Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0023051_Regional Office Historical File Pre 2018
Michael F, Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environrnent and Natural Resources Alan W. Klimek, P,E, Director Division of Water Quality Coleen H. Sullins, Deputy Director Division ofWater Quality September 8, 2003 Mr. Paul Campbell, Director of Engineering City of Concord P.O. Box 308 Concord, North Carolina 28206 Subject: Permit No, WQ0023051 City of Concord Concord-kannapolis Westside Bypass Ext, Wastewater Collection System Extension Cabarrus County Dear Mr. Campbell: In accordance with your application received an September 3, 2003, we are forwarding herewith Permit No. WQ0023051, dated September 8, 2003, to the City of Concord for the construction and operation of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1)15A NCAC 2H :0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, andfor referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 919 N, Main Street, Mooresville. NC 28115 Internet http://h2o.enr,state nc usi Telephone (704) 663-1699 Fax (704) 663-6040 NCDENR DENR Customer Service Center Telephone 1 877 623-6748 Mr Paul Campbell Page 2 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Concord for the construction and operation of approximately 1,341.52 linear feet of 8-inch gravity sewer; and approximately 298.48 linear feet of 12-inch gravity sewer to serve 4 three - bedroom residences as part of the Concord-Kannapolis Westside Bypass Extension project, and the discharge of 1,440 gallons per day of collected domestic wastewater into the Water and Sewer Authority of Cabarrus County's (WSACC) Rocky River WWTP (NPDES No. NC0036269) existing sewerage system, pursuant to the application received September 3, 2003 and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall become voidable unless the agreement between the City of Concord and WSACC for the collection and final treatment of wastewater is in full force and effect. If any parts, re-quirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Sonja Williams at (704) 663-1699. Sincerely, for Alan W, Klimek, P.E. cc: Cabarrus County Health Department Mooresville Regional Office, Water Quality Section (VVWTF Permit No, NC0036269) Ronald Wilkins, NCDOT Design Services Unit Water Quality Central Files NDPU Files NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subjec following specified conditions and limitations: o the 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 28 .0200. b. A map of the sewer system shall be developed prior to January 1, 2004 and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Perrnittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineers Certification, one copy of the "Construction Record Drawings," and one copy of the supporting design calculations to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7, A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215,6A through §143-215.6C. . In the event that the wastewater collection facilities fail to perform satisfactory, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall report by telephone to the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this the 8th day of September, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimel{;`1*'.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0023051 Fast Track Engineering Certification Permit No. WQ0023051 September 8, 2003 Complete and submit this form to the permit issuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project �► Changes to the project should be clearly identified on the record drawings or in written summary form, Pemnit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineers Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial E] Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the Concord-Kannapolis Westside Bypass Extension, Cabarrus County project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable;;. the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE 919 N. MAIN STREET MOORESVILLE NC 28115 The Pemiittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAST -TRACK APPLICATION for CRAVTY SEWERS, PUMP STATIONS, AND FORCE MAINS. PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! 1. Owner. la. City o-fConcord Application Number: (to be completed by DWQ) Z.30S— I Full Legal Name (company, municipality, HOA, utility, etc.) lb. Paul D. Campbell,_pE, Director of En ineerin 0 Signing Official Name and Title (Pease review 15A NCAC 2H ,02 6(b) for authorized signing officials!) - c. The legal entity who will own this system is individual 0 Federal Municipality 0 State/County Private Partnership R Corporation 0 Other (specify): • ld. 850 Warren C. Coleman Blvd,: Post Office Box 308 le. Concord O Street Address LL Z lf. North Carolina State O 1 h. (704) 920-5425 (704L786-4521 Telephone Facsimile („) 2 Project (Facility) Information. 