Loading...
HomeMy WebLinkAboutNC0004839_Wasteload Allocation_19920311NPDES DOCIMENT SCANNING COVER SHEET Permit: NC0004839 NPDES Document Type: Permit Issuance ,-. Wasteload Allocation Authorization to Construct (AtC) Permit Modification Speculative Limits Correspondence Instream Assessment (67B) Environmental Assessment (EA) Permit History Document Date: March 11, 1992 Thia document is printed on reuse paper - ignore any content on the resreriae aide NPDES WASTE LOAD ALLOCATION PERMIT NO.: NC0004839 PERMITTEE NAME: FACILITY NAME: Exxon Company, U. S. A. Charlotte Marketing Terminal Facility Status: Existing Permit Status: Renewal with Modification Major Minor Pipe No.: 002 Design Capacity: 0.057 MGD max Domestic (% of Flow): 0 % Industrial (% of Flow): 100 % Comments: Official application received for groundwater remediation. Included with this WLA is additional information about project and original WLA for the groundwater remediation. Please look over and determine if any changes need to be made. They expect flow range to be between? 15 . C• ei prh c ncl Qb.o c iNqi RECEIVING STREAM: an unnamed tributary to Long Creek Class: C Sub -Basin: 03-08-34 Reference USGS Quad: F 15 SW (please attach) County: Mecklenburg Regional Office: Mooresville Regional Office Previous Exp. Date: 5/31/90 Treatment Plant Class: Classification changes within three miles: no change within three miles. Requested by: Prepared by: Reviewed PLOTTED Randy Kepler Date: 12/13/91 Date: :4l 7 Z. Date: .31/01C1 a - Modeler Date Rec. # SMA 17 1-Ekk 4PVo 7. Drainage Area (m 7Q10 (cfs) 6, O, O / Avg. Streamflow (cfs): 61. Winter 7Q10 (cfs) 0.6 30Q2 (cfs) D, Toxicity Limits: IWC Instream Monitoring: Parameters % Acute/Chronic Upstream Location Downstream Location Recommended Limits Wasteflow (MGD): Benzene (µg/1): Toluene (14/1): Ethylbenzene (}tg/1): MTBE (14/1): om , monitor 1,2-Dichlorobethwie-(41): Chloroform (14/1): monitor Monthly Avg 0.057 Daily Max. 71.4 11 325 98.6 Mon. Freq. WQ or EL weekly monthly WQ monthly WQ monthly WQ monthly WQ monthly WQ monthly WQ Special Instructions or Conditions Permit must contain flow monitoring requirement for weekly volumes of wastewater . Minimum treatment will include air stripping or diffused aeration and Activated Carbon Adsorption. Design and Construction of the Waste Treatment Facility will emphasize the use of plastic pipes aV where practically possible. Comments: }. #.N SS wcka- Table 1 Dissolved Phase Hydrocarbons in Ground Water Exxon Bulk Distribution Terminal Charlotte, North Carolina Analyte Maximum Observed Concentration* (mg/I) Location Date Benzene j Toluene .J Ethylbenzene Xylenes Isopropylether (I PE) MTBE Chlorobenzene 1,2 Dichlorobenzene 1,4-Dichlorobenzene Chloroform 1,1-Dichloroethane 1,2-Dichloroethane Napthalene 2-Methylnapthalene Acenapthalene Dibenzofuran Acenaphthene Fluorene Phenanthrene 8.5 15.0 4.2 12.2 4.5 0.017 0.020 0.0014 0,210 0.029 0.052 0.320 0.710(E)** 0.690(E) 0.022(J)* * * 0.021(J) 0.018(J) 0.041(J) 0.062 MW-15 MW-26 TC-1 TC-1 MW-1 MW-7 MW-12 MW-36 MW-36 MW-31 MW-29 MW-1 MW-26 MW-26 MW-26 MW-26 MW-25/35 MW-26 MW-26 8-89 9-89 8-90 8-90 8-90 2-91 3-90 8-90 9-89 8-90 2-91 2-91 12-90 12-90 12-90 12-90 12-90 12-90 12-90 *Through February 1991 * * E = compound exceeded calibration range * * *J = estimated value 1, 6-ova V-Lawa , = C-(C . -( TABLE 1-1 SITE CONDITIONS, EXXON BULK DISTRIBUTION TERMINAL, CHARLOTTE, NORTH CAROLINA Parameter Design(a) Influent (pg/L) Effluent(b) Requirement (pg/L) POTW. NPDES Benzene 8,500 170 Toluene 15,500 300 Ethylbenzene 4,200 84 Xylene 12,200 244 Iron 5,000 Zinc 50 Other design criteria are as follows: Flow Range . 15 to 40 gpm Design Flow . 25 gpm Design Life.. 5-20 years (a) Based on worst case analytical data from site monitoring wells. (b) POTW effluent treatment requirements are per Charlotte- Meckl nberg Utility Department. NPDES effluent treatment requirements are per NCDEHNR Division of Environmental Management, as described in.15A NCAC 2H.0100. 