Loading...
HomeMy WebLinkAbout20201511 Ver 1_B5642_Permit Package Wetland_Utility_20210324_20210421N.T.S. VICINITY MAP 4DETOUR ROUTE -L- THIS PROJECT IS NOT WITHIN A MUNICIPAL BOUNDARY. (MACO ROAD) NC 87 -L- POT STA. 14+00.00 BEGIN TIP PROJECT B-5642 -L- POT STA. 22+50.00 END TIP PROJECT B-5642 TO US 17 BRANCHBATARORA US 74 TO PALMATIER LN-L- POC STA. 24+10.00 END CONSTRUCTION -L- POT STA. 13+00.00 BEGIN CONSTRUCTION TO THE LIMITS ESTABLISHED BY MODIFIED METHOD III. CLEARING ON THIS PROJECT SHALL BE PERFORMED DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 09/08/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$ SEAL 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 SHEET NO. B-5642STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS T.I.P. NO. ON NC 87 (MACO ROAD) LOCATION: REPLACE BRIDGE NO. 65 OVER BATARORA BRANCH 50 50 50 50 2010510 25 100 25 100 INDEX OF SHEETS FAX (919) 250-4151 PHONE (919) 707-6690 RALEIGH NC 27699-1555 1555 MAIL SERVICES CENTER UTILITIES UNIT DIVISION OF HIGHWAYS XX DEPART ME NT OF TRANSPORTATION STATE OF NORTH CAROLI NANABIL HAMDAN UTILITIES REGIONAL ENGINEER UTILITIES ENGINEER UTILITIES AREA COORDINATOR UTILITIES COORDINATOR JOSH DALTON CONSULTANT CONTACT #1 PREPARED IN THE OFFICE OF UNTIL ALL SIGNATURES ARE COMPLETED DOCUMENT NOT CONSIDERED FINAL TIP PROJECT: B-5642SURFACE WATER IMPACTS PERMIT UTILITY WETLAND AND BRUNSWICK COUNTY SHEET 1 OF 5 PERMIT DRAWING EAU UTILITY PERMIT PLANS COMMUNICATION LINES TYPE OF WORK: RELOCATION OF POWER AND UE-2 UE-1 DUKE/SPECTRUM PROFILE ATT PROFILE ATMC PROFILE IMPACTS PLAN VIEW CONTOURS IMPACTS PLAN VIEW TITLE SHEET DESCRIPTION: UE-6 UE-5 UE-4 UE-3 UE-2 UE-1 SHEET NO.: SUNGATE DESIGN GROUP, P.A. ENG FIRM LICENSE NO. C-890 TEL (919) 859-2243 RALEIGH, NORTH CAROLINA 27606 905 JONES FRANKLIN ROAD KELVIN MARTIN, EI KYLE PLEASANT LARRY JAMES, JR. OWNERS ON PROJECT COMMUNICATIONS POWER AND (D) SPECTRUM - COMM (C) DUKE - POWER (B) ATT - COMM (A) ATMC - COMM DATE: 3-24-2021 -L- POT STA. 17+93.88 BEGIN BRIDGE -L- POT STA. 18+66.13 END BRIDGE NO UTILITY IMPACTS IMPACTS ONLY SITE 2 HAS ROADWAYSawOld Maco Rd.Ma l mo Loop Malmo Loop Rd.SandyRidgeWayTownRd. Town Creek Rd.OldTown Creek Rd. Green Loop Rd. In dustrial MercantileDr. M erca ntile Dr.Trade St. Price Rd.Reed Rd.IndustryDr.Wood Treatment Rd.Fletcher Rd.Lanvale Rd. Dale St.BluffDr.ChurchRd.Park wood Dr. National Ave.Davidso nAve. King Rd.LanvaleRd.Buckeye Rd.Wolfridge Rd.Railroad Rd.Go odman Rd. Bridal Way Dr. Sloan Rd. GoodlandRd.Clarendon Rd. Pad dingto n Ave. Old Fayettville Rd. Old Lanvale Rd. Sno wfield Mi ntzDr.FASPopularSt.Railroad Rd.Hewlett Burt on Rd.Colon Mintz Rd.Rd.LanvaleTown Creek TreeCt.SunnybrookWayLexin gton Ave. Ech o Dr. 1712 1714 1723 1722 1418 1452 1419 1494 1713 1439 1437 1439 1417 1416 1417 1726 1413 1735 1414 1415 1734 1733 1732 1438 1438 1568 1552 1701 1553 1425 1731 1472 1479 1438 1466 1440 1438 1437 1724 1488 1488 1489 1491 1492 1725 1488 1487 1437 1446 1461 1522 1418 1700 1722 1736 1414 1607 1608 1413 1413 1415 1700 1723 .16.61 .46 .10 .24 .2 2 1.17 .41.59.11.22.0 6 .20 2.64 1.84 .07 .53 .54 .75 .23 .691.17 .26 .02 .16.59.34.24 .24.09 .22 .10 .20.21.46.61 .33 .12 .52 .07 .27 .04.07.07.04.08.07.08 .2 8 .2 5 .3 3 .27 .2 1 .26.07.07.07 .54 1.40 .49 .28 .28.24.09 .28.26.20 1.58 2.17 2.34 1.581.6 1 .681.36 .29.3 6 .0 4 .16 .19.20.09 .29 2.25 .19 1.1 3 .22 .27.43 .21.05.22.2 6 .34 .57 1.59.782.89 .551.29 1.08.27.55 .711.14 .30.36 1.03 2.17.15.15HollyHillsDr.BlakeSturgeon Dr.CleatwoodRd.HevenerSueCircleSueCircleLyn-Marie Dr.WayneSt.LloydSt.Westover Dr.Ramp artSt.Moore Rd. Short St.Green Acres Dr.Skipper St.1.2.3.Royal St. Bourbon St. Rampart St. OrleansSt.Highland HillsRachaelWynd Carol-Lynn Dr.Robin Ln.Sandy CreekDr iveGraingerCircleGraingerCircle Hickory DriveJoeBaldwinDr.DogwoodCircle DogwoodCircle1. 