HomeMy WebLinkAbout20141310 Ver 2_As Built Report_20210420Strickland, Bev From: Patrick Smith <psmith@sandec.com> Sent: Tuesday, April 20, 2021 12:00 PM To: David.E.Bailey2@usace.army.mil; Homewood, Sue Cc: Pete Goria; Alexander Elkan; Bob Zarzecki Subject: [External] As -Built Report - Lot 9 McConnell Center, Guilford County, NC (Action ID No. SAW-2018-02038 / DWR # 20141310 V2) Attachments: As -Built Report - Lot 9 McConnell Center - Wetland Restoration - 04-20-2021.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. David & Sue, On behalf of the permittee we are providing the attached As -Built Report for the subject project as required by the permit conditions. Please don't hesitate to contact us if you have any questions. We appreciate your assistance on this project. Best, Patrick PATRICK K. SMITH, PE, LEED®AP President/Principal Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 Office (919) 846-5900 Direct (919) 256-4541 Mobile (919) 302-5783 psmith@sandec.com Visit us at sandec.com This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you. Please consider the environment before printing this email. 1 S& EC Soil & Environmental Consultants, PA 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone: (919) 846-5900 • Fax: (919) 846-9467 sandec.com April 20, 2021 S&EC Project No. 13795.D2 U.S. Army Corps of Engineers Raleigh Regulatory Office Attn: Mr. David E. Bailey 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 RE: NCDEQ Division of Water Resources Winston Salem Regional Office Attn: Ms. Sue Homewood 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27015 Wetland Restoration As -Built Report Lot 9 McConnell Center (Action ID No. SAW-2018-02038 / DWR # 20141310 V2) Guilford County, NC Dear Mr. Bailey & Ms. Homewood: As you are aware, on February 27, 2020, Soil & Environmental Consultants, PA (S&EC) on behalf of Mr. Pierre Goria of Goria Youngs Mill, LLC (the Owner of the referenced property), prepared and submitted a Pre -construction Notification (PCN) application requesting the issuance of a Nationwide Permit (NWP) 39 and the associated DWR 401 Water Quality General Certification (WQGC) No. 4139. The permit requested approval for stream and wetland impacts related to the proposed site development activities in addition to proposing a plan to resolve a previously identified violation regarding unauthorized discharge (fill material) within existing site wetlands. Included in the PCN application were various supporting Construction Drawings, impact maps, etc. prepared by others. The project site is located approximately 4,000 feet west of the intersection of McConnell Road and McConnell Center Drive in Greensboro, NC. See the attached Figure 1- Vicinity Map. The NWP 39 and WQGC No. 4139 were subsequently issued by your offices on April 21, 2020 and April 13, 2020, respectively. As a condition of both permits a total of 1.58 acres of wetlands located within the bed of a previously existing pond on the site were required to be restored as described on the Wetland Restoration Plan (Sheet EXH WL 3 of the Construction Drawings) prepared by the Triad Design Group of Charlotte, NC. A copy of Sheet EXH WL 3 is attached as Figure 2. Page 1 of 4 Lot 9 McConnell Center— Wetland Restoration As -Built Report S&EC Project No. 13795.D2 Soil & Environmental Consultants, PA April 20, 2021 The purpose of this letter report is to summarize the completion of required wetland restoration activities, document as -built conditions of this area (as required by both agencies as conditions of the referenced permits) and provide additional detail regarding future monitoring activities including the proposed monitoring schedule. Construction Summary Based on our discussions with Mr. Goria we understand that a pre -construction site meeting was conducted on August 14, 2020 to review the Construction Drawings (prepared by the Triad Design Group of Greensboro, NC), discuss the proposed restoration activities and the schedule for the work. In attendance were the property Owner, the project design engineer (Mr. Allan Hill, PE of Triad Design Group), the development manager (Mr. Jason Smith of Windsor Commercial of Greensboro, NC) and the construction contractor (Mr. Taft Cables of Cable's Enterprises, LLC of Brown Summit, NC). The Wetland Restoration Plan sheet provides a Restoration Construction Sequence as well as Wetland Restoration Notes and Planting Plan which were utilized by the construction contractor while performing the restoration activities. Restoration grading was performed between August 18, 2020 and October 9, 2020 and included the removal of approximately 42,000 cubic yards of fill material from within the old pond bed and the grading of the adjacent slopes. After grading was completed the perimeter slopes and upland areas were stabilized in accordance with the requirements of the approved land disturbance permit. Stabilization of the restored wetland area was performed on March 8, 2021 by Sides Seeding & Erosion Control of Lexington, NC, and included hydroseeding the area with a wetland seed mix and temporary seed. Where necessary hand application of the seed mix and straw mulch were applied. The wetland seed mix utilized is provided in Attachment 1. NOTE: Based on our discussions with Mr. Goria we also understand that the existing pond dam was breached on December 11, 2020. At that time, the riser/barrel spillway was removed, and the breach channel was lined with riprap and surrounding disturbed area were stabilized with temporary/permanent seed (and straw mulch applied) and select other temporary erosion control measures near and within the pond were also removed, all in general accordance with the Pond Breach Plan. Sheet EXH WL 4 of the Construction Drawings is attached as Figure 3. Based on recent discussions with the project design engineer we understand that the wetland restoration construction, the dam breach, and the associated stabilization of the disturbed areas were performed in general accordance with the design intent and the approved permit documents. As -Built Survey & Photo Documentation As described on the Wetland Monitoring Plan on Sheet EXH WL 3 the as -built survey for the restoration work must include photo point documentation from a minimum of three (3) photo Page 2 of 4 Lot 9 McConnell Center— Wetland Restoration As -Built Report S&EC Project No. 13795.D2 Soil & Environmental Consultants, PA April 20, 2021 points within the wetland restoration area and a plan view diagram of the restoration area (and surrounding vicinity). Details regarding each of these requirements is described below. Following the completion of construction, in coordination with S&EC, the property Owner installed three (3) photo points within the wetland restoration area to allow for future site monitoring. The location of each photo point is identified in the field with steel T-post (painted orange for ease of location). Post -construction field survey data for the wetland restoration area (including the location of the photo points) and the immediately surrounding vicinity was collected by Borum, Wade & Associates, PA of Greensboro, NC. This survey data was utilized to prepare the Topographic Survey Map (As -Built Survey Map) dated April 16, 2021. See Figure 4 attached. The photo points are numbered PNT#1, PNT#2 and PNT#3 and are shown on Figure 4. On March 12, 2021 S&EC visited the project site to observe post -restoration site conditions and collect as -built site photographs at each of the three (3) photo points. While on site we took multiple photos, in varying directions, at each of the three established photo points to document as -built conditions. The locations and approximate directional orientation of each of these photos are shown on the attached Photo Point Map (see Figure 5). See Photos 1 through 9 in Attachment 2. The same photo points (and directional views) will be used in future monitoring reports to allow for the required year-to-year comparison of site conditions within the wetland restoration area. An additional photo was taken at a location upslope of each of the three photo points to provide a general perspective reference for the location of each of the three photo points within the restoration area and document overall site conditions at the time of our visit. See photos 10 through 12. Photos 13 and 14 provide a view of the breach channel from upstream and downstream, respectively. Based on recent discussions with Mr. Goria we understand that the wetland restoration area and its surrounding vicinity have continued to stabilize with vegetative cover. Post -restoration Monitoring As a condition of the USACE and DWR permits monitoring of the wetland restoration areas is required for a period of three (3) years following the completion of the required restoration activities or until such time that both agencies determine that the restoration area can be discontinued. S&EC will perform monitoring visits twice per year (in March or April, and again in August or September) as required by USACE and DWR permit conditions and as described in approved Wetland Monitoring Plan on Figure 2 (Sheet EXH WL 3). Site monitoring will be qualitative in nature and will include a general visual assessment of the overall stability of wetland restoration area and the immediately surrounding slopes and upland areas. A visual assessment of wetland planting success will be made within the vicinity of each photo point. As required in the Wetland Monitoring Plan monitoring photos will be taken at each of the photo points for comparison with those from the preceding monitoring years. Page 3 of 4 Lot 9 McConnell Center — Wetland Restoration As -Built Report S&EC Project No. 13795.172 Soil & Environmental Consultants, PA April 20, 2021 Monitoring reports will be submitted to USACE and DWR not later than December 31' of each monitoring year and include the information described in the Monitoring Report Guidelines shown on Sheet EXH WL 3. A copy of the guidelines is provided as Attachment 3. Please contact us if you have any questions or comments regarding this letter. Sincerely, SOIL & ENVIRONMENTAL CRINI511.0ANTS, PA SAL'; a' 025525 Patrick K. Smith, P.E. 0Z N.C. License No. 25525 4a07, Firm License No. C-2141 K_' Figures: Figure 1 —Vicinity Map Figure 2 — Wetland Restoration Plan (Sheet EXH WL 3) Figure 3 — Pond Breach Plan (Sheet EXH WL 4) Figure 4 —Topographic Survey Map (As -Built Survey Map) Figure 5 Photo Points Map Attachments: 1. Wetland Seed Mix 2. As -Built Site Photos 3. Monitoring Report Guidelines Cc: Mr. Pierre Goria, Goria Youngs Mill, LLC Page 4 of 4 FIGURES Figure 1— Vicinity Map Figure 2 — Wetland Restoration Plan (Sheet EXH WL 3) Figure 3 — Pond Breach Plan (Sheet EXH WL 4) Figure 4 — Topographic Survey Map (As -Built Survey Map) Figure 5 — Photo Points Map McConnell Center - Lot 9 USGS Topographic Map Figure 1 - Vicinity Map S&EC Project No. 13795.D2 Lot 9 McConnell Center Wetland Restoration As -Built Report Figure 2 - Sheet EXH WL 3 - Wetland Restoration Plan S&EC Project No. 13795.D2 Lot 9 McConnell Center Wetland Restoration As -Built Report L / / / AREA TO BE SEEDED — — — / IMTH WETLAND SEED — — — — / _ ' — MIX (SEE CHART) AND MULCHED. ----= �� y • �Jc r...wrw rir.w.ww..r. •11 1•••INw1• ••1••••••• RISER SPARE RE SEED SLOPES ABOVE WETLAND WITH FESCUE MIX /68970.22 SF 1.58 AC NON —PERMITTED FILL IN THIS AREA . W1LL BE REMOVED, RETURNED TO -ORIGINAL GRADES AND PLANTED IN A WETLAND SEED MIX vv \ �� vv v v \ v vv vv vvA v' A,��vV vy.. \ \\\\ \\\ \\:\\\\\\\\ \\\\:: \ Doe \ \ \ `. v \ AREA TO BE SEEDED WITH WETLAND SEED MIX (SEE CHART) AND MULCHED PLUM. NM. • wwsw.r.w ni,ornaq f.111.1.--rrwn�wnww.ea+m \ // SEE DAM BREACH PLAN SHEET EXH WL4 FOR SEEDING IN THIS AREA SEE SHEET EXH WL4 FOR DAM BREACH PLAN ENSGING MMINDSOWAAMEM •WAMoZi W IIMMMES, NT+u.as MIMI] . seam si se 11.3IM.asl �xw�...+sauu1[imq..p..l ..Trlorn1 .0.211,• .16g00n triaddesigngroup Di. Design Group P.0 PROPOSED LOT 9 CC z z w z O A SHE= WETLAND RESTORATION PLAN 5 WL3 2 I 3 I 4 I 5 i — / /�i �\ \\ • MN c...c....mo Irma.n.w .u...w..dw....ue.ry nm..n mow..... .o.. m.r...a sr.. a on..wn.anrmw......r nconv.e... �e rnd nr,m mow M....,.+.. wa, a ••r ..wn e u ttl 0.1N54 // I / / / triaddsrigroup E ,.so.. n.cl,.:ca.mv.nM / / / / E vu u�vzora anu�mmavrn.w...m 0.A' Y SMK .... nme• IIRDSH DETAIL/ /// // /// / / / / ji_-../// // / / D / / SEEDNDD SILT Th AN REILAMD BAFFLE SEED MIX .W. X / /� // / / //// / / 7 / / / / / / / / / ___4/ / I / . / / / / I / //�J I / / • I / /• / / / / / / / DEER SETT CS �// / ' / // / / // '\ d/ / / /— / / / / REMai wd/ t eAmE1 . I I I / 1 / I / / / i / ,� 1 L, \ \\I 1 \ \ \ \ \v v V vvv I 1 i\N/./"///,�//i 1 \ \ / \ \ \\-- \ -/ / / / '� / / / / //h // / / 711.' /—storams Km / \ \ /,_ ma. '/ / v \;:I / /' --- ---_ / / / / /�. / PROPOSED LOT 9 McCONNELL CENTER McCONNELL CENTER DRIVE GREENSBORO, NORTH CAROLINA / / / •`� \\\ \\ \ EXH wLa / 1 \ / �1! ///// 7 /// � --- —,/ v \ ���-- 0/ / //,/ / \v \\ / /;I \ I // / / / \ \ iW��� / )r° / \ I I \\ —' //' \ \ NV I II Figure 3 - Sheet EXH WL 3 - Pond Breach Plan 4 ` 6 S&EC Project No. 13795.D2 Lot 9 McConnell Center Wetland Restoration As -Built Report -�� 714.95 - - WP-ifP-PLUG 14=8401363TJT y r e=IT91224O129 • / 1 / ti / � 5 130 N.6401692164 E-1TT128.931L3 711.3 711.37 WP T POST r/ . 1 / \ \ , ,\ \\ \ \ \ ,, / ,\ \ \ \ 191P' \\, -� �-_ \ \\ -�� M� �`\ \\ ti SITE INFORMATION 5. • �� . .� orb , 9] uwrsmm wsTer emit, N6A -s a- _ 1,, \\ hs.` 09,E 9- } H=84029622392 i E•I?41514,4996 PNr=2 712.45 VP 1 POST \ \ WT.A lellE kab \ WERE. ..g. PIN 142T PS. 24 y.� `�Wita ns t.AGT it u w �} .Tc. \ �'-. �ae�e.s u t WEER OF ILR. } ▪ I ! \ 1 / l_1- 1 718.67 WP-EIP PLUG \_ H4840015.010 , '� f=17915T0"T993 ) / r 1 1• � m 99• .�. 1 i H=839631.76bq 'r Vr .. 3. E=Ii71650.W49 • - - - _ - } } 1., / Irr=3 ,.