Loading...
HomeMy WebLinkAboutNC0078955_NPDES Permit Renewal_20060424April 24, 2006 MEMORANDUM To: Through: From: SUBJECT: Frances Candelaria P.oint Source Branch Michael F. Easley, Governor William G: Ross Jr., Secretary North Carolina Department of Environment and Natural Resources. , Alan W. Klimek, P.E. Director Division bf Water Quality Belinda Henson, Water Quality Regional Supervisor Fayetteville Regional Office glad .C.'Turlington, Environmental Technician Fayetteville Regional Office Minor NPDES Permit Renewal Dunn WTP NPDES Permit No. NC 0078955 Harnett County ktte414,0-vo SA,14-1 Please find below, regional comments for the subject minor permit renewal. Applicant is not requesting modification of the facility or increasing flow at this time. A rating sheet is not attached as no modifications were made to this facility during the previous permit cycle. A review of compliance data did not reveal any significant or repetitive violations. Based on the last NPDES Compliance Inspection, there are no outstanding repairs or 'modifications of the treatment works necessary at this time. No special conditions, limitations, or. monitoring is suggested at this time. Based on the above information, the Fayetteville Regional Office recommends reissuance in keeping with the current basin wide strategy. Cc: Central Files thCarolina atura!!ji 'North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: www.ncwaterquality.org Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper North Carolina Department of Environment afld Natural Resources. , Alan VV:Klimek;P,E: Director, Division. of Water Quality-. April 24, 2006::. Michael Uskiewcz. City. ofDunn sPO Box 1065 DunnNC .28335 SUBJECT: April 21, 2006 Compliance Evaluation Inspection City of Dunn Dunn WTP Permit No: NC0078955, Harnett County Dear Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted on April 21, 2006. The. Compliance Evaluation Inspection wasconducted by Chad Turlington of the Fayetteville Regional Office. The facility was found to be in Compliance with permit NC0078955. Please refer to the enclosed inspection report for additional'observations and comments.If you or your staff have any questions, 'Please call me at 910-486-1541 Ext.720. Sincerely, Chad Turlington ' Environmental. Technician cc: Darryl T Glover,:ORC Central Files gFayettevilleFiles' 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1 800 623-7748 NPOES " ' Inspection Type , (cont . ) 3." •'.'...Ncoolse„55-,--_- „1- .„;,.[.• , . • . Section D: :Summary of Findirig/aoninients (Attach additional sheets Of narrative and chetkileta as necessary) A review of DM R's and lab data for the months of August 2995 through January 200.6 revealed no permit violations and were consistent Calibrationlogs for pH and chlorine were mi.ailahle. WaStaWater;:is primarily alum sludge from the sedimentation basins and:filter.baplwash,W*or::- The wastewater flows into a lagOon. From the lagoon the waSteWater, is pumped into a:sludge tonbentrator. Supernatant flows overweir and on to recieving stream .: Sludge is disposed of by larld;apPliOatiOr., Effluent aPpeared.clear at time of inspebtiOn. Outfall well maintained. FZeoprdS Were neatly Organ i4ed. ' • - • Page # 2 Permit:. NC0078955 Owner - Facllity: Dunn WTP Inspection Date: 04)21/2006 Inspection Type: Compliance Evaluation Record Keeping ' Yes No NA NE Facility has copy of previous year's Annual Report on file for review? 0 0 'III 0 Comment: LaboratorYes No NA NE y , Are field parameters performed by certified personnel or laboratory? • 0 ❑. 0 Are all other parameters(excluding field parameters) performed by a certified lab? • . 0 • ❑ 0 # Is the facility using a -contract lab? • ❑ ❑ ❑ Is proper temperature set for sample storage (kept at 1.0 to4.4 degrees Celsius)? 0 0 0 • Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2degrees? 0 0 ■ 0 Incubator (BOD) set to 20.0 degrees Celsius +/-.1.0 degrees? 0 0 • 0 Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris?. If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Page # 4