HomeMy WebLinkAboutSW6200704_Supplement-EZ Form_20210209SUPPLEMENT-EZ COVER PAGE
1 FORMS LOADED
kasizif i6k . . ............. . . . ..... . ........ .. . ..... . . ...... . ...... . .... .. .. .. .. .. .. .... .... ...... ... ........ ...... .. . .. .. .. .. . ... ..... .. .. .................... ..............................
........ ....... . .. . .......... . .... ... ... . . ...... ........... ..... ................... ... . .. ............ . ...... . . . . . .... .
. ........... .. .. . .... . ........ . .......
1 Project Name
.. ..... ... — ___ " , ", ____ -1 - I - -11, 111 ''1 - 11 11
Cypress Pointe
- , , "' , '"' , _ __,`___ - "' , , -_
1
2 Project Area (8c)
50.88
3 CoastaI Wetland Area (ac)
0
S,urf1aqeW4te! Area (ac)
5 ;Is this project High or Low Density?
6 IDoes this project use an off -site SCM?
. ..... ...... . .. . .... . ...
No
NUMBER AND TYPE OF SM.... ... . ...... . . ................ ...... . ... ........ .. ....... . ....... .... .. . .......... . . . . . . . ... ... ...... . . . ............. . .. ..... . ... ....... .
s.
"77" Infiltration Systern
12 Bioretention C01
13 'Wet Pond
14 Stormwater Wetland
115 iPerTea,bIe_Pavem,ent,
16 il Sand Filter
}Rainwater Harvesting (RWH,�
18 IGreen Roof
19 Level Spreader-Filter'Strip (L S- F S)
20 IlDisco nected Impervious Surface (DIS)
21 !Treatment Swale
22 Dry Pond
23 JStormFflter . ..... .. ....... . .......
24 SilvaCell.. . . ....... ..... .........
25 Bayfilter .. ......
26 Filterra
VINITAXIIIII)OM MA-01
DESIGNER CERTIFICATION
....
me and'Ttle:
. ..................... . ...................................... . ................................... . ... . ..... e f f r e y ............. A .... . .... . ........Nobles„ " P E . ..... . . .. . . .... . . ........ . ...... .... . . .......
28
Organization:
Larry King
29
Street address; ,§yute�210111
30
City, State, Zip-
Tay
31
Phone n mber(s
910-483-4300
32
Email:
jnobles@lkanda.com
�C__qT11fiRjtuon_§jt@terrt%nt
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
SEAL
59
Signatu
. . ...........
Date
DRAINAGE AREAS
1
Is this a, hiqh,, q§#y_prqjeqt?
Yes
2
so number of drainaqea�r !0§
2
Does this ,
1 prqj ect have low de n s Ity_ areas ? . .............
No
4 If so number of low dense ydrainage areas
0
,
s all/part of this project subject to previous rule
5 versions
No
I E(4 LUA�_i _0kQEP
$_RZ_4AGE AlRiix iiF—ORMATION ........... . .. . ...... . ... . ...... . ................. . . . ....... . ... . .. . .. . ... . . . .. . ............ . ...........
......
. .................................................................................... . ...... ....................... . .........
Type of SCM
infiltration Basin
Infiltration, Basin
5
Total drainac[e area (sq ft)
2216331
, ,
829098
6
Onsite drainage areas ft)
22116333
338086
629049
7
'Off,s,it.el,d,lrlal,i,n,age,area (sq ft'),
0
0
0
8
Total BUA in ... . .. . ......
i ct
489491 sf
— — . . .
161093 sf
. ................. . . . . ..... . ............................. . ... .
324891sf
............. . ............ . . . ......... ..... . .......
I
New BUA on subdivided lots (subject to permitting)
9
(sq ft),
364000 sf
124000 sf
240000sf
New BUA not on subdivided lots (subject to
. ............ .
...... . ....... ......
10
permitting) (sf)
125491 sf
37093sf
84891 sf
OffsiiteBUA (sq
sf
sf
12
Breakdown of new BUA not on subdivided lots:
Pa rklnq (sq ft)
sf
sf
sf
sf
sf
sf
7 Roof (sq 11)
sf
- Roadwa (sqft��
"Y
121984 sf
37093 sf
8489 1 sf
-Futures fti . .............. .. ....... .
sf
. . ..... _sf ..... ......
........ ........... ... . .. .sf ... .......... ....... . .