3 4 71 11 144,1-44 ()T C'ttk. 63623 j' o, OZ j p N6 / o, Os-7 £&)a. 7 57 G) u79/0 "141.,-ri Facility Name: NPDES No.: Type of Waste: Facility Status: Permit Status: Receiving Stream: Stream Classification: Subbasin: County: Regional Office: Requestor: Date of Request: Topo Quad: FACT SHEET FOR WASTELOAD ALLOCATION XX0 /01 Charlotte Marketing Terminal NC0004839 Industrial - 100% Existing Renewal UT Long Creek C 030834 Mecklenburg Mooresvillehz Kepler 12/17/91 F15SW Request # 6662 A'. C. DEPT. OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT FEB 1 01992 IIMSUA IF p11ASIt11EATAl YAWNER Stream Charactd YiUf 1EtI»NAI IffICE USGS # Date: Drainage Area (mi2) 0.01 Summer 7Q10 (cfs): 0.0 Winter 7Q10 (cfs): 0.0 Average Flow (cfs): 0.0 30Q2 (cfs): 0.0 IWC (%): 100 Wasteload Allocation Summary (approach taken, correspondence with region, EPA, etc.) Facility requesting renewal of existing permit with modification of wasteflow from 0.0288 MGD tD 0.057 MGD. Tech Support recommends limits per new SOP guidance for petroleum based groundwater remediation projects and additional limits per Federal Criteria documentation. Special Schedule Requirements and additional comments from Reviewers: Recommended by• Date: 1/29/92 Reviewed by V l Instream Assessment: �1. /,1�i Date: e t i('1, l Regional Supervisor: Z�-- Permits & Engineering: J Date: )/0)--I R �-- Date: `67.- RETURN TO TECHNICAL SERVICES BY: MAR 0 5 1992 3 TOXICS/CONVENTIONAL PARAMETERS Type of Toxicity Test: Existing Limit: Recommended Limit: Monitoring Schedule: Existing Limits Wasteflow (MGD): Oil & Grease (mg/1): pH (SU): Benzene (4/1): Toluene (4/1): Ethylbenzene (1g/1): m/p-Xylene (µg/1): o-Xylene (µg/1): Isopropyl Ether (µg/1): MTBE (µ.g/1): Napthalene (µg/1): 2-Methylnapthalene (µg/1): Recommended Limits Wasteflow (MGD): Benzene (µg/1): Toluene (µg/1): Ethylbenzene (4/1): -MTBE 1,2-Dichlorobena e 2/93Chloroform (µg/1): Chronic/Ceriodaphnia/Qi Illy 99% NO TOXICITY TEST Mon. Avg. Daily Max. 0.0288 30 60 6-9 71.4 11 325 monitor monitor monitor monitor monitor monitor Monthly Avg Daily Max. Mon. Freq. 0.057 weekly 71.4 monthly 11 monthly 325 monthly monitor monthly 98.6 monthly monitor monthly WQ or EL WQ WQ WQ WQ WQ (See page three for special monitoring requirements.) Limits Changes Due To: Parameter(s) Affected Change in 7Q10 data Change in stream classification Relocation of discharge Change in wasteflow New pretreatment information Failing toxicity test Other (onsite toxicity study, interaction, etc.) Instream data New regulations/standards/procedures _X_ Parameter(s) are water quality limited. For some parameters, the available load capacity of the immediate receiving water will be consumed. This may affect future water quality based effluent limitations for additional dischargers within this portion of the watershed. OR No parameters are water quality limited, but this discharge may affect future allocations. 3 INSTREAM MONITORING REQUIREMENTS Upstream Location: Downstream Location: Parameters: Special instream monitoring locations or monitoring frequencies: MISCELLANEOUS INFORMATION & SPECIAL CONDITIONS Adequacy ok Existing Treatment Has the fa lity demonstratedjhe ability to meet the proposed new limits with existing treatment facilities? es No ✓✓ If n , which parameters cannot be met? Wo d a "phasing in" of the new limits be appropriate? Yes No ✓ P g If yes, please provide a schedule (and basis for that schedule) with the regional office recommendations: Special Ins If no, why not? ci are 4-0 fie, rY, s G (e o rP 4 l,.Q.Sre, iitylAS a d►e a -e. c, k; . ctions or Conditions Permit must contain flow monitoring requirement for weekly volumes of wastewater . Minimum treatment will include air stripping or diffused aeration and Activated Carbon Adsorption. Design and Construction of the Waste Treatment Facility will emphasize the use of plastic pipes and fi where practically possible. Wasteload sent to EPA? (Major) N (Y or N) (If yes, the I attach schematic, toxics spreadsheet, copy of model, or, if not modeled, then old assumption that were made, and description of how it fits into basinwide plan) Additional Information attached? (Y or N) If yes, explain with attachments.