Loading...
HomeMy WebLinkAboutWQ0022408_Regional Office Historical File Pre 2018 (2)Division of State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16, & SUPPORTING DOCUMENTATION 04' ifY7 Application Number-- . c completed by DrAtj All items must be completed or the application be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Harrisburg (cornpany, municipality, HOA, utility, etc.) 2. Applicant type: 0 Individual Corporation El General Partnership Federal 0 State/County Municipal 3, Signature authority's name: Rob Donham per 5A 02T Title: Director of Engineering 4. Applicant's mailing address: 4100. Main St..#101 City: Harrisburg State: NC Lip: .28075- 5, Applicant's contact inforniation: Phone number: (7()4) 455-0727 Email Address: rdonham@harrisburgnc.org IL PROJECT INFORMATION: Project name: iintonPjStajjonDeconirnissionin,g P Application/Project status: Privately -Owned Public Utility 0 Other gCEiVECIIN CDENRIO R N 1.1 WaROS. M DOR E S V RI E. REGIONAL OFFICE El Proposed (New Permit) Existing Permit/Project If a modification, provide the existing permit number: WQ002240h and issued date: 3/27/2003 If new construction but part of a Ira te r plan, provide the existing permit number: WQ00 3. County whereproject is located: Cabarrus 4..Approximate Coordinates (Decimal Degrees): Latitude: 35.3043' Longitude: -80.6.73 . 5, Parcel ID (ifapplicable: 5506—)8-25810000 (or Parcel ID to closest downstream sewer) ILL CONSULTANT INFORMATION: 1. Professional Engineer: Sean .Mavo License Number: 036837 Firm: Gavel & Dorn Engineering, PLLC Mailing address.: 6730 Freedom Drive City: Charlotte State: NC Zip: 28214- Phone number: (704) 919-1900 Ernail Address: smayo@gaveldomcom WASTEWATER TREATMENT FACILITY(WWTF) INFORMATION: 1. Facility 'Name: Rocky River Regional WORT Permit Number:INC0036269 Owner Name: Water & Sewer Authority of Cabarrus County V. RECEIVING .DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(). WQ Downstream (Receiving) Sewer Size: 8 inch WQCS00328 Owner Name(s): Town of Harrisburg FORM: FTA 04-16 Page 1 of 5 VI. GENERAi, REQUREMENTS 1. Ifthe Applicant is a Privately -Owned Puhlic 'Utility, has a Certificate of .Public Convenience and Necessity been attached? El Yes LINo N/A 2, If the Applicant is a Developer of lots to be sold, has a Developer's Opeottion:Ii —acernem (.14.„)10t ,DEV) been attached? 0 Yes ElNo N/A 3. If the Applicant is a Hot ffe/Poiwerf vS,f2„y ac,rL A,s5ociatiionllas_amOvelational_Agtc,closlajll„fg,NLI-fclA) been attached? 0 Yes EINo N/A 4, Origin of wastewater; (check all that apply): Residential Owned j Residential Leased Ej School / preschool / day care El Food and drink facilities LJ Businesses / offices / factorie' El Retail (stores, centers, malls) El 'Retail with food preparation/service El Medical / dental / veterinary facilities 0 Church LJ Nursing Home 5, Nature of wastewater: 1.00 % Domestic/Commercial % Commercial % Industrial (5(e....1...-51VN( )( 11.1.0;10)) Is there a Pretreatrnent Program in effect? 6. Has a flow reduction. been approved under hA NciNcfc:,(1.0 f:1( Yes If yes, provide a copy of flow reduction approval letter 7, Summarize wastewater generated by project: Ej Car Wash 0 Hotel and/or Motels El Swimming Pool /Clubhouse El Swimming Poi-d/Filter Backwash Ej Other (Explain in Attachment) Yes 0 No No Establishntent Type (see 4 iu N/A Daily Design Flow a'h No 0 Flow 0 GPD a GPD gal/ GPD gaV gal/ GPD GPD gal/ GPD 0 GPD a See 15A 021..01 I 4(f2) Le)(1). and :(eil(j) for caveats to wastewater design flow rates (i,e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined. in G,S. b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table shall be determined. using available flow data, water using fixtures. occupancy or operation patterns, and other measured data, 8. Wastewater generated by project: 0 GPD (per 15A .NCAC (.42T ,01 4) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: LI Pump Station Or Gravity Sewer where flow will he permitted. in subsequentpermits that connect to this line 0 Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected Other (Explain): The Town of Harrisburg is decommissioning the Farmington pump station located on Sunburst Lane.The existing 1..651 LI' of force main will be abandoned in place. The Town will construct 1547 LF new 8-inch gravity sanitary .sewer main to direct flow from