2.3.LewisRd.Webster Ct.Cir.HoodSturgeon Jackeys Pasture Pond Branch W atersHoo d ChinnisBranch Cherry Tree Allig ator Bra nchCowpenB r an chCr eekTurkey Br anchHood Creek Bishop Branch MorganBranchBranchBr anchBenton Cemetery Nelson Cemetery Chinnis Cemetery Williams Cemetery Bethel Church Faith Church Grove Church Damascus Rd.FASF AS Mac oRd.Maco Rd.MacoRd. Maco Sandy Creek Pop. 290 Malmo Lanvale Bishop Batarora Spring Hill Eliah Phoenix FAP FAP FAP FAP FAP FAP Jackson Hwy. Andrew Jackson Hwy. Andrew Jackson Ocean OceanHwy. SWAMP GREEN LITTLE Flat Bay Farmers Chapel Hope Church New St. James Church Hope Church New Bay Rabontown Henrytown Juniper Swamp BeaverdamBeaverdam US DOD SUNNY POINT TERMINAL MILITARY OCEAN Ch. Shiloh Cem. Skipper Br.RAIL ROADCSXCSX TRANSPORTATIONC SXCr..87.07 .07 Single High School Leland Middle School Leland 1416Ho o d Cr e e k.05 .31 Wolfrid geRd. 1412 1414 Rd.Goo dman 1437 1429 .35 .69 1752 .62.25.592. 2 0 87 87 76 74 17 87 87 40 17 76 74 76 74 PROJECT END PROJECT BEGIN SITE 3 SITE 1 NA 2011 NAD 83 / Submitted 4/21/2021 HC HC CLEARING DENOTES HAND SITE 3 SITE 3 WETLAND WA WETLAND WA SITE 1 HC F F F WETLAND DENOTES FILL INFF SHEET 2 OF 5 PERMIT DRAWING UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL DATE: 3-24-2021 UE-2 B-5642 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$5/14/99SHEET NO.PROJECT REFERENCE NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: TRANSPORTATION DEPARTMENT OF NORTH CAROLINA PLANS ONLY UTILITY CONSTRUCTION REVISED: UTILITY CONSTRUCTION UTILITIES ENGINEERING SEC. FAX:(919)250-4151 PHONE:(919)707-6690 NAD 83 /NA 2011 15" RCP 15" RCP WELL HTR 18" RCP 15" CMPGRAVEL CONC 18" RCP 18" CMP GATE PALMATIER LNNC 87 (MACO RD) 23' BSTNC 87 (MACO RD) 23' BST 3 4 5 6 7 8 9 10 11 12 2" WOOD WW 2" WOOD WW 2" WOOD WW 2" WOOD WW WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS SEAT=36.91' SEAT=36.88' SEAT=36.86' SEAT=36.94' ALENE PELLOM HEIRS LEO KNOX, ET UX DAISY MAE OLIVER DAISY MAE OLIVER SALAS ANGELICA JEANNE BETH BAKER BILLY RAY PALMATIER, ET UX BILLY RAY PALMATIER, ET UX JAMES ALSTON, JR, ET UX EIP EIP EIP PK NAILPB 62 PG 2645' PRIVATE EASEMENTPB 62 PG 2645' PRIVATE EASEMENTPB 35 PG 5760' PRI VATE EASEMENT100.00'100.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W DECK S WOODS NC 87 (MACO RD) 23' BST WSE=33.08' SURVEY DATE: 02/17/17 30.00'50.00'Duke Energy Progress Charter Communication Charter Communication AT&T Corp.(2) Progress Duke Energy TT48" WOOD SOIL BATARORA BRANCHCONC 65 BRIDGE 80.00'1520PC Sta. 23+71.72 25PT Sta. 25+87.87 EST 5 SY GF EST 1 TON CL B RIPRAP 2GI 2GI EST 5 SY GF EST 1 TON CL B RIPRAP REMOVE RETAIN REMOVE 18" 18" ( Not to Scale) SPECIAL LATERAL 'V' DITCH 3:1D FROM STA. 14+00 TO STA. 16+90 -L- RT FROM STA. 15+00 TO STA. 17+20 -L- LT Min. D=1.0 Ft. DETAIL 1 Ground Natural Flatter3:1 or Slope Fill SEE DETAIL 1 SPEC. LAT. V-DITCH SEE DETAIL 1 SPEC. LAT. V-DITCH EST 10 SY GF EST 3 TONS CLASS B RIP RAP DAYLIGHT DITCH STA. 18+92 -L- LT & RT END APPROACH SLAB TO SHOULDER BERM GUTTER 15" W/ELBOWS ELBOWS 15" W/ (STRUCTURE PAY ITEM) TO SHOULDER POINT CLASS II RIP RAP (ROADWAY PAY ITEM) TO SHOULDER POINT ROCK PLATING (ROADWAY PAY ITEM) TO SHOULDER POINT ROCK PLATING (ROADWAY PAY ITEM) TO SHOULDER POINT ROCK PLATING EST 10 SY GF EST 3 TONS CLASS B RIP RAP DAYLIGHT DITCH REM REM REM REM ABANDONED ABANDONED COMMUNICATION LINES SPECTRUM-O/H COMMUNICATION LINES SPECTRUM-O/H COMMUNICATION LINES AT&T-U/G POWER LINES DUKE ENERGY-O/H COMMUNICATION LINES AT&T-U/G POWER LINES DUKE ENERGY-O/H POWER LINES 50' POLE DUKE ENERGY-O/H POWER LINES DUKE ENERGY-O/H POWER LINES 50' POLE DUKE ENERGY-O/H COMMUNICATION LINES SPECTRUM-O/H STA 13+75 -L- RT BEGIN BORE ATT-COMM PROPOSED STA 22+75 -L- RT END BORE ATT-COMM PROPOSED F F F F F F F F F F F C F C C C C C C Submitted 4/21/2021 5/14/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SHEET NO.PROJECT REFERENCE NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: UTILITY CONSTRUCTION TRANSPORTATION DEPARTMENT OF NORTH CAROLINA PLANS ONLY UTILITY CONSTRUCTION REVISED: UTILITIES ENGINEERING SEC. UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL 30 FAX:(919)250-4151 PHONE:(919)707-6690 20 40 50 60 20 30 40 50 60 20 30 40 50 60 20 30 40 50 60 12 13 14 15 16 17 18 19 20 21 22 23121314151617181920212223121314151617181920212223 24 251213141516171819202122232425 SHEET 3 OF 5 PERMIT DRAWING B-5642 UE-3 DATE: 3-24-2021 R/R SPIKE IN 28" GUM 53.43' RT, EL. 35.73' -L- STA. 17+16.05 BM #1 STREAM BED @ 15' DEEP BELOW THE 2x1.25" SDR-11 ROLL PIPE 15' MIN STA 22+75-L-RT END BORE STA 13+75-L-RT BEGIN BORE 30"x60"x36" HANDHOLE REPLACED BY 4'x4'x4' BORE PIT 30"x60"x36" HANDHOLE REPLACED BY 4'x4'x4' BORE PITSTA 19+95 -L- RTWETLANDSTA 22+56 -L- RTWETLANDSTA 18+38 -L- RTBATARORA BRANCHCL STREAMATT - COMM PROPOSED Submitted 4/21/2021 5/14/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SHEET NO.PROJECT REFERENCE NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: UTILITY CONSTRUCTION TRANSPORTATION DEPARTMENT OF NORTH CAROLINA PLANS ONLY UTILITY CONSTRUCTION REVISED: UTILITIES ENGINEERING SEC. UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL 30 FAX:(919)250-4151 PHONE:(919)707-6690 20 40 50 60 20 30 40 50 60 20 30 40 50 60 20 30 40 50 60 12 13 14 15 16 17 18 19 20 21 22 23121314151617181920212223121314151617181920212223 24 251213141516171819202122232425 SHEET 4 OF 5 PERMIT DRAWING B-5642 UE-4 STA 25+87 -L- RT WETLAND END DATE: 3-24-2021 R/R SPIKE IN 28" GUM 53.43' RT, EL. 35.73' -L- STA. 17+16.05 BM #1 NEW LINE POLEPOLEPOLE POLE X-POLE STA 18+29 -L- RTBATARORA BRANCHCL STREAMDUKE: 23.0' DUKE: 23.0' DUKE: 24.5' SPECTRUM: 21.0' SPECTRUM: 19.5' SPECTRUM: 19.5' SPECTRUM - COMM DUKE - POWER PROPOSED -L- RTSTA 18+69WETLANDSubmitted 4/21/2021 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 16+96+ to 17+16-L-LTDUKE PWR< 0.013 17+46 to 18+22-L-RT DUKE PWR/SPECTRUM COMM0.0218+34 to 24+09-L-RT DUKE PWR/SPECTRUM COMM 0.010.30TOTALS*:0.010.310 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 5OF 5WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSNC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS3-30-2021Brunswick CountyB-564245597.2.1Submitted 4/21/2021