Other, please specify in the comment box
below (sq fl)
sf
sf
sf
New infiltrating permeable pavement on
1 3
1subdividedlots
sf
sf
sf
New infiltrating permeable pavement not on
14
subdivided lots (sq ft)
sf
sf
sf
Existing BUA that will remain (not subject to
�15_
p�ermitti " 9q) (sq ft)
sf
sf
sf,
16
ExisfiN, q1I that already permitted _(sq Tt)
sf
sf
sf
17
Emsting BUA that wall be removed
sf
sf
sf
18
Percent BUA
.. ... ........................... . . .. . ...........
22%
. . . . . . ........ . .............. ........
48%
. ........ .... ... ... . ... _................... ......
39%
19
Design storm (inches)
1.0 in
1.0 in
1.0 in
Jbe"�gn volume of SCM (cu ft,'�rnn
of
13716 cf
27819 cf
21
�dailculaiion method for design volume
...................................................... . ............... . .... . . . ..................... . .............. ...........
Simple Method
I Simple Method
Simple Method
6&'f10_1;_A_LJNV0
"ii6k
lease use this space to provide any additional information about the
22
ldrainage areas):
INFILTRATION SYSTEM
Drama a area numbe
1
2
„�1
2
Minn= reou!,r!d treatmenit volurn
c f
�BNIffiAlpp
3"
rcuG.
the M sized to treat the SW from all surfaces at build out?
Yes
.......... ...........
yes
4
jIsthe SCIVI located awayfforn contaminated soils?
Yes
Yes
5
W I hat are the side slopes ci�f the - S I CM (H:v or enter "Vertical" for
trenches)?
3:1
3:1
6
Does the SCIVI have retaining walls, gabion walls or other engineered
side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10 year storm}?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
lst
Yes
. .. ......... . ......... . . ............... .....
.. Yes
9
What method for clewatering the SCM for maintenance?
Pump (preferred)
Pump (pre
10
If ap licable, will the SCIVI be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General IVIDC (8)?
I -
Yes
Yes
12
the I drai I ln,�%�easeTeqt comply with I Ge I n I e I- ral - IVID I C "1 1 9 - ) ? .... . .........Yes
Does
'Yes
If the SCIVI is on a single family lot, does (will?) the plat comply with
13
JGeneral IVIDC (10)?
14
Is there an O&M Agreement that complies with General IVIDC (11)?
Yes
Yes
5
here any
is M Plan that complies with G r i
0& �'Y"Dq"(1 2)?,
Yes
Yes
16
D es! S follow the device specific IVIDC?
"e . ... .... . ..........
Yes
.... . .......... . . . .... . Yes
17
Was the SCIVI desioned bvan NC licensed orofessional?
Yes
f Yei
18
Prqpqsed"siope of the subgrade surface N
0 t
0%
19
Are terraces o'r'baffles provided?
No
No
20
T p e of prelrea tment:
Forebay
Forebay
Soils Data
21
, a , s the soil investigated in t I he footprint and at I the elevation of the
infiltration system?l
�SHWT
Yes
22
elevation (fmsl)
118.49
116 514
SHV4per soils report (in)-
112.00
90.00,
24
Ground elevation at boring in soils repo (fmsi)
12404
25
Is a detailed hydrogeologic study attached if the separation is
1 and 2 feet?
N/A
N/A
26
betvyeen
Soil infiltration rate (inih:r)
L
00---
-0.60,
2 7
F.
Factor of safety �FS) (2 is recommended).
2.00
2.00
Elevations
ottom elevation (fmsl)
30
Storage elevation (firnsi)
127.4 ft
120.77 ft
31
Bypass, elevation (frnsi)
127 ft
121 ft
For Basins "O"niy" ... . . .... . ..... . . .... ........ .... . .......
32-
2
�Bottom surface area
5789 ft
33
�Storage elevation surface area
8111.ft
18604.ft
J, o, .... . .. ..... ..
tenches _q!q_
36
Perforated pipe diameter, if applicable (inches),
37
Number of laterals
38
Total length of perforated piping,
39
Stone type, rf applicable
40
Stone porosity (`Xo
41
Is stone free of fines?
42
Is hii, stone I I I I I wrapped - I I in I _geotextile I fabric? 11
.........
"[Has
..... . ......
43
at least one inspection port been provided?
Volumes/Drawdown
44
besign volume of SCM (cu ft)
Jd046"cf
27955 a
45
CTime to draw down (hours
5�8, hrs
71 hrs
46 Please use this space to provide any additionall information about
infiltration systern(s):
127.40' 0 120.80 45. H 157.6 12'170,80
InfilVaboin I 10:00 AM 2/9/2021