decommissioned pump station downstream to an existing WCACC sewer main, The FORM: VIA 04-16 Page 2 of 5 new gravity train evil[ a4so collect se ewater flow roar the existing France ee Haven sut a ision t 11 be generated as part of dais prcajeet, 2121) No t° FORM : At 16 Paget cal VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 Ciravi Se$verst: 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) 1547,45 Material PVC/DIP • Section 11 & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria )> Section RI contains information related to minimum slopes for gravity sewer(s) ')> Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) — o2T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1, Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3, Design flow of the .pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to he permitted (kir this Pump Station): Size (inches) Length (feet) 6, Power reliability inaccordance with .15A 1.N.C,A(1. 02T ,030301,iii): El Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B), Z,* Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ;(. Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: LI Portable power source with manual activation, quick -connection receptacle and telemetry 1.5.A NCAC 02T .0305(h)( 1)(C) or El Portable pumping unit with plugged emergency pump connection and telemetry - 1.5A NCAC 02T .0305(h)(1)(C): ▪ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiplepump stations, an evaluation of all the pump stations' storage capacities and .the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: ETA 04-16 Page 4 of 5 IX, SETBACKS & SEPARATIONS - (02B .0200 & 15A NCAC 02T .0305(f)): 1, Does the project comply with all separations found in 15. \ N(AC 02T .0305i1 15A NCAC 02T.0305(1) contains :minimum separations that shall be provided for sewer s s Setback Parameter* Storm sewers and other utilities not listed below (vertical) Water mains venical-water over sewer including in benched trenches) Water mains (horizontal) Reclaimed water lines (vertical - reclaimed over se Reclaimed water lines (horizontal - reclaimed over sewer) **Any :private or public water supply source, including any wells, WS-I Class 11 impounded reservoirs used as a source of drinking water e s of Class I or a .ers classified WS (except WS-I or WS-V),. B. SA, ORVV, HIQW, or S.B from normal hih water (or tide elevation) and wetlands see item IX.2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation Any basement Top slope of embankment or cuts of 2 feet or more vertical height Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) Yes No ration Required 24 inches 18 inches 10 :feet 1.8 inches 2 feet 100 feet 50 feet 10 feet 5 feet 10 feet 10 feet 5 feet 10 feet 36 inches 1 j!2T Igj contains alternatives where separations in ff2'1()-)5()) cannot be achieved. • **Stream classifications can be identified using the Division's Nr.".Surfricc \ycLiili2c If noncompliance with (j2:11,l.1.(fh;!_tgl, see Section X of this application 2. Does the ,project comply with separation requirements for ‘vetlands? (.50 feet of separation) El Yes • No N/A • See the Division's draft separatic,o l'equirements for situations where separation cannot he meet • No variance is required if the alternative design criteria specified is utilized in design and con strnctmon As built documents should reference the location of areas effected 3, :Does the project comply with setback's found in the river basin rules per 5A NCA.0 0211 .o2oo? El Yes This would include Trout Buffered Streams per 1.5.,A 2B.,0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? • tnforniation can be obtained from the !y1Ij Ycs 1 1 No 5. Does project comply with 15A 02T.0 056'2)(0 (additional permits/certifications)? Yes LJ No. Per 11_52:VS(„..,"..,,V1921....1ljj)5(c)ffn, directly related environmental permits or certification applications are being prepared, have been applied for, or .have been obtained, Issuance. of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.), 6. Does this project include any sewer collection lines that are deemed -high-priority?" Per I 5A NCA(1' 02'1.041.Q., "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. El Yes No N/A If yes, mnelude anattachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.040.3(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Pa2„c 5 of 5 X. • CERTIFIC ATIONS: + 'Does the submitted system comply with the Minintion DesigT Ctitcna for the 1'errifirtill(2,..of Punov Stations ael!ps(TAir_Trujaleg,x,:erjjqrr), and the Gr.:,ivity Scavet Nlirtimum 1„) Criteria (latest version) as applicable? Z Yes —1 No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 5 (.1 attest that this application for (Professional Enginee(s name from Application Item III.I.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications„ engineering calculations, and all other supporting documentation to the best of my knowledge.I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Ivliniin.um Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to he consistent with the proposed design. NOTE - In accordance with General Statutes 11.43-215.6.A and 14'3-215,6B, any person who knowingly makes any false. statement, representation, or certification in any application package shall be guilty of a Class 2 misdemean.or, which may. include a fine not to exceed $10,000, as well as civil penalties up to $25„000 per violation, North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NC.AC 02T .0106(b): attest that this application for (Signature Authority's name & title from Application Item has been reviewed by inc and is accurate and complete to the best of my knowledge. I -understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, .1 understand that any discharge of wastewater from this non discharge system to surface waters or the land will result, in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution, I will make no claim against the Division of Water Resources should a condition of this permit be violated, also understand that if all required parts of this application package are not completed and that if all required supporting information and attachrne,n.ts are not :included, this application package will be returned to me as in.complete,, NOTE - In accordance with General Statutes .1.1L215t2A and 143-2 .5,(a.13,, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misd.emeartor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Date 5,/ 6 FORM: FTA 04- 16 Page 6 of 5 Gavel Dorn Engineering, PLLCC March 11, 2020 NC Department of Natural Resources Mooresville Regional Office Water Quality Section 61.0 E. Center Avenue Mooresville, NC 28115 4 C:FIVFD;RICt7F Ki,: truyrk 1., OFFICE` Re: Town of Harrisburg — Frances Haven & Farmington Pump Stations Decommissioning Project Gravity Sewer System Fast Track Application Dear Reviewer: On behalf of our client, Town of Harrisburg, Gavel & Dorn. Engineering. PLLC (G&D) is pleased to submit the following documents for review relating to the Frances Haven & Farmington Pump Stations Decommissioning Project: (1) Check for application fee in the amount of $480.00; (2) copies of Fast Track Application (1 original & 1 copy) and supporting docu- mentation. The Town of Harrisburg desires to decommission two existing pump stations located on Frances Haven Drive and Sunburst Lane. As part of that decommissioning the Town will be constructing new 8-inch sanitary sewer mains to redirect flow from the existing pwnp stations to an existing gravity main located on Buckingham Lane. No new wastewater flow will begenerated as part of this project. All flow for existing houses located on Frances haven Drive, and Sunburst Lane has been previously permitted. Total new sanitary sewer main to be constructed is 15.47 LF. The flow currently discharges to a Water and Sewer Authority of Cabarrus County (WSACC) main and then is directed to the Rocky River WWTP: The redirected flow from this project will continue to be treated. at the Rocky River WWTP, No additional flows are being proposed as a result of this project. Please contact me at 704.724.5047 if you need any additional information for your revrevw. Sincerel GAVEL DORN ENGINEERING, PLLC Sean Mayo, P.E. WSACC February 19, 2020 Mr. Haynes Brigman Town Manager Town of Harrisburg P.O. Box 100 Harrisburg, NC 28075 Subject: Flow Acceptance Request - Town of Harrisburg Britley #2 Pump Station Decommissioning Dear Mr. Brigman: WATER & SEWER AUTHORDY OF CABARRUS COUNTY 232 Davidson Hwy. Concord, NC 28027 704,786.1783 • 704.795.1564 Fax www.wsacc.ocg This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the Town of Harrisburg on February 18, 2020. This project includes the decommissioning of an existing Town of Harrisburg pump station, and no additional flow allocation was requested with this application. As such, WSACC accepts 0 gallons per day (gpd) with the current request. The wastewater generated by this project will be conveyed through a proposed and existing gravity system and then enter WSACC's system at the existing 36-inch Reedy Creek Interceptor. If construction of this project does not commence within two (2) years of the date of this notice, the notice is rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC, in writing, when construction of this project is initiated. This sewer capacity allocation may also be cancelled pursuant to the conditions set forth in the WSACC Sewer Allocation and Commitment Policy. Please note that the final commitment to service to provide wastewater treatment services shall occur upon application for a building permit for the project and when system development fees are paid pursuant to N.C.G.S. §162A, Article 8. If you have any questions, pi a all me at (704) 788-4164, extension 104. Sincerely, .1. Thomas Hahn, PE Assistant Engineering Director cc: Rob Donham, PE/Harrisburg Sean Mayo, PE/Gavel & Dorn Engineering, MIX Michael Wilson/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC Trent Gobble/WSACC Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE —10/18) (WSACC USE ONLY) Britley #2 Pump Station Decommissioning Section 1. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 El Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 WWTP facility's permitted flow, MGD stimated obli ated flow n t e WWTP faci 1 avg. daily flow, MGD Total flow for this specific request, MGD Total actual and obligated flows to the facility, MGD Percent of pennittesd flow used 26.500 PMGD 2.194 19.911(75.14%ofperr 0.000 22.105 83.42% Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP. Pump Station Pump Station (Name or ' Permit No, Number) Reedy Creek PS WQC S00009 Lower Rocky River PS (A) Finn Design Average Approx, Current Capacity * Daily Flow ** Average Daily MCI) (Finn/PI) Flow Mat MGD (B) 16.500 6.600 1.835 NC0036269 37.000 14.800 12.346 (C) Obligated, Not Yet Tributary Daily Flow MGD 0.462 1.705 (D) = (13+C) Total Current Flow Plus Obligated Pico./ MGD 2.297 14.051 (E)(AD) Available 'speedy*** MGD 4.303 0.749 * The Firm Capacity (design (low) of any pump station is Ithued as the maximum pumped flow that can be achieved with the largest pump taken out of service. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than LS, per Section 2.01(AX4)(c) of the Minimum Design Criteria. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capacity is < O. Section III. WSACC Certification Statement: 1,1, Thomas Hahn, PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I and Section 11 plus all attached planning assessment addendums for which 1 am the responsible party. Signature of this form indicates WSACC's guarantee of capacity for this wastewater flow. 2.0 C's Signing OfficialSignature Late EX. PUMP STATION TO BE DECOMMISSIONED Division of Water Resources State of North Carolina. Department of Environmental Quality Division of Water Resources Watershed Classification Attachment (WSCAS 01-1.5) Along with this form, submit a color copy of a USGS Topographic Map to identify the project area and waterbodies. Each map or maps must show the location of the sewer system and include location identifiers where the system traverses over or near waterbodies. The map should have location ID's for each different waterbody and corresponding classifications should be recorded. Include the completed form and map portions with the permit applicatiion for submittal to the appropriate review agency. A list of the Division's regional offices, their county coverage, and contact information can be obtained from: http://portal.ncdenr.orgJweb/wq/hornejro Location ID Name of Waterbodyl River Waterbody Stream Waterbody Basin Index No. Classification Eida Creek If unnamed, indicate "unnamed tributary to X'', where X is the named watethody to which the unnamed tributary joins. I certify that as a Registered Professional Engineer in the State of North Carolina that I have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief PE Seal, Signature and Date Michael F Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality March 30, 2006 Carl Parmer, Town Manager Town of Harrisburg PO Box 100 Harrisburg, NC 280750100 SUBJECT: Farmington Ridge Permit No. WQ00224188 Wastewater Collection System Extension Final Engineering Certification Acknowledgement Dear Permittee: ATER UA ECTIO ta, Per 15A NCAC 2H .0220, the Division received a final engineering certification for the subject project on March 10, 2005. Enclosed is a copy of the certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Note that the Division does not acknowledge partial certifications by letter. It is the Permittee's responsibility to track all submissions and receipt of partial certifications to the Division. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNOCF-S can be downloaded from http://h2o.enr.state.nc.0 ercs from the Collection Systems Applications page. If you have any questions concerning this document or the completion of Form PNOCF-S (if necessary), please contact me at the letterhead address or via E-mail at marie.doklovicncmail.net. Sincerely, 1)734C1-1- - K. Marle Doklovic, PE Environmental Engineer Enclosure Cc: Mooresville Regional Office, Surface Water Protection Section (all documents) Marc Houle, PE, Yariorough-Williams & Houle Inc (no enclosures) PO Box 7007 , Charlotte, NC 2824 t 7007 Surface Water Protection Section Central Files (certification page only) N)°19thCarolina :A?titurally Pretreatment, Emergency Response and Collection Systems Unit Internet http://h2o enr.nc,state us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper Permit No. W00022408 March 27, 2003 ENGINEER'S CERTIFICATION Partial Final as a duly registered Professional Engineer in the State of North Carolina, . i g been authorized to observe (periodically, weekly, full time) the construction of the project, Project Name f2C)F-- Location and County for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: The above Engineer's Certification shall be completed and submitted to the address below with one copy of the "Construction Record Drawings" of the wastewater collection system extension as well as supporting design calculations for any pump stations permitted as part of this project. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION NON -DISCHARGE PERMITTING UNIT 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 A 2 Michael F. Easley, trov William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan. W. Klimek, RE., Director Division of Water Quality Carl Parmer, Town Manager Town of Harrisburg PO Box 100 Harrisburg, NC 28075 r Mr. Parmer, July 20, 2005 $ Subject: Incorplete/Inadequat; 3 e ring Certification Farmington Ridge Permit Number WQ0022408 Cabarrus County Regretfully, the Division cannot accept the submitted engineering certification tor the subject permit due to the following reasons: 0 The Division no longer accepts typed certification letters. Only the approved Engineering Certification Form provided as the last page in the issued permit is accepted. El Record drawings are not present. Pump station calculations are not present. These are required upon completion of all projects issued a permit through the Division's fast track process. Please submit these calculations and we will then continue the review process. Project changes are not evident in the record drawings or provided in written form nor is there any indication that the project was completed with minimal changes that are in conformance with all statutes, regulations and our Minimum Design Criteria (if applicable). ❑ Partial or full certification is not indicated on the Engineering Certification Form or record drawings. ❑ PE seal, signature or date is missing from the Engineering Certification Form, record drawings and/or pump station calculations (if applicable). © The record drawings do not show all of the required information (Le. plan/profile of all sewer lines, all treatment component locations and sizes, site map, etc.). • Inspection frequency is not specified on the Engineering Ceriification Form.. © The partial certification does not show a completed project section or phase. ❑ Other. Please make the appropriate corrections and resubmit the engineering certification along with a copy of this letter. It is recommended that delivery of certifications provide some method of proof of receipt by the Division. Receipt of engineering certifications in no way absolves