HomeMy WebLinkAbout20210833 Ver 1_Pre-Filing Meeting Information_20210418DWR Pre -Filing Meeting Request Form
ID#*
Regional Office *
Reviewer List*
20210540
Version*
1
Raleigh Regional Office - (919) 791-4200
Stephanie Goss
Pre -Filing Meeting Request submitted 3/10/2021
Contact Name*
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Is this a transportation project?*
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification -
Regular
I— Individual Permit
I— Shoreline Stabilization
Jermaine K white
Jkwtiite815@gmail.com
Creek crossings
Jermaine white
Chatham
Street Address
1895 Flint Ridge Road
Address Line 2
City
Siler City
Fbstal / Zip Code
27344
r Yes r No
I— 401 Water Quality Certification -
Express
I— Modification
Does this project have an existing project ID#?*
C Yes ( No
State / Rovince / Region
NC
Country
United States
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
There are 2 creeks that divide my property in half. One smaller
stream and a larger creek. I would like to get permits to put crossings
on both so I can have access to the entire property. The smaller
creek crossing will be needed as a driveway. Culvert pipe and fill
would be plenty to cross it. The creek just needs a crossing I can walk
across or take a small atv across to access the property.
Parcel 12527 siler city
Please give a couple of dates you are available for a meeting.
3/13/2021
3/19/2021
3/20/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• !also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 3/10/2021