HomeMy WebLinkAbout20190158 Ver 1_As-Built Baseline and Record Drawings_20210414Strickland, Bev
From: Crocker, Lindsay
Sent: Wednesday, April 14, 2021 10:47 AM
To: Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV
(USA); Davis, Erin B; Wilson, Travis W.
Cc: 'worth@restorationsystems.com'; Baumgartner, Tim; Harmon, Beth; Stanfill, Jim
Subject: As -Built Baseline and Record Drawings / Brahma / SAW / Alamance Co.
Attachments: Brahma Site_100092_CF 02_STR_RW_Initial Release.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
All,
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint (and DWR Laserfiche)
for IRT review:
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
Project Information:
Name: Brahma
USACE ID: SAW-2019-00126
DWR ID: 2019-0158
DMS Project #: 100092
RFP: 16-007571 —Issued 5/17/2018
Institution: 12/17/2018 —Full Delivery
CU#: Cape Fear 03030002
County: Alamance
Mitigation Plan Assets: 3,881.066 SMU / 6.655 WMU
Mitigation Plan Lengths/Acreages: 7,063 ft / 9.050 acres
As Built MVO Lengths/Acreages: 7,183 ft / 9.045 acres
FD Provider: Restoration Systems; Contact: Worth Creech (worth@restorationsystems.com) 919-389-3888
DMS PM: Lindsay Crocker (Lindsay.crocker@ncdenr.gov), 919-594-3910
Please note:
Stream construction was completed December 2020, planting was completed January 2021. 2021 will be Monitoring
Year 1 for this project. Deviations from the construction plan are shown on page 2 and 3 of the report due to site
conditions and additional vegetation plantings.
A drone video of the site is available here: https://youtu.be/OeoAZUNO9ww
The credit ledger for the 30% release was posted and is attached.
Lindsay Crocker
1
NC DEQ Division of Mitigation Services
217 West Jones St., Raleigh, NC 27603
919.594.3910
lindsay.crocker@ncdenr.gov
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third
parties unless the content is exempt by statute or other regulation.
2
Mitigation Project Name Brahma Site USACE Action ID 2019-00126
DMS ID 100092 DWR Permit 2019-0158
River Basin Cape Fear Date Project Instituted 12/17/2018
Cataloging Unit 03030002 Date Prepared 4/8/2021
County Alamance Stream/Wet. Service Area Cape Fear 03030002
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the
NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases O/O
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,164.320
1,164.320
0.000
1,164.320
2021
4/8/2021
3 - Year 1 Monitoring
10.00%
388.107
2022
4 - Year 2 Monitoring
10.00%
388.107
2023
5 - Year 3 Monitoring
10.00%
388.107
2024
6 - Year 4 Monitoring
5.00%
194.053
2025
7 - Year 5 Monitoring
10.00%
388.107
2026
8 - Year 6 Monitoring
5.00%
194.053
2027
9 - Year 7 Monitoring
10.00%
388.107
2028
Stream Bankfull Standard
10.00%
388.107
2025
Totals
1,164.320
Total Gross Credits
3,881.066
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,164.320
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,716.746
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases 0/0
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1.996
1.996
0.000
1.996
2021
4/8/2021
3 - Year 1 Monitoring
10.00%
0.666
2022
4 - Year 2 Monitoring
10.00%
0.666
2023
5 - Year 3 Monitoring
15.00%
0.998
2024
6 - Year 4 Monitoring
5.00%
0.333
2025
7 - Year 5 Monitoring
15.00%
0.998
2026
8 - Year 6 Monitoring
5.00%
0.333
2027
9 - Year 7 Monitoring
10.00%
0.665
2028
Totals
1.997
Total Gross Credits
6.655
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1.996
Total Percentage Released
30.00%
Remaining Unreleased Credits
4.659
Page 1 of 2
Mitigation Project Name Brahma Site USACE Action ID 2019-00126
DMS ID 100092 DWR Permit 2019-0158
River Basin Cape Fear Date Project Instituted 12/17/2018
Cataloging Unit 03030002 Date Prepared 4/8/2021
County Alamance Stream/Wet. Service Area Cape Fear 03030002
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
740.000
Warm Stream
Enhancement I
3,034.000
Warm Stream
Enhancement II
2,378.000
Warm Stream
Preservation
911.000
Riparian
Restoration
4.740
Riparian
Enhancement
3.709
Riparian
Preservation
0.601
Debits
Warm Stream
Restoration
Credits
Warm Stream
Restoration
Equivalent
Credits
Riparian
Restoration
Credits
Riparian
Restoration
Equivalent
Credits
Beginning Balance (mitigation credits)
3,789.966
91.100
4.740
1.915
Released Credits
1,136.990
27.330
1.422
0.574
Unrealized Credits
0.000
0.000
0.000
0.000
Converted Credits
0.000
0.000
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
Permit #
DWR Permit #
DCM Permit
#
Remaining Balance (Released credits)
1,136.990
27.330
1.422
0.574
Remaining Balance (Unreleased credits)
2,652.976
63.770
3.318
1.341
Total Remaining Balance (Released and Unreleased credits)
3,789.966
91.100
4.740
1.915
Page 2 of 2