Loading...
HomeMy WebLinkAbout20121107 Ver 1_Maps_201212200 0 0 LOCATION: TYPE OF WORK: 0 0 0 See Sheet 1-A For Index of Sheets See Sheet 1-B For Conventional Symbols DHV D T V = = = = = % % MPH % * 2035 ADT MILES MILES MILES = = = =ADT DESIGN DATA P - 5 2 0 6 A 50 25 50 100 100 50 25 50 10 5 10 20 FUNC CLASS=LOCAL PROJECT BEGIN PROJECT END BRIAN A. WILES, PE ROWAN COUNTY 2015 9 55 50 * 4% TTST + 4% DUALS 8 12 13 14 15 9 7 6 5 4 8 11 1 0 -Y 2 0 - -Y 21 - - Y 2 3 - - Y 1 - -Y B - - Y 2 3 A - -Y 2 - -Y 2 - S R 2662 HAD E R S T S R 2 5 4 5 O RC H A R D L N P E A C H S R 2 5 3 9 O R C H A R D R D P E A C H -Y 3 - T O I - 8 5 T O S A L I S B U R Y T O C H I N A G R O V E NAD 8 3 / N S R S 2 0 07 0.843 0.078 0.765 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 10 / 2 / 2 0 1 2 R : \ R o a d w a y \ P r o j \ p 5 2 0 6 a _ r d y _ t s h . d g n F l o r e n c e & H u t c h e s o n , I n c . C O N T R A C T : T I P P R O J E C T : P.E. D E P A R T M E N T O F T R A N S P O R T A T I O N S T A T E O F N O R T H C A R O L I N A NC DEPARTMENT OF TRANSPORTATION RALEIGH, NC 27699-1556 1556 MAIL SERVICE CENTER CAPITAL YARD ENGINEERING AND SAFETY BRANCH P.E. C N N C C A R O L N I A N O R T H SIGNATURE:SIGNATURE: Prepared in the Office of: 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER D C N PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) NCDOT RAIL DIVISION STATE OF NORTH CAROLINA SUBMITTAL: DATE: GRAPHIC SCALES PROJECT LENGTH ENGINEER HYDRAULICS RIGHT OF WAY DATE: LETTING DATE: -Y2- STA 45+83.12 END BRIDGE -Y2- STA 41+72.12 BEGIN BRIDGE TOTAL LENGTH (-Y2-) TIP PROJECT P-5206A LENGTH STR (-Y2-) TIP PROJECT P-5206A LENGTH RDWY (-Y2-) TIP PROJECT P-5206A CONVENTIONAL PLAN SHEET SYMBOLS U S H W Y 29 S M A I N S T S M A I N S T U S H W Y 2 9 P E E L E R R D S R 2 5 3 8 FROM REID TO NORTH KANNAPOLIS PEELER ROAD - GRADE SEPARATION OVER NCRR/NS -Y2- POT 11+50.00 BEGIN TIP PROJECT P-5206A -Y2- POT 56+00.00 END TIP PROJECT P-5206A N CRR /N S N CRR /N S C E DA R SP R I N G S R D S R 15 6 0 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ROADWAY ENGINEER MARCH 19, 2013 MARCH 30, 2012 NDOT RAIL DIVISION CONTACT: SANDRA STEPNEY, PE VICINITY MAP L O N G M E A D O W D R A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF SALISBURY. S A L I S B U R Y C I T Y L I M I T R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T R O W A N C OUN T Y R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T OFF-SITE DETOUR ROUTE P-5206A 52000.1.STR03T1B STRUCTURES GRADING, DRAINAGE, PAVING, SIGNALS AND R/W 52000.3.STR01T4A 43219.2.STR08P5206 UTIL. CONST. NC License No: F-0258 An Company C 2 0 3 1 4 3 PLFI PLANS OCTOBER 3, 2012 P r e - L e t F i e l d I n s p e c t i o n P l a n s P.E., UTIL P.E. 52000.1.STR04T3 P.E., UTIL P.E. 8520 15400 ARV S I Z E U N K NO W N S I Z E U NK N O W N R ET P ON D 601 601 601 601 1505 1500 1500 1503 1642 1503 1500 1619 1560 2539 2545 2538 1002 2532 2532 1002 2528 2574 2582 1526 2611 1526 2541 1526 1571 1516 1560 1516 1514 1512 1600 1597 2539 1516 1625 1515 1514 C r ee k G r a n t s L ittl e C r e e k G r a n t s C r e e k T o w n C r ee k T o w n C r e e k C o r p . S o u t h e r n N o r f o l k N o rf o l k S o u t h e r n C o r p . 