HomeMy WebLinkAbout20190230 Ver 5_Site 7 on Sheet 31 from R2582A_Permit Drawings - Stream Relocation Modification_20210423EST. 78 S.Y. GEOTEXTILE FABRIC
EST. 38 TONS CLASS I RIP RAP15" RCP-III 15" RCP-III 24" CSP24" RCP-III15" RCP-III 15" RCP-III EST. 7 S.Y. GEOTEXTILE FABRIC
EST. 2 TONS CLASS B RIP RAP
SHT.19 -L- STA. 254+50.00WOODS
WOODS
DB 755 PG 192
KATHERINE ROBINSON, TRUSTEE
-L-
25+00
-Y13A-
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2GI
2GI
2GI
2GI2GI 2GI
2GI
FS
FS FS
FS
HW
STA. 20+45 -Y13A- RT
BEGIN SBG
STA. 248+45 -L- LT
BEGIN SBG
STA. 252+00 -L- LT
END SBG
SEE DETAIL 57
LATERAL 3' BASE DITCH
15" CSP2GI
SEE DETAIL 55
CL B RIP RAP TOE PROTECTION
SEE DETAIL 45
W/ CL B RIP RAP
LATERAL 2' BASE DITCH
SEE DETAIL 56
LATERAL 4' BASE DITCH
SEE DETAIL 58
LATERAL 2' BASE DITCH
-Y13A- RT
STA. 26+00
END SBG
15" RCP-III
ELB
ELBOWS
ELB
ELB
ELBOWS
ELB
(B
U
RIE
D 1')
84"
R
CP-I
V
WETLAND
EXCAVATION IN
SITE 7
V10 = 3.3 fps
Q10 = 9.4 cfs
V10 = 1.1 fps
Q10 = 11.5 cfs
V10 = 1.6 fps
Q10 = 19.5 cfs
SURFACE WATER
TEMPORARY IMPACTS IN
NAD 83SCALE
0'50'50'
SITE 7
WETLAND
DENOTES FILL INFF
E E IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
S S SURFACE WATER
DENOTES IMPACTS IN
SHEET 31 OF 53
PERMIT DRAWING
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
19R-2582A
2/8/2019R:\Hydraulics\PERMITS_Environmental\Drawings\31_R-2582A_SITE7.dgnmeme.buscemi8/17/99DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY