HomeMy WebLinkAbout20061915 Ver 2_Approval Letter_20070530O~O~ W A T ~9pG
r
~ ~
~ Y
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
May 30, 2007
Mr. Ray Sturza
Dare County Planning Department
211 Budleigh Street
Manteo, NC 27954
Re: .Stumpy Point Wastewater Treatment Plant, Dare County
DWQ #20061915; USACE ORM ID #: SAW- 2006-41365-128
APPROVAL of 401 Water Quality Certification and with Additional Conditions
Dear Mr. Sturza:
Attached hereto is a copy of Certification No. 3664 issued to Mr. Ray Sturza of Dare County Planning
Department, dated May 30, 2007. In addition, you should get any other federal, state or local permits
before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion
Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations.
If we can be of further assistance, do not hesitate to contact us.
Since ,
lan W. Klimek, P.E.
AWK/cbk/~m
Attachments: NCDWQ Summary of Permanent Impacts and Mitigation Requirements
Certificate of Completion
cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789
U.S. Army Corps of Engineers, Washington Regulatory Field Office
Wilmington District, USACOE
Kyle Barnes, DWQ, Washington Regional Office
DLR Washington Regional Office
File Copy
Central Files
NCEEP, 1652 Mail Service Center, Raleigh, NC 27699-1652
Gary D. Hattong, The Wooten Company, 120 North Boylan Avenue, Raleigh, NC 27603-1423
Filename: 06 ] 915StumpyPointW WTP(Dare~O ] _IC
401 OversightlExpress Review Permits Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-68931 Internet: htto://h2o.enr.state.nc.us/ncwetlands
Nye Carolina
~tura!!y
An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper
Dare County Planning Department
Page 2 of 4
May 30, 2007
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-
500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ)
Regulations in 15 NCAC 2H, Section .0500 to Mr. Ray Sturza of the Dare County Planning Department, to
fill 1.66 acres of jurisdictional wetland, associated with the construction of the Stumpy Point Wastewater
Treatment Plant, located within the northeast quadrant of the intersection of U.S. Highway 264 and North
Carolina State Road 1100 (Bayview Road), adjacent to the Stumpy Point Bay, in Stumpy Point, Dare
County, North Carolina, pursuant to an application filed on the 28`i' day of July of 2006 (received by DWQ
on December 14, 2006), and by Public Notice issued by the U.S. Army Corps of Engineers on December
12, 2006, and received by the DWQ on December 14, 2006, and in additional correspondence received
December 29, 2006, March 1, 2007, March 7, 2007, Apri13, 2007, May 9, 2007, May 24, 2007 and May
30, 2007.
The application and supporting documentation provides adequate assurance that the proposed work will
not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the
State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,
302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the
supporting documentation, and conditions hereinafter set forth.
This approval is only valid for the purpose and design submitted in the application materials and as
described in the Public Notice. If the project is changed, prior to notification a new application for a new
Certification is required. If the property is sold, the new owner must be given a copy of the Certification
and approval letter and is thereby responsible for complying with all conditions of this Certification. Any
new owner must notify the Division and request the Certification be issued in their name. Should wetland
or stream fill be requested in the future, additional compensatory mitigation may be required as described
in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a
change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in
writing and a new application for 401 Certification may be required. For this approval to be valid,
compliance with the conditions listed below is required.