85 29 29 29 85 85 Salisbury of Satellite R o w a n County Airport 01 0 6 T _ P 1 0 b -0 .6 4 +5 .6 0 C C C C C C C C C F C F F C F C C F F C F C F F F F F F F F F F 7 6 5 7 6 5 7 6 5 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 0 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 7 5 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 780 7 8 0 7 8 0 7 8 0 7 8 0 7 8 0 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 8 5 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 7 9 0 790 7 9 5 L = 3 7 3 .0 7 ’ T = 1 9 5 .7 0 ’ R = 5 0 0 .0 0 ’ PI Sta 30+82.33 D L = 745.43’ T = 399.27’ R = 840.00’ 2 5 3 0 3 5 - Y 2 - P T 2 3 + 9 6 .4 1 -Y 2 - P C 2 6 +8 3 .0 6 -Y2- PT 34+28.49 PI Sta 19+60.26 D L = 1,018.75’ T = 582.60’ R = 840.00’ -Y2- -Y2- -Y 2 - 2 4 ’ 0 6 0 0 0 1 0 1 0 5 0 4 0 3 0 2 0 1 0 0 0 1 0 2 0 2 T Y P 2 5 ’ 0 2 0 3 0 4 0 5 0 6 T Y P 2 5 ’ 0 6 T Y P 2 5 ’ 0 5 G R A U -3 5 0 G R A U -3 5 0 PROPOSED GUARDRAIL PROPOSED GUARDRAIL SE = .06 SE = .06 0 2 0 3 0 4 1 6 ’ 1 6 ’ 2 4 ’ 2 7 0 ’ T A P E R L T a n d R T P S 4 ’ + 3 7 . 3 4 2 G I SEE DETAIL B SPECIAL CUT DITCH F R O M -Y B - S T A . 1 9 +5 0 R T T O -Y B - S T A . 2 1 +0 0 R T ( N o t t o S c a l e ) L A T E R A L B A S E D I T C H F R O M -Y 2 1 - S T A . 2 6 +6 5 R T T O -Y 2 1 - S T A . 2 8 +5 7 R T SEE DETAIL B SPECIAL CUT DITCH SEE DETAIL B SPECIAL CUT DITCH ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2 : 1 D FROM -Y2- STA. 29+65 LT TO -Y2- STA. 32+00 LT Min. D= 1.5 Ft. DETAIL D Ground Natural F l a t t e r 4 :1 o r Slope Fill LATERAL ’V’ DITCH ( Not to Scale) D 2 : 1 2 :1 b 1 "/F t . FROM -Y2- STA. 32+00 LT TO -Y2- STA. 34+50 LT b= 5 Ft. Min. D= 1.5 Ft. DETAIL E Ground Natural Slope Fill HW 0501 0502 0503 0504 1 5 " 3 0 S Y G T E S T 1 7 T O N S C L A S S I R I P R A P F R O M -Y B - S T A . 2 2 +6 7 R T T O -Y B - S T A . 2 4 +0 0 R T F R O M -Y B - S T A . 2 2 +0 0 L T T O -Y B - S T A . 2 4 +0 0 L T F R O M -Y B - S T A . 1 8 +0 0 R T T O -Y B - S T A . 1 9 +5 0 R T F R O M -Y B - S T A . 1 8 +2 5 L T T O -Y B - S T A . 1 9 +5 0 L T S P E C I A L C U T D I T C H D E T A I L B M i n . D = 1 F t . F l a t t e r 4 :1 o r D ( Not to Scale) SPECIAL CUT DITCH DETAIL B Min. D= 1 Ft. Ground Natural Slope Ditch Front o r F l a t t e r 2 : 1 FROM -Y2- STA. 28+00 LT TO -Y2- STA. 29+65 LT FROM -Y2- STA. 22+00 RT TO -Y2- STA. 23+50 RT FROM -Y2- STA. 22+00 LT TO -Y2- STA. 24+00 LT SEE DETAIL H SLOPE = 5.7%; L=55’ DDE = 40 CY EST 110 SY GT EST 75 TONS W/ CLASS I RIP RAP 4’ BASE HEAD DITCH PSRM 20’ X 10’ EST 7 SY GT EST 2 TONS CLASS B RIP RAP SEE DETAIL D V DITCH SPECIAL LATERAL 1 5 " PSRM 20’ X 10’ SEE DETAIL P S = 10.0%, L =30’ DDE = 5 CY EST 14 SY GT EST 7 TONS W/ CLASS B RIP RAP TAIL ’V’ DITCH 0505 5 4 " R C P -I V INVERT 1’ BURY INVERT 1’ BURY F R O M S T A . 2 2 +0 0 T O S T A . 2 6 +6 5 -Y 2 1 - R T F R O M S T A . 3 4 +5 0 T O S T A . 4 1 +0 0 -Y 2 - L T F i l l S l o p e 2 :1 o r F l a t t e r T y p e o f L i n e r = C l a s s B R i p -R a p FROM STA. 34+50 TO STA. 35+00 -Y2- LT FROM STA. 28+00 TO STA. 29+80 -Y2- RT F i l l S l o p e 2 :1 o r F l a t t e r b= 5 Ft. d= 1 Ft. Type of Liner= Class B Rip-Rap b DETAIL F Ground Natural Geotextile ( Not to Scale) TOE PROTECTION d 2 :1 2 : 1 D ( Not to Scale) STANDARD BASE DITCH B d STA. 29+70 -Y2- LT STA. 27+80 -Y2- RT Geotextile DETAIL H B= 4’ Ft. Max. d= 2 Ft. Min. D= 2 Ft. Ground Natural Ground Natural *When B is < 6.0’ Type of Liner= Class I Rip-Rap 2 :1 2 : 1 D ( Not to Scale) d STANDARD ’V’ DITCH STA. 26+92 -Y2- LT Type of Liner= Class ’B’ Rip-Rap Max. d= 1 Ft. Min. D= 1 Ft. DETAIL P Ground Natural Ground Natural Geotextile SEE DETAIL E DDE = 115 CY LATERAL V DITCH SEE DETAIL F EST 190 SY GT EST 63 TONS W/ CLASS B RIP RAP TOE PROTECTION SEE DETAIL F EST 53 SY GT EST 18 TONS W/ CLASS B RIP RAP TOE PROTECTION 15" W/ELBOW B 2 :1 2 : 1 D ( Not to Scale) STANDARD BASE DITCH STA. 27+90 -Y2- RT Ground Natural Ground Natural DETAIL L B=3’ TO 4’ Ft. Min. D=2 Ft. SEE DETAIL L SLOPE = 0.5%; L=50’ DDE = 20 CY 4’ TO 3’ BASE TAIL DITCH BANKS ONLY EST 15 SY GT EST 10 TONS CLASS I RIP RAP LEGEND PAVED SHOULDER N A D 8 3 / N S R S 2 0 0 7 - M A T C H L I N E - S T A . 2 2 + 0 0 .0 0 - Y 2 - S E E S H E E T N O . 4 FOR -Y2- PROFILE SEE SHEET 16 - M A T C H L I N E - S T A . 3 5 + 0 0 .0 0 - Y 2 - S E E S H E E T N O . 6 HYDRAULICS ROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 5 P-5206A $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS D C N R E V I S I O N S NC License No: F-0258 An Company 5 v v v S O I L G R V 6 ’ C H L w / 3 S B W D I 1 2 " P L A S T I C C O N C R E T A I N I N G W A L L V A R H T B L K G R V M T L P O S T S G A T E 7 2 " C H L W / 3 S B W L T C O N C .C O N C . B E A T R I C E B . S T I L L E R D B 4 0 5 P G 1 8 9 8 5 4 .5 2 ’ E I P E I P 5 0 ’ A C C E S S E A S E M E N T P E R D B 9 5 7 , P G . 3 8 3 1 2 .4 9 ’ P E R D B 9 5 7 , P G . 3 8 5 0 ’ A C C E S S E A S E M E N T 2 8 7 .0 0 ’ 2 2 2 .5 1 ’ 2 5 2 .4 2 ’ 3 4 4 .1 1 ’ 1 0 1 7 .8 3 ’ E L E V = 7 7 6 .0 5 -0 . 6 4 + 5 . 6 0 S T A . 2 8 + 4 7 .9 3 S A G 1 8 " R I D G E R I D G E R I D G E W E T L A N D N O C O N S E N T R A T E D F L O W O V E R L A N D F L O W 7 6 8 .3 8 7 7 1 .4 0 7 7 2 .0 3 7 7 2 .8 6 7 6 7 .4 1 7 6 9 .2 9 7 6 9 .2 9 (I N V ) 7 7 1 .1 2 (T O P ) 9’ 1.5’ 0.3’ 4’ 5’ 2’ 0.1’ 3’ 7A 8A 9A 7A 7A 65.00’ +96.41 80.00’ +96.41 70.00’ +83.06 65.00’ +25.00 80.00’ +10.00 70.00’ +00.00 70.00’ +00.00 65.00’ +00.00 75.00’ +00.00 70.00’ +00.00 80.00’ +28.49 100.00’ +55.00 70.80’ +33.81 70.00’ +91.38 40.00’ +25.00 100.00’ +70.00 73.97’ +30.00 65.00’ +00.00 40.00’ +50.00 50.00’ +00.00 40.00’ +83.06 80.00’ +50.00 40.00’ +83.06 62.97’ +28.15 65.00’ +65.05 TO STA. 35+28 -Y2- LT SBG FROM STA. 32+00 T O S T A . 3 6 +1 0 -Y 2 - R T S T A . 2 8 +7 5 -Y 2 1 - L T S B G F R O M