) 25 W 1)1)W "'Harrrshtirgs NC, 7,5 minute Tnpographicai Map O 60°3E1,000" W 000' w s0.)AgfrFR5 a WG S114 00' "O( 80°37,000' W WGS84 B0a50 TOPO Ci201110e P npo c7nJ 7— 04 15:24 MCKIM a CREED 704 841 P.07/07 To: Company: Fax #: From: Union Powe Pages: Mr. Banks, ,July 7, Aav Banks McKimtnoa - Creed 7 7 Robert Mare Fax #:704-298-0408 uding this cover sheet) In response to your request for power outage Information in the area around the Hickory Ridge Road in Cabarrus County: Union Power Cooperative's systemwide average annual electrical outage time per account for the last 5 years is as follows: 1999 = 2.77 hrs., 2000 43.78 hrs., 2001 = 1.39 hrs., 2002 = 17.18 hrs., and 2003 = 2.81 hrs.. Extreme winter storms during the years 2000 and 2002 added significantly to the outage totals for those years (40.0 hours and 14,3 hours contribution to the per account average, respectively). I regret that I am not equipped to be able to provide historical outage data that is tailored specifically to Hickory Ridge Road, However, 1 do not have any knowledge to suggest that outages in this area have been excessive or of duration that is beyond systemwide average levels. The majority of electrical outages in this area have typically been caused by tree or animal contact with our energized lines. This area is fed from our substation on Lower Rocky River Road by approximately 4 miles of three- phase overhead line. Please call me at (704) 289-3145 if you have any questions or need any additional information. Robert G. Maxwell, III Manager of Enoineerinq Moeroe Corporate OMaa • T.O. Buz 501 Oikb ira Division • P.O. Box 549 r u r.. INC 24111-10l4 FAx: poi) ±46-a4±n! NC 1412S1 l 441. . PAX;, (704) 41$ 4725 b.ter... JMA�'7WY.1'IAC w. 1_ti% ww limit:in-nu TOTAL P.07 071061 4 01:32 1ttSACC 70445512e6 Fax! r►ery5aecu WSACC WATER & SEWER AU7H0RITY OF CABARRUS COUNTY ,2 TOWNQFHARRISPL tG JU1 `J 4.1.A144 7. )C) r. u/ reflect project gene change) Mr, Cart Palmer Town Administrator Town of Harrisburg PO Box 100 H nisbtrcg, NC 28075 Subject : Flow Acceptance — NM, LLC (previous name - Carolina International Private Sewer Connection Dear Mr. Parr: PAGE €1:: This is in ose is T wn r u t far flow creep Mead 5/410 4. The 'anal information atiotl �1rze rsrs iron the owztea its order to process t m i st gars received. The Water and. Sew et Authority of Cabarrus County (WSACC l s 0t `t by expects to to make available capacity at the Rocky River Wastewater Treatment Plant and apprnpziete erceptvrs to trensport and treat the domestic wastewater from the proposed private sewer WSACC age to accept wastewater from the proposed sewer lie based on provided by .McKim & Creed (Civil Engu' met for the project) using North Carolina Department of Envirninnent and Netural Resources (NCD ) wastewater .flow guidelines. The projected flow is 8,000 gpd; however WSACC expecte the actual wastewater- flow to more closely approximate 6,400 gpd based upon Master Plan engineering data. The Teem of Harrisburg understands' that separate Flow Acceptance Requests will be required for the future flows that will connect into this sewer line, BY roguestng flow fee Town of Harrisburg ackacrwlthat WSACC may need to upgrade, expand, or enrolee new facilities to accommodate the increased flow volume granted by this and previous flaw acceptance. Appropriate desip and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or corarvl. Baud upon flaw of 8,000 gpd and cost of $8.1261; pd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of $65,008. For informal ott and based upon NaDENR wastewater flow guitiaiine WSACC has arrnroved 1.356.817 rallrrtta of flow acteenttfrilcet for the Town nf,NArrinhnri from 9�Y1 to t t'cort w aI L sJJ,JlrV gav,uL .uw a t. JVV .akncuwc �caskihr^usua iuuau�+tu5 LU. iocjuebt. abet'. upui1 I6e approved flow acceptances WSACC has committed capacity valued in excess of Sl1,0l7,368 far the Town of Harrisburg since 1992 including 61,913,835 for this calendar year. Downort a*co facilieice faun the prapo&cr3 proyoot two eriztic4ttacd n WSAGC'a CUM= Capital Improveeeere Program (CIF) to increase available capacity. Projects on the CIP are subject to / O' d L9 T b6 VOL 03 fl WADW ES : T T t t-so-1nr J C C < m ju 7 0 o G DESIGN CALCULATIONS AND SUPPORTING DOCUMENTS FOR CAROLINA INTERNATIONAL SCHOOL, PHASE 1 GRINDER PUMP STATION CABARRUS COUNTY. NC April, 2004 Design Calculations Prepared by McKim & Creed, PA 2300 Sardis Road North, Suite A Charlotte, NC 28227 &CRED Carol International School Duplex Grinder Pump Station Pump Station Design Delcolation Engineering Report 320 students x 15 gaClorss per 8 hr school daylstudent = 4,600 gallons per 8 hr school day 4,800 gallons per 8 hour school day x 24 hrrl day = 14400 gallon per day rate = gpm 14,400 gallons per day rate x 2.5 peaking factor = 30,010 gallon per day rate 36,000 gallonper day rate x 1 d11440 minutes = 25 gallons per minute w 26 gpm * elect pipe to result in less than one day of hydraulic residence time Try 2 5r die n eter .0331 Volume = Lengthr(Ares) = t1500 f0)0.036 ft2) = 495 ft3 = 3700 gallons =0.77day =18.5hrs(OK) PVC ch. 40, ..5" diameter = ,445" ID elect pump' Design Flow 9 4 to provide velocity of approximately 3 Ells Try 50 et wellDesign 50 gpm _ 3.4 Eris (OK) rage Design Flows (ADF) ADF = 10 gpm Peak Design Flows (P F) P F= 25gpm PO Tc *ADF"(1-(AtJ J PR)) per N DENR r qui errrants Where V = Volume of the w et v+ell storage between pump off and pump -on level ( ailans) To = Time between pump runs (minutes) = 20 Minutes ADF = Average Daily Flow (gallons), aPR = Slagle Pump Rate - 50 gpn 160 gallons' Cycles per Hour Where: Tf = Wet well fill time (minutes) = (V/ADF) _ 16 minutes Tr = Pump run time (minutes) _ (V/(SPR-ADF)) = 4 minutes Tc = Pump cycle time (minutes) = Tf + Tr = 20 minutes C = Cycles per hour = (Tc)/(60 minutes) = 3 cycles per hour Wet Well Sizing We WET WELL Diameter (ft) ell Control Canaan.' Ineernadonri School' Mc1€tin and Geed hgaa No. Z921-O003 1 ,6 Pump Station Top Ground Surface Infiuent,Sewer Invert High Water Alarm Lag Pump On Lead Pump On Pump(s) Off Wet Well Bottom Wet. Well Structure Bottom STORAGE DEPTH (Ft) BASED ON EFFECTIVE VOLUME 1,1 Depth (ft, ) N / A 0,00 5.50 6,00 7,00 8,90 10,00 3 Elevation (ft,) 574,00 574,00 568,50 568,00 567.00 565.10 564,00 561.00 558,33 *Design allows 3.00' from "Pump(s) Off" elevation to 'Wet Well Bottom elevation, 'Wet Well Structure Bottom" Includes 8 inch thick slab plus 2 ft concrete mass fill to provide weight required from byouancy calculations, PUrviP: T t tt t7EP'T H Pulap Selection & Delgn General Desirn Pared'titers Pumping Rate Force Main Size = Force Main Velocity= 50 gpm 2,5 inch 3.4 ftls TDH Hirt where:' Hm =Minor Losses ( P C t ssp Hv : Velocity Head Hf'=Friction tosses Hs = Static Head Equivalent Unit Length Equmvulu+st PS Suction Fittiiincts Sudden contraction PS 5lispha ud Check Valve Gate valve 157 Tee Run FM Rising 2.57 PVC 2." 90 Bend 2.5' 45 Bend AD Fittings and Pipit of FI 2 2 ngs and Piping r Piping Unit 0 To1e# Total 22.0 22 00 20 200 12.0 12.00 1220 12.00 8 0, Total Equivalent en It s Per Fairbanks Mare Pump Hydraul€c Handbook and Plastic Pipe and Fittings Association (PP A)) Net Positive Suction Head Available NP H=tia+hss hfs hvp =3. ft where: ha = Atmospheric Pressure of Water at 500 ft elev, hss = Suction Static dead (Pumps Off Elevation -Volute Cl El his sr Minor tosses for Suction Piping at Design Flow hvp = Vapor Pressure for Water at 60d F 0,54 ft 0.09 ft 3.59 ft Static Head Pump Off El. is FM Discharge Elan: Static head Losses Warms Fri 1271 57 127280, 1271 32 127920 70 80 565 ft 600 35 ft Condition 140 Frictionsl Losses cr i i um Caridition Kazen-V50bams FrmSon Factor 120 2i1 127 t.a7 0.435 1271 C; 0,922 11 7 40 ,' 727' c 1 57 127 C 2 2.75i 5Q 2 db 12r"t;a„== 3337 4 7 t 1271 2C 4.430 56,34' 5,673 '72 7.056 £39„7,, 4 0 0 tvr System Head Curves Minimum Ma.Onrdrn 0 10 20 30 40 50 60 70 80 TDH F7 TOH FT 35 CO 35 OC 36.15 36.53 39.16 40 54 43 82 46.73 50,02 54.99 57 71 65.22 66 83 77.35 77,35 91.34 89.23 107,15 102 45 124,74 Pump Curves Design Point a uPrn 0 10 20 30 40 50 80 70 80 90 TDH 90 00 87 00 64.00 79 00 74.00 69,00 62.00 55.00 48,00 38,00 TOH FT 90 89 87, 85 83 81 79 76 73 70 0 9Pm FT TDH 65.22 Pump Selection Myers WGX30H-21-25 with 4.875' impeller NPSHr NPSHaw Critical Start up Head Hs = Highest Force Main Elevation = 618 ft Potential start up static head = 618 - 565 = 53 ft Pipe length from pump station to Hs = 980 ft Approximate equivalent pipe length to pump station = 1100 ft Hs maximum frictional head loss @ 10 gpm = (1100 ft) (0.121ft/100 tt) = 1,3 ft Required start up head 53 ft + 1.3 ft = 54.3 ft > Less an design Point > OK rPU P AND SYSTEM HEAD CURVES - 2.5" FM 140 1 30 120 110 100 90 80 70 60 50 40 20 10 70 a 20 40 60 80 100 Flow (gpm) Bouancy Calculations Ceredna ievereadonel School MclQrn and Creed Prefect No. 1921-0003 12,20 33,16 I age 6 1:11,100.4 130 120 140 100 90 80 60 50 20 40 60 Fly (gpm) 80 100 inell, 'V 2:'30H-75H Standard (WG3O11-75H) and Explosion -proof (WGX3OH-75H) 3-7 V2 HP, High -Head Submersible Grinder Pumps STATOR 3450 RPM„ 1 and 3 phase. Press tfi for perfect align• ment and best heat trransfer. Oil -tilled motor conducts heal and 'lubricates bearings. GRIND EI ASSEMBLY Grinder impeller and shredding ring are replaceable without dismantling pump. Constructed of 440 SST hardened to 56-60 Rockwell, CABLE ENTRY SYSTEM Provides double seat protection Cable jacket sealed by compression grommet, Individual wires sealed by epoxy polling. SLEEVE BEAR ING Takes radial load: provides flame path. (UL listed pumps only ) HEAT SENSOR Protects motor from burnout due to excessive heal from. any overload condition. Automatically resets when motor has cooled. BALL BEARINGS 'Lipper and lower ball hags support shaft and rotor and take axial and radial toads. HEAVY 416 SST SHAFT Corrosion resistant, Reduces shalt deflection due to grinding loads, SEALS andem mechanical seals protect motor. seal chamber pro- tinu©us lubrication, SEAL LEAX 'PROBES Detect wafer in seal housing, warning light In control }panel, (Test resistor on UL Listed models,) VOLUTE CASE Cast Iron: horizontal discharge. (Drilled for 21/;" pipe llonge -- IMPELLER Bronze recessed impeller handles ground slurry with- out clogging or binding. Provides unobstructed flow passage. Reduces radial loads. Pumpout vanes help keep trash born seal: reduces pressure at seal faces, K3426 9/98 Printed to USA, Myers EN$IONS PERFOR F{_rlNGE ORILLex) FOR 21I'I TO, PPE FLANGE CE'CURVE Capacity Liters P,r h+nws IS© A Gallons Per MAVIS NOTE: On single phase 3 HP pumps do not exceed 5" diameter impeller, F. E. Myers, 1101 Myers Parkway, Ashland, Ohio 44805.1969 419/289w•t144, FAX 419/289-6658, www,femyers.com Myers (Canada), 269 Trittium Dove„ Ktichener, Ontario N2G 4w5 519/74e-5470,FAX: 5r9/748.2553 PENTAIR P IMP GROUP WG3OH H L „in • 1 EAT.3011 7511 6444,4401.4.4. RA YERS WG3OH.75H ARE RUGGED 3-7Y2 HORSEPOWER SUBMERSIBLE CENTRIFUGAL GRINDER PUMPS DE SIGNED FOR RESIDENTIAL, COMMERCIAL OR INDUSTRIAL APPLICATIONS, They are especially suited for use in pres- sure sewer applications or in systems with long discharge runs or high static heads. The WG30H-75H feature a heavy- duty cutter mechanism and recessed impeller design to efficiently grind typical sewage solids into a fine slurry. The WG301-1-75H grinder pumps are available in standard and U L Listed explosion -proof (WGX30H-751-1), construction tor use in Class 1, Group D hazardous locations. WG30H-751-1 grinder pumps ccn be installed in a variety of packaged systems. Factory -assembled simplex or duplex packages with guide rail systems are available. Individual rail components are also mailable for installation in on - site concrete systems. FE. Myers otters a complete line of submersible sump, sewage, effluent, grinder. non -clog wastewater pumps, controls, basins and accessories. For additional iniorrnation, please contact your local Myers representative or the Myers Ashland. Ohio sales office at 419/289-1144 ADVANTAGES BY DESIGN IDEAL FOR USE IN PRESSURE SEWER SYSTEMS. 