Loading...
HomeMy WebLinkAbout20121107 Ver 1_Maps_201212100 0 0 LOCATION: TYPE OF WORK: 0 0 0 See Sheet 1-A For Index of Sheets See Sheet 1-B For Conventional Symbols DHV D T V = = = = = % % MPH % * 2035 ADT MILES MILES MILES = = = =ADT DESIGN DATA P - 5 2 0 6 A 50 25 50 100 100 50 25 50 10 5 10 20 FUNC CLASS=LOCAL PROJECT BEGIN PROJECT END BRIAN A. WILES, PE ROWAN COUNTY 2015 9 55 50 * 4% TTST + 4% DUALS 8 12 13 14 15 9 7 6 5 4 8 11 1 0 -Y 2 0 - -Y 21 - - Y 2 3 - - Y 1 - -Y B - - Y 2 3 A - -Y 2 - -Y 2 - S R 2662 HAD E R S T S R 2 5 4 5 O RC H A R D L N P E A C H S R 2 5 3 9 O R C H A R D R D P E A C H -Y 3 - T O I - 8 5 T O S A L I S B U R Y T O C H I N A G R O V E NAD 8 3 / N S R S 2 0 07 0.843 0.078 0.765 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 10 / 2 / 2 0 1 2 R : \ R o a d w a y \ P r o j \ p 5 2 0 6 a _ r d y _ t s h . d g n F l o r e n c e & H u t c h e s o n , I n c . C O N T R A C T : T I P P R O J E C T : P.E. D E P A R T M E N T O F T R A N S P O R T A T I O N S T A T E O F N O R T H C A R O L I N A NC DEPARTMENT OF TRANSPORTATION RALEIGH, NC 27699-1556 1556 MAIL SERVICE CENTER CAPITAL YARD ENGINEERING AND SAFETY BRANCH P.E. C N N C C A R O L N I A N O R T H SIGNATURE:SIGNATURE: Prepared in the Office of: 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER D C N PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) NCDOT RAIL DIVISION STATE OF NORTH CAROLINA SUBMITTAL: DATE: GRAPHIC SCALES PROJECT LENGTH ENGINEER HYDRAULICS RIGHT OF WAY DATE: LETTING DATE: -Y2- STA 45+83.12 END BRIDGE -Y2- STA 41+72.12 BEGIN BRIDGE TOTAL LENGTH (-Y2-) TIP PROJECT P-5206A LENGTH STR (-Y2-) TIP PROJECT P-5206A LENGTH RDWY (-Y2-) TIP PROJECT P-5206A CONVENTIONAL PLAN SHEET SYMBOLS U S H W Y 29 S M A I N S T S M A I N S T U S H W Y 2 9 P E E L E R R D S R 2 5 3 8 FROM REID TO NORTH KANNAPOLIS PEELER ROAD - GRADE SEPARATION OVER NCRR/NS -Y2- POT 11+50.00 BEGIN TIP PROJECT P-5206A -Y2- POT 56+00.00 END TIP PROJECT P-5206A N CRR /N S N CRR /N S C E DA R SP R I N G S R D S R 15 6 0 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ROADWAY ENGINEER MARCH 19, 2013 MARCH 30, 2012 NDOT RAIL DIVISION CONTACT: SANDRA STEPNEY, PE VICINITY MAP L O N G M E A D O W D R A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF SALISBURY. S A L I S B U R Y C I T Y L I M I T R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T R O W A N C OUN T Y R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T OFF-SITE DETOUR ROUTE P-5206A 52000.1.STR03T1B STRUCTURES GRADING, DRAINAGE, PAVING, SIGNALS AND R/W 52000.3.STR01T4A 43219.2.STR08P5206 UTIL. CONST. NC License No: F-0258 An Company C 2 0 3 1 4 3 PLFI PLANS OCTOBER 3, 2012 P r e - L e t F i e l d I n s p e c t i o n P l a n s P.E., UTIL P.E. 52000.1.STR04T3 P.E., UTIL P.E. 8520 15400 ARV S I Z E U N K NO W N S I Z E U NK N O W N R ET P ON D 601 601 601 601 1505 1500 1500 1503 1642 1503 1500 1619 1560 2539 2545 2538 1002 2532 2532 1002 2528 2574 2582 1526 2611 1526 2541 1526 1571 1516 1560 1516 1514 1512 1600 1597 2539 1516 1625 1515 1514 C r ee k G r a n t s L ittl e C r e e k G r a n t s C r e e k T o w n C r ee k T o w n C r e e k C o r p . S o u t h e r n N o r f o l k N o rf o l k S o u t h e r n C o r p . 