Loading...
HomeMy WebLinkAbout20021687 Ver 2_CAMA Application_20121207,� oa - It'$n 0a- CCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Govemor December 5, 2012 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Braxton C. Davis Director Karen Higgins, Webscape Unit Supervisor Division of Water Quality - Raleigh Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review NC Wildlife Resources Commission Dee Freeman Secretary End of Brumley Road (SR 1259) in Knotts Island, Currituck County Dredge & extend an access channel Please indicate below your agency's position or viewpoint on the proposed project and return this form by 12/26/12 to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264 -3901. When appropriate, in -depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. o.,E /up @a DEC 7 2012 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252 - 26439011 FAX: 252-260723; Internet: www.nocoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NC WRC — Brumley Road Boat Access Area 2. LOCATION OF PROJECT SITE: East end of Brumley Road (SR 1259), Knotts Island, Currituck County, adjacent to Knotts Island Bay. Photo Index — 2006: 199 -7016 (R 19) 2000:199-2373 (Q, R 18 -19) 1995:199-2086 (Q, R 12) 1989: 139 -6 (K 4) 1984:130-645 (H 9) 1978:95-1460 (111-12) State Plane Coordinates - X: 2908172 Y: 1017955 Lat/Long: N 36030.476'W 75 054.589' Quadrangle: Knotts Island, NC, L.R. 3. INVESTIGATION TYPE: CAMA / Dredge & Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 10/24/2012 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received Complete — 12/3/2012 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Currituck County Land Classification from LUP - Limited Service and Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing — N/A Planned - N/A (F) Type of Structures: Existing — Concrete boat ramp, a breakwater on each side of ramp, pier Planned -None (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: [AREA, square feet (SF)] DREDGED FILLED OTHER (A) Shallow Bottom PTA, EW AEC's 3,680 sf (B) Other (D) Total Area Disturbed: 3,680 sf (E) Primary Nursery Area: No (F) Water Classification: SC Open to Shellfishing: No NC WRC — Brumley Road Boat Access Area Field Investigation Report Page 2 8. PROJECT SUMMARY: NCWRC proposes to dredge a previously permitted access channel and extend the channel length to connect the boat ramp to existing deeper water. The proposed dredging is both maintenance and new work. Proiect Setting The project site is located off of NC -615, at the eastern end of Brumley Road (SR 1259) in Knotts Island, Currituck County, adjacent to Knotts Island Bay. To access the site, drive two miles north on NC 615 after leaving the Knotts Island Ferry, turn right (east) onto Brumley Road and stop at the paved cul -de -sac adjacent to Knotts Island Bay. NCWRC's designated parking area is a cleared 1.2 acre lot vegetated by grass with a .5 acre gravel area located on the north side of Brumley Road located approximately 450' to the west of the launch site. The elevation of the 50' wide paved cul -de- sac /maneuvering area serving the concrete boat ramp is t2 feet above NWL. Total shoreline length is t60', has not been hardened (other than the ramp area) and has a shallow 3 foot wide swale located on the south side of the pavement that extends landward ±90' from NWL. Existing structures, previously authorized through CAMA Major Permit #162 -02, include the 22' wide concrete boat ramp, a 145'x1' breakwater located on the north side of the boat ramp, another 145'x1' breakwater located on the south side of the boat ramp and a 75'x5' pier also located on the south side of the boat ramp between the breakwaters. CAMA Major Permit #162 -02 also authorized the dredging of an access channel 78' beyond the end of the boat ramp. The adjacent property to the north is residential in nature, has a bulkheaded shoreline, a pier, boat ramp and breakwater. The adjacent property to the south contains a single - family dwelling, bulkheaded shoreline, a docking facility, and a basin that has a boathouse and breakwaters. Based on available information, there appears to be no archaeological sites on this property or nearby. The waters of Knotts Island Bay are classified as SC and are closed to shellfish taking. Existing water depths within the project area range from -1.7 feet to -4.1 feet with an average depth of -2.5 feet. The bottom substrate within the project area is made up of fine sands. Submerged Aquatic Vegetation (SAV) was observed in the waters adjacent to the applicant's property; however, within the project area SAV's are largely nonexistent. Development Proposal To gain an adequate water depth for boats to launch and access the Boat Access Area, the NCWRC is