'Recessed impeller provides sloop non -overloading operating curve Standard ( WG30H-75H ) and Explosion -proof (WGX30H-75H) 1/2 3-7 HP, High -Head Submersible Grinder Pumps DURABLE MOTOR WILL DELIVER MANY YEARS OF RELIABLE SERVICE, • Oil -filled motor for maximum heat dissipation and constant bearing lubricallon, • Recessed impeller reduces radial bearing loads; increases bearing life, • High -torque capacitor start single phase or three phase motors tor assured starting under heavy load, • Seal leak probes and on -winding heat sensors warn of seal leak condition, and stop -motor it motor over heats. Helps prevent costly motor damage, THE WG3OH-75H ARE DESIGNED FOR EASY MAINTENANCE. • Shredding ring and grinder impeller are replaceable without dismantling pump or motor. PRODUCT CAPABILITIES 98 GPM 367 LPM cr_J ds Handling Intermittent 1iquid Winding Insulation Temp rical Data °tors are capactiOr control panels or it VAS are required and warranty ) td Third Party Approvals Optional Approvals Acceptable pH Ran Specific Gravity .9-1. Viscosity 28-35 SSU 170 ft 52.0 rn 1 , domestic raw sewage ! up to .140F up1060'Ci 266T 1 130•C 3450 RPM, 60 Hz 3-5 HP: 230V, 1 Ph 3-71/3 HP 208, 230, 460V, 3 Ph CSA UL Class 1, Group D crity Discharge (Flange Dim) 2 tn 635r. . Sump Dia, (Sirnplex) 6 in, :91.4 cm Duplex) 98 in. 121,9 cm E Consult tactory or applicaliorls outside ot these recornrnenciations- Construction Materials Motor Housing, SealHousing cast iron. Class 30 Cord Cap and Volute Case ASTM A48-76 speller recessed, bronze Power Cord 2511, SOW/SOW-A onirol Cord 25 tt. SOW/SOWA hanical Seals Standard onat Motor Shaft r double tandem, carbon and ceramic lower tungsten carbide 416 SST — Fasteners I ,t--- 1 300 Series SST Shredding Ring and j 440 SST. 58-60 ockw Grinder 1 rE NOVA770N MEETS TRADITION 150 9001 Certified Company Myers. PENTAIR PUMP GROUP rIR 23—04 16 r 41 PICK P hl & CREED 704 84125E7 P.01/03 2300 Sardis Road North, Suite A Charlotte, NC 28227 FACSIMILE TRANSMITTAL DESIGNATED RECIPIENT: Doug Ijupeycutt COMPANY; Town of Harrisburg Tel: 704-841-2588 Fax: 704-841-2567 FAX NO: (704) 455-1206 DATE: 4-23-04 SENDER; Jose h D a hies P.E. NUMBER OF TRANSMISSION PAGES (including this page): PROJECT NUMBER: 2921-0003 PROJECT NAME: Carolina international Schoa�ll THIS IS YOUR ORIGINAL 0 HARD COPY TO FOLLOW *" IF NOT CORRECTLY RECEIVED OR PAGE$ FAULTY, PLEASE CALL SENDER AT 704-841•2568 " REMARKS: Project: Introduction Carolina International School Highland Ridge Pump Station Analysis The purpose of this fax from McKim & Creed (M&C is to provide a hydraulic analysis of the Highland Ridge Pump Station. The following analysis demonstrates that the High Ridge Pump Station has adequate capacity to accept the wastewater flow from the proposed Carolina International School (CIS). High Ridge Collection System The Highland Ridge Pump Station serves the Highland Ridge and Rocky River Plantation Developments consisting of approximately 120 Tots. The developments are virtually built out with Abbott Enterprises providing potable water service to 110 single family residences. Approximately 30 lots flow by gravity to the Quay Farm Pump Station, which discharges to the Highland Ridge Pump Station at a rate of approximately 50 gpm. The remaining lots discharge to the Highland Ridge Pump Station by gravity. The worst case scenario occurs when the Quay Farm pump station is discharging into he Highland Ridge Pump Station in addition to the gravity flow, Based on the North Carolina Administrative Code (NCAC) and the Town of Harrisburg Unified Development Ordinance, A EN`r`@t N The information contained in this facsimile message is privileged and confidential information intended only for the use of the individual or entity named above, If the reader of this message Ls not the Intended recipient, or the employee of/or agent responsible to deliver it to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited, If you have received this communication in error, please notify us by telephone and return the original message to us at the above address via the lt.S. Postal Service. We will reimburse you for any casts incurred. APR-23-2004 16;42 MCKIM & CREED 704 8412567 P. M&C applied a value of 250 gallons per day per residence shall be applied to the 90 units flowing by gravity and added to the 50 gpm pumping rate of the Quay Farm Pump Station. (90 units) (250 god/unit) = 22,500 gpd Per NCAC T15A:024.0200 for population 10,000 multiply flow by 2.5 peaking factor (22,500 gpd) (2.5) = 56,250 gpd rate 56,250 gpd rate x le1/1440 minutes = 39 gpm 40 cipm The worst case scenario is for a simultaneous discharge of 50 gpm from the Quay Farm Pump Station 40 gpm 50 gpm = 90 cipm Per NCAC, the Highland Ridge pump station must be capable of transferring the flow through the 6" 0 force main at a minimum velocity of 2 ft/s. Based on the standard equation: Flow (Q) = Velocity (V) x Area (A) We determine that Qm,„ = 180 gpm This corresponds with the information provided by The Town of Harrisburg on a fax dated March 11, which indicates that the Highland Ridge Pump Station is equipped with 20 HP Peabody Barnes pumps sized for 200 gpm 200 gpm — 90 gpm = 110 gpm available capacity The Carolina International School proposes installing a duplex grinder pump station, similar to the unit installed off Quay Farm Road, with Lp pin of roxi tel pm to transfer the w stewater from CIS to the Highla thon. Detailed calculations for the pump station have been submitted under separate cover; however -the runoff calculation for the grinder pump station is as follows: 320 students x 15 gallons per 8 hr school day/student = 4,600 gal ons per 8 hr school day 4,800 gallons per 8 hour school day x 24 hr/1 day = 14,400 gallon per day rate 14,400 gallons per day rate x 2.5 peaking factor 36,000 gallon per day rate 36,000 gallon per day rate x 1d/1440 minutes = 25 gallons per minute =2 gpm The pump station has been design to operate three (3) times per hour at a pumping rate of approximately 50 gm. As a result, the Highland Ridge Pump Station will still have 60 gpm of available capacity. 110 gpm — 50 gpm CIS discharge 60 gpm remaining capacity after CIS ATTENTION The information contained in this fac:simile message is privileged end conNential intonation interidee only for the use of the individual or entity named above, If the reader of this message is not the intended recipient, or the employee of/or agent responsible to deliver it to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited, If you have received this communication in error, please notify us by telephone and return the original message to us at the above address via the US Postal Service, We will reimburse you for any costs incurred, SECTION 01410 — PROJECT REQUIREMENTS 1.1 GENERAL DESCRIPTION OF WORK A. The Work to be performed under these Contract Documents consists of sediment and erosion control; clearing; grubbing; earthwork; drainage structures and piping, onsite sanitary sewer lines and manholes; onsite water lines and appurtenances; curb and gutter; and asphalt paving. The site of the work is located in Cabarrus, North Carolina, on Highland Ridge Road south of Rocky River Road, 1.2 OFFSITE STORAGE A. Offsite storage arrangements shall be acceptable to Owner for all materials and equipment not incorporated into the work. No materials may be stockpiled within 500 feet of a project entrance or public road beyond those materials actually needed for construction of that portion of the work. 1.3 EQUIVALENT MATERIALS AND EQUIPMENT A. Whenever a material or article is specified or described by using the name of a proprietary product or the name of a particular manufacturer or vendor, the specified item mentioned shall be understood as establishing the type, function, and quality desired. Other manufacturers' products may be accepted, provided sufficient information is submitted to allow Engineer to determine that the products, proposed are equivalent to those named. Such items shall be submitted for review by the procedure set forth in the submittal section. Requests for review of equivalency will not be accepted from anyone except Contractor. Such requests will not be considered until after the contract has been awarded, and must be approved by the Engineer and the Owner. 1.4 PREPARATION FOR SHIPMENT A. All materials shall be suitably packaged to facilitate handling and protect against damage during transit and storage. Painted surfaces shall be protected against impact, abrasion, discoloration, and other damage. All painted surfaces which are damaged prior to acceptance of equipment shall be repainted to the satisfaction of Engineer. B. Each item, package, or bundle of material shall be tagged or marked as identified in the delivery schedule or on the Shop Drawings. Complete packing lists and bills of material shall be included with each shipment. EASEMENTS AND RIGHTS OF WAY A. The easements and rights of way for the project will be provided by Owner. Contractor shall confine his construction operations within the limits indicated on the drawings, and shall use due care in placing construction tools, equipment, Carolina International School, Phase 029210003 Page 1 action 01Ct11— Project Requirements April, 2004 excavated materials, and pipeline materials and supplies, so as to cause the least possible damage to property and interference with traffic. B. The Contractor shall strictly adhere to the right-of-way within the subdivision. C. Work within Highway Rights -of -Way. Permits shall be obtained by Owner. All Work performed and all operations of Contractor, his employees or Sub- contractors within the limits of highway rights -of -way shall be in conformity with the requirements, and be under the control (through Owner) of the highway authority owning or having jurisdiction over and control of the right-of-way in each case. 1.6 NOTICES TO OWNERS AND AUTHORITIES A. Contractor shall notify owners of adjacent property and utilities when prosecution of the Work may affect them, B. When it is necessary to temporarily deny access by owners or tenants to their property, or when any utility service connection must be interrupted, Contractor shall give notices sufficiently in advance to enable the affected persons to provide for their needs, Notices will conform to any applicable local ordinance: and, whether delivered orally or in writing, will include appropriate information concerning the interruption and instructions on how to limit their inconvenience, C. Utilities and other concerned agencies shall be contacted at least 48 hours prior to cutting or closing streets or