85 29 29 29 85 85 Salisbury of Satellite R o w a n County Airport 01 0 6 T _ P 1 0 b Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Baseline Control Point RIGHT OF WAY: Existing Right of Way Marker Existing Right of Way Line h Existing Control of Access Proposed Control of Access Proposed Right of Way Line C F Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ; z v W K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R } T p Q l e ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) r | I ] GAS: Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW v v Drainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M W W S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber Optics Cable (S.U.E.*) Designated U/G Water Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G Gas Line (S.U.E.*) U/G Test Hole (S.U.E.*) *S.U.E. = Subsurface Utility Engineering WLB EIP B ECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Note: Not to Scale SHEET NO.PROJECT REFERENCE NO. 1-B P-5206A Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS 0 4 / 1 6 / 1 1 Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland Proposed Permanent Easement with Iron Pin and Cap Marker Proposed Temporary Utility Easement TUE Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker Proposed Right of Way Line with DUE Proposed Permanent Drainage / Utility Easement AUE Proposed Aerial Utility Easement CR Proposed Curb Ramp STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring UST Known Soil Contamination: Area or Site Potential Soil Contamination: Area or Site D C N 01 0 6 T _ P 1 0 b N C G R I D N A D 8 3 / N S R S 2 0 0 7 SHEET NO.PROJECT REFERENCE NO. 6 / 2 / 9 9 Location and Surveys NO TE : D R A W I N G NO T T O S C A L E SURVEY CONTROL SHEET P-5206A P-5206A 1C -Y 20 - -Y 2 0 - -Y 21 - - Y 2 3 - - Y 1 - -Y B - - Y 2 3 A - -Y 2 - -Y 2 - -Y 3 - S A L I S B U R Y C I T Y L I M I T R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T R O W AN C OUN T Y S A L I S B U R Y C I T Y L I M I T R O W A N C O U N T Y R O W A N C O U N T Y S A L I S B U R Y C I T Y L I M I T H AD E R S T S R 266 2 U S H W Y 29 /S M A I N S T 60 ’ B S T T O S A L I S B U R Y T O C H I NA G R OV E T O I - 8 5 U S H W Y 29 /S M A I N S T N CR R /N S C E DA R S P R I NG S R D S R 1 5 6 0 C ON T R O L B Y T H E N C DO T L O C A T I ON AND S U R V E Y S UN I T . P R O J E C T C ON T R O L E S T A B L I S H E D U S I NG G L O B A L P O S I T I ON I NG S Y S TE M . N ET W O R K E S T A B L I S H E D F R O M E X I S T I NG HA R N M ONU M E N T A T I ON 1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE HARN THE FILES TO BE FOUND ARE AS FOLLOWS: HTTP://WWW.NCDOT.ORG/DOH/PRECONSTRUCT/HIGHWAY/LOCATION/PROJECT/ NOTES: S E E G PS C A L I BR A T I ON S H EET F O R HO R I Z O N T A L AND V E R T I C A L C OO R D I NA TE VA L U E S . P5206A_LS_CONTROL.TXT BL-28 BL-21 BL-22 BL-23 BL-24 BL-25 BL-26 BL-27 BL-29 ELEV.=779.52’ E=1550516.9910 N=690385.2990 P3414P GPS-2 ELEV.=792.05’ E=1545405.8630 N=684729.7380 P3414P GPS-3 ELEV.=796.53’ E=1544936.9550 N=683960.7580 P3414P GPS-4 BM#1 BM#2 BM#3 BM#4 BM#23 -YB- POT 29+00.00 END CONSTRUCTION -Y3- POT 17+00.00 END CONSTRUCTION -Y2- POT 11+50.00 BEGIN TIP PROJECT P-5206A -Y23A- PT 14+53.43 END CONSTRUCTION -Y2- POT 55+80.00 END TIP PROJECT P-5206A -YB- POT 11+00.00 BEGIN CONSTRUCTION F A R M R D R E I D -Y2- 45+83.12 END BRIDGE -Y2- 41+72.12 BEGIN BRIDGE S R 2662 HAD E R S T S R 15 1 6 A I R P O R T R D S R 2 5 4 5 P E A C H O R C H A R D L N M E A D O W D R L O N G S R 2 5 3 8 P E E L E R R D S R 2 5 3 9 O R C H A R D R D P E A C H -Y20- POT 10+00.00 BEGIN CONSTRUCTION VICINITY MAP I ND I C A T E S G E OD ET I C C ON T R O L M ONU M E N T S U S E D O R S E T F O R HO R I Z O N T A L P R O J E C T (HIGH ACCURACY REFERENCE NETWORK) NAD 83/NSRS 2007 ADJUSTMENT. THIS CALIBRATION WILL ALLOW THE END USER TO WORK WITHIN THE SAME COORDINATE SYSTEM WHEN USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES. 2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING PROJECT CONTROL DATA AT: THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE THE SITE CALIBRATION FOR THE END USER’S GPS EQUIPMENT. IF AND SURVEYS UNIT. FURTHER INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "P3414P-10" WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 666744.654(ft) EASTING: 1531939.796(ft) ELEVATION: 821.60(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.99985378 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "P3414P-10" TO -Y20- STATION 10+00.0 IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 115 115 73 73 3 49 52 150 150 801 152 153 BUFFALO 2 WOODLEAF V49 ELI COUNTY DAVIE COUNTY ROWAN COUNTY CABARRUS COUNTY IREDELL C O U N T Y M E C K L E N B U R G COUNTY STANLY 3 152 801 152 P-5206A TIP PROJECT 77 115 P5206A-P3414P_LS_GPSCALIB.HTML P5206A-P3414P_LS_WGS84.TXT P5206A-P3414P_LS_LOCAL.TXT 77 70 601 29 70 52 85 52 29 601 85 601 29 85 21 21 01 0 6 T _ P 1 0 b SHEET NO.PROJECT REFERENCE NO. 6 / 2 / 9 9 Location and Surveys NO TE : D R A W I N G NO T T O S C A L E SURVEY CONTROL SHEET P-5206A P-5206A 1D I ND I C A T E S G E OD ET I C C ON T R O L M ONU M E N T S U S E D O R S ET F O R HO R I Z ON T A L P R O J E C T C ON T R O L B Y T H E N C DO T L O C A T I ON AND S U R V E Y S U N I T . P R O J E C T C ON T R O L E S T A B L I S H E D U S I NG G L O B A L P O S I T I ON I NG S Y S TE M . THE WGS84 AND LOCAL FILES ARE COMMA DELIMITED AND CAN BE USED TO REPRODUCE THE SITE CALIBRATION FOR THE END USER’S GPS EQUIPMENT. IF FURTHER INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. N ET W O R K E S T A B L I S H E D F R O M E X I S T I NG HA R N M ONU M E N T A T I ON P3414P_LS_LOCAL.TXT WILL ALLOW THE END USER TO WORK WITHIN THE SAME COORDINATE SYSTEM WHEN 1. THE SITE CALIBRATION SHOWN IS BASED UPON A NETWORK TIED TO THE HARN USING RTK (REAL TIME KINEMATIC) GPS AND A LOCAL BASE STATION. IF ANOTHER SYSTEM SUCH AS VRS (VIRTUAL REFERENCE STATION) IS USED, ADDITIONAL FIELD TIES MAY BE NEEDED TO REDUCE POSSIBLE ERRORS, OR BIASES. 2. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING PROJECT CONTROL DATA AT: THE FILES TO BE FOUND ARE AS FOLLOWS: HTTP://WWW.NCDOT.ORG/DOH/PRECONSTRUCT/HIGHWAY/LOCATION/PROJECT/ P3414P_LS_GPSCALIB.HTML (HIGH ACCURACY REFERENCE NETWORK) NAD 83/NSRS 2007 ADJUSTMENT. THIS CALIBRATION NOTES: P3414P_LS_WGS84.TXT S E E G PS C A L I BR A T I ON S H E E T F O R HO R I Z ON T A L AND V E R T I C A L C OO R D I NA TE VA L U E S . P5206A_LS_CONTROL.TXT Datum Transformation computation not requested Datum Transformation Parameters 1_GPS 0.003sft 0.001 Three-dimensional 9_GPS 0.001sft 0.000 Vertical 1_GPS 0.003sft 0.001 Horizontal