proposing to dredge an area that is ±82' longer in length then what was previously authorized through MP #162 -02. The proposed dredge area will extend 160' beyond the end of the concrete boat ramp and will be 23' wide with a dredging depth of -4 feet. The connective water depth is -4.1 feet. A bucket and barge will be utilized to dredge the channel. The spoils will then be transferred to a dump truck and transported to the parking area will it will placed in a 100'x50' area to dry. Erosion control will be maintained by the construction of a double silt fence around the perimeter of the spoil area. When dry, the spoils will be loaded and transported to an upland disposal area. NC WRC — Brumley Road Boat Access Area Field Investigation Report Page 3 Anticipated Impacts • The proposed dredging will temporarily increase turbidity within Knotts Island Bay. • The proposed dredging within the access channel will result in the disturbance of ±3,680 ft2 of shallow water bottom within the PTA and EW AEC's. • The proposed dredging within the access channel will generate ±204 cubic yards of spoil material made up of fine sands. Submitted by: Ron Renaldi Date: 12/3/2012 Project Narrative Project Information: Brumley Road Boating Access Currituck County RECEIVED F 0CT 2 2 COASTAL MANAGEMENT Y Engineer: Mark R. Lee, PLS North Carolina Wildlife Resources Commission 1720 Mail Service Center Raleigh, NC 27699 Project Summary: 10/15/2012 The Brumley Road Boating Access Area project it located end of Brumley Road in Currituck County, NC on Knotts Island. The current property is mostly asphalt with grassed edges, with a concrete boat ramp and wood/vinyl breakwaters. This project involves the maintance of an existing WRC boating access area. This site requires dredging to a depth of 4.0' from the end of the existing concrete boat ramp for 160' along the existing boat channel to the existing 4.0' contour. Impervious Surface: The total property owned by the Wildlife Resources Commission is 58,122 sf (1.33 acres) includes R/W. No change to the impervious surface area on site. Dredging: Dredging is required for this project. And area from the ramp and in between the breakwaters will be dredged to tie to the existing depth of 4.0'. This dredging will be done bucket to barge and will remove approximately 200 cubic yards of material. Existing Stormwater Conditions: The existing site has no stormwater controls. The majority of runoff is infiltrated, with sheet flowing to the sound. Ramps/Docks: An existing wooden dock and existing wood/vinyl sheet pile breakwaters are on the outside of the ramps/dock. Wetlands: There is no disturbance of coastal wetlands during this project. M WI WRICIT1811fer Nolor Development Femit (Iasi nvlsed 1?JV=) RECEIVED OCT 2 2 2012 COASTAL MANAGEMENT ELIZABETH CITY North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name North Carolina Wildlife Resources Commission Project Name (if applicable) Brumley Road Boating Access Area Applicant 1: First Name Division of Engineering Services MI Last Name Applicant 2: First Name MI Last Name ff additional applicants, please attach an additional page(s) with names listed. Mailing Address 1720 Mail Service Center PO Box City Raleigh State NC ZIP 27699 Country Phone No. 919 - 707 - 0150 ext. FAX No. 919-707-0162 Street Address (d different from above) City State ZIP Email I101Ff�o -G , �� 2 AgentContractor Information Business Name ? 2012 North Carolina Wildlife Resources Commission AgenU Contractor 1: First Name MI Last Name Wegq ;& V R QUj T—TMy Mark R Lee AgenU Contractor 2: First Name MI Last Name Mailing Address PO Box City State 1720 Mail Service Center Raleigh NC ZIP Phone No. 1 Phone No. 2 27699 252 - 670 - 4450 exL - - ext. FAX No. Contractor # 919 707 0162 Street Address (rf different from above) City State ZIP Email mark.lee @ncwildlife.org <Forfn continues on back> Form DCM MP -1 (Page 2 of 4) RECEIVED OCT 2 z 2012 APPLICATION for Major Development Permit 3. Project Location a. Total length of shoreline on the tract (t) b. Size of entire tract (sq.fL) 60 ft. property = 54,522 sf project area (includes rAN) = 58122 County (can be multiple) Street Address ELIZABETH CITY State Rd. # Cunituc k 192 Brumley R 4' ❑NHW or ®NWL 1259 Subdivision Name City State zip We Knotts Island NC 27950- Phone No. Lot No. (s) (d many, attach additional page with list) n/a - - ext. n/a, I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank -Suf tt elt wand Knchh 10c—d Ur, y 1z ,k. a. c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Curituc k Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed []Yes ®No work falls within. n/a 4. Site Desciriipdon a. Total length of shoreline on the tract (t) b. Size of entire tract (sq.fL) 60 ft. property = 54,522 sf project area (includes rAN) = 58122 sf c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or n/a, I NWL (normal water Woo (lf many lot sizes, please attach additional page with a list) 4' ❑NHW or ®NWL e. Vegetation on tract This site is mostly asphalt, concrete or gravel, with centipede grasses along edges. f. Man-made features and uses now on tract Currently there are is cone ramp, wooden docks and bulkhead and gravel parking area.The property is currently an existing public boating access area g. Identify and describe the existing land uses adiaoe to the proposed project site. Adjacent land uses include residential property. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? We (Attach zoning compliance certificate, it applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does ft involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Fotm continues on next page> Form DCM MP -1 (Page 3 of 4) RECEIVED nnT ')') x(111 APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? COAST," IO 10GEA -IENT ❑Yes ®No EUZARFTH CITY (iii) If yes to either () or (ii) above, has a deline n ucted? []Yes ®No (Attach documentatron, ifevailable) n. Describe existing wastewater treatment facilities. None. o. Describe existing drinking water supply source. None. p. Describe existing storm water management or treatment systems. The existing site has no stormwater management. There are no existing BMP's. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ®PublidGovemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This project is the exist site of a Wildlife Resources Commission boating access area, include a single lane launch ramp, a parking area, and is open to the public 24 hours a day. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. , Construction equipment will include (but not limited to) excavators, backhoes, bull dozers, motor graders and dump trucks. The marine construction will include a barge and trackhoe. All equipment will be stored on the the project property. d. List all development activities you propose. Dredging of boat baisn to use for access to Currituck Sound e. Are the proposed activities maintenance of an existing project, new work, or both? 1411eintenenee- f. What is the approximate total disturbed land area resulting from the proposed project? - 8660 S- p o 0 ®Sq.Ft or ❑Acres spo,I S.,k R40t g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes []No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Currently, storm water sheet flows into the sound. The proposed development will not add any point discharge and will continue difuse/sheet flow into the sound i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No []NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Fonn continues on back> Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Addidonallnformadon In addition to this completed application form, (MP -1) the following Hems below, if applicable, must be submitted in on ler for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Jill Brumbley Sarver Phone No. Address 2124 Agecroft Road Virginia Beach, VA 23457 Name Carova Bound Inc. do Norman Zwahlen Phone No. Address 500 Winston Salem Ave. Apt 308 Virginia Beach, VA 23457 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Major (10-02) #162 -02 h. Signed consultant or agent authorization forth, if applicable. I. Watiand delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owned k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 11 3A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date October 10, 2012 Signature Print Name _Mark R. Lee Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP-5 Bridges and ❑DCM MP -3 Upland Development ❑DCM MP-4 Structures Information RECEIVED OCT 2 2 2012 COASTAL MANAGENIENT ELIZABETH CITY Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) RECEIVED OCT 2 2 2012 COASTAL MANAGEMENT ELIZABETH CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yams. 200 cy (tie bottom of ramp to existing -4.0 contour) c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS OWL PgNone (ii) Describe the purpose of the excavation in these areas: n/a ❑This section not applicable b. Type of material to be excavated. Sand d. High -ground excavation in cubic yards. 12. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. . On site at overflow parking area iQC KS7C ?A-1z. c. (i) Do you claim title to disposal area? d. () Will a disposal area be available for future maintenance? ❑Yes ❑No ®NA ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? On site at overflow parking area e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands OW)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ❑Yes ❑No ®NA (i) If yes, how much water area is affected? Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL ) stabilization Length 160' Width 23' Avg. Existing -2.6 NA NA Depth Final Project -4.0' NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yams. 200 cy (tie bottom of ramp to existing -4.0 contour) c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS OWL PgNone (ii) Describe the purpose of the excavation in these areas: n/a ❑This section not applicable b. Type of material to be excavated. Sand d. High -ground excavation in cubic yards. 12. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. . On site at overflow parking area iQC KS7C ?A-1z. c. (i) Do you claim title to disposal area? d. () Will a disposal area be available for future maintenance? ❑Yes ❑No ®NA ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? On site at overflow parking area e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands OW)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ❑Yes ❑No ®NA (i) If yes, how much water area is affected? A . Form DCM MP -2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: []Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other. Width: c. Average distance waterward of NHW or NWL d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: L (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (0) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Mprap Breakwater /Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES AThis section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? []Yes ®No ❑NA b. @ Will fill material be placed in coastal wetlands/marsh (CW), If yes submerged aquatic vegetation (SAV), shell bottom (SB), or (ii) Amount of material to be placed in the water other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill ❑WL []None ' (ii) Describe the purpose of the fill in these areas: IS. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? a spoil area with a double row of sift fence will be used trackhoe, backhoe, dozer, motorgrader, compactor, dump truck, barge c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No ❑NA site? ❑Yes ®No []NA (ii) if yes, explain what type and how they will be implemented. (i7 If yes, explain steps that will be taken to avoid or minimize environmental impacts. October 10, 2012 RECEIVED Mai c R. Lee Date App scant Name Brumley Road Boating Access A OCT 2 2 2012 App cant Signd Project Name I COASTAL hAANAGENIENT EL!?AE�TH GITY MAJOR PERMIT FEE MATRIX ADDIiCant: NC. -9- - gr.enIcX Rz 8.4A Selection Development Type Fee DCM % DWO % (143001601 4351000931625 6253) (243001602 435100095 2341) I. Private, non - commercial Ej development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands of op en water areas: II. Public or commercial — development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and /or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non - E] commercial development, if $250 100%($250) 0%($0) General Water Quality Certificatiory No. 3490 (See attached ) can beia lied: III(B). Public or commercial E] development, if General $400 100%($400) 0%($0) Water Qualit ,Certification No. 3490 (See attached) can be a lied: III(C). If General Water ❑ Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: Inn. If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) cannot be a lied: IV. For development that E] involves the filling and /or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and/or open water areas: North Carolina Wildlife Resources Commission Drawing Index Sheet 1 Cover Sheet Sheet 2 Existing Overall Site Sheet 3 Existing Elevations Basin Sheet 4 Proposed Elevations Basin Sheet 5 Dredge Profiles Division of Engineering Services NORTH CAROLINA RESOURCES Proposed Brumley Rd Boating Access Area Date Prepared: OcWber 10, 2012 Project Site Information y � yruaraa -� owl" RECEIVED OCT 2 2 2012 COASTAL MANAGEMENT ELIZABETH CITY lJShPr.� kh 09l Size of Ramp Area= 0.11 Acres Size of Lot Containing Parking Area =1.24 Acres All tidal flow is wind initiated, therefore all elevations are based on NWL = 0. Water level fluctuations of +/- l' are wind driven DEC 7 2012 Pwpertn Line r Dewatering Area: 50' x 100' located in the existing parking lot will allow for placement of material in a 3' thick lift in order to dewater. Dried material will them be removed to an approved upland disposal site. Area retains the material outside of wedand and estuarine waters. Erosion control will be maintained by the construction of a double silt fence around the perimeter of the waste area 125 Acres total lot size 0 45 Acres gravel parking area / / RECEIVED OCT 2 2 2O t2 COASTAL MANAGEMENT li— ELIZABETH CITY Sole l"= 60' 0 60 120 Exiting Overall Site including Parking Area and Ramp f All elevations are based on NWL = 0 / i eeS'�e � / S w Approx 1.5 miles to opposite shoreline V / North Carolina Wildlife Resources Commission I Division of Engineering Services M.R Lea DEBWHBY M.R. Lee MAN" Brumley Road Boating Access Area Full Faristing Site Brumley Rd Atedgedwg Pht Drwr October 10, 2012 oW orPhdAVE 2 agoED err DATE aP 5 BY pEVIgpHg DATE M.R. Lea Revised Spoil Area Sim 9/18112 F Jill Brumley Sarver 2124 Agecroft Road Virginia Beach, VA 23457 RECEIVED OCT 2 2 2012 COASTAL MANAGEMENT ELIZABETH CITY Banchmuk TopRamp8mikwater Wdm afR=* Top of Won - I.Y 23'x160' Limits 23 Edge 'M Rrfirdn t Bhakwwr 0 1 -43, ..................................................................................................... I .................... ....... 14� A . ......... ............... ........................................... ................................. ...... ...... ............................. ... .............. ...... ................ 0--A 4*40, • Ezkft Coat Ramp ' i*�7 1.1.1.1.1.v ..... ....... ►.................. �!v ... ............. i. .................. ..................... ...... ....... . . ' ... . .......... ¢. RdWood Dock . . . .............3, .......... ..................................................................... -t'3 3, d36, 3, 3;,, Carova Bound Inc c/o Norman Zwahlen 500 Winston Salem Ave. Apt 308 Virginia Beach, VA 23451 All elevations are based on NWL = 0 20 0 20 Scale I" = 20' INorth Carolina Wildlife Resources Commission Division of Engineering Services I Bnunley Road Boating Access Area Existing Ramp Conditions MIL Lot VmmhyRdDn*Aps DEMBN BY Rod Deem MIL L40 0, 1 10.2012 DRAWN fff Dab of Plod po'dw 40 60 5 M CHECK Of ME OF fff meow T DATE M.R. Lee Raised Dredsing I h-fts IW10/12 IM 0 Jill BrumleY Sarver 2124 Agecroft Road Virginia Beach, VA AfL APL 23457 /Top Rompgreakwat watus E4P Carova Bound Inc c/o Norman Zwahlen 500 Winston Salem Ave. Apt 308 ' Virginia Beach, VA 23451 ofRamp Bendknmk 110P of wan - Limits 23`dW RECEIVED OCT 2 2 2012 COASTAL MANAGEMENT ELIZABETH CITY ........... .......................................... ... .... ... ....... ... .......... ..... ................ ....... .......... .............. ............... ...... ... �4� ......................... ............... �%4 . .................................. & ..... .... ....... ........... . ................................ ............................ ............................................................. ................. .......... .......................................................... ..... .......... .............. .................. ................ .......... ...................... ................ ' ....... .......... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................ . . . . . . . . . . . . . . . . . . . . ..'.'.'..'.'.'::.'.'.'.•.'.'.' . ................. ...................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............. . . . . . . . . . . . . . . . .......................... ... ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....... .... ...... . . . . . . ......... ........ ................. ...... .................... ........ ....... ..... ....... ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........ . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . .... . . . . . . . . . . . . . .... . . . . . . . ........ :4 ........... . . . . . . . . . . . . . . 4 -t Bsiatiag Wood Dock 12-11 __71P _j All elevations are based on NWL = 0 20 — 0 20 Scale P = 201 V& '3, !021:1 -t3 w North Carolina Wildlife Resources Commission WWI= of Engineering Services Brumley Road Boating Access Area Proposed Dredging Conditions MAL La �_ -, &=kyRdM*p&ft -'--'4 -=WNW 0daba 1% arm" w wft of Pw 40 60 1 5 of REVWXM DATE MIL Lee R6WwdDrCdgw81j.'ftH MGM OCT 2 2 2012 COASTAL MaNaGEMEN ELJZARETH CITE: TOp atat IL Top of Well =1S Limits 235460' zEsisfing Breshrotw V3, I' +1•+ t + ;. + +� 0' + ++ ++ d ++ `�p. ++t++' t? 4, ++++ ++ + + +�' +6++ ++ ++ +t +g +36,+t+ + + + ++ + + + +�+ + + + + + + + + + + + + + + + + + + + + + + + + + + + atisft + ,+ r .}} + Camc �P + + zit + + + + + + ��' + + + + + a + + + + + + + + + + + + +t -"t" + + + + + + + + + + + + + + + + + + +^3 J;t +++++ ., + + + + + + + + + �hg, + + + + + + + + + + + , + + + + + + + + g + t 6'+ +�t. + t + + + afiR + + + + + + + + + +t + + + t + + + + + + + + + + . + + + t + + + + + + + + + + + + + + + Q.r $ Wood t �. 8. d d 33, 0 _ I r ............... ............ .... .......................... 4.0' I?mDossd 1� 4.a All elevations are based on N� = 0 Proposed Dredge Area 2OOyds ^3 North Carolina Wildlife Resources Commission Division of Engineering Services Brumley Road Boating Access Area Profiles MR.L= s�yxanre a � DEMN fly Ffot Drew MR. LM 00A)w a 2012 om" Dy Dino of PIS P��an 20 0 20 40 60 5 CHECKm By DATE OF By p�DNS DATE Scale 1" = 20' MIL Lee �°°���°� MGM