other traffic areas, or excavating near underground utilities or pole lines, 1.7 LINES AND GRADES A. All Work shall be done to the lines, grades, and elevations shown on the drawings. B, Horizontal and vertical control points will be established or designated by Engineer. Contractor shall be responsible for all construction surveying, and shall utilize services of a Professional Land Surveyor to perform these functions. C. Contractor shall provide an experienced instrument man, competent assistants, and such instruments, tools, stakes, and other materials required to complete the survey, layout, and measurement Work. in addition, Contractor shall furnish, without charge, competent men from bis force and such tools, stakes, and other materials as Engineer may require in establishing or designating control points, or in checking survey, layout, and measurement Work performed by Contractor, D. Contractor shall keep Engineer informed, a reasonable time in advance, of the times and places at which he wished to do Work, so that horizontal and vertical control points may be established, and any checking deemed necessary by Engineer may be done with minimum inconvenience to Engineers and minimum delay to Contractor. E. Contractor shall remove and reconstruct Work which is improperly located. Carolina International School, Phase SecUon 0 010 - Project Requirements 02921.0003 April, 2004 Page 2 F Contractor shall replace all lost or damaged right-of-way monuments or property corners at his expense, 1.8 FIELD ENGINEERING A, The Contractor shall provide field engineering as the work progresses to confirm that the work is being constructed in accordance with the approved plans and specifications. Field Engineering for gravity sewers shall include confirming the actual invert of gravity sewers at 10-foot stations as the pipe is installed, invert in/out of each manhole, and either 1. The NC grid coordinates of each manhole centerline; or 2. The angular deflection of the sewer line at each manhole and the distance between each manhole. Reports supplying the information above shall be submitted monthly with Applications for Payment. D. Field engineering data do not need to be collected by a Registered Professional Surveyor or Engineer, and are being required to assist Owner and Contractor in confirming that the work is being installed properly. E. At the completion of the work, Contractor will prepare a final record survey of the project. All deficiencies in the construction (pipe grades, inverts, locations) will be reported to the Contractor, who shall be responsible for correcting all deficiencies in the work. A digital copy of manhole locations, sewer pipe inverts, and manhole rim elevations shall be transmitted to Owner prior to requesting final payment. As a means of defining acceptable tolerances in construction of the work, the following shall apply: 1. Inverts of installed pipe shall be within 0.10 feet ± of design inverts at each manhole or connection. 2. Manholes shall be within two feet horizontally of the coordinates shown on the plans. O. The requirement for the Contractor to "self monitor" the accuracy of construction shall in no way relieve the Contractor of correcting all deficiencies in the work prior to final acceptance. CONNECTIONS TO EXISTING FACILITIES A. Unless otherwise specified or indicated, Contractor shall make all necessary connections to existing facilities, including structures, drain lines, and utilities such as water, sewer, gas, telephone, and electric. In each case, Contractor shall receive permission from Owner or the owning utility prior to undertaking connections. Contractor shall protect facilities against deleterious substances and damage. Carolina Interned©nal School, Phase 02921,0003 Page 3 Se Project Requirements April, 2004 Connections to existing facilities which are in service shall be thoroughly planned in advance; and all required equipment, materials, and labor shall be on hand at the time of undertaking the connections. Work shall proceed continuously (around the clock) if necessary to complete connections in the minimum time. Operation of valves or other appurtenances on existing utilities, when required, shall be by or under the direct supervision of the owning utility. 1.10 UNFAVORABLE CONSTRUCTION CONDITIONS A. During unfavorable weather, wet ground, or other unsuitable construction conditions, the Contractor shall confine his operations to work which will not be affected adversely by such conditions. No portion of the Work shall be constructed under conditions which would adversely affect the quality or efficiency thereof, unless special means or precautions are taken by Contractor to perform the work in a proper and satisfactory manner, 1.11 CLEANING UP A. Contractor shall keep the premises free at all times from accumulations of waste materials and rubbish. Contractor shall provide adequate trash receptacles about the site, and shall promptly empty the containers when filled, Construction materials, such as concrete forms and scaffolding, shall be neatly stacked by Contractor when not in use, Contractor shall promptly remove splattered concrete, asphalt, oil, paint, corrosive liquids, and cleaning solutions from surfaces to prevent marring or other damage. C. Volatile wastes shall be properly stored in covered metal containers and removed daily. Wastes shall not be buried or burned on the site or disposed of into storm drains, sanitary sewers, streams, or waterways. All wastes shall be removed from the site and disposed of in a manner complying with local ordinances and anti- pollution laws. E. Contractor shall keep all public roads free of dirt, dust and mud, stone, or other construction materials. Dust and mud shall be removed from roads on a daily basis, using appropriate equipment. F. Adequate cleanup will be a condition for recommendation of progress payment applications, G. Owner shall reserve the right to limit the movement of construction crews when an area is not acceptably cleaned. Delays caused to Contractor because of his negligence in keeping the construction areas cleared shall be absorbed by the Contractor at no additional costs to the Owner in time or money. 1.12 APPLICABLE CODES A, References in the Contract Documents to local codes mean the NC State Building Code, Carolina International School, Phase 02921.0003 Page 4 ction 0 0 0 Project Requirements April, 2004 B. Other standard codes which apply to the Work are designated in the specifications. 1.13 REFERENCE STANDARDS A. Reference to the standards of any technical society, organization, or associate, or to codes of local or state authorities, shall mean the latest standard, code, specification, or tentative standard adopted and published at the date of receipt of bids, unless specifically stated otherwise. 1.14 TESTING A. The Contractor shall furnish all water required for testing the work. 1.15 ABBREVIATIONS AND SYMBOLS A. Abbreviations used in the Contract Documents are defined as follows: AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute AISI American Iron and Steel Institute ANSI American National Standards Institute ASAE American Society of Agricultural Engineers ASCE American Society of Civil Engineers ASME American Society of Mechanical Engineers ASSE American Society of Sanitary Engineering ASTM American Society for Testing and Materials AWG American Wire Gauge AWWA American Water Works Association CISPI Cast Iron Soil Pipe Institute CRSI Concrete Reinforcing Steel Institute CS Commercial Standard Fed Spec Federal Specifications IBBM Iron Body, Bronzed Mounted IEEE Institute of Electrical and Electronics IPS Iron Pipe Size MIL Military Specification NEC National Electrical Code NEMANational Electrical Manufacturers Association NCDOT NC Department of Transportation NPT National Pipe Thread PCI Pre -stressed Concrete Institute UL Underwriters' Laboratories 1.16 PRECONSTRUCTION CONFERENCE A. Prior to the commencement of Work at the site, a preconstruction, conference will be held at a mutually agreed time and place. The conference shall be attended by: 1. Contractor and his superintendent. 2. Principal Subcontractors, Cardin a International School, Phase 02921.0003 Page 5 ion 01010.- Project Requirements April, 2004 3. Representatives of principal suppliers and manufacturers as appropriate. 4. Engineer and his Resident Project Representative. 5. Representatives of Owner. Others as requested by Contractor, Owner, or Engineer. Unless previously submitted to Engineer, Contractor shall bring to the conference a tentative schedule for each of the following: 1. Progress. 2. Procurement. 3. Values for progress payment purposes, 4. Shop Drawings and other submittal. C. The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed, and procedures for handling such matters established. The agenda will include: 1. Contractor's tentative schedules. 2. Transmittal, review, and distribution of Contractor's submittal. 3. Processing applications for payment. 4. Maintaining record documents. 5, Critical Work sequencing. 6. Field decisions and Change Orders. 7. Use of premises, office and storage areas, security, housekeeping, and Owner's needs. 8. Major equipment deliveries and priorities. 9. Contractor's assignments for safety and first aid. D. Engineer will preside at the conference and will arrange for keeping and distributing the minutes to all persons in attendance. 1.17 PROGRESS MEETINGS A. Contractor shall attend regular progress meetings at least monthly and at other times as requested by Engineer or required by progress of Work. Contractor, Engineer, and all Subcontractors active on the site shall be represented at each meeting. Contractor may at his discretion request attendance by representatives of his suppliers, manufacturers, and other subcontractors* B. Engineer shall preside at the meetings and provide for keeping and -distribution of the minutes. The purpose of the meetings wilt be to review the progress of the Work, maintain coordination of efforts, review changes in scheduling, and resolve other problems which may develop. 