Loading...
HomeMy WebLinkAboutNCC212294_NOI Application_20210423Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/12/2021 3:15:22 PM (NCG01 NOI Submission) Approve by Clark, Paul 4/15/2021 12:59:08 PM (Review- Construction NOI 50079) • Gamble, Aana C reassigned the task to Clark, Paul 4/13/2021 8:42 PM • The task was assigned to Gamble, Aana C by round robin distribution 4/12/2021 3:17 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: April 14, 2021 5:00 PM 4/12/2021 3:17 PM Submit by Selkane, Aziza 4/23/2021 9:27:17 AM (Payment Verification for NCC212294) * Kelsey Pace • Selkane, Aziza assigned the task to Selkane, Aziza 4/23/2021 9:25 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 27, 2021 5:00 PM 4/15/2021 1:00 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 48059 NOI No. Prior Reviewer Paul Clark Name 1a. Project Name * PNG Line 470 Phase 1 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers 1 c. Parcel ID List all R% associated w ith this project. Number(s) (PIN) 14106103 14106125 14106121 14106142 14106140 14124101 14107109 20101169 20101197 20101192 20101191 20101190 20145102 20129160 20129159 20129158 20137293 20137291 20137/214 20137213 20137212 20137211 20137204 20137203 20137202 20130151 20137290 20130111 20130120 20301128 20301127 20301105 20301104 2. County* Mecklenburg 3. Highway or Street W Arrowood Rd, Charlotte, NC 28273 Address* Street name only is acceptable if no address nunber assigned yet 4. CityorTownship* Charlotte 5. State * NC 6. Zip Code* 28273 7. Latitude* Enter the latitude in decirral degrees 35.1478 8. Longitude * Enter the longitude in decinal degrees (MJST be negative) -80.9285 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 04/26/2021 Estinated Construction Project Start Date 10. Date to End * 12/31 /2021 Estinated Construction Project End Cate 11. SIC (Primary) * Other (9999) Standard Industrial aassification for Developrnent 12. Acres to be 43.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 43.10 (acres) * 14. Post- 0.70 construction (Estirrated) impervious area (acres) * NCC Project NCC-MECKL-2021-PNG Line 470 Phase 1 Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Coffey Creek Wate rbody* %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-137-4 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally %sponsible Entity Name * Piedmont Natural Gas IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Kelsey IF Corporation, enter Faegistered Agent First Wre 3. Last Name* Pace IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Project Manager 4. Permitee E-mail kelsey.pace@duke-energy.com Address* 5. Permittee 7047314705 Telephone No.* 6. Permittee Mailing Street Address Address* 4720 Piedmont Row Drive Address Line 2 City Charlotte Fbstal / Zip Code 28210-4269 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 4720 Piedmont Row Drive Address Line 2 city Charlotte Fbstal / Zip Code 28210-4269 State / Frovince / Fbgion NC Country us State / Frovince / Faegion NC Country us 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Shaun Contact - First Name * 2. Primary Site Huneycutt Contact - Last Name * 3. Title Implementation Superintendent 4. Site Contact E- shaun.huneycutt@duke-energy.com mail Address* 5. Site Contact 7044380036 Telephone No. 6. Organization Piedmont Natural Gas Name 7. Site Contact Street Address Mailing Address* 4720 Piedmont Row Drive Address Line 2 City Charlotte Fbstal / Zip Code 28210-4269 8. Consultant Name (Optional) Ryan Parker First and Last narre 9. Consultant E-mail rparker@kleinfelder.com This person will be copied on all correspondence. 10. Consultant 9196537057 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) kelsey.pace@duke-energy.com Default is legally responsible person a-rrail 12. Billing (For Annual Fee correspondence) Telephone 7047314705 Default is legally responsible person telephone State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/13/2020 Approved * 2. E&SC Plan Project MECKL-2021-022 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan MECKL-2021-022-10132020.pdf 2MB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mist be RDFforrret (lint 20 NB) Line 470 Phase 1_USGS Map_Reduced.pdf 8.71 MB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-20210212-DEMLR- Form 866.22KB SW.pd.pdf Mast be FDFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ` K6:-9� Type Name* Kelsey Pace Title Project Manager Organization Legally Responsible Entity Duke Energy Date * 04/12/2021 F. Tracking and COC Info NOI Tracking No. 50079 NC Reference No. NCG01-2021-2294 Uses 'count_nurber' variable (increrrented by SP) Certificate of NCC212294 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 2294 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC212294-2021 Invoice Due Date 5/15/2021 Initial Fee $ 100.00 Invoice Status OPEN