2a. Concord-Kannapolis Westside Bypass Extension 2b. Cabarru a. Brief Project Name (permit will refer to this name) O 3. Contact Person. City 0 3a. Ronald B. Wilkins, PE Name and Affiliation of Someone Who Can Answer Questions About his Apptcation rbao 3c...PA*444ms@dot.state.nc.us 28206:0308 Zip Code lj. compl2e1 Loon d,nc.us E-mail County Where Project is Located 3b. (919) 250-4128 Phone Number E-maii 1 Project is New Modification (of an existing permit) If Modification, Permit No: For modifications, attach a separate sheet clearly explaining the reason for the modification (Le. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is Public (skip to Item B(3)) 0 Private (go to Item 2(a)) 2a. If private, applicant will be: 2b, If sold, facilities owned by a (must choose one) 0 Retaining Ownership (i.e. store, church, single office. etc) or 0 Leasing units (lots, townhomes, etc, - skip to item B(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) Public Utility (Instruction HI) 0 Homeowner Assoc./Developer (ns 'CC 3, Citty f CtnR,(ifEr v4.4. Ala.- 2 Owner of Wastewater Treatment Facility(WWTF) Treating Wastewater From This Project O • 4a. Rocky River Regional Wastewater Treatment Plant 4b. NC0036269 LL Name of WWTF WWTF Permit No, Z 5a. City of Concord 5b. 8-inch 5c. tion IV) Owner of Downstream Sewer Receiving Sewer Size Permit Number of Downstream Sewer (if known) • 6, The origin of this wastewater is (check all that apply). CC Z Residential Subdivision 0 Car Wash LLI EI Apartments/Condominiums 0 Institution CL 0 Mobile Home Park 11 Hospital ai 0 School El Church 0 Restaurant 0 Nursing Home 0 Office ill Other (specify): 7, Volume of wastewater to be permitted in this project, 1440 gallons per day 100 % Domestic/Commercial % Industrial % Other (specify): 8. If the permitted flow is zero, indicate why: 0 Interceptor Line - Flow will be permitted is subsequent permits that connect to this line 0 Flow has already been allocated in Permit No, 0 Rehabilitation or replacement of existing sewer with no new flow expected FAST -TRACK APPLICATION for VITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H ,0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below, Values other than that in 15A NCAC 2H .0219(1)(1-2) must be approved prior to submittal of this application Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H ,0219(1)(3), The new sewer line will serve four dwellings. Each dwelling will generated 360 gallons/day of wastewater, The calculation for the total wastewater generated is four times 360 galiday or 1440 gallons per day, 10, Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8" 12" D 2 1- z Length (feet) 1341 52 ft. 298,48 ft, Gravity or Force Main (use the pull down menu) Gravity Gravity 0 ENTER TOTAL LINE LENGTH IN MILES 0.31 miles 11— 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID Power Reliability Option Cit (self chosen - as shown on Design Flow Operational Point (1- dual line feed; 2- permanent generator w/ATS; 3- 0 plans for cross-reference) (MGD) GPM TDH portable generator me/telemetry; 4-wet well storage) 2 LL 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Perrnitfing of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H 0200 as applicable? Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13. Have the following permits/certifications been submitted for,approval? Wetland/Stream Crossings - General Permit or 401 Certification? 0 Yes 0 No Sedimentation and Erosion Control Plan? Yes LJ No Stormwater? 0 Yes No 4 N/A El N/A El NIA r-r, 4 flfl fl fl -- t", FAST -TRACK APPLIC4TION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary) This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: 0 A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody, AND, 4:C El A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability (1) 0 2a. Ronald B. Wilkins, PE Professional Engineer Name 2b. NCDOT Desi_gn Services Unit Engineering Firm 2c. 1591 Mail Center Address 2d. Raleigh 2e. NC 2 City State Zip 2g. (910) 250-4128 2h. (91)250-4119 2i, Rbwilkins dot.statenc.us Telephone Facsimile E-mail option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on Name of Waterbody Stream Waterbody map for cross-reference) Waterbody County River Basin Index Classification Kannapolis, NC Coddle Creek Cabarrus Yadkin 13-17-6(5 5) C Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certification: la. I, Paul