1.18 SITE ADMINISTRATION A. Contractor shall be responsible for all areas of the site used by him and all Subcontractors in the performance of the Work. He will exert full control over the actions of all employees and other persons with respect to the use and preservation of property and existing facilities, except such controls as may be specifically reserved to Owner or others. Contractor has the right to exclude Carolina International School, Phase I 02921.0003 Page 6 Section 01010 — Project Requirements April, 2004 from the site ail persons +h have no purpose related to the Work or its inspection, and may require all persons on the site (except owners employees) to observe the same regulations as he requires of his employees; 19 CONSTRUCTION RODRAVVINGS The Contractor shell maintain a set of drawings high shall be used to note any changes to the work, adjustments of existing underground utilities,, or other information resulting from the construction. These construction record drawings shall be submitted to the Engineer along with the final pay request. Carolth International School, Phase 029210003 Page END OF SECTION 01010 Section 01010 Pr j t Reguirer nts ri 2004 SECTION 02190 — EROSION AND SEDIMENTATION CONTROL PART 1 — GENERAL 1.1 WORK INCLUDED A. Take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams or other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 RELATED WORK A. Provide protective covering for disturbed areas upon suspension or completion of land -disturbing activities. Permanent vegetation shall be established at the earliest practicable time, Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period, 1.3 REGULATORY REQUIREMENTS A, Prevent damage to properties outside the construction limits from siltation due to construction of the project. Assume all responsibilities to the affected property owners for correction of damages which may occur. Erosion control measures shall be performed conforming to the requirements of and in accordance with plans approved by applicable state and local agencies and as per the erosion control portion of the construction drawings and these specifications, The Contractor shall not allow mud and debris to accumulate in the streets, Should the Contractor pump water from trenches during construction, appropriate siltation preventative measures shall be taken prior to discharge of pumped water into any storm drain or stream. PART 2 — PRODUCTS 2.1 Open mesh biodegradable mulching cloth, 2.2 Fertilizer shall be 10-10-10 grade or equivalent, 2.3 Lime shall be Dolomitic Agricultural Ground limestone containing not less than 10% magnesium oxide. 2.4 Phosphate shall be 20% superphosphate or equivalent. 2.5 Provide permanent grass seed in accordance with Section 02230. 2.6 Provide temporary grass seed in accordance with Section 02230. 17 Silt fence shall consist of non -biodegradable filter fabric (Trevira, Mirafi, etc.) wired to galvanized wire mesh fencing and supported by wood or metal posts. 2.8 Erosion Control Stone: NCDOT Section 1042 A. Class 1 Rip Rap 5 Ibs. to 200 Ibs. Carolina International Schoo , Phase 02921.0003 Page 1 n 02190 — Erosion and Sedimentation Control April, 2004 B. Class 2 Rip Rap 25 Ibs. to 250 Ibs. C. Class A 2" to 6" D. Class B 5' to 15" 2.9 Filter Fabric for placement under rip rap shall meet the requirements of Type 2 fabric in accordance with NCDOT standards and specifications, Section 1056-2 for Roads and Structures. PART 3 - EXECUTION 3.1 CLEARING A. Clearing and grubbing shall be scheduled and performed in such a manner that subsequent grading operation and erosion control practices can follow immediately thereafter. Excavation, borrow, and embankment operations will be conducted as a continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover within 30 working days after completion of active construction. 3.2 STABILIZING A. The angle for graded slopes and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control devices or structures. All disturbed areas outside of embankment left exposed will, within 30 working days of completion of any phase of grading, be planted or otherwise provided with either temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. 3.3 REGULATORY REQUIREMENTS A. Whenever land disturbing activity is undertaken on a tract, a ground cover sufficient to restrain erosion must be planted or otherwise provided within 30 working days on that portion of the tract upon which further active construction is to be undertaken, If any earthwork is to be suspended for any reason whatsoever for longer than 30 calendar days, the areas involved shall be seeded with vegetative cover or otherwise protected against excessive erosion during the suspension period, - Suspension of work in any area of operation does not relieve the Contractor of the responsibility for the control of erosion in that area. PART 4 - CONSTRUCTION PHASE 4.1 PRACTICES A. Avoid dumping soil or sediment into any stream bed or watercourse. B. Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. C. Avoid equipment crossings of streams, creeks, andditches where practicable. Carolina Internatonal School, Phase I Section 02190 — Erosion and Sedimentation Control 02921,0003 Page 2 April, 2004 PART 5 — SEDIMENT CONTROL FEATURES 5.1 GENERAL A. All devices (silt fences, retention areas, etc.) for sediment control shall be constructed at the locations indicated prior to beginning excavation on the site. All devices shall be properly maintaun�ld l � �ected to lace until permanent structure eemopaving the makes the device unnecessary or device, 5.2 DESIGN APPLICATIONS A, Mulch shall be used for t©mf seed beds astabilization planting where required excessive erosion, and for protection B. Silt fences shall be used as shown on the plans to restrict movement of sediment from the site. Silt fence shall be installed prior to when grading commences. c3. Establish vegetative cover on all unpaved areas disturbed by the work. 1. Preparation of Seedbed, Areas to be seeded shall be scarified a depth of six inches until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous, and fertilizer shall be applied during the scarification process in accordance with the following rates: a. Lime — 1 ton per acre. b. Phosphorous — 500 pounds per acre. c, Fertilizer — 500 pounds per acre. 2. Seeding. Disturbed areas along embankments shall be permanently seeded with mix specified in Section 02230. Seeding performed during the period from October to February shall be temporarily. in accordance with Section 02230. The permanent vegetative cover will be over seeded at the earliest possible time as specified. 3. Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. 5.3 MAINTENANCE A, Maintain all temporary and permanent erosion control measure in functioning order, Temporary structures shall be maintained until completion of the project. Areas which fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. Carolina International Soho° Phase I 02921.0003 Page 3 Sec 021J0 Erosion and Sedi enteion Control 5.4 REMOVAL OF EDI ENT CONTROL DEVICES A. Near completion of the project, when directed by the Owner's agent, the Contractor shall dismantle and remove the temporary devices used for sediment control during construction. All erosion control devices in seeded areas shallbe left in place until the grass is established. Seed areas around devices and mulch after removing or filling temporary control devices, END OF SECTION 02190 Caro eta international School; Phase 02921„0003 Page Section 021 ro tart and Sedimentation Control April, 2004 Seeding Mixture Species Rye (grain) TABLE 1 Temporary Seeding Reberntendatiun fb Late Winter and Early Spring Annual lespedeza (Kobe in Piedmont and Coastal Plain; Korean in Mountains) Omit annual lespedeza when duration of Seeding Dates Mountains Piedmont Coastal Plain Soli Amendments pore Rate bare 120 50 cover is not to extent beyond June. Above 2500 ft: Below 2500 ft Jan 1 - May 1 Dec 1 - prll 15 Feb 1 . Feb 1 - lay y 1 Follow recommendations of sell tests or apply 2,000 b/acre ground agricultural Iirnestone and 750 lb/acre 10-1 -1 } fertilizer: Mulch Apply 4,000 b/acre straw, Anchor straw by tacking with asphalt, netting, ur a mulch and wring tool. A disk with blades set nearly straight can be used a a mulch anchoring tool, Maintenance Re -fertilize if growth is not fully adequate. Reseed, re -fertilize, and mulch immediately fall a ng erosion or other damage. Carolina International School, Phase J 02921,0003 Page don 0 1 0 — Erosion and SediSedimentation Control April, 2004 TABLE 6.10b Temporary Seeding Recommendations for Summer Seeding Mixture Species Rate (lblacre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding Dates Mountains - May 15 - Aug 15 Piedmont - May 1 - Aug 15 Coastal Plain - April 15 Aug 15 Soil Amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 lblacre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Re -fertilize if growth is not fully adequate. Reseed, re -fertilize and mulch immediately following erosion or other damage. Carolina Intern 02921.0003 Page 6 nal School, Phase Section 02190 — Erosion and Sedirnentation Control April. 2004 Seeding Mixture Species TABLE . Oc Temporary Seeding Recommendations for Fall Rye (grain) Seeding Dates Mountains Coastal Plain and Piedmon Aug 1 -Dec 30 Soil Amend eras Aug 1 - Dec 15 Rat e (lb/acre) 120 Follow recommendations of soil tests or apply 2,000 b/acre ground grrcultural iimestone and 1000 ib/acre 10-10-10 fertilizer, Mulch Apply 4,000 b/acre straw. Anchor strain r by tacking with asphalt, netting, or a mulch anchoring tool A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and re - fertilize e damaged areas immediately, Topdress with 50 lb/acre of nitrogen in March, If it is necessary to extend temporary cover beyond June 15, over -seed with 50 lb/acre Kobe (Piedmont and Coastal Pain) or Korean (Mountains) lespedeza in late February or early March, Carolina International chool, Phase 1 02921,0 03 Page 7 flan 02190 - Era on and Sedimentation Control April, 2004 SECTION 02210 — EXCAVATION AND TRENCHING PART 1 — GENERAL 1.1 SCOPE A. This section covers excavation and trenching work; excavation and trenching as required; the handling, storage, transportation, and disposal of all excavated material; all necessary sheeting, shoring, and protection work; preparation of subgrades; pumping and dewatering as necessary or required; protection of adjacent property; backfilling; pipe embedment; surfacing and grading; and other appurtenant work. 1.2 GENERAL REQUIREMENTS A. Excavations shall provide adequate working space and clearance for the work to be performed therein and for installation and removal of concrete forms. In no case shall excavation faces be undercut for extended footings. B, Subgrade surfaces shall be clean and free of loose material of any kind when concrete is placed thereon. C. Except where exterior surfaces are specified to be damp -proofed, monolithic concrete manholes and other concrete structures or parts thereof which do not have footings and extend beyond the outside face of exterior walls may be placed directly against excavation faces without the use of outer forms, provided that such faces are stable, and also provided that a layer of polyethylene film is placed between the earth and the concrete. Excavations for manholes and similar structures constructed of masonry units shall have such horizontal dimensions that not less than six inches of clearance are provided for outside plastering. E. Backfilling and construction of fills and embankments during freezing weather shall not be done except by permission of the Engineer. No backfill, fill, or embankment materials shall be installed on frozen surfaces; nor shall frozen materials, snow, or ice be placed in any backfill, fill, or embankment, 1.3 RELATIVE WORK A. Section 02110 — Site Clearing and Grubbing. B. Section 02200 — Earthwork. 1.4 BLASTING A. Blasting any type of explosive is permitted only when approved. Carolina International School, Phase I Section 02210 — Excavation and Trenching 02921.0003 April, 2004 Page 1 1.5 UNAUTHORIZED EXCAVATION A. Except where otherwise authorized, indicated, or specified, on allgradeterand ials excavated below the bottom of concrete walls, footings, foundations shall be replaced, by and at the expense of the Contractor, with concrete placed at the same time and monolithic with the concrete above. 