HomeMy WebLinkAboutNCC212294_ESC Approval Submitted_20210423ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Duke Energy
Attention: Kelsey Pace
4720 Piedmont Row
Charlotte, North Carolina 28210
NORTH CAROLINA
Environmental Quality
October 13, 2020
LETTER OF APPROVAL
RE: Project Name: Line 470 - Phase 1
Acres Approved: 43.1
Project ID: MECKL-2021-022
County: Mecklenburg
City: Charlotte
Address: Center Park Drive
River Basin: Catawba
Stream Classification: Other
Submitted By: Duke Energy
Date Received by LQS: September 18, 2020
Plan Type: New
Dear Ms. Pace:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.ne.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be
charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh.
Title 15A NCAC 413 .0118(a) and the NCGOI permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
E
n;;:n+c,nttounn
Oepamnam of Enrironmantal QuaNry�
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite :301 1 Mooresville, North Carolina 28115
704,663.1699
Letter of Approval
Duke Energy
October 13, 2020
Page 2 of 2
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there, is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
ames Moore
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
ec: RParker@kleinfelder.com
cc: Inspection Department
O,
C-D
CD cD
CD CD
cn
CD
C, G[ZEATCIO
SF�I
'411 -1
CD
Pl-
z C-D
CD
® C
VI
CD
cn
CD
CD
CD
c