Loading...
HomeMy WebLinkAbout20070503 Ver 2_Worksheets_20070531 Project No. DWQ EXP 07-0503 Project Name: E-22 School Bio-retention 1 SUBMITTED DESIGN: REQUIRED DESIGN: elevations Permanent Pool (ft) 310 1 ft. depth Temporary Pool (ft) 311 areas Permanent Pool SA (sq ft) 20037 18401 sq. ft. Drainage Area (ac) 14.32 ac Impervious Area (ac) 5.67 39.6 % impervious Rational C 0.59. Size % 5 no sand underdrain volumes Inlet Velocity 6.5 0 fps Inlet Flow Depth 6 in Depth to Ground Water 6 6 ft Planting Soil Infiltration 1.2 0.52 in/hr In-Situ Soil Infiltration 0.5 0.00 in/hr C~~ check depth ok check veloci ok ok 5~~, G~ Project No. DWQ EXP 07-0503 Project Name: E-22 School Bio-retention 2 SUBMITTED DESIGN: REQUIRED DESIGN: elevations Permanent Pool (ft) 322 1 ft. depth Temporary Pool (ft) 323 areas Permanent Pool SA (sq ft) 7396 4048 sq. ft. Drainage Area (ac) 2.95 ac Impervious Area (ac) 1.41< 47.8 % impervious Rational C 0.63 Size % 5 no sand underdrain volumes Inlet Velocity 5.2 0 fps Inlet Flow Depth 6 in Depth to Ground Water 5 6 ft Planting Soil Infiltration 1.2 0.52 in/hr In-Situ Soil Infiltration 0.5 0.00 in/hr check depth ok check veloci ok ok