Loading...
HomeMy WebLinkAbout20121107 Ver 1_More Info Received_20121221Euliss, Amy From: Scott Davis [sdavis @axiomenvironmental.org] Sent: Friday, December 21, 2012 4:19 PM To: Euliss, Amy Cc: White, Ryan L; Hamel, Marc L; John .T.Thomas.JR @usace. army. mi1; Sandy Smith Subject: RE: P5206A application Attachments: P5206A_Hyd_prm wet_psh05.pdf; P5206A WetlandpermitSummary.pdf Amy, Please find attached revised impacts and permit drawings based upon your previous questions and our conversation earlier. John, As impact amounts have changed slightly, we propose to address any impact changes in an upcoming permit modification after we receive 100% plans, if that is acceptable to you. Please let us know if you have any questions about the revised impacts or any other aspects of the project. Happy Holidays, Scott Scott G. Davis Senior Scientist Project Manager Axiom Eilu'rowiielltal, hic. 919 - 696 -3005 From: Euliss, Amy [mai Ito: amy.eul iss@ncdenr.gov] Sent: Friday, December 21, 2012 9:57 AM To: Scott Davis Cc: White, Ryan L; Hamel, Marc L; John.T.Thomas.]R @usace.army.mi Subject: RE: P5206A application That will suffice. Thanks Scott. Hope you have a good holiday. Amy From: Scott Davis [mailto :sdavis @axiomenvironmental.orq] Sent: Friday, December 21, 2012 9:09 AM To: Euliss, Amy Cc: White, Ryan L; Hamel, Marc L; John.T.Thomas.10usace.army.mil Subject: FW: P5206A application Good morning Amy, I'm sorry I was not in the office yesterday to receive your inquiry yesterday. I have been sent the answers to your questions by the design engineer and am forwarding them to you. Please see the notes below in red. If you have any other questions or comments, please let us know. Happy Holidays! Scott Scott G. Davis Senior Scientist Project Manager Axiom Eilu'rowiielltal, hic. 919 - 696 -3005 From: Wiles, Brian [mai Ito: bwiles0ohut,com] Sent: Friday, December 21, 2012 7;32 AM To: Scott Davis; Stepney, Sandra A Cc: White, Ryan L (rlwhiteftclotgov) (rlwhiteftclotgov); mhamelftclot,gov; Josh Dalton (jdaltonftn.atec�desii.nc�com) Subject: FW; P5206A application Scott, Here are our responses to DWQ's questions regarding the permit for P- 5206A. Florence ► Hutcheson An Kingdom VVay, Suite 100, Raleigh, 60 1 919-851-6066 Fax- 919- 851 -6846 flohut.com From: Turner, Herb Sent: Friday, December 21, 2012 7;01 AM To: Wiles, Brian Cc: Bailey, Stacey Subject: RE; P5206A application Brian, Per Axiom's request, below are our responses to DWQ's questions 1 & 2 regarding the permit application for P5206A. 1. Was the rip rap in the stream bed required per the Erosion Control review at the pipe inlet and outlet? RE: Since project improvements lowers the channel bed at inlet and outlet, these impacts are considered permanent impacts. Riprap in bed is not required for channel stability at outlet. However, since we are steepening the inlet channel slope to provide adequate pipe cover, riprap in bed is recommended channel stability. c) If it's necessary for erosion control, then we'd prefer at cross vein installed at the tie in of the disturbed channel and the existing channel. Also cross veins in the piedmont typically require no more than V of elevation (preferably 6 "�, so more than one might be necessary. RE: With an inlet slope of 5.7 %, six log veins at approximately 9 -ft spacing would be required for 6" steps. Unless NCDOT is receiving mitigation credits for channel improvements, we do not recommend use of log veins at this location. b) If the channel is perennial, then log veins will suffice. RE: Based on our review of Planning document, impacted channel is intermittent. Refer to attached document excerpt. Axiom concurs that this stream is intermittent. c) At the outlet, with a slope of <0.57o, I don't see that rip rap is necessary. If I'm missing something, please let me know. RE: We concur that riprap in the outlet channel can be reduced. With the proposed design shifting the steeper channel section to the inlet, the outlet channel slope has been flattens. Therefore, we will revise outlet section with approximately 20 LF of Class I riprap on Banks Only. Refer to attached annotated plan sheet. 2. There's a section of the rip rap on the outlet side of the rip rap that's in TDE. If there's to be permanent rock that may need to be maintained post construction, then a PDE is necessary. RE: Riprap limits at outlet have been reduced to be contained within the R /W. No RIDE is required. Please forward our responses to Scott Davis and Josh Dalton. After Scott's coordination with DWQ, we request confirmation on whether DWQ agrees with our recommendations and we will update plans accordingly. If you have any further questions, please contact us. Regards, Herb Florence & Hutcheson - An ICA Company 5121 Kingdom Way, Suite 100, Raleigh, NC 27607 Main: 919.851.6066 ext.1640 Direct: 919.900.1640 From: Euliss, Amy [mai Ito: amy,eulissftclenr,gov] Sent: Monday, December 17, 20121;53 PM To: Scott Davis Cc: Thomas, John T JR SAW (John,T,Thomas,]R( usace,army,mil) Subject: P5206A application have a couple questions regarding the permit application for P5206A, 1, Was the rip rap in the stream bed required per the Erosion Control review at the pipe inlet and outlet? If it's necessary for erosion control, then we'd prefer at cross vein installed at the tie in of the disturbed channel and the existing channel. Also cross veins in the piedmont typically require no more the V of elevation (preferably 6 "�, so more than one might be necessary. If the channel is perennial, then log veins will suffice. At the outlet, with a slope of <0.57o, I don't see that rip rap is necessary. If I'm missing something, please let me know, 2. There's a section of the rip rap on the outlet side of the rip rap that's in TDE, If there's to be permanent rock that may need to be maintained post construction, then a PDE is necessary. 3. I don't need copies of the FONSI and the JD drawings if they've previously been submitted. Overall, the application looks great. I can tell you guys are really learning from previous applications. I appreciate it, Amy Please note my new email address: amy,euliss ancdenr,gov Amy Euliss NC DEN Winston -Salem Regional Office Division of Water Quality, Surface Water Protection 585 Waughtown Street Winston - Salem, NC 27107 Voice: (336) 771 -5000 FAX: (336) 771 -4630 o a m z O o a - e IdF /`1 /+i4oll, r o � i - Nw 3 � i Z o w ry J'0 O N k _ z " '' 7 od z G � a� u V:3 y3 w E3 z 0 dwwm 03 Qi 0. \ 0 z_ z z zh ❑� oW � o a m z O o a - e IdF /`1 /+i4oll, r o � i - Nw 3 � i Z o w ry J'0 O 'V9ozs -d d v ­—NI .... d 0 "' ­V, a 0200V - zroz/sz/b - ....N M/a ww�0- lo E ° 0 dwwm �s \ z_ s - LL 'V9ozs -d d v ­—NI .... d 0 "' ­V, a 0200V - zroz/sz/b - ....N M/a \)ƒy zM0 C/)%\0E 33= / e G G ƒ ±g k - _ / / ®} / \ § / ` 2 G /C) § / / m cz �\ 77 -'s \ \ 2 ¥ / § f m $ § /k� E\ E a , a k j . a _0 / \ _� my � a \=g k a) \ \ \e4� � wo / > U) g G .2 % /y A 3 / / * § * E�\� E 3 g e * + =2 cz cz 2 2 EE %3 a a I * t5 � Cl) i/ \E / a y + \ o \ C/)£ \ 0) a 2 a / 22 0 e