1.6 ©EWATERING A. Provide and maintain adequate dewateringeequipment renchesmorve otherdpaispose of rts of the all surface and ground water entering work. Each excavation shall be kept dry during subgrade prto rbtiontailnd n and continually thereafter until the structure is to be built, or the pipe therein is completed to the resu extent that no damage from hydrostatic pressure, flotation, or other cause will All excavations for concretee b dewatered by lowering and keeping the groundwater below groundwater shall level beneath such excavations two feet or more below the bottom of the excavation. Surface water shall be diverted or otherwise practicable prevented causing damage to areas or trenches to the greatest adjacent property. The Contractor shall be responsible for the condition of any pipe or conduit which hem and freef orf drainage sediment, purposes, and all such pipes or conduits shall be left clean 1.7 SHEETING AND SHORING uctures A. Except where banks are cut bcbraced,on a sandleshlored ascnece4ssary for torprevent and trenches shall be sheeted, caving or sliding. 1.8 STABILIZATION A. Subgrades for concrete structures and trench bottoms from shall e and muck, and firm, dense, and thoroughly compacted and consolidated, sufficiently stable to remain firm and intact under the feet of the workmen. B. Subgrades for concrete structures or trench bottoms which are otherwise solid - but which become mucky on top due to construction operations shall be reinforced with one or more layers of crushed rock or gravel. The stabilizing material shall be spread and compacted to a depth terma9tmore all be furnished and if the required depth exceeds four inches, t installed as specified for granular fills, Not more than %-inch depth of mud or muck shall be allowed to remain on stabilized trench bottoms when the pipe bedding material is placed thereon. C. The finished elevation of stabilization subgrades for concrete structures shall not be above subgrade elevations indicated on the drawings. Carolina !rite natlonal School, Phase 02921.0003 Page 2 eotiora 02210 Exoaveti0n a d Tren hing 1.9 EARTH FILLS AND EMBANKMENTS A. To the maximum extent available, excess suitable material obtained from structure and trench excavations shall be used for construction of fills and ernbankments. Additional material shall be provided as required. B. Wherevera trench passes through a fill or embankment, the fill or embankment material shall be placed and compacted to an elevation 12 inches above the top of the pipe before the trench is excavated. 1.10 GRANULAR FILLS A. Granular fills shall be placed on suitably prepared subgrades and compacted by vibration, Granular fill material shall be crushed rock or gravel, shall be free from dust, clay, or trash, and shall be graded to the requirements of NCDOT No. 57 fine aggregate. Granular fill shall be compacted to not less than 70% relative density as determined by ASTM D4253 and D4254, Granular fills under concrete slabs shall be compacted with a minimum of three passes of a vibratory steel drum or plate type compactor, 1.11 TRENCH EXCAVATION A. No more trench shall be opened in advance of pipe laying than is necessary to expedite the work. 400 feet shallbe the maximum length of open trench on any line under construction. Except where tunneling is indicated on the drawings, is specified, or is permitted by the Engineer, all trench excavation shall be open cut from the surface. 1.12 ALIGNMENT, GRADE, AND MINIMUM COVER A. The alignment and grade or elevation of each pipeline shall be fixed and determined from offset stakes, Vertical and horizontalalignment of pipes, and the maximum joint deflection used in connection therewith shall be in conformity with requirements of the section covering installation of pipe. B. Where pipe grades or elevations are not definitely fixed by the contract drawings and specifications, trenches shall be excavated to a depth sufficient to provide a minimum depth of backfili cover over the top of the pipe of 36 inches in paved or graded streets where surface grades are definitely established, and 36 inches in other locations. Greater pipe cover depths may be necessary on vertical curves_ or to provide necessary clearance beneath existing pipes, conduits, drains, drainage structures, or other obstructions encountered at normal pipe grades. Measurement of pipe cover depth shall be made vertically from the outside top of pipe to finished ground or pavement surface elevation except where future surface elevations are indicated on the drawings, Carolina In national School, Phase I Section 02210 — Excavation and Trenching 02921,0003 April, 2004 Page 3 1.13 LIMITING TRENCH WIDTHS A. Trenches shall be excavated to a width which will provide adequate working space and sidewall clearances for proper pipe installation, jointing, and embedment. Minimum trench widths shall be as follows: Nominal Pipe Size Minimum Trench Widths (inches) (inches) Less than 33" Pipe OD plus 16" Greater than 33" Pipe OD plus 24" B. Cutting trench banks on slopes to reduce earth load to prevent sliding and caving shall be done only in areas where the increased' trench width will not interfere with surface features or encroach on construction limits. 1.14 !MECHANICAL EXCAVATION A. The use of mechanical equipment will not be permitted in locations where its operation would cause damage to trees, buildings, culverts, or other existing property, utilities, or structures above or below ground. In all such locations, hand excavating methods shall be used. B. Mechanical equipment used for trench excavation shall be of a type, design, and construction, and shall be so operated and that trench alignment is such that pipe, when accurately laid to specified alignment, will be centered in the trench with adequate clearance between the pipe and sidewalls of the trench. Undercutting the trench sidewall to obtain clearance will not be permitted. 1.15 EXCAVATION BELOW PIPE SUBGRADE A. Except where otherwise required, pipe trenches shall be excavated per the detail in the plans 1.16 ART F CIAL FOUNDATIONS IN TRENCHES A. Whenever unsuitable or unstable soil conditions are encountered, trenches shall be excavated below grade and the trench bottom shall be brought to embedment grade with suitable material, 1.17 BELL HOLES A. Bell holes shall provide adequate clearance for tools and methods used in installing pipe. No part of any bell or coupling shall be in contact with the trench bottom, trench walls, or granular embedment when the pipe is jointed, 1.18 EMBEDMENT MATERIALS A, General: Use soils free of organic matter, refuse, rocks and lumps greater than four inches in diameter, and other deleterious matter, Carolina International School, Phase 1 02921,0003 Page 4 Section 022 0 — nd Trenching April, 2004 1.19 CLASSIFICATION A. For the purpose of this specification, soils to be used as fill material are grouped into five classes according to soil properties and characteristics. 1. Class I — Granular Material — angular bedding material well graded crushed stone meeting the requirements of ASTM D448 size No. 67, 2. Class 11 — Coarse sands and gravels with maximum practical size of 44 mm (1-1/2 inches) including variously graded sands and gravels containing small percentages of fines, generally granular and non - cohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class. Class — Fine sand and clayey gravels, including fine sands, sand -clay mixtures, and gravel -clay mixtures, Soil Types GM, GC, SM, and SC are included in this class. 4. Class IV — Silt, silty clays, and clays, including inorganic clays and silts of medium to high plasticity and liquid limits. Soil Types MH, ML, CH, and CL are included in this class. These materials are not recommended for bedding, haunching, or initial backfill. Class V — This class includes the organic soils, OL, OH, and PT, as well as soils containing frozen earth, debris, rocks, larger than 40 mm (1-1/2 inch) in diameter, and other foreign matters, These materials are not recommended for bedding, haunching, or initial backfill, 1.20 TRENCHING A. Trench widths at and below the top of the pipe shall be the minimum necessary for proper installation, All trenching shall meet OSHA requirements for cut slope and/or trench shoring techniques. Over -depth excavation shall be backfilled with Class I material. 1.21 DEPTH A. Trench to the lines and grades shown on the drawings. Where elevations are not shown, trench to a depth sufficient to provide at least 36 inches of cover above the top of pipe, unless otherwise specified. Grade trenches to provide a constant slope free of sags and high spots. 1.22 TRENCH BRACING A. Properly brace, sheet, and support trench walls in strict conformance with all pertinent laws and regulations. Provide adequate bracing and shoring to protect adjacent improvements. 1.23 BEDDING, HAUNCHING, AND INITIAL BACKFILL A. Tamp subgrade to provide firm, even bedding. Excavate bedding material to match the shape of the bottom of the pipe and bell, as detailed in the Drawings. Carolina hternationai ShooI, Phase I 02921.0003 Page 5 Section 02210 — Excavation and Trenching April, 2004 Place haunching material so as to provide full bearing around the bottom of the pipe. Place bedding, haunching, and initial backfill as specified below, 1.24 DUCTILE IRON PIPE A, If no backfill is required after the initial trench excavation, undisturbed earth may be suitable for bedding in cover less than 12 feet deep. Excavate to match bottom of pipe and bell. Provide Class 1 material as bedding for pipe cover greater than 12 feet. Class II, or SM, SC soil for haunching to pipe springline. Class II or III material and soil types SM and SC shall be used as initial backfill to six inches above top of pipe. 1.25 BACKFILL A. Backfill the remainder of the trench with soils free of organic matter, refuse, rocks, and lumps greater than four inches in diameter and other deleterious matter compacted to a minimum 95% ASTM D698 density. 1.26 TESTS A. Al) tests to ensure that embedment, fill, and backfill materials and their placement comply with specified requirements shall be made by an independent testing laboratory at the expense of the Owner, as required by the Engineer. 1.27 DRAINAGE MAINTENANCE A. Trenches across roadways, driveways, or other trafficways adjacent to drainage ditches or water shall be constructed on the upstream side of the trafficway to prevent impounding water after the pipe has been laid. Bridges and other temporary structures required to maintain traffic across such unfilled trenches shall be constructed and maintained by the Contractor. Backfilling shall be done so that water will not accumulate in unfilled or partially filled trenches. All material deposited in roadway ditches or other water courses crossed by the line of trench shall be removed immediately after backfilling is completed, and the original section, grades, and contours of ditches or water courses shall be restored. Surface drainage shall not be obstructed longer than necessary. 1.28 PROTECTION OF TRENCH BACKFILL IN DRAINAGE COURSES A. Where trenches are constructed in ditches or other water courses, backfill shall be protected from surface erosion. Where the grade of the ditch exceeds 1°/0, ditch checks shall be installed. Unless otherwise indicated on the drawings, ditch checks shall be installed. Unless otherwise indicated on the drawings, ditch checks shall be concrete. Ditch checks shall extend not less than two feet below the original ditch or water course bottom for the full bottom width and at least 18 inches into the side slopes, and shall be at least 12 inches thick. 