Loading...
HomeMy WebLinkAbout20210619 Ver 1_Pre-Filing Meeting Request_20210323DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210619 Version* 1 Raleigh Regional Office - (919) 791-4200 Stephanie Goss Pre -Filing Meeting Request submitted 3/23/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Eric Kulz eric.kulz@townofcary.org Parkway Sewer Crossings Repairs Town of Cary Wake Owner Address: Street Address Town of Cary Address Line 2 P.O. Box 8005 City State / Bovine / Region Cary North Carolina Fbstal / Zip Code Country 27512-8005 United States Is this a transportation project?* r Yes a No Type(s) of approval sought from the DWR: 17 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes a No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * Two sanitary sewer stream crossings were identified by Town staff as requiring repairs to avoid a broken sewer pipe and discharge of sewage to streams. Both are located in close proximity to each other on property owned by the Parkway Community Association, Inc., within Town of Cary sanitary sewer easements. Both sewer lines were installed around 1990. Site 1 is a near -perpendicular stream crossing of an eight -inch PVC line which was formerly constructed at the stream bed elevation and encased in concrete. Stream erosion has resulted in the undercutting of the crossing, such that the crossing is now suspended over the stream channel. The weathering of the concrete has resulted in the exposure of the lower portion of the PVC pipe. The PVC pipe and concrete casing will be removed and replaced with a ductile iron pipe aerial crossing. Riprap will be used to stabilize the stream bed and banks, as the stream is actively downcutting and widening. Site 2 is a diagonal crossing that was formerly buried beneath the stream bed, but due to erosion, the upper portion of the ductile iron pipe is exposed. In addition, channel widening has exposed a portion of the PVC line that is connected to the ductile iron pipe. The Town proposes to place fill over the exposed PVC pipe, and then to stabilize the stream bed and banks with riprap, as the channel is actively downcutting and widening. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. Photos.pdf pdf only 1.83MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/23/2021 Parkway Sewer Crossing Repairs - Site 1 Parkway Sewer Crossing Repairs - Site 1 II{41fII 1 II II i a; iIIIL,f11III,]illlr,�lruui Parkway Sewer Crossing Repairs - Site 2 Parkway Sewer Crossing Repairs - Site 2