Maximum error Root Mean Square error Point Summary Residual Differences Between GPS (WGS84) And Local Coordinates G03NC Geoid Model Definition 0.902ppm Slope east -0.708ppm Slope north 0.061sft Vertical separation at origin 1551534.529sft Easting coordinate of origin point 691593.681sft Northing coordinate of origin point Vertical Adjustment Parameters 0.99999875 Scale factor 0.003sft Translation east 0.075sft Translation north 000’00"Rotation about the center point 1532682.097sft Easting coordinate of rotation center 667263.504sft Northing coordinate of rotation center Horizontal Adjustment Parameters Updated default projection not requested Updated Default Projection (Transverse Mercator) Definition GPS during construction layout. of the two systems. This file is to aid in the use of Real Time Kinematic (RTK) derived. Please take care in utilizing these coordinates to eliminate confusion System which is very similar to North Carolina Zone 3200 from which it is The North Carolina Department of Transportation uses a Localized Coordinate 719.931sft Height Site Scale Factor 1.0001462406 Longitude 8034’26.64222"W 3534’18.46142"N Latitude Localized around LOCAL SITE INFORMATION US survey feet Height Units US survey feet Distance Units US survey feet Coordinate Units G03NC Geoid Model NAVD 88 Vertical Datum NAD 1983 (Conus)Horizontal Datum North Carolina 3200 Zone US State Plane 1983(at ground)Coordinate System 6:15:58 AM 3/30/2009 Date & Time tbovender User name P3414P TIP Number Project : P3414PZ GPS Calibration Report 3D error 0.000sft Vert error 0.000sft Horz error 0.000sft Elevation 796.530sft Easting 1544936.955sft Northing 683960.759sft 3D error 0.001sft Vert error 0.000sft Horz error 0.001sft Elevation 792.047sft Easting 1545405.862sft Northing 684729.738sft 3D error 0.003sft Vert error 0.000sft Horz error 0.003sft Elevation 779.520sft Easting 1550516.988sft Northing 690385.298sft 3D error 0.003sft Vert error 0.000sft Horz error 0.003sft Elevation 772.105sft Easting 1551534.529sft Northing 691593.681sft Quality Adjusted quality Utilized Horz and Vert Elevation 796.530sft Easting 1544936.955sft Northing 683960.758sft Point 4 Quality Adjusted quality Utilized Horz and Vert Elevation 792.047sft Easting 1545405.863sft Northing 684729.738sft Point 3 Quality Adjusted quality Utilized Horz and Vert Elevation 779.519sft Easting 1550516.991sft Northing 690385.299sft Point 2 Quality Adjusted quality Utilized Horz and Vert Elevation 772.105sft Easting 1551534.532sft Northing 691593.682sft Point 1 Height 694.583sft Longitude 8031’52.55258"W Latitude 3537’10.70693"N Point P3414P GPS-4 Height 690.082sft Longitude 8031’47.01758"W Latitude 3537’18.38221"N Point P3414P GPS-3 Height 677.436sft Longitude 8030’46.16340"W Latitude 3538’15.07971"N Point P3414P GPS -2 Height 669.991sft Longitude 8030’34.06069"W Latitude 3538’27.18153"N Point P3414P GPS-1 DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "P3414P-10" WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 666744.654(ft) EASTING: 1531939.796(ft) ELEVATION: 821.60(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.99985378 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "P3414P-10" TO -Y20- STATION 10+00.0 IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 01 0 6 T _ P 1 0 b