1.29 DISPOSAL OF EXCESS EXCAVATED MATERIALS A. Except as otherwise permitted, all excess excavated materials shall be disposed of in onsite areas as directed by Owner's Representative. Excavated rock, Carolina International School, Phase I 029210003 Page 6 Section 02210 — Excavation and Trenching April, 2004 debris encountered in excavation work, and other similar waste materials shall be disposed of away from the site of the work, 1.30 SETTLEMENT A. The Contractor shall be responsible for all settlement of backfills, fills, and embankments which may occur within the correction period stipulated in the General Conditions, The Contractor shall make, or cause to be made, all repairs or replacements made necessary by settlement within ten days after notice from the Engineer or Owner. 1.31 BACKFILL A. All backfill shall be placed so as to achieve a minimum compaction of 95% based on the Standard Proctor and in Place Density Tests, The Contractor will be required to retain the services of an independent testing laboratory to certify compaction along existing State maintained roadways, as required, END OF SECTION 02210 Carolina International School, Phase I 02921.0003 Page 7 ion 02210 — Excavation and Trenching April, 2004 SECTION 02600 — BEDDING AND BACKFILL ATERIALS PART 1 — GENERAL 1.1 DESCRIPTION A. This Section covers the stone bedding and soil or stone backfill materials used in pipeline construction, and other similar installations where shown on the drawings, required in the specifications, or as directed by the Engineer, 1.2 QUALITY ASSURANCE A. Materials shall meet the requirements of Part 2 of these specifications, and shall be acceptable to the Engineer, PART 2— MATERIALS 2.1 STONE BEDDING A. Bedding material shall conform to Standard size #57 or Standard size #67, and conform to the gradation requirements of Table 1005-1 of the NCDOT Standard Specifications. B. All stone bedding required for normal pipe installations is to be included as a cost of the pipe installation, and covered in the pipe price. Additional payments for stone bedding will only be made for the stone required over and above standard bedding requirements. Stone will be paid for additionally when used in over cut areas, excessive wet areas, etc. The cost of all mucking or removal of unsuitable debris where additional stone is used will be included in the stone price. Any use of extra stone bedding requires notification to the Engineer. Quantities for payment wUL be made from visual observations and stone delivery tickets, less the amount for standard bedding, 2.2 SELECT BACKFILL A. Where other than local material is used for backfill, such material will be classified as select backfill. This material shall be a soil material which meets the requirements of AASI-ITO for M 145 for Class A-2-4 soils. This material shall be a well graded, gravelly, silty, or clayey sand with a plasticity index equal to or less than ten and a liquid limit equal to or less than forty. PART 3 — EXECUTION 3.1 INSTALLATION A. The usage and installation of stone bedding shall be in accordance with the specification for the particular item being installed. B. Select backfill will be used only when directed by the Engineer, or when specifically called for in another section of these specifications. Carona Internationa1 School, Phase 029210003 Page 1 Section 02600 edding and BackfiU Materials April, 2004 3.2 METHODOF MEASUREMENT A. Payment for excavation and backfilling bedding material shall be the unit price bid per cubic yard for "Unsuitable Material," complete, including Mauling off of bad material, Payment for unsuitable material in water and sanitary sewer ditch excavation and backfill for bedding shall be made at the unit price bid per cubic yard complete. END OF SECTION 0 600 Carolina International hool, Phase l 9 9 1.090 Page Section 02600 Bedding and Sack ll M April{ 20 SECTION 02607 — PRECAST CONCRETE MANHOLES PART 1 — GENERAL 1.1 SCOPE OF WORK A. The Contractor shall furnish all materials, labor, and equipment; and shall construct manholes consisting of precast sections as shown on the drawings and as specified herein. The manholes shall have an invert channel shaped to correspond with the lower half of the pipe. The top of the shelf shall be sloped to drain toward the flowing channel, Every effort shall be made by the Contractor to construct watertight structures. Structures that are not watertight or meet the requirements of ASTM C-443 are not acceptable. C. The forms, dimensions, concrete and construction methods shall be available for inspection by the Engineer in advance of construction. The Engineer shall reserve the right to inspect the facilities of the supplier. D. Manholes shall have eight inches minimum wall thickness, and shall conform to ASTM C478 for structures designed to support vehicles loadings, based on ASSHTO H20. E. Flexible gasket connectors for connecting pipes shall meet the requirements of ASTM C-923-89 or latest revision, and are required in all manholes, F. Lifting devices shall not penetrate the walls of the manholes. 1.2 RELATED WORK NOT INCLUDED A. Section 02210: Excavation and Trenching. 1.3 SUBMITTALS A. Submit to the Engineer, as provided in the General Conditions, shop drawing showing details of construction, reinforcing, joints, openings, and all other specified details. 1.4 INSPECTION A. The quality of all materials, the process of manufacture, and the finished sections shall be subject to inspection and approval by the Engineer or other representative of the Owner. Such inspection may be made at the place of manufacture, and/or at the site. Wherever possible, the precast sections shall be inspected prior to unloading from the delivery truck and marked by the inspector showing acceptance or rejection. However, discovery at any time of failure to meet requirements of these specifications is cause for rejection. Sections rejected after delivery to the job shall be marked for identification and shall be removed from the job at once. All sections which are damaged after delivery will be rejected; and, if already installed, shall be acceptably repaired, if Carolina Internatto 02921.0003 Page 1 chool, Phase ion 02 Concrete Manholes April, 2004 permitted, or removed and replaced entirely at the Contractor's expense, as determined by the Engineer. C. All sections shall meet the manufacturing tolerance requirements of ASTM C478 or the following casting tolerances, whichever are more severe: 1. Wall Thickness ±3/8" 2, Inside Diameter ±3/8" 3. Outside Diameter ±1/2" 4. Height or Length ±3/8" D. Piping openings shall meet the recommended tolerances of the individual manufactured pipe to manhole connectors; however, the horizontal location shall be within ±2 degrees of arc of that detailed on shop drawings. E. At the time of inspection, the sections will be carefully examined for compliance with ASTM C478 latest revision, these specifications and with the approved manufacturer's drawings. All sections shall be inspected for general appearance, dimension, "scratch -strength," blisters, cracks, roughness, soundness, etc. The surface shall be dense and close -textured. F. Imperfections may be repaired subject to the approval of the Engineer after demonstration by the manufacturer that strong and permanent repairs result. Repairs shall be carefully inspected before final approval. Cement mortar used for repairs shall have a minimum compressive strength of 4,000 PSI at seven days, and 5,000 PSI at 28 days. Epoxy mortar may be utilized for repairs subject to the approval of the Engineer. PART 2 — PRODUCTS 2.1 PRECAST CONCRETE SECTIONS A. General: Except as modified in the specifications, manholes shall meet the requirement of ASTM 0478, or most recent revision, Specification for Precast Reinforced Concrete Manhole Sections. Cement shall meet the requirements of ASTM C150-89, or most recent revision, Specification for Portland Cement, Type IL Concrete shall have a compressive strength of 4,000 PSI. Minimum wall thickness for manholes shall be eight inches," or 1/12 the inside manhole diameter, whichever is greater. Sections shall be custom made with openings to meet indicated pipe alignment conditions and invert elevations. Submit shop drawings, consisting of manufacturer's standard details of various sections for approval prior to manufacture, Drawings of individual manholes showing invert elevations, pipe sizes and similar details are required. Manufacturer shall submit concrete mix designs together with certified test results for the Engineer's review prior to commencing manufacture. Joints: Form joint contact surfaces with machined castings. Surfaces shall be parallel, and the tongue equipped with a proper recess for the installation of a rubber gasket. Gaskets shall meet the requirements of Specifications for Joint Carolina International School, Phase I 02921 0003 Page 2 Section 02607 — Precast Concrete Manholes April, 2004 for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets (ASTM C- 443). In addition to this rubber gasket joint, the installation contractor may, at his own choice, add an exterior seal such as "Waterstop Rx," 'Adeka Ultra Seal: "Cadilloc Sealing Bands," or approved equal. C. Masonry for Grade Adjustment: Precast grade rings or brick shall be used for final grade adjustment. Bricks shall be wetted prior to laying. Bricks shall be set true to line with each coarse plumb. No mortar shall be used which has begun to set. The grade rings or bricks used on manholes with fiberglass linings shall also be protected in the same way. D. Masonry 1 Brick: ASTM C32-73 or more recent revision, Specification for Sewer and Manhole Brick (made from clay or shale). Sound, hard, and uniformly burned, regular and uniform in shape and size of compact texture. Grade MA. 2. Cement: Portland, ASTM C150-189 or most recent revisions, Specification for Portland Cement, Type It. E. Sand: Washed silica sand, ASTM C144, latest revision, Specification for Aggregate for Masonry Mortar. F. Invert Construction 1. Inverts: Form with Type II cement and sand mortar and brick to provide a smooth flowing channel of similar shape and size of the sewer to which it connects, 2. Straight Run Manholes: Shape inverts while manholes are under construction. Cut off pipe at inside faces of manhole, and construct invert to exact shape and size of pipe indicated. Junction Manholes: Shape inverts while manholes are under construction. Cut off pipe at inside faces or manhole and construct invert to shape and size of pipe indicated: All inverts shall follow grades of pipes entering manholes, Provide a true curve of the largest radius possible for changes in direction of sewer and entering branch or branches. G. Manhole Frames and Lids: ASTM A48-74, or most recent revision, Specification for Gray Iron Castings: All casting shall comply with Federal Specification QQ-T- 652. Cast in a true symmetrical pattern of tough, dense and even grained iron, free from warping, scales, lumps, blisters, sand holes, or any defects of any kind. Provide indented pattern lids with lettering as shown on the drawings. Machine or grind frames and lids at touching surfaces to provide firm seats, and prevent rocking. Remove and replace any set not matching perfectly. All frames and covers shall be designed to withstand an HS20-44 wheel loading as defined by AASHTO specifications. Carolina International School, Phase I 02921,0003 Page 3 Section 02607 — Precast Concrete Manholes April, 2004 H. Manhole Steps: Manholes shall be furnished with non -corrosive plastic encapsulated No, 4 deformed steel rod steps. Steps shall be spaced at 16 inches on center one over the other: Steps whenever possible shall be positioned over the inlet pipe. 2.2 LATERALS A, Service Connections: Install types of connections shown on the drawings, or as directed by the Engineer, Each connection location shall be accurately recorded by station and offset method, and referenced from the center of the downstream manhole. Furnish two copies of this record to the Engineer. B. Service Assembly: Provide wye branch, six inch curve pipe, and clean -out pad as shown on the drawings. 