the Permittee°s responsibility to ensure the project meets all statutes, regulations and design criteria associated with the project. North Carolina Naturally Pretreatment, Emergency Response and Collection Systems Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 Fax (919) 733-0059 Internet httpl/h2o.enr,nc.state.us/ndpu An Equal Opportunity Action Employer 5O% recycled/10% post -consumer paper YARBROUGH—WILLIAMS & HOULE, INC. Planning • Surveying • Engineering FARMINGTON RIDGE PUMP STATION SPECIFICATIONS: AVERAGE DAILY FLOW = 210 LOTS 0 360 GPD/LOT + 360 GPD FOR AMENITY = 75,960 GPD = 53 GPM PEAK INFLOW RATE _ (2.5) (53 GPM) = 130 GPM PUMPING RATE = 180 GPM TDH = 41 FT. PUMPS = EBARA PUMPS MODEL NO. 800CMF63.7 1800 RPM 195 MM IMPELLER SIZE MOTORS = 5 HP. 3 PHASE, (3 PHASE POWER 15 AVAILABLE TO THE SITE) DISCHARGING PIPING, INSIDE STATION TO TEE IN VALVE VAULT- 4" DIP OUTSIDE STATION = 6" DIP FORCE MAIN = 6" WET WELL DIAMETER = 6 FT. WET WELL LEVELS AT FULL DEVELOPMENT RIM = 662.7 FINISH GRADE = 662.0 INFLUENT IN = 652.5 HIGH WATER ALARM = 652.0 LAG PUMP ON = 651.5 LEAD PUMP ON = 650.5 LAG OFF = 648.5 LEAD PUMP OFF = 648.0 LOW LEVEL ALARM SHUT OFT' = 647.5 WET. WELL INVERT = 646.0 IMPELLER ELEVATION = 647.0 CYCLE TIME GIVE VOLUME AND FLOW: V/((Q(PUMP)-Q(IN)) + V/Q(IN) VOLUME = 422 GALLONS (PUMP) = 180 GPM (IN) = 53 GPM L TIME = 7.96 MIN. MPTY TIME = 3.32 MIN. YCLE TIME - 11.28 MIN. S PER HOUR = 5.32 ES PER HOUR PER PUMP = 2.66 CALCULATIONS: SUCTIONC HEAD = 0.50 FT. DISCHA ( ANTIC HEAD = (680-646) = 34 FT. FORCE LENGTH C = 120 FLOW = 180 GP VELOCITY = 2.04 F HEAD LOSS = 6.00 FT.�`"' SUCTION AND DISCHARGE HE TOTAL DYNAMIC HEAD = (34+ i 0 6, 730 Windsor Oak Ct. (28273) • P.O. Box 7007 ( 82 Ch at , C x 7 I4. .0 05 YARBROUGH-WILLIAMS & HOULE, INC. Planning • Surveying • Engineering March 4, 2005 North. Carolina. Division of Water Quality Water Quality Section Non -Discharge Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: ha rnir ton 'Ridge Wastewater Collection System Extension Permit Number: WQ0022408 Cabarrus County, North Carolina Dear Sirs: The final instal tion of the sanitary sewerco complia.nce with the approved plans and spec Thank you for your assistance, Sincerely Houle. President MAH/ir Attachment cc: Project File Farmington sewer cent O3.04 n system refetnnced above is construeted in substantial :ions. Our certif cakiia of this work, is attached. 730 Windsor Oak Ct. (28273) • P.O. Box 7007 (282' • w t { 9 . S6 0 0 CERT- '7,ATI A CHECKLIST To be completed by the certifYing engineer prior to opertition of the 'permitted sewers. per 1,5A NCAC 021„.0 Certifying Engitieer: \1311°F.' h(Ig'.OI1 P Certification Review Date: 1/8/2021 Project. Name: FARMINGTON PUMP STATION DECOMMISSIONING PROJECT \\QOO 22408 Project County: CABARRUS !) Has permittee information changed since the permit was issued (or last modified): change of mailing address, change of ownership. transfer from developer to HOA.,1)0,i\„ etc,. El Yes N „ • If yes, please provide either a change of ownership form or new contact information. Note that transfer or permits from the developer to the 110„A/PO.A must occur with the first certification, 2 1 lave the tts-buitt iirawings have been signed, 'oiled tine dated by an N,(„ PE? Yes No 3.) Final Engineering certification? Yes No • If Partial Engineering certification, provide detailed narrative including hat is being certified in the current phase, what was previously certified (if applicable), and what is left to be certified, Adequate information related ttt sewer lines: Yes I1 No Cl N/A • Three feet minimum cover has been provided for irtil sowers unless ferrous pipe was installed, • Mlinimum diameters for gravity sewers are 8-inches for public lifiCS and (i-inches for private lines, • Manholes have been installed: At the end of each Inc at Lill, changes in grade. or idignment, at all intersections, and at distances not greater than 4-25 feet: minimum diameter shall be 4 feet4ionL he 5). „i:\ decimate information related to pump stations: .2 Yes L No 7 \ • Ensure power reliability option was selected per 6) 'ts project construction completed in ttccordance with .i.ill of the tot1o' n c E No I N.A. Criteria .''