Loading...
HomeMy WebLinkAboutWM0501432_Permit (Correction)_20210419ROY COOPER Governor DIONNE DELLI-GATTI Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality April 19, 2021 Marchell Adams -David, City Manager City of Raleigh P.O. Box 590 Raleigh, N.C. 27602 Subject: Monitoring Well Construction (Revised) Permit # WM0501432 West Street Extension 600 West Cabarrus Street Raleigh, NC -Wake County Dear Mr. Adams -David: In accordance with the application received on April 9, 2021, and the additional requested information received on April 13, 2021, we are forwarding herewith Monitoring Well Construction Permit No. WM0501432 dated April 19, 2021, issued for the construction of a monitoring well system at the subject property. Please be aware that some counties have well construction programs, and you may be required to obtain a well construction permit before installation. This Permit will be effective from the date of its issuance and shall be subject to the conditions and limitations as specified therein. Please note the addition of stipulation #3 to the permit enclosed If you have any questions about this permit please contact Eric Rice at (919) 791- 4242. Sincerely, —DocuSigned by: BCDA9D825D4A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ Enclosure cc: RRO Files Wake County Health Depailiuent Email: nzirps@espassociates.com Nora Zirps, ESP Associates Inc. 7011 Albert Pick Road, Greensboro, NC NORTH E _ 0e0rhneM of Environmentalau.fi North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO City of Raleigh FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM (West Street Extension) consisting of one well owned by the City of Raleigh at mailing address P.O. Box 590 in Raleigh, NC. The well will be located on the property owned by David Tim Clancy located at 600 West Cabarrus St. in Raleigh, NC -Wake County. This Permit is issued in accordance with the application received on April 9, 2021, and the additional requested information received on April 13, 2021, in conformity with specifications and supporting data, all of which are filed with the Department of Environment and Natural Resources and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. Permit issued the 19t11 of April 2021 FOR THE NORTH CAROLINA EV NTAL MANAGEMENT COMMISSION Scott Vinson, Regi�upervisor Divi o3lir4 Kesources By Authority of the Environmental Management Commission Permit No. WM0501432 NOR D E Q F nao um or EnWronmenteluui� North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200