2.3 MANHOLE CONSTRUCTION Precast Concrete Manhole Installation: Set precast concrete sections vertical and in true alignment. Install rubber gasket in the previously set section, A, The finished manhole shall not be out of plumb by more than 3/8-inch per ten feet of height. B. Any job or offset of wall surface each side of a joint shall not exceed 1/2-inch. C. Variation in the joint width around the circumference of the manhole shall not exceed 3/8-inch, D. Grade Adjustment Construct brick masonry or set precast concrete grade rings on top of manhole slabs, and precast concrete manhole cones to provide grade adjustment in setting manhole frames: E. Setting Manhole Frames: Set manhole frames and lids to conform accurately to the finished ground or pavement as shown or as directed by the Engineer. Set frames on manholes concentric with the masonry and in a full bed or mortar so that the space between the top of the manhole masonry and the bottom flanges of the frame will be completely filled and made watertight. Place a ring of mortar around the outside of the bottom flange at least one inch thick, and pitched to shed water away from the frame, Extend mortar to the outer edge of the masonry and finished smooth and flush with the top of the flange. 2.4 TESTING A. After each manhole is constructed to its finished height, and before backfilling, each manhole shall be tested for watertightness in the following manner: Plug pipe lines and perform vacuum test. Observing all recommended safety measures, induce a backpressure of 5.0 PSI equivalent to 10: Hg (mercury). The manhole assembly is considered satisfactory if the vacuum loss is less than 1" Hg for the length of time listed in the following table: Carolina International School, Phase I 02921,0003 Page 4 Section 02607 — Precast Concrete Manholes April, 2004 Depth (Feet) 4 Time of Test in Seconds Manhole Diameter t 4 10 8 20 12 0 16 40 20 50 24 60 T 26 39 65 52 5 6.5 Note: Add 'T seconds for each additional 2'-0" of depth.. Failure td pass one of this tests requires the contractor to correct the problems and retest. The Contractor will replace leaking gaskets and/or concrete sections, and retest the completed manhole. No manhole will be accepted without t u c full passing thitest. END OF SECTION 0.607" Carolina international School, Phase 1 02821.0003 Page Section 02607 Precast Concrete Manholes April, 2004 SECTION 02610 — RIP RAP PART 1-- GENERAL 1.1 DESCRIPTION A. This Section covers the furnishing and installation of plain and grouted rip rap in accordance with these specifications and the contract drawings, or as directed by the Engineer. 1.2 QUALITY ASSURANCE A. Materials shall meet the requirements of Part 2 of these specifications, and shall be acceptable to the Engineer. PART 2 — MATERIALS 2A PLAIN RIP RAP A, Stone for plan rip rap shall consist of field stone or rough quarry stone. The stone shall be sound, tough, dense, resistant to the action of air and water, and suitable in all other respects for the purposes intended. Where broken concrete from demolished structures of pavement is available, it may be used in place of stone provided that such use meets with the approval of the Engineer. However, the use of broken concrete which contains reinforcing steel will not be permitted. The stone or broken concrete shall be graded to meet the following requirements. 1. Class 1 Rip Rap a. Stone shall vary in weight from 5 to 200 pounds. At least 30% of the total weight of the rip rap shall be in individual pieces weighing a minimum of 60 pounds each. Not more than 10%© of the total weight of the rip rap may be in individual pieces weighing Tess than 15 pounds each. 2, Class 2 Rip Rap a. Stone shall vary in weight from 25 to 250 pounds. At least 60%© of the total weight of the rip rap shall be in individual pieces weighing a minimum of 100 pounds each. Not more than 5% of the total. weight of rip rap may be in individual pieces weighing less than 50 pounds each. Class A Rip Rap a. Stone shall vary in size from 2" to 6" in diary eter, A 10% tolerance will be allowed on top and bottom sides, . Grouted Rip Rap a. Grouted rip rap shall be installed as indicated on the project drawings. The rip rap shall be installed as provided in this section, Carolina International School, Phase I 02921, 0003 Page 1 Section 02610 — Rip Rap April, 2004 SECTION 11070 - DUPLEX GRINDER PUMP STATION PART 1 — GENERAL 1.1 DESCRIPTION OF WORK A. One (1) Duplex Grinder Pump Station shall be provided for the Carolina International School to transport wastewater to the existing manhole that discharges to the Highland Ridge Pump Station as shown on the contract drawings. B. The grinder pumps shall be explosion proof Class 1, Division 1, Group D and the systems shall include a pump basin, grinder pump, and pump controls, 1.2 QUALITY ASSURANCE A. The grinder pump stations shall be provided byle han ten manufacturer(1of ypproven ability having similar units in service for a period of not B, The system supplier shall maintain an inventory of replacement pumps, piping and controls within 100 statute miles of the project location in Belmont, NC. C. Available manufacturers„ subject to compliance with all of the requirements of these specifications, shall include: 1. EF Myers Ashland, KY 2, Barnes Pumps — Mansfield, OH 3. Flygt Pumps - Trumbull, CT (, Grinder pump, valves, and controls shall be supplied by a single distributor, who shall assume single point responsibility for all components. 1.3 SUBMITTALS A, Submit four (4) sets of shop drawings and detailed specifications for all systems and equipment. B. Submit four (4) sets of detailed O&M instructions, PART 2 — PRODUCTS 2.1 PUMP BASIN A. The pump basin and valve vault shall be constructed of concrete. The pump station basin shall have a minimum internal diameter of 60 inches in diameter and Fifteen (15) feet in depth. The basin shall be mass filled with concrete two (2) feet in depth to provide the required weight to prevent floatation resulting in a net internal depth of thirteen (13) feet. Each basin shall be capable of withstanding 150% of the anticipated maximum pressure exerted by saturated Carolina international School, Phase 1 Se #ion lt? 0 — Duplex Grinder Pu mppnStlet ons 02921.0003 Page 1 soil (120 lb/cf) at maximum bury depth. All station components shall fun tion normally when exposed to these loadings. 2.2 BASIN COVERS A. One-piece concrete basin cover shall be provided with hinged aluminum hatch access door. The minimum opening shall be 24 inches by 42 inches as shown on the plans. A gasket shall be installed an the upper flange of the basin to provide a watertight seal against the cover. 2.3 GRIN ER PUMP A. Pumping system design shall designate a specific pump requirement for each grinder to be provided as a part of the low pressure wastewater system serving Reflection Pointe. Individual lots shall incorporate either a standard or high head grinder pump as shown on the plans. B. The submersible grinder pumps shall be capable of meeting the following performance requirements: Standard Pumps C. Materials HEAD (TDEI) 65 FLOW (GPMI 50 1. The pumps shall be manufactured in the United States utilizing domestic parts and components in its construction. The volute, seal plate, cord cap, motor housing and impeller shall be constructed of high quality ASTM Class 30 minimum cast iron. The pumps shall be painted with air- dry enamel. All exposed hardware shall be 300 series stainless steel. Discharge connection shall be a standard 2.5 inch NPT in the vertical position. 2. The pump impeller shall be of the recessed, vortex design, The impeller shall be of cast iron construction and machined for threading to the motor shaft, The impeller shall be capable of being trimmed to meet specific performance characteristics, The pump shall have a two (2) bearing design consisting of an upper ball bearing for the purpose of carrying the thrust loads, and lower ball bearing to carry radial loads, Bali bearings shall be designed for 50,000 hours B-10 life, 4. The motor shaft shall be of 416 stainless steel. D. Grinders 1, The grinder mechanisms shall consist of radial cutter threaded and locked an the motor shaft by a screw, washer, and a shredding ring. Carolina International School, Phase Section 11070 — Duplex Grinder Pump Stations 029210003 Page 2 April, 2004 Grinding shall be accomplished by a slicing action as opposed to a chopping action. Both the shredding ring and radial cutter shall be constructed of 440C stainless steel hardened to a minimum Rockwell C55 and shall be finish ground for a fine cutting edge. The grinder shall be placed immediately below the pumping elements and. shall be direct -driven by a single, one-piece, stainless steel motor shaft. The grinding assembly shall be balanced and operate without objectionable noise or vibration over the entire range of recommended pressures. The grinder shall be constructed so as to eliminate clogging and jamming under all normal operating conditions including starting. The grinder shall be capable of reducing all components in normal domestic sewage, including a reasonable amount of "foreign objects", such as paper, wood, plastic, glass, rubber and the like, to finely -divided particles which will pass freely through the passages of the purnp and the 2.5" diameter discharge piping. The grinding mechanism must be capable of handling reasonable amounts of grit, often found in domestic sewage systems. E. Electric Motor 1, The motor shall be squirrel -cage, induction type. Single phase motors shall be of the capacitor start, capacitor run design, 230 volt, single phase, 3 HP, 3450 RPM. Single phase motors shall be NEMA L Type. The motor shall be constructed with open windings operating in a sealed housing which contains clean dielectric oil for heat dissipation from the windings and for lubrication of the bearings and seals. The stator windings shall be the open type with Class F insulation rated for 155 degrees C maximum operating temperature. 