= z _ .:• ` I 1 I T POSr I r "\.. \ 1_ VP oa 1 \ J _ J � ;� / 9 \ \ /• 1 \ \ / \ \ \ / t N \ \ • \ I 714. 9 WP."I PLUG O=M6.45T6 E,rmloiip096 /- / lgure - As -Built Su rvey Map A S&EC Project No. 13795.D2 Lot 9 McConnell Center Wetland Restoration As -Built Report `6�9� TRACT 2 AREA - 29.087 AC. PARCEL NCt 84368 \N �A •.\ \\ \ \ \ / , \ \ // r -\ , t a r I / / I ,.., ric,44 Cc pm. • • r1 CWLIn 1 ,M6w w VIGI1I MAF (Air elLosic 5,12er. SITE NOTES ErEEW leagn.1 LH4 Winf 051. lE.J IW W ro N EWERS B1:16P FIELD aRVEY aRTIFICATICH5TATM5NT RAT W REV. EWE,. mo euv..e MEOW, ES MEW LAW., 5RAPHIL SGALE I a » n w BWA a.,l P l.+ee I ....ro.. ..eI+«." P.A. aI w.`ffi wAr.91—wire rir .� �mn: EMS LU I— ~ W • ¢ V c C, = - J — LU Lu s • - 2 O > x of d U a 2 J v } - o 33 m�kn Q J mor amuse- na a.a vsmeaxaw WA.." ew+na OEM- EIENEWL PEW EVE NEW YET ERE TOPOERAPIIG 3R1+ Y +w FLEW RtwErwERREWHERER• N=8401612764 E=1-M1258.3113 RCA 711.37 WP T POST IPNT#1I fr 705.91 GND,- � 7r• x 71500 - 10• 4 GNfi x 7C9.5$ GND r 710'- /*G7 000 -71!• -- - - r 714.96 - WP iP- PLUG 6_ • - . N43401363111 -- / E=1111224.0123 •t r / ' / • I I N OTE5: I . PHOTO POINTS PNT# I , PNT#2 AND PNT#3 ARE MARKED WITH STEEL T-POSTS (PAINTED ORANGE FOR EASE OF LOCATION). 2. THE LOCATION OF PHOTO POINTS WERE SURVEYED AND DEPICTED ON THE AS -BUILT SURVEY MAP (BY OTHERS). 3. THE DIRECTIONAL ORIENTATION OF PHOTO POINTS ARE APPROXIMATE AND INTENDED FOR REPRESENTATION PURPOSES ONLY. Figure 5 - Photo Points Map S&EC Project No. 13795.D2 Lot 9 McConnell Center Wetland Restoration As -Built Report x 7Q7-ae GN0 / 4 LGRRELTY€TLN. MBA � U EARTH MINE IC _ x 7Q9.77 GNL %G 9� .• x 731.72 �N➢ TRACT 2 AREA = 29.087 AC. PARCEL NO. 84368 R 7I1 •E2 709.99 'kLN3 N=840086.223,12 7,06' E=1111574.4aaa 1 . euo PNT 2 71Q59 4 GHQ 712.45 WP PO 718.07 WP-EIP PLUG N=840018.9GI0 E=I7G1570.1193 \ y \ �. 4,' 1 % \ x-. ZaS11 ' 1 1 1 / l / L I '1. i 1 II ' ' 1 I r1 ?I ./ ,, II4ilir,1;iii: .• :-.:\:_.4.:II.!:.\-,,../?"-ti-,i I IfI 7pgq,71��+++p18 µ up RIP RnP� A �iI r'i� �r/!•- ++31+I I I II11. 1,,,,,,,,,,,,,,„ }. - 1�r' 7QS.56 i ! �+ i i ' I +I I , 14 i i _ - - .y+++ H=839831.7864 .,� ; , 1 , I , 1 14 r-{+r + E=1141658.3R461 "1 I l I� 705.57 ,, \ 71 i 71j� I 1� PNT 3 GND-Toe Rs ro r� I 1 ,1 � /f II. 111, 14�1 1 f+r;; 710.3D rr,_ v� .•=.�: •.,�i/!! pIJ 111,1,�1,1�N.4 r; WP T POST �.,�``r�z .. ��7,I — 11111 �, 11--f%/::.. 0\�\\, �a.\���-J !1 1 ,,~//mil\ \\ • /i/ 11,, 1'1:;,,�P8 m!//`liy \�"\\;,\ � �. 1 \\ ` Alf�fii! 1\'\7 \ 4 /,!/ I / \\ + ., \\ \ + \R14. I ! a1P� I9 PLUG \ \'' 1I I 1 ' N83151 4516 ' ! 1 !J I E= 11c11031.R&�16 , 1 1 I - - - - Source: As -Built Survey \ \ Map, Borum, Wade and IfRNUTtemzr ipF, Associates, PA, NNN, L 1 ti \-\ L .l _o M xfGN1UATER GNe-TOP 1'\' 141 1 ' 765.7Q 047, r,4'� , GND warER x7G0&k452/ l xG7a54a ND VATCF? 709:46 GhP- LEGEND Photo Point Photo No. & Direction of View P# 11 1 ATTACHMENTS Attachment 1— Wetland Seed Mix Attachment 2 — As -Built Site Photos Attachment 3 — Monitoring Report Guidelines Attachment 1 - Wetland Seed Mix WETLAND SEED MIX 4OLBS 23.00% SWITCHGRASS 20.00% VIRGINIA WILDRYE 14.00% SMOOTH PANICGRASS 12.00% FOX SEDGE 08.00% REDTOP PANICGRASS 08.00% DEERTONGUE 07.00% SHOWY TICKSEED 04.00% SOFT RUSH 02.00% EASTERN BUR REED 02.00% PENNSYLVANIA SMARTWEED ORGIN NC MN NC NC PA PA NC NC NC PA GERM 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% NOXIOUS WEEDS PER LB TEST DATE: 09-20 NET WT: 40 LBS GREEN RESOURCE PO BOX 429 COLFAX, NC 27235 Attachment 2 - As -Built Site Photos Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration S&EC Project No. 13795.D2 Representative Photographs Photo 1— Looking Northeast from PNT#1 Photo 2 — Looking East from PNT#1 Page 1 of 7 Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration S&EC Project No. 13795.D2 Representative Photographs Photo 3 — Looking Northwest from PNT#2 Photo 4 — Looking North from PNT#2 Page 2 of 7 Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration S&EC Project No. 13795.D2 Representative Photographs Photo Point 5 — Looking Northeast from PNT#2 Photo 6 — Looking East from PNT#2 Page 3 of 7 Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration S&EC Project No. 13795.D2 Representative Photographs Photo 7 — Looking Southeast from PNT#2 Photo 8 — Looking North from PNT#3 Page 4 of 7 Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration Photo 9 — Looking Northeast from PNT#3 S&EC Project No. 13795.D2 Representative Photographs Photo 10 — View of Restoration Area from Upslope of Photo Point 1 Page 5 of 7 Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration S&EC Project No. 13795.D2 Representative Photographs Photo 11— View of Restoration Area from Upslope of Photo Point 2 Photo 12 — View of Restoration Area from Upslope of Photo Point 3 Page 6 of 7 Soil & Environmental Consultants, PA Lot 9 McConnell Center — Wetland Restoration S&EC Project No. 13795.D2 Representative Photographs Photo 13 — Dam Breach, Looking Downstream (Southeast) Photo 14 — Dam Breach, Looking Upstream (Northwest) Page 7 of 7 Attachment 3 - Monitoring Report Guidelines Monitoring Report Guidelines A. Monitoring Reports should be concise and effectively provide the information necessary to describe the site conditions. B. The Monitoring Report Narrative will contain the following: 1. Project Overview a. Corps Permit Number. b. Name of party responsible for conducting the monitoring and the datets) the inspection was conducted. c. A brief paragraph describing the purpose of the project, acreage and type restoration performed. d. Written description of the location, any identifiable landmarks of the project including information to locate the project perimeter, and coordinates of the project site. e. Date the restoration project commenced and was completed. f. Short statement the existing site conditions. g. Dates of any recent corrective or maintenance activities conducted since the previous report submission. h. Specific recommendations for any additional corrective or remedial actions, if any are deemed necessary. 2. Summary Data a. Provide photo documentation to support the findings and recommendations referenced in the Monitoring Report. Submitted photos should be formatted to print on a standard 8.5" x 11" piece of paper, dated and dearly labeled with the direction from which the photo was taken. The photo location points should also be identified on the appropriate maps. 3. Maps and Plans a. Maps should be provided to show the location of the project site relative to other landscape features, locations of photographic reference points, and/or other features pertinent to the restoration plan. b. The submitted maps and plans should delineate the site perimeter, c. Each map or diagram should be formatted to print on a standard 8.5" x 11" piece of paper and include a legend and the location of any photos submitted for review. As -built plans may be included. 4. Conclusion a. A general statement should be included that describes the conditions of the project site.