Loading...
HomeMy WebLinkAbout20061915 Ver 2_Approval Letter_20070530O~O~ W A T ~9pG r ~ ~ ~ Y Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality May 30, 2007 Mr. Ray Sturza Dare County Planning Department 211 Budleigh Street Manteo, NC 27954 Re: .Stumpy Point Wastewater Treatment Plant, Dare County DWQ #20061915; USACE ORM ID #: SAW- 2006-41365-128 APPROVAL of 401 Water Quality Certification and with Additional Conditions Dear Mr. Sturza: Attached hereto is a copy of Certification No. 3664 issued to Mr. Ray Sturza of Dare County Planning Department, dated May 30, 2007. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. Since , lan W. Klimek, P.E. AWK/cbk/~m Attachments: NCDWQ Summary of Permanent Impacts and Mitigation Requirements Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Washington Regulatory Field Office Wilmington District, USACOE Kyle Barnes, DWQ, Washington Regional Office DLR Washington Regional Office File Copy Central Files NCEEP, 1652 Mail Service Center, Raleigh, NC 27699-1652 Gary D. Hattong, The Wooten Company, 120 North Boylan Avenue, Raleigh, NC 27603-1423 Filename: 06 ] 915StumpyPointW WTP(Dare~O ] _IC 401 OversightlExpress Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-68931 Internet: htto://h2o.enr.state.nc.us/ncwetlands Nye Carolina ~tura!!y An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper Dare County Planning Department Page 2 of 4 May 30, 2007 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Ray Sturza of the Dare County Planning Department, to fill 1.66 acres of jurisdictional wetland, associated with the construction of the Stumpy Point Wastewater Treatment Plant, located within the northeast quadrant of the intersection of U.S. Highway 264 and North Carolina State Road 1100 (Bayview Road), adjacent to the Stumpy Point Bay, in Stumpy Point, Dare County, North Carolina, pursuant to an application filed on the 28`i' day of July of 2006 (received by DWQ on December 14, 2006), and by Public Notice issued by the U.S. Army Corps of Engineers on December 12, 2006, and received by the DWQ on December 14, 2006, and in additional correspondence received December 29, 2006, March 1, 2007, March 7, 2007, Apri13, 2007, May 9, 2007, May 24, 2007 and May 30, 2007. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved Units Plan Location or Reference 404/CAMA Wetlands 1.66 (acres PN and Construction Plans Sediment and Erosion Control: Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. Dare County Planning Department Page 3 of 4 May 30, 2007 b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; Continuing Compliance: 6. Mr. Ray Sturza and the Dare County Planning Department, shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Ray Sturza and/or the Dare County Planning Department, NC and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Ray Sturza and/or the Dare County Planning Department, NC in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; Deed Notification: A deed notification or similar mechanism shall be attached to the deed and final plat clearly denoting all remaining jurisdictional wetlands and waters. This mechanism shall be put in place within 30 days of the date of issuance of the 401 Certification letter or the issuance of the 404 Permit (whichever is later). A sample deed notification format can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. DWQ shall be sent copies of all deed restrictions applied to these lots; Dare County Planning Department Page 4 of 4 May 30, 2007 Written Stormwater Management Plan (No Further Approval Needed 8. Written Stormwater Management Plan (No Further Approval Needed) The final, written Stormwater management plans (including a signed and notarized Operation and Maintenance Agreement), must be implemented and the stormwater management facilities shall be constructed and operational before any permanent building is occupied at the subject site. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization ftom the Division of Water Quality. 9. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/sulForms_Documents.htm.; 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 OversightlExpress Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 30~' day of ay 20 DNIS N O A R Q LITY Alan W. Klimek, P.E. 3664 A W IUcbk/ijm O~O~ wAT ~RpG r > -i Q `C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Mr. Ray Sturza of the Dare County Planning Department, to fill 1.66 acres of jurisdictional wetland, associated with the construction of the Stumpy Point Wastewater Treatment Plant, located within the northeast quadrant of the intersection of U.S. Highway 264 and North Carolina State Road 1100 (Bayview Road), adjacent to the Stumpy Point Bay, in Stumpy Point, Dare County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ PROJECT #: 20061915 LOCATION: Stumpy Point COUNTY Dare BASIN/ SUB BASIN Pasquotank/03020105 As required by 15A NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Im acts Miti ation 1.66 Acres 404/Wetland 1.66 Acres 404/Wetland One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1652 Mail Service Center RALEIGH, N.C. 27699-1652 .(919)733-5205 Filename: 061915StumpyPointW WTP(Dare~01_IC_EEP Nye Carolina 401 Oversight/Bxpress Review Permitting Unit ~lTlCll~~l,J 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http;//www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper