HomeMy WebLinkAboutNCG170194_Emails RE Renewal COC_20200421Georgoulias, Bethany
From: Georgoulias, Bethany
Sent: Wednesday, April 21, 2021 9:05 AM
To: Mike.Garlick
Cc: David.Limbacher; Selkane, Aziza; McCoy, Suzanne
Subject: RE: [External] Stormwater Permit Renewal NCG170194 - Burlington Industries Raeford
Plant
Attachments: NCG170194_Fees Owed Letter_20190517 Wrong Address.pdf, NCG170194_Paid Up
Renewal COC_20200218.pdf
Good morning,
Yes, the permit was not renewed at the time this website was set up because there are fees still owed. In our database,
the permit appears to be active, though (as of Feb last year). Suzanne McCoy enabled that renewal in our system, and
she also put the record of the new COC and letter that was generated in our digital repository:
https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=1001782&dbid=0&repo=WaterResources
I have also put you in touch with Aziza Selkane, our billing specialist, to sort out the payment and revise the billing
contact information.
Best regards,
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Mike.Garlick [mailto:Mike.Garlick@elevatetextiles.com]
Sent: Wednesday, April 21, 2021 8:43 AM
To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Cc: David.Limbacher <David.Lim bacher@elevatetextiles.com>
Subject: [External] Stormwater Permit Renewal NCG170194 - Burlington Industries Raeford Plant
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Bethany,
I was reviewing the Burlington Raeford Plant Stormwater Permit and noticed we do not have the new COC. I tried the
online renewal request but it will not let me put the dates in. I downloaded what was in the files and it appears there is an
incorrect mailing address for the facility. I suspect the invoices have been going to the wrong address and the fees have
not been paid.
Can you help with this issue. I can go ahead and pay the past due fees by P Card and I want to get the correct contacts and
mailing address on file.
Attached are files that should help explain.
Thanks, and give me a call at my office, 336-379-2941, or my ce11336-501-3913.
Mike
Elevat i til -
G. Mike Garlick, PE
Elevate Textiles
Sr. Environmental Engineering & Regulatory Mgr.
804 Green ValleyRd., Suite 300
Greensboro, NC 27408
336-379-2941
*ITG is now Elevate Textiles! Please note the change in my email address. *