‘,11)(1.:" 'ilk:,Lperm'oitim4 (Iirx, latest 'version). and (latest ersion)? If not, it variance approval is required in accordance wiith 02T, prior to certification and operation. • Contact iLlyc .Central Office to discitss the variance to determine a course of iiiction. • Applicant must Submit two copies- of the variance request tiorm, plans. specificettions, calculations, and any other pertinent information to the Central Office (one hard copy, eine digital copy). • The central office will review the vtir lance request, and irapprovable. specific language regarding the vitritmce will be incorporated into the permit, either via. a special condition or iit supplementary fetter A copy odf the reissued permit with variance language or the variance letter must he maintained with thc original documents. 7i Does the project contains high priority lines 1,31A NiCAt„ {12 f [7 Yes , No • If yes. ensure that the permit already contains the necessary condition related to high priority lines !,-.",A N(:AC 02T.0403 ta)(5). If INC permit does not include this language, the Fast Track reviewer will reissue the permit with the appropriate language, 8) re Permit modifications are required for any changes rosulting in non-compliance with this permit 1 including, but not limited to pipe length changes of I 0% or greater, change in tlow, pump station 'design capacity design change of ist% or '1" eatei . and:or change in the numberitype of connections)? L.J. ye,s lm No • If yes. a permit moditicatittn request must be s.iihruitted to the Lippropriate Regional Office, aind a modified permit Nvith revised certification must be issued prior to certification and operation, NC DWR Water Quality Regional Operations Mooresville Regional Office tion 610 East Center Avenue, Suit 301, Mooresville, NC 28115 Phone (704) 663-1699 FAX (704)-633-6040 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: TOWN, OF ITARRISBURG PERMIT #: WQ0022408 Modification PROJECT: FARMING -ION PUMP STATION DECOMMISSIONING PROJECT ISSUE DATE: JEINE 19, 2020 'Fhis project shall not be considered complete nor all( wed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation„ It should he submitted in a manner that documents the Division-s receipt,. Send the - required documentation to the 'Regional Supervisor. Water Quality Regional Operations Section at the Liddress rioted in the page footer, Any wastewater flow made tributary to the wastew-ater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, The Perlin -Live is responsible for tracking all partial certifications up until a final certification is received by the Division, A Final Certification shall be a complete set of record drawings tend design calculations regard less of hether partials have been submitted, PERMEFTEE'S CER:FIFICATION 1, the undersigned agent for the Permittee. hereby state that this project ha,s been constructed pursuant to the iiipplicable standards & requirements, the Professional Engineer below has provided applicable designleonstruction information to the Perminee, and the Perminee is prepared to operate maintain the ‘Vastewater collection system permitted herein or portion t hereoL Robert Donham. PF I)ircctor of Public Works Printed 'Name. Title Signature ENGINEER'S CERTIEWATI(..)N Jan 11, 2021 Date Mallory Hodgson P F as a duly registered Professional Engineer in the State of North Carolina. having been authorized to observe (0 periodically, 0 weekly, [7 hill time) the construction of the project -name and location as referenced above for the above Permittee hereby state that, to the best of rti, abilities, due care and diligence was used in the observation of the following: decomm ission of the 180 GPM Pumps station, and 1.651 linear feet of 6-inch force main, in addition approximately 1.,547 linear feet of 8-inch gravity line will be constructed: such that the construction was observed to be built within substantial compliance of this permit: I 5A NCAC 02'T; the Division of \Vater Resources.' (Division) Gravity Sewer Nlinimum Design Criteria adopted February I 2, 1996 AS the Division's Minimum Design Criteria. for the Fast - Track Peminting of Pump Stations and Force Mains adopted June 1: 2000 as applicable: and other supporting materials, North 1::arolina Professional .Engineer's Seal wfsignature g Final P1 Partial (include description) Jan 11, 2021 Certification Comments/ !a -s; (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office: Phone: (704) 663-1699 FAX (704)-63,3-6040