Loading...
HomeMy WebLinkAboutNCC212478_ESC Approval Submitted_20210426Gaston County Soil Erosion and Sedimentation Control Program www.castongov.com /departments /Natural -Resources CONTACT: Gaston Natural Resources Department 1303 Cherryville Hwy Dallas, NC 28034 Telephone: 704-922-4181 Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Dellview Gastonia High Shoals Kings Mountain Lowell McAdenville Mount Holly Ranlo Spencer Mountain Stanley Mission Statement "To provide leadership and conservation assistance to the people of Gaston County to improve and sustain their soil, water, air, plant and wildlife resources." GASTON COUNTY Gaston Natural Resources Department Soil Erosion & Sedimentation Control RE: Letter Of Approval Date: 04/01/2021 Project Name The Courtyards on New Hope Permit #: 3721 Responsible Party NewStyle Communities, Inc Address 2125 Southend Drive , Unit #453 City, State, Zip Charlotte NC 28203 Location S. New Hope Road Submitted By Date Received: 03/25/21 New Submittal 0 Revision Watershed Cramerton I Disturbed Acreage: 12.00 ATTN: Broack Frankhauser The Erosion and Sedimentation Control Plan submitted for the above project has been reviewed and is approved. Please be advised that the Ordinance (Section 18 (c) and Title 15 NCAC 0413.0127(b) requires that a copy of the approved Soil Erosion & Sedimentation Control Plan be on file at the job site. This letter is also Notice required by the Ordinance (Section 21) and G.S. 113A-61.1 of our right of periodic inspection to insure compliance with the approved plan. After commencement of this project, if it is determined that the Soil Erosion & Sedimentation Control Plan is inadequate to meet the reqirements of the Ordinance (Section 18 (c)(f) and G.S. 113A-51 through 66), this office may require revisions to the Plan and implementation of the revisions to insure compliance. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinaces or rules may also apply to this land -disturbing activity. This approval does not supercede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form which you have provided. You are requested to file an amended form if there are any changes in the information included on the form. Please notify our office (704-922.4181) at least 48 hours before commencement of the land -disturbing activity. (Ordinance Section 8 (e). Sincerely, GASTON COUNTY NATURAL RESOURCES DEPARTMENT Joe Lineberger: Conservationist joseph.lineberger@gastongov.co Gaston County Erosion & Sedimentation Control Program CC1: Scott Doerr P.E. CC2: Gaston County Soil Erosion and Sedimentation Control Program www.co.gaston.nc.usf Natural Resources CONTACT: Gaston Natural Resources Department 1303 Cherryville Hwy Dallas, NC 28034 Telephone: 704-922-4181 Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Dellview Gastonia High Shoals Kings Mountain Lowell McAdenvil le Mount Holly Ranlo Spencer Mountain Stanley Mission Statement "To provide leadership and conservation assistance to the people of Gaston County to improve and sustain their soil, water, air, plant and wildlife resources." GASTON COUNTY Gaston Natural Resources Department Stormwater Control RE: Letter Of Approval Date: 04/01/2021 Project Name The Courtyards on New Hope Responsible Party NewStyle Communities, Inc Address 2125 Southend Drive , Unit #453 City, State, Zip Charlotte NC 28203 Location S . New Hope Road Submitted By Date Received: 02/11/21 New Submittal 0 Revision Watershed Cramerton I ATTN: Brock Frankhauser Gaston Natural Resources Department received a complete Stormwater Control Plan for the above project. Staff review of the plans and specifications determined that the project, as proposed, will comply with Gaston County's Stormwater Ordinance. The Gaston County Stormwater Permit number, 000000312 is approved. Your Stormwater Permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein. Please pay special attention to your Operation and Maintenance requirements. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. Section 11, As -built Plans and Specifications, of the Stormwater Ordinance shall be validated at completion of the project. Note that a Certificate of Compliance or Occupancy will not be issued without as -built plans or cerffication of previously submitted plans. Be advised of the annual inspection report, maintenance agreement/restrictive covenant, and record easements for access, maintenance, and inspections required under Section 18, Assurance that Improvements will be Maintained, in Gaston County's Stormwater Ordinance. If any parts, requirements, or limitations contained in this permit are unacceptable, or you need additional information concerning this permit, please contact Gaston Natural Resources Stormwater Division at (704) 922-4181. We look forward to working with you throughout this project. This approved plan shall become null and void if no progress is realized on -site within six months after the date of approval (Section 7.p). If any parts, requirements, or limitations contained in this permit are unacceptable, or you need additional information concerning this permit, please contact Gaston Natural Resources Stormwater Division at (704) 922-4181. We look forward to working with you throughout this project. Stormwater Admin istrator Gaston County Stormwater Control Program CC1: Scott Doerr P.E. CC2: GhSTO GAS n c DQ-� m ° ��.51 " w3 o (�a0 N n .. kACP own° c 0 o 1+ (A a ID° 0 se+W 0 C) m w �• _ o " c cD cD = o•rn 0 Vi m n 3 c w(� a �sQ� c>e ON O 0 O °w oa%4 1 �*fD° IMM z RO Z o a (A -4 Q�0e+ 3 ^ Qo �M `r V 3 f+ f1 0 "—�' �° ..^ ° Z rn _ w e n m M s o ° (D A)o o 3' 3 Z� -,,o 0.° st D a D, n 3 0 o w w Zv'00 Fact Sheet on the New NCGO1 Permit pEQ� April 2019 HG -;1111� The NC Construction General Permit (also known as "NCG01") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or (919) 707-3639. Organizational Updates The new permit: Repeats state requirements for E&SC Plans and organizes them with federal construction activity requirements; Is clearly organized by topic; and Has less text and more tables. Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);' • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p. 11-14);2 • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously 0.5 inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take place (p. 23). 1 This list is based on website guidance by the DEMLR Sediment Program. Z The number of calendar days was selected to be as equivalent as possible with the previous permit. 3 The intent is to provide predictability to the inspection schedule. Acronyms to Know COC: Certificate of Coverage, proof of coverage under an NCGO1 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI: Notice of Intent, application form for the NCGO1 permit e-NOT: Notice of Termination, form for closing out the NCGO1 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1 The NCGO1 Process The new NCGO1 applies to permits approved on or after April 1, 2019. Permittees will no longer receive a copy of the NCGO1 permit in the mail with their E&SC Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an NCI on each construction project and issue each construction project its own COC. Under the new NCGO1 process, construction sites will continue to receive approval for E&SC Plans from either DEMLR or the delegated local E&SC program just like before. After receiving E&SC Plan approval, permittees will officially obtain coverage under the NCGO1 by completing an a-NOI (available at deg.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. Initially, there will be no charge associated with applying for an NCGO1 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annual general permit fee as required per §143-215.3D. DEMLR is working on creating a single application form that will allow an applicant to simultaneously apply for an E&SC permit and an NCGO1 COC. That effort is part of a larger Permit Transformation project at DEMLR.