Loading...
HomeMy WebLinkAboutNCC200875_Notice of Termination_20210420Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/20/2021 9:58:47 AM (NOT Submittal) Approve by Morman, Alaina 4/22/2021 3:39:07 PM (NOT Request Review- NCC200875) • The task was assigned to Morman, Alaina. The due date is: April 23, 2021 5:00 PM 4/20/2021 9:58 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC200875 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAST DUE ivby be blank (if not yet billed). This permittee owes a fee that is PAST DUE and has a pending NOD or NOV. Do not approve this NOT request until payment is resolved. If this NOT request is acceptable, payment may be waived if applicable, but that action must be completed first (at the NOD or NOV Review step) to ensure records are routed to the correct folder in the repository. However, you can reject the NOT now if it is not acceptable. Information associated with this permit: Project Name Smithfield Foods Expansion Address 15855 Highway 87, TarHeel, NC County Bladen Latitude 34.7492 Longitude -78.8092 Permittee Listed Smithfield Foods Legally Responsible Kenneth Jackson Individual NC Reference No. NCG01-2020-0875 E&SC Plan ID BLADE-2020-006 Original NOI 22633 Tracking No. Date COC Issued 3/5/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a newCOC) Coverage * r Mistake or Invalid Coverage f Other Add ional We information about the basis of this request, if needed. Explanation Supporting Upload Supporting Ibcurrentation if applicable. Documentation Mist beFDFformat Project Close-out Information: Final Close-out 4/5/2021 Inspection Approval Project Close-out blade-2018-006close.pdf 55.91KB Approval Mist be FDFformat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature C�Cleo 1_4 C�A"c W' Type Name* Kenneth Jackson Title * Senior Project Engineer Organization* Smithfield Foods Date * 04/20/2021 Email for kjackson@smithfield.com Confirmation * Contact Telephone * +19103162816 NOT Certification NCG01-eNOT-Certification-Form-20210305- Form 63.93KB DEMLR-SW. Signed pdf.pdf Mist be FDF Format Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) Original Permittee CCdonNotificationErrails Email kjackson@smithfield.com Original Site Contact CCd on Notificaiton Errails Email kjackson@smithfield.com