Conditions of Certification:
Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount A roved Units Plan Location or Reference
404/CAMA Wetlands 1.66 (acres PN and Construction Plans
Sediment and Erosion Control:
Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices
in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
Dare County Planning Department
Page 3 of 4
May 30, 2007
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most recent
version of the North Carolina Sediment and Erosion Control Manual. The devices shall be
maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the 404/401 Permit Application. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur;
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
Protective Fencing -The outside buffer, wetland or water boundary and along the construction
corridor within these boundaries approved under this authorization shall be clearly marked with
orange warning fencing (or similar high visibility material) for the areas that have been approved to
infringe within the buffer, wetland or water prior to any land disturbing activities;
Continuing Compliance:
6. Mr. Ray Sturza and the Dare County Planning Department, shall conduct construction activities in a
manner consistent with State water quality standards (including any requirements resulting from
compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of
State law and federal law. If the Division determines that such standards or laws are not being met
(including the failure to sustain a designated or achieved use) or that State or federal law is being
violated, or that further conditions are necessary to assure compliance, the Division may reevaluate
and modify this Certification to include conditions appropriate to assure compliance with such
standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the
Certification, the Division shall notify Mr. Ray Sturza and/or the Dare County Planning
Department, NC and the US Army Corps of Engineers, provide public notice in accordance with
15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC
2H.0504. Any new or revised conditions shall be provided to Mr. Ray Sturza and/or the Dare
County Planning Department, NC in writing, shall be provided to the United States Army Corps of
Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and
shall also become conditions of the 404 Permit for the project;
Deed Notification:
A deed notification or similar mechanism shall be attached to the deed and final plat clearly
denoting all remaining jurisdictional wetlands and waters. This mechanism shall be put in place
within 30 days of the date of issuance of the 401 Certification letter or the issuance of the 404
Permit (whichever is later). A sample deed notification format can be downloaded from the
401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. DWQ shall be sent copies of
all deed restrictions applied to these lots;
Dare County Planning Department
Page 4 of 4
May 30, 2007
Written Stormwater Management Plan (No Further Approval Needed
8. Written Stormwater Management Plan (No Further Approval Needed)
The final, written Stormwater management plans (including a signed and notarized Operation and
Maintenance Agreement), must be implemented and the stormwater management facilities shall be
constructed and operational before any permanent building is occupied at the subject site. The
structural stormwater practices as approved by this Office as well as drainage patterns must be
maintained in perpetuity. No changes to the structural stormwater practices shall be made without
written authorization ftom the Division of Water Quality.
9. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES
General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the
project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
permit [applicable to construction projects that disturb one (1) or more acres], full compliance with
permit conditions including the sedimentation control plan, self-monitoring, record keeping and
reporting requirements are required. A copy of this permit and monitoring report forms may be
found at http://h2o.enr.state.nc.us/sulForms_Documents.htm.;
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 OversightlExpress Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as
depicted in your application shall expire upon expiration of the 404 or CAMA Permit.
If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written
request within sixty (60) days following receipt of this Certification. This request must be in the form of a
written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If
modifications are made to an original Certification, you have the right to an adjudicatory hearing on the
modifications upon written request within sixty (60) days following receipt of the Certification. Unless
such demands are made, this Certification shall be final and binding.
This the 30~' day of ay 20
DNIS N O A R Q LITY
Alan W. Klimek, P.E.
3664
A W IUcbk/ijm
O~O~ wAT ~RpG
r
> -i
Q `C
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
North Carolina Division of Water Quality
401 Water Quality Certification
Summary of Permitted Impacts and Mitigation Requirements
In accordance with 15A NCAC 2H.0500, Mr. Ray Sturza of the Dare County Planning Department, to fill 1.66
acres of jurisdictional wetland, associated with the construction of the Stumpy Point Wastewater Treatment Plant,
located within the northeast quadrant of the intersection of U.S. Highway 264 and North Carolina State Road 1100
(Bayview Road), adjacent to the Stumpy Point Bay, in Stumpy Point, Dare County, North Carolina. All activities
associated with these authorized impacts must be conducted with the conditions listed in the attached Permit
transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS.
COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM
DWQ PROJECT #: 20061915
LOCATION: Stumpy Point
COUNTY Dare
BASIN/ SUB BASIN Pasquotank/03020105
As required by 15A NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for
the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface
waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of
the state.
Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be
rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest
foot according to 15 2R.0503(b).
Im acts Miti ation
1.66 Acres 404/Wetland 1.66 Acres 404/Wetland
One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of
a fee to the Wetlands Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and
mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement
Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt
of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE
NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT
PROGRAM.
Signature
Date
ECOSYSTEM ENHANCEMENT PROGRAM
1652 Mail Service Center
RALEIGH, N.C. 27699-1652
.(919)733-5205
Filename: 061915StumpyPointW WTP(Dare~01_IC_EEP
Nye Carolina
401 Oversight/Bxpress Review Permitting Unit ~lTlCll~~l,J
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone (919) 733-1786 / Fax (919) 733-6893
Internet: http;//www.ncwaterquality.org
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper