Loading...
HomeMy WebLinkAbout20120789 Ver 2_Approval Letter_20121207.r. --_MA NCDENR North Carolina Department of Environment and Natura Division of Water Quality Beverly Eaves Perdue Governor Energy Renewal Partners, LLC Ms, Trisha Elizondo 305 Camp Craft Road, Suite 575 Austin, TX 78746 Charles Wakild, P. E. Director December 7, 2012 Subject Property: Washington, White Post Road Solar Farm Tar - Pamlico River Basin, Boyd Creek Resources Dee Freeman 5ecretary DWQ Project # 12 -0789 Ver.2 Beaufort County Approval of 401 Water Quality Certification with Additional Conditions Dear Ms. Elizondo; You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 84 linear feet of streams for the purpose of placing 2 -78 inch diameter CMP roadway culverts (44 linear feet and 38 linear feet). It is also proposed 66 linear feet of temporary stream impacts from the placement of coffer dams during construction, as described within your application dated November 8, 2012 and received by the N.C. Division of Water Quality (DWQ) on November 30, 2012. After reviewing your application, the proposed impacts are covered by General Water Quality Certification Number(s) 3886 (GC3886). The Certification(s) allows you to use Nationwide Permit(s) 14 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non - discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved North Carolina Division of Water Quality Internet: www.newater ualit .or 943 Washington Square Mall Phone: 252- 946 -6481 Washington, NC 27889 FAX 252- 946 -9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper NonrthCarolina ;Vaturally Washington, White Post Road Solar Farm December 7, 2012 Page 2 of 4 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), Trout (Tr), SA, WS -1, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 04B .0124) supersede all other sediment and erosion control requirements. 3. No Waste, Spoil, Solids, or Pill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification and authorized by this written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by DWQ. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, Amount Approved Units Plan Location or Reference Stream 84 (linear feet) Culverts 66 linear feet Temporary Drawings 1.1 through 1.5 404 /CAMA Wetlands (acres) Waters acres Buffers _(square ft. 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), Trout (Tr), SA, WS -1, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 04B .0124) supersede all other sediment and erosion control requirements. 3. No Waste, Spoil, Solids, or Pill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification and authorized by this written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by DWQ. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, Washington, White Post Road Solar Farm December 7, 2012 Page 3 of 4 then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources has released the project. 5. If concrete is used during the construction, then a dry work area should be maintained to prevent direct contact prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life /fish kills. 6. Work in the Dry All work in or adjacent to stream waters shall be conducted in a dry work area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. 7. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. 8. The applicantlpermittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. Washington, White Post Road Solar Farm December 7, 2012 Page 4 of 4 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act 15A NCAC 02H..0500. If you have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252- 948 -2940 or Karen Higgins of the Wetland, Buffer, Stormwater, Compliance and Permitting (Webscape) Unit at 919 -807 -6360 Sincerely, For Chuck Wakild, P.E. Enclosures: Certificate of Completion GC 3 886 cc: Vanessa Goff, Washington White Post Solar, LLC, 1880 Winton Road, Suite 7, Rochester, NY 14618 Lauren Sicarelli, Energy Renewal Partners, LLC, 305 Camp Craft Road, Suite 575, Austin, TX 78746 William Wescott, Corps of Engineers, Washington Regulatory Field Office DWQ Webscape Unit DLR, WaRO File copy Filename: 12 -4789 Vert