Loading...
HomeMy WebLinkAboutNCG210272_Inspection Report_20210419ROY COOPER Governor DIONNE DELLFGATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality April 19, 2021 WM Cramer Lumber Company Inc. Attn: Wendell M. Cramer 3486 Tex's Fish Camp Road Connelly Springs, North Carolina 28612 Subject: Compliance Evaluation Inspection WM Cramer Lumber Co Incorporated Permit: NCG210000 Certificate of Coverage: NCG210272 Burke County, North Carolina Dear Mr. Cramer: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on April 6, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4S00 or by email at Isaiah.reed@ncdenr.gov. Zry, Isaiah Reed, EI, CPSWQ MS4CE I Environmental Specialist Land Quality Section Enclosure: Inspection Report rillilli North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Offlce 1 2090 U.S. Highway 70 1 Swannanoa, North Carollna 28778 rvoa�ry cuaxnae owmmemnem,oi.�v..man", 828.296.4500 Compliance Inspection Report Permit: NCG210272 Effective: 08/01/18 Expiration: 07/31/23 Owner: WM Cramer Lumber Company Inc SOC: Effective: Expiration: Facility: W M Cramer Lumber Cc Incorporated County: Burke Tex's Fishcamp Rd Region: Asheville Hildebran NC 28637 Contact Person: Randy Sheffield Title: Phone: 828-397-7481 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 04/06/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 10:30AM Exit Time: 10:50AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ❑ Compliant M Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210272 Owner -Facility: wM Cramer Lumber Company Inc Inspection Date: 04/06/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On April 6, 2021 this facility was visited for inspection. Staff for the follow-up inspection were not available due to medical emergency. Be advised that training efforts at the facility should include all staff necessary such that staff availability is not an issue. This facility will be re -inspected on or after May 25, 2021. If an inspection cannot be performed at that time, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210272 Owner- Facility: WM Cramer Lumber Company Inc Inspection Date: 04/06/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ N ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: A Stormwater Pollution Prevention Plan was not made available at the time of the inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Qualitative Monitoring Records were not made available at the time of the inspection. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ N ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Analvtical Monitoring records were not made available at the time of the inspection Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ 0 ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3