Loading...
HomeMy WebLinkAbout20210147 Ver 2_Meeting Request Review_20210421 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20210147 Version* 2 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 4/21/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jason Dilday Contact Email Address* jldidlay@ncdot.gov Project Name* US 64 Widening from US220 to Asheboro Bypass Project Owner* NCDOT Project County* Randolph Owner Address: Street Address 1000 Birch Ridge Road Address Line 2 City State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27610 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: r- 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit rJ Modification r- Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* 20210147 Do you know the name of the staff member you would like to request a meeting with? Rob Ridings Please give a brief project description below and include location information.* This submittal is the pre-filing request for potential future modifications. Please give a couple of dates you are available for a meeting. 4/23/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 4/21/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* c Yes r No If rrnre information is needed,please add convents for the errmil notification below.