HomeMy WebLinkAbout20210147 Ver 2_Meeting Request Review_20210421 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20210147 Version* 2
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 4/21/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jason Dilday
Contact Email Address* jldidlay@ncdot.gov
Project Name* US 64 Widening from US220 to Asheboro Bypass
Project Owner* NCDOT
Project County* Randolph
Owner Address: Street Address
1000 Birch Ridge Road
Address Line 2
City State/Rovince/Region
Raleigh NC
Fbstal/Zip Code Country
27610 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
r- 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit rJ Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
20210147
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below and include location information.*
This submittal is the pre-filing request for potential future modifications.
Please give a couple of dates you are available for a meeting.
4/23/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 4/21/2021
Reviewer Meeting Request Decision
Is a meeting required or is there more info needed?*
c Yes r No
If rrnre information is needed,please add convents for the errmil notification below.