2. Protection against excessive temperature shall be provided by a heat sensor thermostat attached to the stator windings and connected in series with the contactor coil in the control panel. The heat sensor shall stop the motor if the motor winding temperature reaches 221 degrees F. The high temperature shutoff will cause the pump to cease operation, should a control failure cause the pump to run in a dry wet well. The thermostat shall reset automatically when the motor cools to a safe operating temperature, Carolina International School, Phase 1 02921,000 Page 3 Section 11070 — duplex Grinder Pump Stations April, 2004 F. Mechanical Seal 1. Motors shall be equipped with double mechanical shaft seals to prevent leakage between the motor and pump, The seal assemblies shall consist of two Type 21 oil -lubricated rotary shaft seals in an oil -filled chamber. The materials of construction shall be carbon for the rotating faces and ceramic for the stationary faces, lapped and polished to a tolerance of one light band, with 300 stainless steel hardware, with all elastomer parts of Buna-N. 2. The pump shall be equipped with a seal leak detection probe and warning system. This shall be designed to alert maintenance personnel of lower seal leakage without having to take the unit out of service for inspection or requiring access for checking seal chamber oil level consistency. There shall be an electric probe or seal failure sensor installed in the seal chamber between the two tandem mechanical seals. If the lower seal leaks, contaminants which enter the seal chamber shall be detected by the sensor and send a signal to operate the specified warning device. G. Power Cord Motor power cord shall be SOW/SOWA type 14 gauge, 5 conductor of a length of 20 feet, Cable shall be provided with a green ground wire to be accordance with local and national electric codes. H. Cable Entry System The cable entry system shall consist of the cable fastened by means of a cord grip in the top of the pump. The top of the pump shall contain a waterproof junction box which will provide space to connect the power cord to the motor leads. The motor leads shall seal between the motor housing and junction box by means of a rubber compression fitting around each wire. 2.4 BASIN DISCHARGE PACKAGES A. Schedule 80 PVC discharge piping and fittings shall connect a pump disconnect fitting to the outlet of each basin. Discharge pipe, fittings, valves and outlets shall be sized at or above the size of the pump discharge connection. Each basin outlet shall be constructed of cast iron with NPT threads and an integral sealing flange for bolting to the basin. Stainless steel bolts and a sealing gasket shall be included for each outlet. The pump discharge outlet shall be located 36" from the top flange of the basin. The conduit outlet shall be located 18" from the top flange of the basin. 2.5 SHUT-OFF VALVES A. PVC true union ball type shut off valves with Teflon seats shall be furnished as an integral part of each internal piping assembly. Art extension handle shall be included with each shut off valve, Carolina International School, Phase 1 02921.0003 Page 4 Section 11070 — Duplex Grinder Pump Stations April, 2004 2,6 PUMP DISCONNECTS A. The basins shall include a slide rail lift -out system for each of the two (2) pumps. Each lift -out system shall consist of a cast iron discharge base, cast iron pump carrier and sealing plate, steel pump guide plate, and cast iron elbow, All exposed hardware shall be stainless steel, 1. Discharge elbow shall be 3,0" NPT and shall be integral to the base assembly. 2. Sealing plate/Elbow has a female mating end and shall be threaded to the pump with a stainless steel schedule 80 close nipple. An integral ball check valve suitable for sewage shall be included in the pump carrier assembly. A simple downward sliding motion of the pump and guide plate on the guide rails shall cause the unit to be automatically connected and sealed to the base. The open face of the sealing plate shall have dovetailed groove machined into the face to hold a sealing 0-ring. The 0-ring shall provide a redundant leak -proof seal at all operating pressures. Two guide rail pipes shall be used to guide the pump from the surface to the discharge base connection. The guide rails shall be 1.5" schedule 40 stainless steel pipes. The weight of the pump shall bear solely on the discharge base and not on the guide rails, The guide rails shall be firmly attached near the top of the basin interior with a stainless steel bracket. 4. An adequate length of stainless steel lifting chain shall be supplied for removing the pump, The chain shall be of sufficient length and strength for easy removal. B. All basins shall include a stainless steel eye near the top of the basin interior to serve as a rope or chain keeper. 2.7 INLET FITTING A, A one-piece inlet fitting for 6-inch SCH 40 or SDR 35 plastic pipe shall be shipped loose for field installation as required by the installation. 2.8 JUNCTION BOX A, The junction box shall be constructed of structural plastic for corrosion resistance and of adequate thickness to provide stability and mechanical strength. The junction box shall have a fully gasketed cover that is held in place by four (4) captive stainless steel screws with heads of adequate size so that they may easily be installed and removed without the use of special tools, The heads of the screws shall be totally encapsulated so that no metal parts are exposed. The cover shall be fastened to the main body of the junction box by means of a totally corrosion -resistant tether to prevent dropping the cover during service. B. An adequate number of sealing -type cord grips shall be supplied for incoming pump and level control cords. The cord grips shall be made Of non -corrosive Carolina International School, Phase 1 02921.0003 Page 5 Section '11070 -- Duplex Grinder Pump Stations April, 2004 material, such as PVC or nylon, and shall make an effective seal around the wire jacket, The cord grips shall seal to the junction box with an 0-ring or gasket. The junction box shall have a PVC solvent weld type conduit hub of adequate size to accommodate the number of wires required for pump and level control operation. The incoming wires shall be sealed by an external EY type seal -off (supplied by others) so that condensation from the conduit or groundwater will not enter the enclosure. The interior of the enclosure shall be of adequate size to accommodate the wires and connections for pump and level control operation. D. The wires running between the control panel and the junction box shall be color - coded and fastened to the pump and level controls by means of adequately sized and insulated twist lock or crimp connectors. E. The junction box shall be explosion proof Class1, Division 1 designed to NEMA 7 standards, 2.9 LEVEL CONTROLS A. Pump on, off and alarm levels shall be controlled by three (3) mercury tube float switches Switches shall consist of a mercury tube switch sealed in a corrosion - resistant polypropylene housing with a minimum of 18 gauge, 2-wire, SJOW/A jacketed cable, The cable shall be of sufficient length to reach the junction box with no splices. The level controls shall be suspended from a stainless steel bracket located near the top of the basin interior so that adjustment or replacement may be done without the use of any tools. Level controls shall be UUCSA listed. 2.10 CONTROL PANEL A. A NEMA 4X fiberglass control panel shall be furnished with each pumping unit to be installed, as shown on the plans. The control panel enclosure shall be molded of glass reinforced polyester resins which are chemically resistant to corrosive atmospheres. The resin system shall be pigmented to impart a gray color to the enclosure and be resistant to ultraviolet light. The resin system also shall include a flame retardant to obtain a flammability rating which meets U.L. 94V-0, Heat distortion temperature shall be 350 degrees Fahrenheit. The enclosure shall be of one-piece, weatherproof construction with smooth, rounded corners and shall be constructed to have a smooth exterior and interior. The enclosure shall be fitted with a closed cell neoprene gasketed cover. The enclosure shall be provided with back panel mounting provisions: The cover shall be hinged with a heavy-duty corrosion resistant stainless steel piano hinge. The cover shall be lockable by means of two (2) high quality combination stainless steel latches and padlock hasps. The enclosure shall be provided with external mounting feet on the top and bottom of the enclosure. These mounting feet shall be of fiberglass and molded as an integral part of the enclosure. The back panel shall be a minimum of .080" aluminum and held in place by four (4) #1O screws, which will mate to the four (4) threaded standoffs, which are molded into the enclosure — Carolina inte 02921.0003 Page 6 ional School, Phase 1 Seciion 70 — Duplex Grinder Pump Stations April, 2004 0. The panel shall include a double pole 20 amp main disconnect breaker, alarm circuit fuse, control circuit fuse, I.E.C. rated motor contactor, Klixon overload, pump hand -off -auto switches (momentary in the hand position), pump run lights, seal leak lights, start and run capacitors, start relays, terminal blocks, ground lug and all necessary wiring and brackets, D. The control panel shall be fitted with a red lexan (polycarbonate) alarm light. The light shall be approximately 3" high by 3-1/2" diameter. The globe shall be mounted on top of the enclosure with a neoprene gasket. The lens cannot be removed from the exterior of the enclosure. The lens may be removed by entering the interior of the enclosure and removing four (4) #8 screws. The bulb shall be 40 watt minimum high intensity -medium base type. The bulb shall be easily replaced by removing a thumbscrew from the support bracket on the interior of the panel. The alarm shall have a bright glow and flash during high water conditions. The alarm light will go out when the water level drops. An acknowledge alarm circuit (with buzzer) shall be provided to indicate an alarm condition. The buzzer shall be energized by either the alarm float switch or the alarm test switch and operate in conjunction with the alarm light, The buzzer shall be weatherproof and be rated for 85 DB at 10 feet. There shall be an exterior acknowledge switch that will silence the buzzer but allow the light to remain flashing during an alarm condition, E. A lightning arrestor shall be supplied in the control panel for each pump. The arrestor shall protect the equipment from overvoltages caused by lightning discharges. The arrestor shall be rated at 650 volts RMS L-G. F. All internal wiring shall be neat and color -coded, Each wire shall be a different color or stripe (except for ground), and all incoming wires shall terminate into a box clamp type terminal block (except incoming power). All wires shall be 14GA. Type TEW rated for 105 degrees Celsius, A schematic diagram (showing wire color) shall be permanently fastened to the inside of the enclosure, An installation and service manual shall also be included with each control panel. G. The control panel shall be U.L. listed as an assembly. PART 3 — EXECUTION 3.1 INSTALLATION A. Installation of grinder pump systems shall be in strict accordance with the plans andspecifications, and all applicable State and local codes. 3.2 WARRANTY A. The grinder pump manufacturer shall offer a standard one (1) year warranty to ensure that the pump station is free from defects in materials and/or workmanship. Carolina International School, Phase 1 02921.0003 Page 7 END OF SECTION 11070 Section 1 070 — Duplex Grinder Pump Stations April, 2004