Loading...
HomeMy WebLinkAbout20181598 Ver 4_R-1015 Revised Impact Summary Sheets165_167 April 21 2021_20210422Revised 4/21/2021 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 42+12 TO 54+15 -L- RT ROADWAY FILL 0.59 0.32 0.25 2 57+70 TO 76+06 -L- RT ROADWAY FILL 2.68 1.65 0.73 0+00 TO 33+68-RP1CD- RT 3 70+94 TO 122+68 -L- RT/LT ROADWAY FILL 26.03 0.32 3.07 22+61 TO 29+63-RP1AB- LT 4 127+97 TO 132+42 -L- LT/RT ROADWAY FILL 1.53 0.09 5 136+88 TO 140+23 -L- LT/RT ROADWAY FILL 0.10 0.06 0.07 0.08 6 138+19 TO 149+15 -L- LT/RT ROADWAY FILL 5.17 0.37 7 154+60 TO 163+94 -L- LT/RT ROADWAY FILL 2.52 0.32 8 167+89 TO 168+21 -L- LT/RT ROADWAY FILL 0.02 < 0.01 9 170+05 TO 197+19 -L- LT/RT Dual Bridges; 12@ 135', 72" MBT 4.90 0.03 0.03 0.65 3.92 10 197+45 TO 210+28 -L- LT/RT ROADWAY FILL 6.69 0.55 11 211+31 TO 218+97 -L- LT/RT ROADWAY FILL 2.82 0.21 12 218+39 TO 224+77 -L- LT/RT ROADWAY FILL 2.46 < 0.01 0.16 13 229+73 TO 238+69 -L- LT/RT ROADWAY FILL 6.85 0.37 14 7+87 TO 11+18-Y3RPB- LT/RT 72" RCP, BURIED 0.83 0.16 0.05 < 0.01 337.9 56.1855 15 12+60 TO 13+72-Y3RPB- LT/RT ROADWAY FILL 0.32 0.03 16 237+79 TO 244+33 -L- LT/RT 72" RCP, BURRIED 1' 2.42 0.22 0.03 < 0.01 200.9 58.8936 17 52+61 TO 53+18-Y3DET- LT/RT 72" RCP, BURRIED 1' 0.04 0.01 0.01 0.03 0.02 129.7 88.99 17A 52+61 TO 53+18-Y3DET- LT/RT 60" TEMP PIPE 0.05 0.01 18 20+55 TO 24+91-Y3RPD- LT/RT ROADWAY FILL 0.98 0.02 0.10 18A 55+30 TO 57+16-Y3DET- LT/RT TEMP DETOUR 0.15 0.03 19 16+94 TO 17+92-Y3RPD- LT/RT 84" RCP, BURIED 1' 0.09 0.05 0.06 < 0.01 261.2 44.1 TOTALS*: 67.06 0.23 2.40 7.42 4.03 0.16 0.04 930 248 0 *Rounded totals are sum of actual impacts NOTES: Bridge Impacts at Site 9: 0.02 acres for Temporary Bents, <0.01 acres for all permanent bents. Revised 2016 09 09 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04/21/2021 CRAVEN COUNTY R-1015 34360.1.2 SHEET 165 OF 167 Revised 4/21/2021 Revised WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 38A 489+64 TO 493+80 -L- LT/RT ROADWAY FILL 0.49 0.03 38B 496+92 TO 498+23 -L- LT/RT ROADWAY FILL 0.30 0.06 39 507+39 TO 518+70 -L- LT/RT 2 @ 10'X8' RCBC 2.99 0.07 0.20 0.22 0.03 984.87 116.37 40 RP2AC/RP2A/LP2A ROADWAY FILL 5.38 0.12 0.78 41 41+40 TO 47+97-RP2AC- LT/RT EXTEND 3@ 9'X7' RCBC 0.03 0.12 0.05 0.08 48.71 56.79 42 34+08 TO 37+91 -Y4- LT 72" RCP, BURIED 1' 0.01 0.04 0.06 < 0.01 < 0.01 20.43 11.6 43 33+80 TO 35+02 -Y4- RT 72" RCP, BURIED 1' < 0.01 0.01 0.04 < 0.01 < 0.01 41.75 10.35 44 51+17 TO 53+70 -Y4- LT 2 @ 84" RCP, BURIED1' 0.24 0.02 0.09 0.02 < 0.01 121.5 10.7 45 50+49 TO 57+08-Y4DET- LT/RT 2 @ 84" RCP, BURIED1' 0.35 0.12 0.04 0.02 116.4 98.9 45A 50+47 TO 57+03-Y4DET- TEMP DETOUR 0.51 0.19 46 533+11 -L- RT 30" RCP < 0.01 < 0.01 10.0 16.0 47 563+36 -L- RT 36" RCP < 0.01 12.0 SUB TOTAL THIS SHEET: 9.79 0.51 0.27 1.50 0.19 0.34 0.13 1356 321 SUB TOTAL SHEET 1: 67.06 0.23 2.40 7.42 4.03 0.16 0.04 930 248 SUB TOTAL SHEET 2: 21.89 0.25 0.80 2.47 3.77 0.05 0.01 584 61 TOTALS*: 98.74 0.99 3.47 11.39 7.99 0.55 0.18 2869 630 0 *Rounded totals are sum of actual impacts NOTES: At Site 45/45A, 0.03 acre of Temporary Fill in Wetlands in the Hand Clearing area for erosion control measures. 2016 09 09 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 04/21/2021 CRAVEN COUNTY R-1015 34360.1.2 SHEET 167 OF 167