Campbell, PE, attest hat this application for Concord-Kannapolis Westside Bypass Extension has been reviewed by me and is accurate and complete to the best of My knowledge, I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, Note: In accordance with North Carolina General Statutes 143-215,6A and 143-215.6E, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as welt as civil penalties up to s2,5,9g0 per v Signing Official Signature 2. Professionai'Engineer's Certifi io Date I attest that this application for 6" and 12" sewer lines crossing Concord-Kannapolis Westside Bypass has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge, 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12,, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance, Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I ,have reviewed this material and have judged it to be consistent with the proposed design, Note: In accordance with NC General Statutes 143-215,6A and 143-215,68, any person who knowingly makes any false statement. representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a tine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, vrt74* '2f, Seal, Signature & Date If-^"T r,In, 141 O C661 rz©-J1-Yf-08O5E JN 'SI IOJVNINV 0 State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 2762E-4535 James G. Martin, Governor Ocorgc T. Evcrctt, Ph.D. William W. Cobcy, Jr_, Sc *.ary Dirt. -tor May 1.1991 Memorandum To: Delegated Mut,. From.: Steve W. Tedder, Chief Water Quality Section Subject: Delegated Municipalities Checklist for Revi Non -Discharge Permit Applications. The Division of Environmental Management's Water Quality Section has revised, the Gravity Sewer Non -Discharge Permit Application Form. The form now incorporates the basic information that the Division feels is necessary in order for the delegated municipalities to perform a review on a gravity sewer project for the Division; therefore, the Division will no longer re.quirc that the "Delegated Municipalities Gravity Sewer Design Checklist" be completed and submitted. We do, however, require that the delegated municipality perform the same type of review as always rrqugred and c©nplcte the bottom portion of this page and attach it as the last page of all gravity scwcr applications that 7.17. bang submitted as a delegated municipalities project. If you have any questions on this matter, please contact Mr. Randy Jones at 919f733-5O83. - f DELEGATED WIUNICIPALITY GRAVITY SEWER CERTIFICATION (THIS FORM MAYBE PHOTOCOPIED FOR USE AS AN ORIGINAL) City of Concord Pr ojcct Name: Westside Bypass Waterline Poplar Tent Rd. to Crisco Rd. Project No. 2003-008 Applicant: Delegated M'unicipality Reviewer's Cer I Paul D. Campbell specifications have been reviewed under r, y su consistent with the info: mma6on that has been s Division of Environmental Management's minimum Delegated Municipality Reviewer's NC Professional Seal and Signature (specify date): FORM: DMGS 4191 PAGE 1 OF 1 nt that the subject plans and d that those plans and spccif cations are d on the Non-Disehar ge Application and the sign r--quircmcnts for gravity sever projects. gin-ers Registation N 9 WATER & SEWER AUTHORITY OF CABARRUS COUNTY August 20, 2003 W. Brian Hiatt City Manager City of Concord P. O. Box 308 Concord, NC 28026-0308 Subject: Flow Acceptance Westside Bypass Sewer Extension Dear Mr. Hiatt: vidson f-Iwt. NC' 28027 RO. Box 426 rd, NC 28026-0428 Phone: 704 786.1783 Fax: 704,795.1564 This is in response to the subject request for flow acceptance received 8/8/03. The Water and Sewer Authority of Cabarrus County (WSACC) has or currently expects to be able to make available capacity at the Rocky River Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed Westside Bypass Sewer Extension. WSACC agrees to accept wastewater from the proposed project based on information provided by NCDOT Design Services Unit (Civil Engineer for the project) using North Carolina Department of Environment and Natural Resources (NCDENR) wastewater flow guidelines. The projected flow is 1,440 gpd; however WSACC expects the actual wastewater flow to more closely approximate 1,000 gpd based upon Master Plan engineering data. By requesting flow acceptance, the City of Concord acknowledges that WSACC may need to upgrade, expand, or construct new facilities to accommodate the increased flow volume granted by this and previous flow acceptance. Appropriate design and construction will be initiated when actual flows dictate but may be subject to situations that WSACC does not expect or control. Based upon flow of 1,440 gpd and cost of $8,126/gpd to provide treatment and transportation capacity, this flow acceptance represents an estimated capital expenditure in excess of $11,701, For your information and based upon NCDENR wastewater flow guidelines, WSACC has approved 11,252,847 gallons of flow acceptance for the City of Concord from 1992 to present and 505,414 gallons of flow acceptance year-to-date including this request. Based upon the approved flow acceptances WSACC has committed capacity valued in excess of $91,440,634 for the City of Concord since 1992 including $4,106,994 for this calendar year. Downstream facilities from the proposed project are scheduled in WSACC's current Capital Improvement Program (CIP) to increase available capacity. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The following schedule of CIP projects is tentative and may be delayed by unforeseen circumstances: Lower Coddle Creek Interceptor will be paralleled. Scheduled completion date: 2009. Rocky River Wastewater. Treatment Plant phase Il upgrade. Scheduled completion date: 2004. City ofConcord Westside Bypass Sewer August 20, 2003 Page 2 of cons t si n c of this project is not started within one year of the date of this approval, the approval i rescinded and a second request and approval will be required. Please notify WSACC writing when construction of this project is initiated, If you have any questions, please e ll me at 70786-1783, WSACC Engmeenngta Adam I, a enha t ""one rd Sherri Mire '"nerd. Ron itlins, PENCDOT, uicereI John C. Murdock, i Executive Director 09/08/03 Permit Number INCI0023051 Permit Tracking Slip Program Category Non -discharge Permit Type :451 Track Gravity Sewer Ext.ension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer sonja.williams Status Project Type in review New Project Version Permit Classification Permitted Flow 1440 Facility Facility Name Concord-kannapolis Westside Bypass Ext Location Address Owner Individual Permit Contact Affiliation Major/Minor Minor Region Mooresville County Cabanas Facility Contact Affiliation Owner Name City of Concord Dates Events Orig Issue App Received Draft Initiated 09/03/03 Regulated Activities Subdivision (Duffed NULL Owner Type Government - Municipal Owner Affiliation Paul Campbell PO Box 308 Concord NC 28026 Scheduled Issuance Public Notice Issue Effective 41/8/03 Requested/Received Events Additional information requested Additional information received Expiration Wale y Name Stream Index Nu Current Class Subbasin OF THIS DOCUMENT HAS A C 10 THE IN OF NC Department of Transportation 1514 Mail Services Center Raleigh, NC 27699-1514 NC DEPT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMEN 1617 MAIL, SERVICE CTR RALEIGH NC 27699-1617 wcact223125 I State Treasurer, Ra1N1'igh, North Carolina Payable at Par Through Federal Reserve System CNMENT C' NTAB S A UINE W TEPMANN AP 'q, TFBBS DOCUMENT HAS BI"aISLE AND Ft.UQRESCENT FIDE 311' 1:o 5 3 L L05 '4': 5» 000ir-E,o Los Warrant 1474903 Date 08/14/2003 $ 40000 C. Wayne Stallings hlef Financial Officer City of Concord Engineering Department Scott Padgett, Mayor W. Brian Hiatt, City Manager Paul D. Campbell, P.E., Director of Engineering September 2, 2003 N.C. Department of Environment and Natural Resources Division of Water Quality Non -Discharge Permitting Unit 919 N. Main St, Mooresville,North Carolina 28115 SUBJECT SANITARY SEWER EXTENSIONS Westside Bypass Waterline Poplar Tent Road to Crisco Road City of Concord Cabarrus County Dear Sir or adam: We are enclosing for your review and approval, one original and one copy of the executed Non -Discharge .Permit Application form, a check in the amount of $400.00, a letter of flow acceptance from the WWTF and the Delegated Municipality Certification flint' for the installation of 1341.52 +/- linear feet of 8-inch gravity sanitary sewer and 298.48 +/- linear feet of 12-inch gravity sanitary sewer to serve 4 dwellings with a total average daily flow of 1,440 GPD in the western section of Cabarrus County on Poplar Tent Road, and George .Lyles Parkway (formally Crisco Road.) This application is in accordance with your Gravity Sewer Minimum Design Criteria. Upon completion of the project, you shall receive a copy of the Engineer's Certification and a copy of the Record Drawings. Your cooperation in this matter is greatly appreciated. If there are any questions concerning this application or plans, please call us at (704) 920-5425. Sincerely, CITY OF CONCORD ue A. Blat, P.E. SEP 0 Deputy City Engineer Enclosures cc: Project NoL: 2003-008 File No. 2 (pNVQ) Alfred M. Brown Operations Center 850 Warm C„ Coleman Blvd. P.O. Bax 348 Conconi, North Cambria 28026 (704)92(1-5,125 • Fax (704) 7 86-4521 * TDD 1-800-735-8262 I, I